Forwards Updated Const Status Rept as of 831231
ML20127D423
Person / Time
Site: 05000000, Hope Creek
Issue date: 01/20/1984
From: Landrieu P
Public Service Enterprise Group
To: Hartfield R
NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
Shared Package
ML082170543 List: ... further results
References
FOIA-84-367 NUDOCS 8504150242
Download: ML20127D423 (3)


Text

'

G PublicUrvin ElIctric and G:s Company 80 Park Plaza, Newark, NJ 07101/ 201430 7000 MAILING ADDRESS / P.O. Box 97s,.tk;7 ark f(LD7 Lot,,

January 20, 1984 Mr.

R.

A.

Hartfield Chief, Management Information Branch Office of Resource Management United States Nuclear Regulatory Commission Washington, D.C.

20555

Dear Mr. Hartfield:

HOPE CREEK GENERATING STATION UNIT NO. 1 DOCKET NO. 50-354 LICENSE NO. CPPR-120 CONSTRUCTION STATUS REPORT AS OF DECEMBER 31, 1983 Attached is the construction status report for Hope Creek Unit 1 statused as of December 31, 1983.

very truly yours,

~,

P.-R.

H.

Landrieu Project Manager - Hope Creek Engineering and Construction HPC:srd Attachments CC:

Mr.

L.

E.

Tripp - IE, Region 1 8504150242 840606 PDR FOIA KILLEFE84-367 PDR M P 82 117/11 The Energy Peopc man a

CONSTRUCTION STATUS REPORT PAGE NO:

2-065 NUCLEAR POWER PLANTS HOPE CREEK 1 STATUS AS OF:

12/31/83 PLANT CHARACTERISTICS:

KEY PERSONNEL:

DOCKET NO:

05000354 CORPORATE CONTACT:

T. J. MARTIN - VICE PRESIDENT CP NO. & DATE ISSUED:

CPR-120 / 11/04/74 ENGINEERING AND CONSTRUCTION CP EXPIRATION DATE:

12/31/86 CORPORATE ADDRESS:

80 PARK PLAZA APPLICANT:

PUBLIC SERVICE ELECTRIC & GAS CO.

NEWARK, NEW JERSEY 07101 PLANT LOCATION:

IE REGION:

1 CORPORATE PHONE NO:

(201) 430-8316 AE BECHTEL NRC LPM:

D. WAGNER NSSS:

GENERAL ELECTRIC IE PRINCIPAL INSPECTOR:

CONTRACTOR:

BECH1EL

-CONSTRUCTION:

W. H. BATEMAN (RESIDENT INSPECTOR)

REACTOR TYPE:

BWR

-TEST AND STARTUP:

DER (MWE):

1067 IE RESIDENT INSPECTOR:

INSPECTION STATUS:

FUEL LOAD DATE CHANGES AS REPORTED BY UTILITY:

TIME PERIOD REPORT NEW REASON FOR CHANGE DATE SCHEDULE REPORTED BY UTILITY JULY 1983 - SEPTEMBER 1983 04-00-75 06-00-82 DELAY IN OBTAINING STATE OF NEW JERSEY COASTAL AREAS FACILITY PERMIT.

REPORT BEG DATE END DATE NUMBER OF INSP.

OF INSP.

05-00-76 12-00-82 REEVALUATION OF DELAY CAUSED BY N. J.

COASTAL AREAS FACILITY PERMIT.

83-13 08-18-83 10-16-83 83-16 10-17-83 12-04-83 10-00-76 11-00-83 RE-EXAMINATION OF THE EFFORT REQUIRED TO 83-17 12-20-83 12-23-83 CONSTRUCT THE PLANT.

02-00-80 11-00-84 NO REASON GIVEN.

08-00-80 06-00-86 LOWER THAN ANTICIPATED ELECTRICITY SALES GROWTH, CONTINUED INFLATION, AND RECESSIONARY TRENDS IN ECONOMY.

08-00-82 01-00-86 TARGET FUEL LOAD DATE.

LOCAL PUBLIC DOCUMENT ROOM:

SALEM FREE PUBLIC LIBRARY 112 WEST BROADWAY SALEM, NEW JERSEY 08079 M P83 11/04 1-sed a

CONSTRUCTION STATUS REPORT PAGE NO:

2-066 NUCLEAR POWER PLANTS HOPE CREEK I STATUS AS OF:

12/31/83 CONSTRUCTION STATUS:

APPLICANT'S CURRENT ESTIMATED ' FUEL LOADING DATE:

01-00-86 APPLICANTS CONSTRUCTION COMPLETION ESTIMATE AS' APPLICANT'S PREVIOUS ESTIMATED FUEL LOADING DATE:

11-00-84 DEFINED IN CP: (EARLIEST)

APPLICANT'S ESTIMATED FUEL LOADING DATE AT CP lSSUANCE:

06-00-81 (LATEST) 12-31-86 APPLICANT'S CURRENT ESTIMATED COMMERCIAL OPERATION DATE:

12-00-86 CURRENT ESTIMATED PERCENT CONSTRUCTION COMPLETE: 815 COMMENTS REGARDING CURRENT CONSTRUCTION STATUS: NONE 1

ESTIMATED ACTUAL ESTIMATED ACTUAL ESTIMATED i

START START COMPLETION COMPLETION

$ COMPLETE MOBILIZE AND PREPARE SITE:

02/76 03/76 08/77 08/77 1005 PLACE STRUCTURAL CONCRETE (REACTOR BLDG. TO RPV PEDESTAL):

07/77 08/77 10/79 09/79 1005 INSTALL REACTOR PRESSURE VESSEL:

11/80 11/80 12/80 12/80 1005 INSTALL LARGE BORE PROCESS PIPE:

04/79 04/79 07/85 965 79%

lNSTALL LARGE BORE PIPE HANGERS, RESTRAINTS, AND SNUBBERS:

04/79 04/79 06/85 605

' INSTALL SMALL BORE PIPES-12/81 07/81 08/85 99$

INSTALL CABLE TRAY:

08/79 08/79 07/85 INSTALL EXPOSED METAL CONOUlT:

09/81 05/81 07/85 755 INSTALL POWER, CONTROL, INSTRUMENTATION, AND SECURITY CABLE:

02/83 11/82 09/85 33%

20%

INSTALL ELECTRICAL TERMINATIONS:

03/83 02/83 11/85 CONDUCT REACTOR CODE HYDROSTATIC TEST:

04/85 05/85 05 Of 12/85 CONDUCT COLD FUNCTIONAL TEST:

12/85 05 01/86 CONDUCT PREOP AND ACCEPTANCE TESTS NECESSARY FOR FUEL LOAD:

09/85 M P83 11/04 2-srd