Forwards Updated Const Status Repts as of 831130
ML20127D413
Person / Time
Site: 05000000, Seabrook
Issue date: 02/03/1984
From: Devincentis J
PUBLIC SERVICE CO. OF NEW HAMPSHIRE
To: Hartfield R
NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
Shared Package
ML082170543 List: ... further results
References
FOIA-84-367 SBN-621, NUDOCS 8504150235
Download: ML20127D413 (6)


Text

i LOUEUC PUEBUC BERVICE se se sosin 4 om.

Companyof NewHampshire 1671 Worcose.r Rood Framingham, Mossochusetts 01701 (617) - 872 - 8100 February 3,1984 SBN-621 T.F. B4.4.2 United States Nuclear Regulatory Commission Washington, D. C. 20555 Attention:

Mr. R. A. Hartfield, Chief Management Information Branch Office of Management and Program Analysis Re ferences:

(a)

Construction Permits CPPR-135 and CPPR-136, Docket Nos. 50-443 and 50-444 Subjec t :

Construction Status Report : Seabrook Station Unit 1 and Unit 2

Dear Sir:

We have attached the Construction Status Report for the period ending November 30, 1983.

Very truly yours, YANKEE ATO IC ELECTRIC COMPANY J. DeVincentis Project Manager Attachment ec: Atomic Safety and Licensing Board Service List 8504150235 840606 PDR FOIA KILLEFEB4-367 PDR

CONSTRUCTIOO STATUS REPQRT PACE NO. 2-120 SEABROOK STATION !

NUCLEAR POWER PLANTS STATUS AS OF N u-30*93 CONSTRUCT, ION S T A T U S:

APPLICANT'S CURRENT tESTIMATED FUEL LOADING DATE:

09-30-84 APPLICANTS CONSTRUCTION COMPLETION ESTIMATE AS DEFINED IN APPLICANT'S PREVIOUS ESTIMATED FUEL LOADING DATE:

11-30-83 CP (EARLIEST) February, 1979 APPLICANT'S ESTIMATED FUEL LOADING DATE AT CP ISSUANCE:

08-01-81 (LATEST) June, 1983*

APPLICANT'S CURRENT ESTIMATED COMMERCIAL OPERATION DATE:

12-31-84 CURRENT E!!INATED PERCENT CONSTRUCTION C00eLETE: 84f $7%

C00eENTS RECARDING CURRENT CONSTRUCTION STATUS:

ESTIMATED ACTUAL.

ESTIMATED ACTUAL ESTIMATED START START C00fLETION COIFLETION Z C0bfLETE MOBILIZE AND PREPARE SITE:

7-76 8-77 100 1-PLACE STRUCTURAL COIICRETE:

9-77 8-83 99 Z INSTALL REACT 0E PRESSURE VESSEL:

5-81 5-81 100 1 INSTALL LARGE BORE PROCESS PIPE:

10-79 7-84

.34 1 $7 -

INSTALL IARCE BORE PIPE NAIIGERS, RESTRAINTS, AND SNUBBERS:

10-79 8-84 4f' I 7/

INSTALL SMALL BORE PIPE:

9-80 8-84 he I SF INSTALL CABLE TRAY:

9-79 12-83 De197-INSTALL EXPOSED IETAL COBIDUIT:

4-79 7-84 SW 1 INSTALL poler, CONTROL, INSTRUIENTATION, AND SECURITY CABLE:

5-81 7-84 MZ INSTALL ELECTRICAL TERNIIIATICIIS:

6-81 8-84 he Z CoeIDUCT REACTOR COLD NYDROSTATIC TEST:

4-84 4-84 0I CONDUCT NOT PutlCT100BAL TEST:

6-84 CoelDUCT PREOF AllD ACCEPTAIICE TESTS NECESSARY FOR FUEL LOAD:

8-84 01 11-82 9-84 eZ[

  • Request for eatension of construction permit latest construction completion d ta es submitted in Applicant Letter dated May 26, 1983. NRC approval pendin 2

a s

I e

d

e C0N5TRUCTION 5iATU5 REPORT PAGE N08 2-100 SEABROOK 1 HUCLEAR P0WER PLANT 5 STATUS A5 0Fs Oi 2: !ll

//- 10 -V.T PLAHT CHARACTERI5 TIC 5 KEY P E R 5 0 M N E Lt g,g N.y,gerar gya DOCKET N08 65000443 CP H0. 8 DATE ISSUED: CPPR-135/ 07-07-76 CORPORATE CONTACT

"^ ;. *^;^.m.

CHIEF EXEC. OFFICER CP EXPIRATIDH DATE:

06-30-83 1

CORPORATE ADDRE55:

1000 ELM STREET APPLICANT 4 PUGLIC SERVICE OF MEW HAMP5 HIRE PLANT LOCATION 8 le MI 5 0F PORTSMOUTH. HH MAHLHESTER. NEW HAMP5 HIRE 03:05 i

IE REGIOMs t

CORPORATE PHONE N0s (603) 669-4000 AEs UNITED ENG. 8 CONSTRUCTORS M5558 WESTINGHOUSE P

CONSTRUCTOR UNITED ENG. 8 CONSTRUCTORS HRC LPM 8

'.. ::: i:S Y.Nd82383 REACTOR TYPE:

PWR IE PROJECT INSPECTOR:

DER.tMWE)8 8198 IE RESIDENT IH5PECTOR8 A. C. CERHE I N 5 P E C T I O N.5 T A T U 58 FUEL L0AD DATE CHANGE 5 i

$dPT 1993 1 -- - ^ 2:2 -

2--

~ TIME PERIOD A5 REPORTED BY UTILITYs "002-DICs 1983 8

REPORT NEW REASON FOR CHANGE REPORT BEG DATE END DATE DATE SCHEDULE REPORTED BY UTILITY gpfg OF.INSP.

OF INSP.

wt 09-06-77 09-01-82 DELAYS DUE TO EPA REVERSAL OF PREVIOUS 05-04-8

..-oc 82-05 05-06-82 APPROVAL 0F ONCE THROUGH CIRCULATING WATER SYSTEM & SUBSEQ. NRC WITHDRAWAL OF 6-21-82

... :2-??

CONST PERMIT. 8 TIME REQ 70 REM 081LIZE 11-08-78 01-01-83 SCHEDULE REEVALUATIOH.

04-04-81 11-30-83 SCHEDULE REEVALUATIDH.

Inspection Reports are available at local PDRs.

  1. -30-F7. 09 70-8Y SdNe ut.E 8EEV4 W 4Dod

$3-15 o9-2.-23 to-14-23 2 3 - 16 og-27-93 o9-Jo-83 S3 -l'T io-i7-83 12-os-83 I

L0 CAL PU8LIC D0CUMENT R00Mt EXETER PUBLICiLIBRARY FRONT STREET 6 EXETER. NEW HAMPSHIRE 03883 l'

~

4 9

>[

t C0N5TRUCTION 5 T A T U.5 REP 0RT PACE N0s 2-102 i

SEABROOK 2 HUCLEAR POWER PLANTS STATUS AS OF 46=.44.=44 11-10-Et PLANT CHARACTERI5TICSt KEY PERS0NNELag,g,gjgggesg DOCKET N08 05000444' CORPORATE CONTACTS

". O.

7 2. r^2 ". PRESIDENT AND CH6V CP NO. 8 DATE ISSUED: CPPR-136/ 07-07-76 1000 ELM STREET pygc, oFried*g, CP EXPIRATION DATE:

10-31-84 CORPORATE ADDRE558 APPLICANT:

PUBLIC $ERVICE OF NEW HAMPSMIRE MANCHESTER. NEW HAMP5 HIRE 03105 PLANT LOCATION 8 10 MI S OF PORTSMOUTH. NN IE REGION:

1-CORPORATE PHONE N08 (6033 669-4000 AEs UNITED ENG. 8 CONSTRUCTCRS.

NS$$s WESTINGHOUSE CONSTRUCTOR 8 UNITED ENG. 8 CONSTRUCTORS HRC LPM by-WHEEtGR V.N4R.5d5 i

REACTOR TYPE 8 PWR IE PROJECT INSPECTOR:

]

l.

DER (MWE38 1898 IE,RESIDEJtT INSPECTOR:

A. C. CERNE l

IN5PECTION 5TATUS:

FUEL LOAD DATE CHAMGES TIME PERIOD A5 REP 0RTED 8 Y-UTILITYa

- San fit 3

  • m -me - *=r-nst-bec> 1923 s

REPORT HEW REASON FOR CHANGE REPORT BEG DATE END DATE l DATE

},Qigpjj,L,,E REPORTED BY UTILITY i

NUMBER OF INSP.

OF INSP.

4 I

99-06-77 09-01-84 DELAYS DUE TO EPA REVERSAL OF PREVIOUS l

as-a&-as APPROVAL OF ONCE THROUGH CIRCULATING j

as-;;

,3-se-ag e; :: !*

WATER SYSTEM & SUB5EO. HRC WITHDRAWAL'0F i

CON 5T PERMIT, a TINE REQ TO REMOBILIZE 11-08-78 11-01-84 SCHEDULE REEVALUATIDH.

04-04-88 02-28-86 SCHEDULE REEVALUATION.

Inspection Reports are available at local PDRs.

11-30-92 12-11-14 Sewaua Reevne.unnoW N.I 09-17.-83 10-154-23

+

g3 g3 06-to-83 0y-30-87 Senbuw Rewc.un noN 10-17-93 12-as-83 k

j L0 CAL PUBLIC.D0CUMENT R O O Mt EXETER PUOLIC LIBRARY FRONT STREET EXETER. NEW HAMPSHIRE 03883 l

J J

C0NSTRUCTION STATUS EEP0RT PACE NO. 2-122 SEABROOK STATION 2 NUCLEAR POWER PLANTS STATUS AS OP: 49 30m&3.

// =30 *O_1 C0NSTRUCTION 3 T A T U S:

APPLICANT'S CURRENT ESTIMATED PUEL LOADING DATE:

04-30-87 APPLICANTS CONSTRUCTION COMPLETION ESTIMATE AS DEFINED IN APPLICANT'S PREVIOUS ESTIMATED PUEL LOADING DATE:

12-31-86 CP: (EARLIEST) January,1981 APPLICANT'S ESTIMATED PUEL LOADING DATE AT CP ISSUANCE:

'10-01-83 (LATEST) October, 1984*

APPLICANE'S CURRENT ESTIMATED COISERCIAL OPERATION DATE:

07-31-87 CURRENT ESTIMATED PERCENT CONSTRUCTION ColeLETE:.368 QN C0091ENIS RECARDING CURRENT CONSTRUCTION STATUS:

ESTIMATED ACTUAL ESTIMATED ACTUAL ESTIMATED START START C0teLETION COMPLETIOtt 1 COMPLETE MOSILIZE AND PREPARE SITE:

7-76 8-77 100 1 PLACE STRUCTURAL CollCRETE:

8-81 5-86 M%M INSTALL REACTOR PRESSURE VESSEL:

) 44

/O*f3 3-84

  1. % d/o INSTALL LARGE BORE PROCESS PIPE:

9-82 10-86 4%

INSTALL IARCE BORE PIPE HANGERS, RESTRAINIS, AND SNUBBERS:

9-82 11-86 2%

' INSTALL SMALL BORE PIPE:

7-84 10-86 0%

INSTALL CABLE TRAY:

1-84 1-86 01 INSTALL EXPOSED METAL CONDUIT:'

4-84 9-86 0%

INSTALL POWER, COIITROL, INSTRUINENTATION, AND SECURITY CABLE:

9-84 9-86 0%

INSTALL ELECTRICAL TERMINATI0 TIS:

10-84 10-86 01 CONDUCT REACTOR COLD HYDROSTATIC TEST:

11-86 12-86 0%

CONDUCT HOT FUNCTICIIAL TEST:

1-87 2-87 0%

CONDUCT PREOP AND ACCEPTANCE TESTS NECESSARY FOR FUEL LOAD:

3-85 11-86 0%

  • R1 quest for extension of construction permit latest construction completion dates submitted in Applicant Letter dated May 26, 1983. NRC approval pending.

O

)

i l

m

William S. Jordan, III, Esquire Brentwood Board of Selectmen Harmon & Weiss RED Dalton Road 1725 I Street, N.W. Suite 506 Brentwood, New Hampshire 03833 Washington, DC 20006 Roy P. Lessy, Jr., Esquire Office of the Executive Legal Director Edward F. Meany U.S. Nuclear Regulatory Commission Designated Representative of Washington, DC 20555 the Town of Rye 155 Washington Road Robert A. Backus, Esquire Rye, NH 03870 116 Lowell Street P.O. Box 516 Calvin A. Canney Mancehster, NH 03105 City Manager City Hall Philip Ahrens, Esquire 126 Daniel Street Assistant Attorney General Portsmouth, NH 03801 Department of the Attorney General Augusta ME 04333 Dana Bisbee, Esquire Assistant Attorney General Mr. John B. Tanzer Office of the Attorney General Designated Representative of 208 State House Annex the Town of Hampton Concord, NH 03842 5 Morningside Drive Hampton, NH 03842 Anne Verge, Chairpersen Board of Selectmen Roberta C. Pevear Town Hall Designated Representative of South Hampton, NH 03842 the Town of Hampton Falls Drinkwater Road Patrick J. McKeon Hampton Falls, NH 03844 Selectmen's Office 10 Central Road Mrs. Sandra Gavutis Rye, NH 03870 Designated Representative of the Town of Kensington Carole F. Kagan, Esq.

RFD 1 Atomic Safety and Licensing Board Panel East Kingston, NH 03827 U.S. Nuclear Regulatory Commission Jo Ann Shotwell, Esquire Assistant Attorney General Mr. Angie M chiros a

Environmental Protection Bureau Chairman of the Board of Selectmen Department of the Attorney General Town of Newbury One Ashburton Place, 19th Floor Newbury, MA 01950 Boston, MA 02108' Town Manager's Office Senator Gordon J. Humphrey Town Hall - Friend Street U.S. Senate Amesbury, Ma, 01913 Washington, DC 20510 (Attn: Tom Burack)

Senator Gordon J. Humphrey 1 Pillsbury Street Diana P. Randall Concord, NH 03301 70 Collins Street (Attn: Herb Boynton)

SEabrook, NH 03874 Richard E. Sullivan, Mayor Donald E. Chick City Hall Town Manager Newburyport, MA 01950 Town of Exeter 10 Front Street Exeter, NH 03833 O

,