Partially Deleted Document Re Demand for Info Re Tv Greene, Gr Frederick,H Majors & MW Horton
ML20128H311
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 03/08/1994
From: Milhoan J
NRC OFFICE OF THE EXECUTIVE DIRECTOR FOR OPERATIONS (EDO)
To:
Shared Package
ML20128F432 List: ... further results
References
FOIA-95-81 EA-94-036, EA-94-36, NUDOCS 9610090305
Download: ML20128H311 (12)


Text

i

?

e DRAFT PREDECISIONAL INFO ION LO T M TOR, OE

\-

Rev. 6: VOGDFIl.R6 3/8/94 UNITED STATES NUCLEAR REGULATORY COMMISSION In the Matter of ) *

)

GEORGIA POWER COMPANY )

(Vogtle Electric Generating ) Docket Nos. 50-425/50-425 Plant, Units 1 & 2) ) License Nos. NPF-68/NPF-81

) EA 94-036 DEMAND FOR INFORMATION REGARDING THOMAS V. GREENE, GEORGIE R. FREDERICK, HARRY MAJORS, AND MICHAEL W. HORTON I

Georgia Power Company (Licensee) is the holder of Facility License Nos. NPF-68, and NPF-81 (Licenses) issued by the Nuclear Regulatory Commission (NRC or Commission) pursuant to 10 CFR Part 50. The Licenses authorize the operation of the Vogtle Electric Generating Plant (VEGP) Units 1 and 2, in accordance with conditions specified therein.

II I

I On December 17, 1993, an investigation of licensed activities was completed by the NRC's Office of Investigations (OI) at l Licensee's VEGP facility. The investigation was initiated in response to information received in June 1990 by NRC Region II alleging, in part, that material false statements were made to the NRC by senior Licensee officials regarding the reliability of 1

Information in this record was deleted in accordance with the Fr edom of information 7 Act. exemptions

/

FOIA- W-8/ -

9610090305 960827 PDR FOIA WILMOTH95-81 PDR

. . = - - .- . - ~ ._ . --- - - -- - . . . . - _ _ . - . . . . - . . . . . . . . . - .-- _

a 1

1 o 7 5 -2 -

a i

the Diesel Generators (DGs). The pertinent events involved in

. this matter are described below.

4 On March 20, 1990, during a. refueling outage at VEGP Unit 1, GPC declared a Site Area Emergency (SAE) When offsite power was lost 4

concurrent with the failure of the only Unit 1 DG that was

available (1A). The other Unit 1 DG (IB) was unavailable due to maintenance activities.

The NRC immediately responded to the SAE at the VEGP site with an Augmented Inspection Team (AIT). The NRC effort war upgraded to  ;

i an Incident Investigation Team (IIT) on March 23, 1990. The IIT 1

1 was composed of NRC Headquarters technical staff and industry l f

personnel. The results of this investigation are documented in t i

i NUREG-1410, " Loss of Vital AC Power and the Residual Heat Removal l System During Mid-Loop Operations at Vogtle Unit 1 on March 20, J l

1990."

l On March 23, 1990, the NRC issued a Confirmation of Action Letter (CAL) to GPC that, among other things, confirmed that GPC had l agreed not to return VEGP Unit 1 to criticality until the i Regional Administrator was satisfied that appropriate corrective actions had been taken, and that the plant could safely return to power operations.

I l

l l

l l

l o

._1 . ._ _ _ _ . _ . _ __.m_._.. _ _ . - - - - _ . . _ . _ . ~ - - _ _ - _ __ . - _ . _ _ _ _ __

l l

3-On April 9, 1990, GPC made a presentation to the NRC in the Region II offices in support of GPC's request to return VEGP i Unit 1 to power operations. As part of this presentation, GPC l

provided information on DG starts in response to a specific NRC l'

~ '

request t6at GPC addre'ss DG' reliability in its April 9 fresentation. GPC submitted a written summary of its April 9 l presentation in an April 9, 1990 letter, "Vogtle Electric Generating Plant Confirmation of Action Letter."

On April 12, 1990, the NRC formally granted permission for VEGP l Unit 1 to return to criticality and resume power operations.

On April 19, 1990, pursuant to 10 CFR 50.73, GPC submitted Licensee Event Report (LER) 50-424/90-06, " Loss of Offsite Power Leads to Site Area Emergency."

{

On June 29, 1990, CPC submitted a revised LER, 50-424/90-06-01.

l The purpose of the submittal was to clarify information renated to successful DG starts that were discussed in the April 9, 1990 letter and the April 19, 1990 LER, and to update the status of corrective actions in the original LER.

From August 6 through August 17, 1990, the NRC conducted a Special Team Inspection at VEGP, as a result of NRC concerns about, and allegations related to, VEGP operational activities.

! This inspection examined the technical validity and safety i

l

_ .._ . _ . . _ _ . _ _ _ _ . . . _ . _ ~ . . _ . _ _ . . _ _ . _ . _ .._. _- . . _ . _ . _ - . _ _ _ . _ _ _ _

w . ---

_a. .3 97 , _ ,

-4 -

l significance of the allegations, but did not investigate alleged

! wrongdoing. The Special Team informed GPC that the June 29, 1990 l

submittal failed to address the April 9, 1990 data and requested that GPC~cl~arify DG starts' reported on-April'9, 1990. Results of i

this inspection are documented, in part, in NRC Inspection Report No. 50-424,425/90-19, Supplement 1, dated November 1, 1991.

l

  • l On August 30, 1990, GPC submitteo a letter, " Clarification of l f

Response to Confirmation of Action Letter." The purpose of the submittal was to clarify the diesel start information that was 1

addressed in the April 9, 1990 submittal.

l 1

III

! The NRC has reviewed the evidence associated with these events, 1

submittals, and representations to the NRC. Specifically, the NRC reviewed information gathered as part of the OI investigation, information gathered during the IIT, NUREG-1410,

{ Supplement 1 of NRC Inspection Report 90-19, discovery responses f in the Vogtle operating license amendment proceeding (Docket

]

Nos. 50-424 OLA-3, 50-425 OLA-3), and other related information.

i 1

1 4

1 1

i l

l i l

i l

i 1

+

i i

l i

On June 29, 1990, the draft cover letter for the LER revision was being reviewed at the VEGP site. The draft had originated in GPC corporate headquarters and included language personally developed by the Senior Vice President - Nuclear Operations (George W.

Hairston, III) and the Vice President - Vogtle Project (C.

Kenneth McCoy). During this review, a VEGP Technical Assistant (TA) (formerly the Acting VEGP Assistant General Manager - Plant Support) (Alan L. Mosbaugh) noted that the draft cover letter was incomplete and challenged the accuracy of the reasons stated in the draft cover letter in conversations with the Supervisor -

Safety Audit and Engineering Review (SAER) (Georgie R.

i Frederick), the VEGP Assistant General Manager - Plant Support j (Thomas V. Greene), the VEGP Manager - Engineering Support 1

i

_.-.__._____._..__.m._

1

, (Michael W. Horton), and a Licensing Engineer - Vogtle Project (Harry W. Majors). Mr. Mosbaugh stated that: (1) the letter failed to clarify the DG starts reported on April 9, 1990 (2) DG 1 record keeping practices were not a cause of the difference in the DG starts reported in the April 19, 1990 LER because adequate informatior. to formulate an accurate count was available when the counting errors were made, and (3) the erroneous counts resulted from personnel errors in developing the count.

4 Mr. Majors had staff responsibility for preparing the cover letter for the LER revision and was specifically instructed by the Senior Vice President - Nuclear Operations to work closely with the site to ensure that the submittal was accurate and complete.

1 Mr. Horton was responsible for the Diesel Start Logs and agreed with the audit report findings regarding deficiencies in their condition. Given that bis logs had not been used to collect the

-l r

_ _ _ _ . _ . . _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . . _____..________________m _ _ _ , _ _ _ . . _ _ _

l WS M j .

l i

  • i 7-

} DG start data, he pointed out that it was wrong to state the' the q condition of his logs caused errors in the information initially provided to the NRC.

i I

i I

l 1

l l

L i

I l

l l

l i

! Mr. Frederick was made aware by Mr. Mosbaugh on June 12, 1990 that, to identify the root cause of the error in i

i the April 19, 1990 LER (i.e., personnel errors), the audit scope I

would need to include an assessment of the performance of the i

Unit Superintendent and the VEGP General Manager, the individuals t

j that developed the initial count. Yet, the audit report did not l include either of these individuals in the list of persons i

1 1

-8 -

contacted during the audit. On June 29, 1990, Mr. Frederick was again made aware by Mr. Mosbaugh that the root cause for the difference was personnel error.

N' Mr. Greene was apprised of concerns regarding the June 29, 1990 letter by Mr. Mosbaugh (an individual who had been involved in preparing the April 19, 1990 LER and had been involved in developing an accurate DG start count) Mr. Mosbaugh identified to him the failure of the June 29, 1990 draft cover letter to address the inaccuracies in the April 9, 1990 letter that it referenced and Mr. Mosbaugh pointed out the erroneous causes stated for the reasons for the difference in the June 29, 1990 DG start counts. ,_ ___ , , _

\

.e-w._...una-a -.m...ma- .,a.._m-+w a r.. i mwa .smena aaha, ..an.,y3y m.__,._h,p___a._m _.mmgwa---aea a- W&J --'mw6 4 a.4 e as. 4e.4,u_-Me4m,A. mea + As e &A N .nd e _. me a 4 3 J a mA a4.masA__a%

4 4

1 4

t 9-11 i

e h

a .a.-> ae.Ana-u.- .

6,,,,s ms,..J,e na A,, ae4 .~-kea,. .-m + a.m- -- r - m-s, ,a.e a .e,m,um,as---ua -_a.4 ...m, .wew -..w.s_-a _ ----w -w-w ,---,w---

9 ,

1 1

4., i i

4 s

4

)

10 -

M I

1 a

i l

l, k

i.

4 1

1 i

a 1

i J

1 a

1 t

I f

i t

4 1

I 1

4 L

N t

a 1

f f

4 6

4 E

4 i

e 4

i 4

k 4

4 4

.a

?

4 t

i i

+

i i

t

.-,q

- m ...e .. . . .u my , . . _

5 e

. _ . _ _ _ _ _ _ . . _ - _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ . _ _ ____________.__._____..___...m__.____.__.

}

1 1 M_

i

!a l

i i

i i

l i

l i

l 1

FOR THE NUCLEAR REGULATORY COMMISSION i

James L. Milhoan

{ Deputy Executive Director l

for Nuclear Reactor Regulation, Regional Operations, and Research Dated at Rockville, Maryland I

this day of (Month) 19(ZX) i k

i t

4 i

a i

4 1

1

)

l 1 _ __ _ _ . _