Cp&L Carolina Power & Light Company JAN 271983 Mr. R. A. Hartfield, Chief Management Information Branch Office of Management and Program; Analysis United States Nuclear Regulatory Commission Washington, D.C.

20555 SHEARON HARRIS NUCLEAR POWER PLANT UNIT NOS. 1 AND 2 DOCKET NOS. 50-400 AND 50-401 CONSTRUCTION STATUS REPORT

Dear Mr. Hartfield:

Carolina Power & Light Company hereby submits, as requested for NUREG-0030 (Construction Status Report), the updated Shearon Harris Nuclear Power Plant construction information f or the fourth quarter of 1982, to reflect the construction status data aa of December 31, 1982.

Yours ver>y truly, S.

immerman Manager Licensing & Permits PS/kjr (6068C10TS)

Attachment cc:

Mr. N. Prasad Kadambi (NRC)

Mr. G. F. Maxwell (NRC-SHNPP)

Mr. J. P. O'Reilly (NRC-RII) 8504150219 840606 hE

-367 PDR 411 Fayetteville Street

  • P. O. Box 1551
  • Raleigh, n' C. 27602 L

C0NSTRUCTION STATUS REPORT PAGE NO. : 1 HARRIS l NUCLEAR POWER PLANTS STATUS AS OF: 12/31/82 PLANT' CHARACTERISTICS:

KEY PERSONNEL:

000(ET NO:

05000400 CORPORATE CONTACT:

M. A. MCDtFFIE, SEN.' V. PRESIDENT CP NO. & DATE ISSUED:

CPR-158 / 01-27-78 CORPORATE ADORESS:

ENGINEERING & CONSTRUCTION CP EXPIRATION DATE:

06-01-84 411 F AYETTEVILLE STREET APPLICANT :

CAROLINA POWER & LIGHT RALEIGH, NORTH CAROLINA 27602 PLANT LOCATION:

NEW H I LL, NC IE REGION:

1i CORPORATE PHONE NO:

(919) 836-6663 AE ERASCO NRC LFW:

IRAS#.D KADAM81 NSSS:

WESTINGHOUSE IE PRINCIPAL INSPECTOR:

CONSTRUCTOR :

DANIEL INTERNATIONAL

-CONSTRUCTION :

REACTOR TYPE PWR

-TEST AND STARTUP:

DER (NWEls 900 IE RESIDENT INSPECTOR :

G., F. MAXWELL lNSPECTION S T A T U S:

FUEL LOAD DATE CHANGES AS REPORTED BY UTILITY:

TIME PERIOD REPORT NEW REASON FOR CHANGE REPORT.

BEG DATE END DATE DATE SCHEDULE REPORTED BY UTILITY NtM BER OF iNSP.

OF iNSP.

05-07-75 06-01-83 REVISED CURRENT ENERGY AND LOAD FORECAST.

09-08-8t.'

06-00-84 LOWER RATE GROWTH IN CUSTOMER DEMAND THAN PROJECTED.

12-16-81 12-00-84 LOWER RATE GROWTH IN CUSTOMER DEMAND THAN PROJECTED.

09-30-82 05-00-85 12-31-82 061-00-85 LOCAL PUBL1C DOCUMENT ROOM:

I CAKE COUNTY PUBLIC LilRARY 104 F AYETTEVILLE STREET RALElGH, NOHTH CAROLINA 27601

m C0NSTRUCTl0N ' STATUS REPORT-PAGE NO.: 2 HARRIS'1.

'N ti C L E A R POWER PLANTS STATUS AS'0F: 12/31/82

-C 0 N S T R U C T l O'N 5TATUS:

APPLICANT'S CURRENT ESTMATED FUEL LOADING DATE:

06-00-85 APPLICANT'S CONSTRUCTION CWLETl'A ESTMATE AS APPLICANT'S PREvl005 ESTINATED FUEL LOADING DATE:

12-00-84 DEFINED IN CP: (EARLIEST)

APPLICANT'S ESTMATED FUEL' LOADING DATE AT CP M91ANCE:

09-00-80 (LATEST)

FPLICANT'S CURRENT ESTINATED COMMERCI AL OPERATION DATE: 03-01-86 CURRENT ESTMATED PERCENT CONSTRL", TION CMLETE: 765 C(MMENTS REGARDING CLARENT CONSTRUCTION STATUS:

i l

ES T M ATED ACTUAL EST MATED ACTUAL EST MATED jiTART START COWLETION C00FLET10N

$ COWLETE

' NOBILIZE AND PREPARE SITE:

01-14-74 01-14-74 01-28-78 01-28-78 1005 PLACE STRUCTLRAL CONCRETE:

01.'8-78 01-28-78 02-01-84 925

' lHSTALL REACTOR PRESSURE WESSEL:

12-On-79 04-15-80 04-01-80 08-29-80 1005

' INSTALL LARGE BORE PROCESS PIPE:

04-01-YS 04-01-79 08-01-84.

715 lNSTALL LARGE BDRE PIPE HANGERS, RESTRAINTS AND SNUBBERS:

04-01-79 04-01 11-01-83 555 INSTALL SNALL 60RE PIPE:

04-01-79 04-01-79 08-01-84 6 25 INSTALL CABLE TRAY 04-01-79 04-01-79 04-01-84 92%

INSTALL EXPOSED NETAL CONDUlT:.

04-01-79 04-01-79 04-01-84 695 lNSTALL POWER, CONTROL, INSTRLMENTATION AND SECtRITY CAELE:

03-01-81 02-26-81 06-01-84 37%

INSTALL ELECTRICAL TERNINATIONS:

01-01-82 06-15-81 12-01-84 315 CONDUCT REACTOR COLD HYDROSTATIC TEST:

05-01-84 06-01-84 05 CONOLET HOT FUNCTIONAL TEST:

08-01-84 10-01-84 Of

' CONDUCT PREOP AND ACCEPTANCE TEST NECCSSARY FOR FUEL LOAD:

06-01-83 12-01-84 0%

  • RPV set; exclude Internals and head ' package, r

4

CONSTRUCTION 3TATUS REPORT PAGE NO.: 3 HARRIS 2 NUCLEAR POWER PLANTS STATUS AS OF 12/31/82 PLANT CHARACTERISTICS:

KEY PERSONNEL:

DOCKET NO:

05000401 CORPORATE CONTACT:

M. A. MCDUFFIE, SEN. V. PRESIDENT

. CP NO. & DATE ISSUED:

CPR-159 / 01-27-78 CORPORATE ADORESS:

ENGINEERING & CONSTRUCTION CP EXPIRATION DATE:

06-01-86 411 FAYETTEVILLE STREET APPLICANT:

CAROLINA POWER & LIGHT RALElGH, NORTH CAROLINA 27602 PLANT LOCATION:

NEW HILL, NC IE REGION:

Il CORPORATE PHONE NO:

(919) 836-6663

' AE:

EBASCO NRI.; LPM:

PRASAD KADAMBI NSSS:

WESTINGHOUSE IE PRINCIPAL INSPECTOR:

CONSTRUCTOR:

DANIEL INTERNATIONAL

-CONSTRUCTION:

. REACTOR TYPE PWR

-TEST AND STARTUP:

DER NWE):

900 IE RESIDENT INSPECTOR :

G. F. MAMWELL 1NSPECTl ON'

'S T A T U S:

FUEL L0AD DATE CHANGES AS REPORTED 8Y UTIL1TY:

TIME PERIOD REPORT NEW REASON FOR CHANGE REPORT BEG DATE END DATE DATE SCHEDULE REPORTED BY UTILITY NU4 ER OF INSP.

OF INSP.

05-07-75 06-01-85 REVISED CURRENT ENERGY AND LOAD FO'1ECAST.

01-00-80 06-01-86 REVISED CURRENT ENERGY AND LOAD FORECAST.

09-08-80 06-01-87 SLOWER RATE GROWTH IN CUSTOMER DEMAND THAN PROJECTED.,

12-16-81 06-01-88 EXPANDED CONSERVATION AND LOAD MANAGEMENT PROGRAN.

09-30-82 UNDER REVIEW 12-31-82 06-00-89 LOCAL PUBL1C DOCUMENT ROOM:

CAKE COUNTY PUBLIC LIBRARY 104 FAYETTEVILLE STREET CALEIGH,

  • NTH CAROLINA 27601 6

m CONSTRUCTION STATUS REPORT PAGE NO. :' '4 HARRIS 2 NUCLEAR POWER PLANTS STATUS AS OF: '9/30/82 CONSTRUCTION STATUS:

APPLICANT'S CURRENT ESTMATED FUEL LOADING DATE:

06-00 APPLICANT'S CONSTRUCTION CWLETION ESTMATE AS

^ #2PLICANT'S PREVIOUS ESTIMATED FUEL LOADING DATE:

06-01-88 DEFINED IN CP: (EARLIEST)

APPLICANT'S ESTNATED FUEL LOADING DATE AT CP ISSUANCE:

06-01-85 (LATEST)

APPLICANT'S CLRRENT. ESTIMATED COMIAL OPERATION DATE: 03-00-90 CURRENT ESTMATED PERCENT CONSTRUCTION CWLETE: 45 C044ENTS REGARDING CURRENT CONSTRUCTION STATUS:

EST M ATED ACTUAL EST Mt.TED ACTUAL ESTib,ATED START START COWLETION COWLETION 5 CowtETE hiOBILIZE AND PREPARE SITE:

01-14-74 01-14-74 01-28-78 01-28-78 100%

PLACE STRUCTtRAL CONCRETE:

02-01-79 02-01-79 04-01-86 315 lNSTALL REACTOR PRESSURE WESSEL:

09-01-85

.01-01-86 Of INSTALL LARGE BORE PROCESS PIPE:

06-01-79 06-01-79 02-01-87 135 INSTALL LARGE BORE PIPE HANGERS, RESTRAINTS AND SNUBBERS:

07-01-82 07-On-82 02-01-88 0%-

lNSTALL SNALL BORE PIPE:

06-01-79 06-01-79 02-01-88 4%

INSTALL CABLE TRAY 04-08-85 10-01-87 05 lNSTALL EXPOSED NETAL CONDulT:

04-01-85 10-01-87 35 lNSTALL POWER, CONTROL, INSTRtMENTATION AND SECLRITY CAS.E:

06-01-85 03-01-88 0%

lNSTALL ELECTRICAL TERMINAT10NS:

08-01-85 04-01-88 05 CONDUCT REACTOR COLD HYDROSTATIC TEST:

11-01 12-01-87 Of CONDLCT HOT FUNCTIONAL TEST:

02-01-88 04-01-88 05 CONOUCT PREOP AND ACCEPTANCE TEST NECESSARY FOR FUEL LOAD:

12-01-86 06-01-88 0%

e

-