ML20127D392
Text
-
Cp&L Carolina Power & Light Company JAN 271983 Mr. R. A. Hartfield, Chief Management Information Branch Office of Management and Program; Analysis United States Nuclear Regulatory Commission Washington, D.C.
20555 SHEARON HARRIS NUCLEAR POWER PLANT UNIT NOS. 1 AND 2 DOCKET NOS. 50-400 AND 50-401 CONSTRUCTION STATUS REPORT
Dear Mr. Hartfield:
Carolina Power & Light Company hereby submits, as requested for NUREG-0030 (Construction Status Report), the updated Shearon Harris Nuclear Power Plant construction information f or the fourth quarter of 1982, to reflect the construction status data aa of December 31, 1982.
Yours ver>y truly, S.
immerman Manager Licensing & Permits PS/kjr (6068C10TS)
Attachment cc:
Mr. N. Prasad Kadambi (NRC)
Mr. G. F. Maxwell (NRC-SHNPP)
Mr. J. P. O'Reilly (NRC-RII) 8504150219 840606 hE
-367 PDR 411 Fayetteville Street
- P. O. Box 1551
- Raleigh, n' C. 27602 L
C0NSTRUCTION STATUS REPORT PAGE NO. : 1 HARRIS l NUCLEAR POWER PLANTS STATUS AS OF: 12/31/82 PLANT' CHARACTERISTICS:
KEY PERSONNEL:
000(ET NO:
05000400 CORPORATE CONTACT:
M. A. MCDtFFIE, SEN.' V. PRESIDENT CP NO. & DATE ISSUED:
CPR-158 / 01-27-78 CORPORATE ADORESS:
ENGINEERING & CONSTRUCTION CP EXPIRATION DATE:
06-01-84 411 F AYETTEVILLE STREET APPLICANT :
CAROLINA POWER & LIGHT RALEIGH, NORTH CAROLINA 27602 PLANT LOCATION:
1i CORPORATE PHONE NO:
(919) 836-6663 AE ERASCO NRC LFW:
IRAS#.D KADAM81 NSSS:
WESTINGHOUSE IE PRINCIPAL INSPECTOR:
CONSTRUCTOR :
DANIEL INTERNATIONAL
-CONSTRUCTION :
REACTOR TYPE PWR
-TEST AND STARTUP:
DER (NWEls 900 IE RESIDENT INSPECTOR :
G., F. MAXWELL lNSPECTION S T A T U S:
FUEL LOAD DATE CHANGES AS REPORTED BY UTILITY:
TIME PERIOD REPORT NEW REASON FOR CHANGE REPORT.
BEG DATE END DATE DATE SCHEDULE REPORTED BY UTILITY NtM BER OF iNSP.
OF iNSP.
05-07-75 06-01-83 REVISED CURRENT ENERGY AND LOAD FORECAST.
09-08-8t.'
06-00-84 LOWER RATE GROWTH IN CUSTOMER DEMAND THAN PROJECTED.
12-16-81 12-00-84 LOWER RATE GROWTH IN CUSTOMER DEMAND THAN PROJECTED.
09-30-82 05-00-85 12-31-82 061-00-85 LOCAL PUBL1C DOCUMENT ROOM:
I CAKE COUNTY PUBLIC LilRARY 104 F AYETTEVILLE STREET RALElGH, NOHTH CAROLINA 27601
m C0NSTRUCTl0N ' STATUS REPORT-PAGE NO.: 2 HARRIS'1.
'N ti C L E A R POWER PLANTS STATUS AS'0F: 12/31/82
-C 0 N S T R U C T l O'N 5TATUS:
APPLICANT'S CURRENT ESTMATED FUEL LOADING DATE:
06-00-85 APPLICANT'S CONSTRUCTION CWLETl'A ESTMATE AS APPLICANT'S PREvl005 ESTINATED FUEL LOADING DATE:
12-00-84 DEFINED IN CP: (EARLIEST)
APPLICANT'S ESTMATED FUEL' LOADING DATE AT CP M91ANCE:
09-00-80 (LATEST)
FPLICANT'S CURRENT ESTINATED COMMERCI AL OPERATION DATE: 03-01-86 CURRENT ESTMATED PERCENT CONSTRL", TION CMLETE: 765 C(MMENTS REGARDING CLARENT CONSTRUCTION STATUS:
i l
ES T M ATED ACTUAL EST MATED ACTUAL EST MATED jiTART START COWLETION C00FLET10N
$ COWLETE
' NOBILIZE AND PREPARE SITE:
01-14-74 01-14-74 01-28-78 01-28-78 1005 PLACE STRUCTLRAL CONCRETE:
01.'8-78 01-28-78 02-01-84 925
' lHSTALL REACTOR PRESSURE WESSEL:
12-On-79 04-15-80 04-01-80 08-29-80 1005
' INSTALL LARGE BORE PROCESS PIPE:
04-01-YS 04-01-79 08-01-84.
715 lNSTALL LARGE BDRE PIPE HANGERS, RESTRAINTS AND SNUBBERS:
04-01-79 04-01 11-01-83 555 INSTALL SNALL 60RE PIPE:
04-01-79 04-01-79 08-01-84 6 25 INSTALL CABLE TRAY 04-01-79 04-01-79 04-01-84 92%
INSTALL EXPOSED NETAL CONDUlT:.
04-01-79 04-01-79 04-01-84 695 lNSTALL POWER, CONTROL, INSTRLMENTATION AND SECtRITY CAELE:
03-01-81 02-26-81 06-01-84 37%
INSTALL ELECTRICAL TERNINATIONS:
01-01-82 06-15-81 12-01-84 315 CONDUCT REACTOR COLD HYDROSTATIC TEST:
05-01-84 06-01-84 05 CONOLET HOT FUNCTIONAL TEST:
08-01-84 10-01-84 Of
' CONDUCT PREOP AND ACCEPTANCE TEST NECCSSARY FOR FUEL LOAD:
06-01-83 12-01-84 0%
- RPV set; exclude Internals and head ' package, r
4
CONSTRUCTION 3TATUS REPORT PAGE NO.: 3 HARRIS 2 NUCLEAR POWER PLANTS STATUS AS OF 12/31/82 PLANT CHARACTERISTICS:
KEY PERSONNEL:
DOCKET NO:
05000401 CORPORATE CONTACT:
M. A. MCDUFFIE, SEN. V. PRESIDENT
. CP NO. & DATE ISSUED:
CPR-159 / 01-27-78 CORPORATE ADORESS:
ENGINEERING & CONSTRUCTION CP EXPIRATION DATE:
06-01-86 411 FAYETTEVILLE STREET APPLICANT:
CAROLINA POWER & LIGHT RALElGH, NORTH CAROLINA 27602 PLANT LOCATION:
NEW HILL, NC IE REGION:
Il CORPORATE PHONE NO:
(919) 836-6663
' AE:
EBASCO NRI.; LPM:
PRASAD KADAMBI NSSS:
WESTINGHOUSE IE PRINCIPAL INSPECTOR:
CONSTRUCTOR:
DANIEL INTERNATIONAL
-CONSTRUCTION:
. REACTOR TYPE PWR
-TEST AND STARTUP:
DER NWE):
900 IE RESIDENT INSPECTOR :
G. F. MAMWELL 1NSPECTl ON'
'S T A T U S:
FUEL L0AD DATE CHANGES AS REPORTED 8Y UTIL1TY:
TIME PERIOD REPORT NEW REASON FOR CHANGE REPORT BEG DATE END DATE DATE SCHEDULE REPORTED BY UTILITY NU4 ER OF INSP.
OF INSP.
05-07-75 06-01-85 REVISED CURRENT ENERGY AND LOAD FO'1ECAST.
01-00-80 06-01-86 REVISED CURRENT ENERGY AND LOAD FORECAST.
09-08-80 06-01-87 SLOWER RATE GROWTH IN CUSTOMER DEMAND THAN PROJECTED.,
12-16-81 06-01-88 EXPANDED CONSERVATION AND LOAD MANAGEMENT PROGRAN.
09-30-82 UNDER REVIEW 12-31-82 06-00-89 LOCAL PUBL1C DOCUMENT ROOM:
CAKE COUNTY PUBLIC LIBRARY 104 FAYETTEVILLE STREET CALEIGH,
- NTH CAROLINA 27601 6
m CONSTRUCTION STATUS REPORT PAGE NO. :' '4 HARRIS 2 NUCLEAR POWER PLANTS STATUS AS OF: '9/30/82 CONSTRUCTION STATUS:
APPLICANT'S CURRENT ESTMATED FUEL LOADING DATE:
06-00 APPLICANT'S CONSTRUCTION CWLETION ESTMATE AS
^ #2PLICANT'S PREVIOUS ESTIMATED FUEL LOADING DATE:
06-01-88 DEFINED IN CP: (EARLIEST)
APPLICANT'S ESTNATED FUEL LOADING DATE AT CP ISSUANCE:
06-01-85 (LATEST)
APPLICANT'S CLRRENT. ESTIMATED COMIAL OPERATION DATE: 03-00-90 CURRENT ESTMATED PERCENT CONSTRUCTION CWLETE: 45 C044ENTS REGARDING CURRENT CONSTRUCTION STATUS:
EST M ATED ACTUAL EST Mt.TED ACTUAL ESTib,ATED START START COWLETION COWLETION 5 CowtETE hiOBILIZE AND PREPARE SITE:
01-14-74 01-14-74 01-28-78 01-28-78 100%
PLACE STRUCTtRAL CONCRETE:
02-01-79 02-01-79 04-01-86 315 lNSTALL REACTOR PRESSURE WESSEL:
09-01-85
.01-01-86 Of INSTALL LARGE BORE PROCESS PIPE:
06-01-79 06-01-79 02-01-87 135 INSTALL LARGE BORE PIPE HANGERS, RESTRAINTS AND SNUBBERS:
07-01-82 07-On-82 02-01-88 0%-
lNSTALL SNALL BORE PIPE:
06-01-79 06-01-79 02-01-88 4%
INSTALL CABLE TRAY 04-08-85 10-01-87 05 lNSTALL EXPOSED NETAL CONDulT:
04-01-85 10-01-87 35 lNSTALL POWER, CONTROL, INSTRtMENTATION AND SECLRITY CAS.E:
06-01-85 03-01-88 0%
lNSTALL ELECTRICAL TERMINAT10NS:
08-01-85 04-01-88 05 CONDUCT REACTOR COLD HYDROSTATIC TEST:
11-01 12-01-87 Of CONDLCT HOT FUNCTIONAL TEST:
02-01-88 04-01-88 05 CONOUCT PREOP AND ACCEPTANCE TEST NECESSARY FOR FUEL LOAD:
12-01-86 06-01-88 0%
e
-