a UNION ELacTmac COMPANY seos enariar synest er. t.ouis. Missoumi sUo.
monaa.o sr..cnnsu.
4 October 25, 1982
.v.u,o oo.,
Chief, Management Information Branch UIRRC-589 i -
Office of Management and Program Analysis U.S. Nuclear Regulatory Comission Washington, DC 20555 1
Dear Sir:
CONSTRUCTION STATUS REPORT CALIAWAY UNIT 1
)-
Enclosed is the Construction Status Report revised for a status date of September 30, 1982. Construction of Unit 1 is approximately 84.57.
complete.
Since our last report,the Callaway Startup and Consnercial dates have been rescheduled. The new fuel load date is April 2, 1984, with com-
- mercial operation to occur in late 1984 or early 1985.
The precise nature of the remaining work on the plant combined i
with extremely rigid quality requirements resulted in an increase in our 7
. projection of the craft and technical support manhours and time necessary
]
to complete the project.
t i
There was an error in your June 30,.1982, edition of the Construc-tion Status Report.- The December' 31, 1982, " Estimated Start" date for the activity " Conduct Pr'eop...Fttel Ioad" should be deleted.
l This letter constitutes our report to be filed by October 29, 1982.
!=
Very truly yours, Donald F. Schnell FLK/1kr~
Enclosure cc: Messrs. H. M. Wescott E. K. Dille J. Neisler, h
- p g 840606 0 MILLEFE84-367 PDR :~
w
.,%w
-=
r v.
CONSTRUCTION STATUS REPORT Page ~ No. '.2-018 -
CALIAWAY l NUCLEAR POWER PLANTS Status As'of:
06-30-82:'
CONSTRUCTION STATUS:
Applicant's Current Estimated Fuel
' Applicants Construction Completion Estimate Loading Date:
04-02-84 As Defined in CP:
(Earliest) 06-30-81 Applicant's Previous Estimated Fuel (Latest) 12-31-83 J
Loading Dates, 06-01-83
' Applicant's Estimated Fuel 'Ioading i
Date.At CP Issuance:
06-01-81 Applicant's Current Estimated Commercial Operation Date:
-Late 1984/Early 1985 Current Estimated Percent Conatruction Complete:
84.5%
Comments'Regarding Current Construction Status:
4 t
Estimated Actual Estimated Actual
' Estimated-Start Start Completion Completion
% Complete-
+
Mobilize and Prepare Site:
09-03-75 05-01-76 100%-
Place Structural Concrete:
04-01-76 12-20-82 99%
Install Reactor Pressure Vessel:
03-15-79 04-01 91%
Install Large Bore Process Pipe:
01-12-78 08-01-83 99%
Install 'Large Bore Pipe Hangers, Re straints and. Snubbers:
01-10-78 11-30-83 84%
I.nstall-Small Bore Pipe:
01-19 08-01-83 94%
Install. Cable Tray:-
07-09-78 10-01-83.
98%
Install Exposed Metal Conduit:
07-01-78 11-01-83 89%
. Install Power, Control', Instrumentation and Security Cable:
08-08-79 12-01-83 82%
~
I l
1 4
_2_
e t.
Estimated Actual Estimated.
Actual' Estimated' Start Start Completion Completion
% Complete Install Electrical Terminations:
04-04-80 01-01 '64%.
i
- Conduct Reactor Cold. Hydrostatic Test:
04-29-83 05 O2 0%
Conduct Hot Functional Test:
09-12-83 10-25-83 0%
Conduct Preop' and Acceptance Tests Necessary For Fuel Load:
10-30-81 02-02-84 19%
t W
L L
t h
4 4
l i
i
I t
n C0NSTRUCTION STATUS REPORT PAGE NO: 2-018 CATAWSA 1 NUCLEAR POWER PLANTS STATUS AS oft 82 PLANT CNARACTERI5TICSt KEY PERS0NNELt DOCKET NO:
85000413 CORPORATE CONTACT:
H.B. TUCKER. VICE PRESIDENT NUCLEA PRODUCTION. DUKE POWER CD.
CP MO. 8 DATE ISSUED: CPR-116 / 08-07-75 CP EXPIRATION DATE:
06-01-81 CORPORATE ADDRESS:
P8 33189. 422 5. CNRUCN STREET CHARLOTTE. NORTM CAROLINA. 28242 APPLICANT:
DUKE POWER PLANT LOCATION 6 MI HNW OF ROCK NILL. SC IE REGION:
2 CORPORATE PHONE NO:
(704) 373-4531 AEt DUKE POWER NS$$8 WESTINGHOUSE CONSTRUCTOR:
DUKE POWER NRC LPM:
K. JABBOUR REACTOR TYPE PWR IE PROJECT INSPECTOR:
DER (MWE)*
1945 IE RESIDENT INSPECTOR K. VAN DOORN IN5PECTION STATUSt FUEL L0AD DATE CNANCES TIME PERIOD AS REPORTED BY UTILITY
- Apr. 1982 - Jun. 1982 REPORT NEW REASON FOR CHANGE REPORT
. BEG DATE END DATE pATE SCHEDULE REPORTED BY UTILITY NUMBER OF INSP.
OF INSP.
09-27-74 08-00-80 CONSTRUCTION DELAYS DUE TO CRITICAL 8208 04-05-82 04-08-82 CONDITIONS EXISTING IN THE FINANCI/L 8209 04-13-82 04-16-82 MARKETS.
8211 04-26-82 04-27-82 05-00-7'7 09-00-80 REVISED LDAD FORECASTS.
8212 05-25-82 05-25-82 03-00-78 02-00-81 PROJECTED LOAD FORECAST.
8213 04-26-82 05-25-82 01-00-80 06-00-83 NO REASON REPORTED.
8214 06-08-82 06-11-82 05-01-80 04-00-83 NO REASON REPORTED.
8215' 06-08-82 06-11-82 08-00-80 08-00 MAJOR UNIT RESCHEDULE.
05-00-82 11-00-84 NO REASON REPORTED.
Inspection reports are available at local PDRs.
08-00-82 10-00-84 REASSESSMENT OF SCOPE OF REMAINING WORK.
1 L-0 C A L PUBLIC D0CUMCHT R00M YORK COUNTY LIBRARY 325 SOUTM OAKLAND AVENUE ROCK HILL. SOUTH CAROLINA 29730 e
, ~ --
i C0N51RUCTION 5TATUS REP 0RT PAGE NO: 2-019 CATAWBA 1-NUCLEAR P0WER PLANT 5-STATUS A5 GF g-30-82 C 0 N 5.7 R U C T I O N 5TATU5:
APPLICANT'S CURRENT ESTIMATED FUEL LOADING DATES, 10-00-84 APPLICANTS CONSTRUCTION COMPLETION ESTIMATE A5 APPLICANT'S PREVIOUS ESTIMATED FUEL LOADING DATE:
.08-00-83 DEFINED IN CP: (EARLIEST)
APPLICANT'S ESTIMATED FUEL LOADING DATE AT CP 1550ANCE:
12-00 (LATEST)
. APPLICANT'S CURRENT ESTIMATED ConMERCIAL OPERATION DATE: 06-00-85~
CURRENT ESTIMATED PERCENT CONSTRUCTION COMPLETER.
COMMENTS REGARDING CURRENT CONSTRUCTION STATUS: STATUS IS NOT REPORTED FOR PIPING ON THE BASIS OF PIPE SIZE.
STATUS IS NOT RECORDED FOR CABLE TRAY OR EXPOSED METAL CONDUIT.
I ESTIMATED ACTUAL ES!! MATED ACTUAL ESTIMATED
_51 ART MARL C_0titL F1193 190tLFllD3 UDMM MOBILIZE AND PREPARE SITE:
05-86-74 05-16-74 10-01-76 04-01-76 100-4 PL?CE STRUCTURAL CONCRETE:
04-01-76 04-05-76 99%
INSTALL REACTOR PRESSURE VESSEL:
06-01-78 06-09-78 07-13-78 07-13-78 100%
INSTALL LARGE BORE PROCESS PIPE:
04-01-77 04-08-77 08-01-83 97%
INSTALL LARGE BORE PIPE MANGERS, RESTRAINTS AND SNUBBERS:
11-01-78 11-01 07-16-84 75%
INSTALL SMALL BORE PIPE:
N/A N/A N/A N/A N/A INSTALL CABLE TRAY:
N/A N/A N/A N/A N/A i
INSTALL EXPOSED METAL CONDUIT:
N/A N/A N/A N/A N/A INSTALL POUER, CONTROL, INSTRUMENTATION AND SECURITY CABLE:
08-01-78 08-21-78 08-27-84 88%
INSTALL ELECTRICAL TERMINATIONS:
09-01-78 10-06-78 09-10-84 76%
CONDUCT REACTOR COLD HYDR 0 STATIC TEST 02-00-84 02-00-84 0%
CONDUCT NOT FUNCTIONAL TEST:
05-00-84 06-00-84 0%
CONDUCT PRE 0P AND ACCEPTANCE TESTS HECESSARY FOR FUEL LOAD:
10-00-84 0%
l 4
. ~.. _. - - - - _ - _.- -
~.
C0N$TRUCTION 5TATUS OEP00T PA3E NO: 2-020 CATAWBA 2 NUCLEAR POWER PLANTS STATUS AS OFI 82-PLANT C N A R A C T E R I S T I C S:
KEY PERS0NNELa DOCKET NO:
65000414 CORPORATE CONTACT:
N. B. TUCKER. VICE PRESIDENT.
NUCLEAR PRODUCTION. DUKE POWER CO.
CP NO. 8 D*.T~ !$5UED: CPR-It? / 08-07-75 s
CP EXPIRATION Da~.Es 06-08-82 CORPORATE ADDRESS:
PB 33!89. 422 S. CHURCN STREET CHARLOTTE. NORTH CAROLINA 28242 APPLICANT:
DUKE POWER PLANT LOCATION:
6 MI NNW OF ROCK HILL. SC IE REGION:
2 CORPORATE PHONE N08-(704) 373-4531 AE DUKE POWER MSSS:
WESTINGHOUSE CONSTRUCTOR:
Dt!KE POWER NRC LPM:
K. JABBOUR REACTOR TYPE:
DER (ItWE):
1845 IE RESIDENT INSPECTOR:
K. VAN DOORN.
4 I N S P E C.T I O N $TATUSt FUEL L0AD DATE CHANGES
. TIME PERIOD A5 REPORTED BY UTILITYa l
Apr. 1987 - Jon. 198&
REPORT NEW REASON FOR CHANGE REPORT BEG DATE END DATE DATE 1[NERELE R1 PORTED BY (fTILITY MUMP _ER OF INSP.
OF INSP.
.09-27-74 08-00-81 CONSTRUCTION DELAYS DUE TO CRITICAL 8208 05-25-82 05-28-82 CONDITIONS EXISTING IN THE FINANCIAL 8209 04-26-82 04-27-82 MARKETS.
8280 04-26-82 05-25-82 05-00-77 08-00-82 REVISED LOAD FORECASTS.
8211 06-08-82 06-11-82 03-05-80 10-00-84 NO REASON GIVEN.
8232 06-08-82 06-11-82 08-00-80 02-00-85 MAJOR UNIT RESCHEDULE.
05-00-82 03-00-87 NO REASON PROVIDED.
Inspection reports are available at local PDRs.
08-00-82 10-00-86 REASSESSMENT OF SCOPE OF REMAINING WORK.
I f
j 1
l 4
L0 CAL PUBLIC D0CUMENT R00M i
YORK COUNTY LIBRARY 325 SOUTH OAKLAND AVENUE ROCK HILL. SOUTH CAROLINA 29730 4
e I
~
C0N5TQUCTION
$TA TUS REPORT PA?E NO: 2-021 CATAMBA 2 NUCLEAR POWER PLANTS STATUS AS OF: 0 82 C0NSTRUCTION S T A T U $2 APPLICANT'S CURRFNT ESTIMtirD Furl LOADING DATE:
10-00-86 APPLICANTS CONSTRUCTION COMPLETION EST!i1 ATE AS APPLICANT'S PREVIOUS ESTIGATED FULL LCADING DATE:
02-00-85 DEFI;:ED IN CP: (EARLIEST)
APPL IC ANT'S ESTIrlATED FUEL LOAD:liG DATE Al CP I}SUANCE:
12-00-79' (LATEST)
APPL ICulT'S CURRfHT ESTIMA TED C0rir1E2CI AL OPLRATION DATE: 06-00,
CURIENT ESTIMATED Pr.RCENT CONSTRUCTION COMPLETE: 45%
COMMEHTS REGliRDING CURREtIT CONSTRUCTIO;l ST ATUS: "'A.US IS NOT REPORTED FOR PIPING ON THE BASIS OF PIPE SIZE.
STAIUS IS NOT RECORDED FOR CABLE TRAY OR EXPOSED METAL CONDUIT.
l ESTIMATED ACTUAL ESTIMATED ACTUAL ESTIMATED
___iTART 11ARL SortPlELIDH tiDBILIZE AND PREPACE SITC 05-16-74 05-16-74 10-01-76 ' [DftPLEIIDH % CDP 1PL ETE 04-01-16 100%
PLACE STRUCTLRAL CONCRETE:
08-01-76 08-01-76 96%
INSTALL REACTOR PRESSURE VTSSEL:
01-05-80 01-18-80 04-15-80 04-15 100%
INSTALL LARGE EORE PROCESS PIPE:
01-05-77 01-05-77 05-03-85 59%
INSTAtt LARG BORE PIPE HANGERS. RESTRAIN!S A6tC SHUBBERS:
07-08-81 06-10-86 9% -
IilSTALL SftALL BORE PIPE:
N/A N/A N/A N/A N/A INSTALL CABLE TRAY:
N/A N/A N/A N/A N/A INSTALL EXPOSED METAL CONDUIT:
N/A N/A N/A N/A N/A I:tSTALL FO:4ER. C02:TTOL. INSTRUMENTATION AtID SECURITY CABLE:
11-01-79 11-01-79 11-18-85 26%
I!: STALL ELECTRICAL TE IIINATIDHS:
11-15-79 11-19-79 12-08-85 17%
C0!:0UCT RE'.CTOR COLD H)DRCST ATIC TEST 01-00-86 01-00-86 0%
CPNDUCT HOT TUMCTIONAL TEST 05-00-86 06-00-86 0%
C0t:3UCT PREOP AND ACCEPTANCE TESTS NECESSARY FOR TUEL LOAD:
10-00-86 0%
f
~~-_
CDN$TRUCTION
$TATU$
REPQRT PAGE NO: 2-022 CHER0REE 1 MUCLEAR PLWER PLANTS STATUS AS OF: 0 82 PLANT CHARACTERISTICSt KEY P E R S 0 N N E L:
.i DOCKET NO:
95000491 CORPORATE CONTACT:
L. C. DAIL. VICE PRESIDENT CP NO. 8 DATE ISSUED: CPPR-167/ 12-30-77 DESIGN ENGINEERING. DUKE POWER CO.
CP EXPIRATION DATE:
CORPORATE ADDRESS:
PB 33189. 422 5. CHURCH STREET.
CHARLOTTE. NORTH CAROLINA 28242 APPLICANT:
DUKE POWER PLANT LOCATION:
21 MI E OF SPARTANBURG, SC CORPORATE PHONE NO:
(704) 373-4062 IE REGIDH 2
AE:
DUKE POWER NSSS:
COMBUSTION ENGINEERING CONSTRUCTOR:
DUKE POWER NRC LPM:
UNASSIGNED REACTOR TYPE:
DER (MWE):
1280 IE RESIEENT INSPECTUR IN$PECTION $ T A T U S:
FUEL L0AD DATE CHANGES TIME PERIOD AS REPORTED BY U T I L I T Y:
Aor. 1982 - Jun. 1982 REPORT NEW REASON FOR CHANGE REPORT BEG DATE END DATE DATE SCHEDULE RFPORTED BY UTILITY NUMBER OF INSP..
OF INSP.
05-09-78 05-00-84 REVISED LOAD FORECAST.
MONE 03-05-80 07-00-89 NO REASON GIVEN.
09-30-31 N/S INDEFINITELY DELAYED.
Inspection reports are availatile at local PDRs.
9 L0 CAL PUBLIC D0CUMENT R 0 0 M:
CHEROKEE COUNTY LIBRARY 300 E. RUTLEDGE AVENUE GAFFHEY. SOUTH CAROLINA 29340 i
4 C0N$TRUCTION 5TATUS REP 0RT PAGE N0s 2-023-q CHERDREE T.
NUCLEAR P0WER PLANT 5 STATUS A5 0F2 Of-30-80 C0N5iRUCTION 5TATU58 APPLICANT'S CURRENT ESTIMATED FUEL LOADING DATEt N/5 APPLICANT'S CONSTRUCTION COMPLETION ESTIMATE AS APPLICANT'S PREVIOUS ESTIMATED FUEL LOADING DATE:,
07-00-89' DEFINED IN CP: (CARLIEST)
APPLICANT'S ESTIMATED FUEL LOADING DATE AT CP ISSUANCE
- 05-00-83 (LATEST)
-APPLICANT'S CURRENT ESTIMATED C0f;MERCIAL OPERATION DATE: N/5 1
CURRENT ESTIMATED PERCENT CONSTRUCTION CGMPLETE:
18%
COMMENTS REGARDING CURRENT CONSTRUCTIDH STATUS: INDEFINITELY DELAYED.
l ESTIMATED ACTUAL ESTIMATED ACTUAL ESTIMATED
__STAPT UART_
50f1PLEM
$0ftPJ Qi.03 3__CQt;ElfE MOBILIZE AND PREPARE SITE:
01-09-16 03-01-18 100%
PLACE STRUCTURAL CONCRETE:
03-01-78 48%
l'
. INSTALL REACTOR PRESSURE VESSEL:
Ih5 TALL LARGE BORE PdOCESS PI'Er INSTALL LARGE BORE PIPE NANGERS. RESTPAINTS AND SNUBBERS INSTALL.5 MALL BORE PIPE:
INSTALL CABLE TRAY 05-30-7/h-1%
INSTALL EXPOSED METAL CONDUIT!
INSTALL POWER CONTROL, INSTRUMENTATION AND SECURITY CABLE 8 INSTALL ELECTRICAL TERMINATI0HS:
CONDUCT REACTOR COLD NYDR0 STATIC TEST CONDUCT NOT FUNCTIONAL TEST CONDUCT PREOP AND ACCEPTANCE TESTS HECESSARY FDL FUEL LOAD:
I l
~.
C0N$TRUCTION
$TATUS REP 0RT PAGE NO: 2-824 Of-30-82 CHEROKEE 2' NUCLEAR POWER PL4NT$
. STATUS AS OF:
PLANT CHARACTERI$TICSt KEY P E R S O N N E L:
DOCKET NG:
05000492 CORPORATE CONTACT:
L. C. DAIL. VICE PRESIDENT DESIGN ENGINEERING, DUKE POWER CO.
CP MO. 8 D4TE ISSUED: CPPR-168/ 12-30-77 CORPORATE ADDRESS:
PB 33189. 422 S. CHURCH STREET CP EXPIRATION DATE:
CHARLOTTE, NORTH CAROLINA 28242 APPLICANT:
DUKE POWER PLANT LOCATION:
21 MI E OF SPARTAMBURG. SC CORPORATE PHONE NO:
(7043 375-4062 IE REGION:
2 AE DUKE POWER NS$$r COMBUSTION ENGINEERING CONSTRUCTOR:
DUKE P0tiLR NRC LPM:
UNASSIGNED IE PROJECT INSPECTOR:
REACTOR TYPE:
DER (fCIE):
1280 FUEL L0AD DATE CHANGE $
INSPECTION $TATUS:
TIME PERIOD A$ REPORTED BY U T I L I T Y:
A rm. 1982 - Jun. 1982 REPORT HEW REASON FOR CHANGE REPORT BEG DATE END DATE PATE 1pHfDULE REPORTED BY UTILITY NUT'B E3 0F INSP.
OF INSP.
01-25-78 11-00-85 t.
LOWER FORECASTS FOR GROWTH IN DEMAND.
2.
UNCERTAINTY REGARDING THE PERKINS u
MONE UNITS.
04-31-78 05-00-86 PROJECTED LOAD GROWTH.
Inspection reports are available at local PDRs.
03-05-C0 07-00-98 NO REASON GIVEN.
09-30-81 ti/S INDEFINITELY DELAYED.
L0 CAL P U B L.I C D0CUMEHT k00M CHEROKEE COUNTY LIBRARY 300 E. RUILEDGE AVENUE GAFFNEY, SOUlit CAROLIttA 29340 a
4
~.
C0NSTRUCT ION STATUS. REPORT PAGE NO: 2-825 I CHEROKEE 2 -
NUCLEAR POWER P L A.H.T S STATUS AS OF: 0 82 C 0 N 5 T R U C T I O N-S T A T U 5:
APPLICANT'S'CURRFHT ESTIMATED FUFL LOADING DATE:
N/S APPLICAN15 CONSTRUCTION COMPLETION ESTIMATE AS APPLICANT'S PREVIOUS ESTIM41ED FUEL LOACING Da1E:
07-00-90 DEFIHED IN CP: (EARLIEST)
ArrLICA9T'S ESTIMATED FUEL 19*SidG DATE'AT CP ISSUANCE:
05-00-85 (LATEST)
APPLICANI'S CURRENT ESTIMATED Cor2:ERCIAL OPERATIDH DATE: N/S CURRENT ESTIMATED PERCENT CONSTRUCTICM COMPLETE:
Di COMMENTS REGARDING CURRENT CONSTRUCTION STATUS: INDEFINITELY DE. LAYED.
ESTIMATED ACTUAL ESTIMATED ACTUAL ESTIMATED START START i.0MPLETION COMPLETERH % COMPLETE MOBILIZE AND PREPARE SITE:
07-09-76 50-4 PLACE $1RUCTURAL CONCRETE:
IHSTALL REACTOR FRESSURE VESSEL:
INSTALL LARGE BORE PROCESS PIPE:
/
INSTALL LARGE BORE PITE.l! ANGERS. RESTRAINTS AND SHUB5ERS:
INSTALL SMALL BORE PIPE:
INSTALL CABLE TRAY:
INSTALL EXPOSED METAL CONDUIT:
INSTALL PO!!ER. CONTROL. INSTRUMENTATION AND SECURITY CABLE:
INSTALL ELECTRICAL TERMINATIONS:
CONDUCT REACTOR COLD HYDROSTATIC TEST:
CONDUCT HOT FUNCTIONAL TEST:
CONDUCT PREOP AND ACCEPTAMCE TESTS HECESSARY FOR FUEL LOAD:
t t
PA!E N08 2-026 C0N5TRUCTION STATUS REP 0RT STATUS AS CF: 0 82 CHEROKEE 3 N U C L E A,R P 0 SI E R PLANTS KEY PERS0NNEL PLANT CHARACTERISTICSt CORPORATE CONTACT:
L. C. DAIL. VICE PRESIDENT DOCRET NO:
05000493 DESIGN ENGINEERING. DUKE POWER CO.
CORPORATE ADDRESS:
PB 33189. 422 S. CHURCH STREET CP MO. 8 DATE ISSUED: CPPR-169/ 12-30-77 CP EXPIRATION DATE:
CHARLOTTE. NORTH CAROLINA 28242 APPLICANT
- DUKE POWER PLANT LOCATIOM8 21 MI E OF SPARTANBURG. SC CORPORATE PHONE Not (704) 373-4062 i-IE REGION:
2 AE DUKE POWER HS$$
COMBUSTION ENGINEERING NRC LPM:
UNASSIGNED CONSTRUCTORt DUKE POWER IE PROJECT INSPECTOR:
REACTOR TYPE:
- DER (MWE)*
1288 FUEL L0AD DATE CHANGE 5 INSPECTION STATU$2 A5 REP 0RTED BY U T I L I'T Y:
TIME PERIOD Anr. 1982 - Jun. 1982 REPORT NEW REASON FOR CHANGE REPORT BEG DATE END DATE DATE jfGLEfdlLE REPORTED _BY UTILITY
}!1LMJ1R OF INSP.
OF INSP.
04-00-80 N/S INDEFINITELY DELAYED.
. NOME Inspection reports are available at local PDRs.
~
L0 CAL PUSLIC D0CUMENT R00M CHEROKEE COUNTY LIBRARY 303 E. RUTLEDGE AVENUE GAFFNEY. SOUTH CAROLINA 29340 I
C0N5iRUCTIOH 3TA TU$
REPORT PAGE NO: 2-027 CHEROKEE 3
' NUCLEAR P 0'W E R PLANTS STATUS AS OF: 0 82
~
C0NSTRUCiT0N 5TATU5:
APPLICANT'S CURRENT ESTIMATED FUEL LOADING DATE:
N/S
. APPLICANT'S CONSTRUCTION COMPLETION ESTIMATE AS APPLICANT'S PREVIOUS ESTIMATED FUEL LOADING CATE:
05-00-88 DEFIHED IN CP: (EARLIEST)
APPLICAFT'S ESTIMATED FUEL LOADING DATE AT CP ISSUANCE:
05-00-88 (LA1EST)
APPLIC4NT'S CURRCNT. ESTIMATED ConMERCIAL OPERATIDH DATE: N/S CURRENT ESTIMATED PERCENT CONSTRUCTION COMPLETE:
0%
COMMENTS REGARDING CURRENT CONSTRUCTIDH STATU : INDEFINITELY DELAYED.
ESTIMATED ACTUAL ESTIMATED ACTUAL ESTIMATED START SIARL LOMPL ET ION
$01PLETION Up:JPE TJ MOBILIZE AND PREPARE SITE:
07-09-76 50%
PLACE STRUCTURAL CONCRETE:
INSTALL REACTOR PRESSURE VESSEL:
INSTALL LARGE BURE PROCESS PIPE:
INSTALL LARGE BORE PIPE HANDERS. RESTRAINTS AND $NUBBERS:
INSTALL SMALL BORE PIPE:
INSTALL CABLE TRAY:.
c INSTALL EXPOSED METAL CONDUIT:
INSTALL POWER. CONTROL. INSTRUMENTATIDH AND SECURITY CABLE:
INSTALL ELECTRICAL TERMINATIONS:
CONDUCT REACTOR COLD HYDROSTATIC TEST:
CONDUCT HOT FUNCTIONAL TEST:
CONDUCT PREOP AND ACCEPTANCE TESTS NECESSARY FOR FUEL LOAD: