Forwards Updated Const Status Repts as of 820930 for Inclusion in NUREG-0030
ML20127D526
Person / Time
Site: 05000000, Harris
Issue date: 10/20/1982
From: Zimmerman S
CAROLINA POWER & LIGHT CO.
To: Hartfield R
NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
Shared Package
ML082170543 List: ... further results
References
FOIA-84-367, RTR-NUREG-0030, RTR-NUREG-30 NUDOCS 8504150370
Download: ML20127D526 (7)


Text

1

~

l 1

CD&L Carolina Power & Light Company OCT 2 01982 Mr. R. A. Hartfield. Chief Management Information Branch Office of Management and Program Analysis United States Nuclear Regulatory Commission Washington. DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT UNIT NOS. 1 AND 2 DOCKET NOS. 50-400 AND 50-401 CONSTRUCTION STATUS REPORT

Dear Mr. Hartfield:

Carolina Power & Light Company hereby submits the information required by NUREG-0030, " Construction Status Report," for the Shearon Harris Nuclear Power Plant (SHNPP).

This information revises our previous submittal dated July 30, 1982. The information provided for both units is updated through September 30, 1982.

If you have any questions on this subject, please contact our staff.

Yours very truly,

~

e=c=;

S. R. Zimmerman Manager Licensing & Permits JDK/lr (5590P3T3)

Attachments cc:

Mr. Prasad Kadambi (NRC) l Mr. G. F. Maxwell (NRC-SHNPP)

Mr. J. P. O'Reilly (NRC-RII)

Mr. Daniel F. Read (CHANGE /ELP) i Mr. Travis Payne (KUDZU) l l

8504150370 840606 l

PDR FOIA KILLEFE84-367 PDR l

l l

411 Fayetteville Street

  • P. O. Box 1551 e Ra,oigh, N. C. 27602 O

CONSTRUCTION STATUS REPORT PAGE NO.

I HARRIS 1 NUCLEAR POWER PLANT $

STATUS AS OF: 9/30/82 PLANT CHARACTER 1STlCS:

KEY PERSONNEL:

DOCKET NO:

05000400 CORPORATE CONTACT:

M.' A. MCDUFFIE, SEN. V. PRESIDENT CP NO. & DATE ISSUED:

CPR-158 / 01-27-78 CORPORATE ADDRESS:

ENGINEERING & CONSTRUCTION CP EXPlRATION DATE:

06-01-84 411 FAYETTEVILLE STREET APPLICANT:

CAROLINA POWER & LIGHT RALElGH, NORTH CAROLINA 27602 PLANT LOCATION:

NEW HILL, NC IE REGION:

il CORPORATE PHONE NO:

(919) 836-6663 AE

.EBASCO NRC LPM:

PRASAD KADAMBI NSSS:

WESTINGHOUSE lE PRINCIPAL INSPECTOR:

CONSTRUCTOR:

DANIEL INTERNATIONAL 4X)NSTRUCT10N:

- REACTOR TYPE PWR-

-TEST AND STARTUP:

' DER NWE):

900 IE RESIDENT INSPECTOR :

G. F. MA* ELL lNSPECTION S T A T U S:

FUEL LOAD DATE CHANGES AS REPORTED B Y.

UTILITY:

TIME PERIOD REPORT NEW REASON FOR CHANGE REPORT BEG DATE END DATE DATE SCHEDULE REPORTED BY UTILITY NLDEER OF 1NSP.

OF lNSP.

05-07-75 06-01-83 REVISED CURRENT ENERGY AND LOAD FORECAST.

09-08-80 06-00 LOWER RATE GROWTH IN CUSTOMER DEMAND THAN PROJECTED.

12-16-81 12-00-84 LOWER RATE GROWTH IN CUSTOMER DEMAND THAN PROJECTED.

09-30-82 05-00-85 2

LOCAL PUBL1C D O C fl M E N T.

ROOM:

WAKE COUNTY PUBLIC LIBRARY 104 FAYETTEVILLE STREET RALEIGH, NORTH CAROLINA 27601

C0NSTRUCTION STATUS REPORT PAGE NO.

2

.l HARRIS 1 NUCLEAR POWER PLANTS STATUS AS OF 9/30/82 C'ONSTRUCT(1ON

$TATUS:

APPLICANT'S CURRENT ESTIMATED FUEL' LOADING DATE:

05-00-85 APPLICANT'S CONSTRUCTION COFLETION ESTMATE AS -

l APPLICANT'S PREVIOUS ESTIMATED FUEL LOADING DATE:

06-00-84 DEFINED IN CP: (EARLIEST)

APPLICANT'S ESTMATED FUEL LOADING DATE AT CP ISSUANCE:

09-00-80 (LATEST)

APPLICANT'S CURRENT ESTIMATED C004ERCI AL OPERATION DATE: 03-01-86 l

I CURRENT ESTMATED PERCENT CONSTRUCTION C0FLETE: 715 l

C0pe4ENTS REGARDING CURRENT CONSTRUCTION STATUS:

ESTIMATED ACTUAL EST MATED ACTUAL ESTIMATED START START COIFLETION COWLETION 5 COWLETE MOBILIZE AND PREPARE SITE:

01-14-74 01-14-74 01-28-78 01-28-78 100%

PLACE STRUCTLRAL CONCRETE:

01-28-78 01-28-78 02-01-84 89%

l

'* lNSTALL REACTOR 1RESSURE VESSEL:

12-01-79 04-15-80 04-01-80 08-29-80 1005 lNSTALL LARGE BORE PROCESS PlPE:

04-01-79 04-01-79 08-01-84 665 INSTALL LARGE BDRE PIPE HANGERS, RESTRAINTS AND SNUBBERS:

04-01-79 04-01-79 11-01-83 44%

INSTALL SMALL BORE PlPE:

04-01-79 04-01-79 08-01-84 505 INSTALL CABLE TRAY 04-01-79 04-01-79 04-01-84 935 -

INSTALL EXPOSED METAL CONDulT:

04-01-79 04-01-79 04-01-84 955 lNSTALL POWER, CONTROL, INSTRLMENTATION AND SECURITY CABLE:

03-01-81 02-26-81 06-01-84 295 lNSTALL' ELECTRICAL TERMINATIONS:

01-01-82 06-15-81 12-01-84 255 CONDUCT REACTOR COLD HYDROSTATIC TEST:

05-01-84 06-01-84 05 CONDLET HOT FUNCTIONAL TEST: '

08-01-84 10-01-84 05 CONDUCT FREOP AND ACCEPTANCE TEST NE.CESSARY FOR FUEL LOAD:

06-01 12-01-84 05

  • RPV set; exclude internals and head package.

i 1

4 e

+

m

.m 7

C0N3TRUC7 10N S T A.T U S REPORT PAGE NO.

3 HARRIS 2 :

NUCLEAR POWER PLANTS STATUS AS OF: 9/30/82 PLANT CHARACTERISTlCS:

KEY P E R S O N N E L.:

DOCKET NO:

d5000401-CORPORATE CONTACT:

M. A. MCDUFFIE, SEH. V. PRESIDENT -

CP NO. & DATE ISSUED:

CPR-159 / 01-27-78 CORPORATE ADDRESS:

EfBNEERING & CONSTRUCTION CP EXPlRAfl0N DATE:

06-01-86 411 FAYETTEVILLE STREET APPLICANT:

CAROL.lNA POWER' & LIGHT RALEIGH, NORTH CAROLINA 27602 8'

.' PLANT LOCATION:

NEW HILL, NC IE REGION:

11 CORPORATE PHONE NO:

(919) 835-6663 AE:

EBASCO NRC LPM:

PRASAD KADAMBI NSSS:

WESTINGHOUSE lE PRINCIPAL INSPECTOR:

CONSTRUCTOR:

DANIEL lNTERNATIONAL

-CONSTRUCT 10N:

REACTOR TYPE PWR

-TEST AND STARTUP:

DER MdE):

900 IE RESIDENT INSPECTOR :

G. F. MA)ttELL w

' l N S P E C T 1 O N.

S T A T U S:

FUEL LOAD DATE CHANGES AS REPORTED, BY UTILITY:

T!ME PERIOD REPORT NEW REASON FOR CHANGE REPORT.

BEG DATE END DATE DATE SCHEDULE REPORTED BY UTILITY NUMER OF INSP.

OF INSP.

05 47 06-01-8'.

REVISED CURRENT ENERGY AND LOAD FORECAST.

01-00-80 06-01-86 REVISED CURRE'NT ENERGY AND LOAD FORECAST.

09-08-e0 06-01-87 SLOWER RATE (ROWTH IN CUSTOMER DEMAND THAN FHONCTED.

12-10 81 06-01-88 EXPANDED CONSERVATl01 AND LOAD MANAGEMENT PROGRAM.

09-30 e*

UNDER REV1EW.

LOCAL PUBL'lC.00CUMENT ROOM:

WAKE COUNTY PUBLIC LIBRARY 104 FAYETTEVILLE STREET

' RALE lGH, NORTH CAROLINA 27601

(

l_ n C0NSTRUCTION

  • TATUS REPQRT.

FAGE N0 : 4-0 HARRIS 2 NUCLEAR PO1ER PLANTS' STATUS AS OF: 9/30/82 l

CONSTRUCTION-STATUS:

.. APPLICANT'S CURRENT ESTMATED FUEL LOADING DATE:

UNDER REVIEW APPLICANT'S CONSTRUCTION CNLET10N ESTMATE AS

-l' APPLICANT S PREVIOUS ESTINATED FUEL LOADING DATE:

06-01-87 DEFINED IN CP: (EARLIEST)

' APPLICANT S ESTMATED FUEL LOADING DATE AT CP ISSUANCE:

06-01-85 (LATEST) l-APPLICANT'S CURRENT ESTINATED ColetERCI AL OPERATION DATE: UNDER REVIEW CURRENT ESTMATED PERCENT CONSTPUCTION C04PLETE: 45

'CaetENTS REGARDING CURRENT CONSTRUCTION STATUS:

4 1

ESTINATED ACTUAL EST MATED ACTUAL G flNATED START START COWLETl0N COWLETION 5 COWLETE NOBILIZE AND PREPARE SITE:

01-14-74 01-14-74 01-28-78 01-28-78 1005 PLACE STRUCTLRAL CONCRETE:

02-01-79 02-01-79 04-01-86 315 l

09-01-85 01-01-86 05 lNSTALL REACTOR PRESSURE VESSEL:

g lNSTALL LARGE BORE PROCESS PIPE:

06-01 06-01-79 02-01-87 135

INSTALL LARGE BORE PIPE HANGERS, RESTRAINTS AND SNUBBERS:

07-01-82 07-01-82 02-01-88 05 INSTALL SNALL BORE PIPE:

06-01-79 06-01-79 02-01-88 45 INSTALL CABLE TRAY ~

04-01-85 10-01-87 05.

s 04-01-85 10-01-87 35 l

INSTALL EXPOSED NETAL CONDUlT:

4 lNSTALI. POWER, CONTROL, INSTRLMENTATION AND SECURITY CABLE:

. 06-01-85 03-01-88 05' INSTALL ELECTRICAL TERNINATIONS:

08-01-85 04-01-88 05 CONDUCT REACTOR COLD HYDROSTAllC TEST:

11-01-87 12-01-07 05 CONDLET HOT FUNCTIONAL TEST:

02-01-88 04-01-88 05 CONDUCT PPEOP AND ACCEPTANCE TEST NECESSARY FOR FUEL LOAD:

12-01-86 06-01-88 05 f

4

- 4 1

e

,n e

C0N$TRUCTION 5TATUS REP 0RT PACE ND:-2-053:

LCSALLE 2 NUCLEAR POWER.

PLANTS STATUS AS OF: 09-30-82<

PLANT C H A R'A C T.E R I 5 T I C 5 KEY P E R S 0 N N E'L:

l

)

DOCKET N0:

05000374 CORPORATE CONTACT:

C. REED, VICE PEESIDENT CP NO. 8 DATE ISSUED:

CPPR-100/ 09-10-73 P. O. BOX 767 CP EXPIRATION DATE:'

'12-31 CORPORATE ADDRESS COMMONWEALTH EDISON CHICAGO. ILLIMOIS ~ 60690 APPLICANT:

11 MI SE OF DTTAWA. ILL

' PLANT LOCATION:

3 CORPORATE PHONE NO:

(312) 29h-3121

!E REGION:

.AE SARGENT 8 LUNDY

.HSSS:

GENERAL ELECTRIC CONSTRUCTOR:

C0fi10NWEAL TH EDISON NRC LPM:

A.

BOURNIA

' REACTOR TYPE:

BWR IE PROJECT INSPECTOR:

H. WESCOTT H.

D E R ' (tf.J E ) :

1078 IE RESIDENT ItiSPECTOR:

R. UALKER 1

4

.I N S'P_E C TlI O N' S T A T U 5:

FUEL L0A D DA TE CHANGES TIME PERIOD A 5 REPQR T ED BY UT IL ITY 1

Ace,_1982 - Jun. 19R2~

l REPORT NEW REASON FOR CHANGE-l REPORT

. BEG DATE END DATE PATF LCHFD_tHE MP_0,8,T ED BY tW_t i T Y HVf t9 f q OF TNSP.

-OF INSP.

(

09-01-76 LICENSIt!G DELAYS.

.8202

'03-24-82 03-26-82 10-01-77 LICENSIllG D* LAYS /PUBLIC HEARINGS.

8203 04-14-82 h4-15-82 t o-15-7 3 01-01-7 9 - PUBLIC NEARINCS.

8204 04-16-82 04-16-82 10-87-74 06-01-79 ECO:;0: TIC RDSD'iS.

8205 05-25-82 06-10-82 04-20-77 03-c o-30. REASSESS;tE*;T Or CO* S!"L'CTION SCHEDUL E STAIUS.

Inspection Reports are available at local F1Rs.

09-24-79 06-00-31 DESIGN DELAYS t.ND C0fiSTRUCTIPH EELAYS CAUSED BY CC;**L EX11Y OF II CL t,OIt;S It'.:X II !

N CO*iT AIt::: Erit litL770)tA::IC LO*.DS.

I 05-lh-80 12-00-81 TO INCORPORATE TMI RELATED CHANGES INTO DESIGN AND CONSTRUCTION, AND REFLECT CONTINUING NRC LICENSING l

SLOWDOWN.

I 1-lh-81 05-00-82 CONTAINMENT LOADING MODIFICATIONS.

09-30-81 12-00-82 FOCUS ON UNIT 1 ALTERATIONS WHICH REFLECT ON UNIT 2 INSTALLATION.

l 03-31-82 05-30-83 FOCUS ON UNIT 1 ALTERATIONS WHICH i

REFLE'CT ON UNIT 2 INSTALLATION.

j.

1 L10 C'A L PUBLIC D 0 C U M E H.T R 0 0 T1:

1 ILLINDIS VALLEY C0f1MUNITY COLLEGE I

RURAL ROUTE NO. 1 1

OGL ESBY..ILLINDIS.16348

t C0NSTRUCTION 5TA T'U'S-REPOQT PAGE'N3:~ 2-059 y

?LASALLE'2.

NUCLEAR P0WER P,L A H.T S

~ STATUS AS OF: 09230.

C 0 N 5 i R U'C T ION S T A T U S:

I I

l APPLICANT'S CURRENT ESTIMATED FUEL LOADING DATE:

04-30-83 s APPL ICAt:TS'CONSTRUCTICH COMPLETION ESTIMATE AS 1

APPLICANT'5 PREVIOUS ESTIMATED FUEL LDADING DATE:

12-00-32 DEFIKED IN CP: ( F AR L I ES T ) 09-30-83 l

APPLICANT'S ESTInATED FUEL. LOADING DATE AT CP ISSUANCE:

08-01-75 (LATEST)

APPLICANT'S CURRENT ESTIMATED Cat:MERCIAL OPERATION DATE ' 10-31-83 CUR' RENT' ESTIMATED PERCrNT CONSTRUCTION COMPLETE:92%

COMMENTS REGARDING CURRENT. CONSTRUCTION'STATU.'.:

I l

.I Ei......tv ACTUAL ESTIMATED-ACTUAL ES T It:ATED-START H ART _,

pfiQF T_)ON COM:' t. F T_T QN LCOUttr'EL MOBILIZE AND PREPARE SITE:

10-00-73 01-00. i00%

.].

[

PLACE STRUCTURAL CONCRETE:

07-00-74 09-00-76 100*:

I INSIALL' REACTOR PRESSURE VESSEL:

11-0C-76 11-00-76 10 c r.

INSTALL LARGE BORE PROCESS PIPE:

11-00-76 03-00-32 100*:

I.

~

INSTALL LARGE BORE PIPE HANGERS. RESTRAINTS AND SNUBBERS:

01-00-77 01-00-83 90%

INSTALL SM'.LL BORE-PIPE:

'11-00-76 06-00-82 1C O::

INSTALL CABLE TRAY:

09%40-77 04-00-82.

10 0 P.

INSTALL EXPOSED METAL CONDUIT:

01-00-77 12-00-82 95%.

1

[ INSTALL PC' ER. CONTROL, INSTRUMENTAT' ION AND SECURI1Y CABLE:

02-00 02-CO-33 90%

LI' t

4 f

' INSTALL E'ECT*ICAL TERMINATI0HS:

02-00-73.

04-00-83 8h%

6 CONCUCT' REACTOR. COLD HYDROSTATIC TEST:

10-4}0-82 10-4)0-82 100%

1 CottDUCT 1807 - rVNCTICHAL TEST N/A N/A N/A N/A N/A i

CONDUCT PRE 0P.AND ACCEPTANCE TESTS HECESSARY FOR.rUEL LOAD:

07-00-82 04-00-83 10%. l I

Y e