CCT 3 1934 Docket Nos. 50-424/425 3
i MEMORANDUM FOR: Thomas M. Novak, Assistant Director l
for Licensing Division of Licensing FROM:
William V. Johnston, Assistant Director j
Materials, Chemical & Environmental Technology 5
Division of Engineering
SUBJECT:
GDC 51 COMPLIANCE: GEORGIA FGWER COMPANY, V0GTLE ELECTRIC GENERATING PLANT, UNITS 1 AND 2 Plant Name: Vogtle Electric Generating Plant, Units 1 and 2 Suppliers:
Westinghouse; Bechtel Licensing Stage: OL Docket Nos.: 50-424, 50-425 Responsible Branch & Project Manager: LB #4; M. Miller Reviewer:
J. Halapatz i
Requested Completion Date: October 1, 1984 l
Description of Task: SER re GDC 51 Compliance Review Status: Awaiting Confirmatory Information The Materials Engineering Branch (MTEB), Division of Engineering, performed the GDC 51 compliance review of Vogtle 1 and 2 reactor centainment pressure boundary materials on December 15, 1983, in a mceting in Bethesda with the applicant's representatives. The review identified the limiting materials of the containment pressure boundary and the limiting environmental tempera-ture placed on these materials under operating, maintenance, testing and postulated accident conditions cited by GDC 51, " Fracture Prevention of Containment Pressure Boundary."
Based on the review, the applicant will provide information confirming that the limiting postulated design temperatures will not violate the limiting temperatures identified by the review. Our safety evaluation is presented in the attachment.
e,
',i,, 3.,,. ',., e ', -
' " ~
William V. Johnston, Assistant Director Materials, Chemical & Environmental Technology Division of Engineering
Attachment:
As stated cc:
See next paga O {(bbf Y
il OCT 3 1984 l
Thomas M. Novak i cc:
R. Volln.er i
D. Eisenhut l
E. Sullivan S. Pawlicki
.,j B. D. Liaw W. Hazelton 3
1 C. Chang
)
R. Klecker
)
M. Miller j
J. Halapatz t
i I
t
' )
t t
t f
l 1
i l
i i
b i
l i
i e