Forwards Updated Const Status Repts as of 831231.Info for Inclusion in NUREG-0030
ML20127D331
Person / Time
Site: 05000000, Catawba
Issue date: 02/20/1984
From: Tucker H
DUKE POWER CO.
To:
NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
Shared Package
ML082170543 List: ... further results
References
FOIA-84-367, RTR-NUREG-0030, RTR-NUREG-30 Y, NUDOCS 8504150178
Download: ML20127D331 (5)


Text

. - _.

i d

DUKE POWER GOMPANY P.O. Isox 33189 CHARLOTTE, N.C. 28242 HAL B. TUCKER TELEPHONE

== e.

.e.,

(704)373 453 February 20, 1984 1

Chief, Management Information Branch Office of Resource Management U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Re: Catawba Nuclear Station Units 1 and 2 Docket Nos. 50-413 and 50-414

Dear Sir:

Attached please find Fourth Quarter,1983 Yellowbook (NUREG-0030) updates for the above referenced units. This update reflects the status of construction as of December 31,1983.

Very truly yours, C

/Ye Hal B. Tucker ROS/php Attachment cc: Mr. W. H. Lovelace Office of Resource Management U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Dr. K. N. Jabbour Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D. C. 20555 i

i 0504150178 840606 PDR FOIA KILLEFEe4-367 PDR

C0MSTRUCTIOM

$TATUS REPORT PAGE Not 2-018 CATAW94 I-NUCLEAR POWER PLANTS STATUS AS OFr ;; ;; -

t t -3 #-f l CHARACTERI$ThC5 KEY PERS0NNEL PLANT DOCKET NO:

95008413 CORPORATE CONTACT:

H.B. TUCKER. VICE PRESIDENT HUCLEA PRODUCTION. DUKE POWER Co.

CP MO. 8 DATE ISSUED: CPR-tt6 / 88-07-75 CP EXPIRATION DATE:

86-81-81 CORPORATE ADDRESS:

PB 33139, 422 S. CHRUCH STREET CIIARLOTTE. NORTH CAROLINA. 28242 APPLICANT:

DUKE POWER

. PLANT LOCATION:

6 MI MHW OF ROCK HILL SC CORPORATE PHONE NO:

(704) 373-4531 IE RECIDM 2

AE DUKE POWER MSSS:

WESTINGHOUSE CONSTRUCTOR:

DUKE POWER NRC LPM:

K. JABBOUR IE PROJECT INSPECTOR:

REACTOR TYPE:

PWR IE RESIDENT INSPECTOR:

K. VAN DOORN DER (MWE):

1845 IN$PECTIOM STATU5:

FUEL L0AD DATE CHANGES TIME PERIOD A5 REPORTED BY UTILITY Apr. 1982 - Jun. 1982 REPORT MEW REASON FOR CHANGE REPORT BEG DATE END DATE RATE SCHF.DULE REPORTED BY UTILITY NUMBER OF INSP.

OF INSP.

09-27-74 08-00-80 CONSTRUCTION DELAYS DUE TO CRITICAL 8208 84-05 04-08-82 CONDITIONS EXISTING IN THE FItIAt:CIAL 8209 04-13-82 04-16-82 Mr.R K E T S.

8211 84-26-82 04-27-82 05-00-77 09-00-80 REVISED LOAD FORECASTS.

82f2 05-25-82 85-28-82 03-00-78 02-00-89 PROJECTED LDAD FORECAST.

8213 84-26-82 05-25-82 01-00-80 06-00-83 HD REASON REPORTED.

8294 96-08-82 06-II-82 05-01-80 04-00-83 NO REASON REPORIED.

8215 06-08-82 06-19-82 08-00-80 03-00-83 MAJOR UNIT RESCHEDULE.

05-00-82 11-08-84 HD REASON REPORTED.

Inspection reports are available at local PDRs.

08-00-82 10-00-84 REASSESSMENT OF SCOPE OF REMAINING WORK.

1 L0 CAL PUBLIC D0CUMENT R00M YORK COUNTY LIBRARY 325 SOUTH OAKLAND AVENUE ROCK HILL SOUTH CAROLINA 29739 9

i W*

.-,=+e..-4espes*=W

C0N5TRUCTION

$TATUS REPORT PAGE NO: 2-019 -

CATAWBA I NUCLEAR P0WER PLANT $

STATUS AS GF: 7 :: -'

12-1/-&

C0N$TRUCTION 5TATU5 APPLICANT'S CURRENT ESTIMATED FUEL LOADING DATE:

W 34 APPLICANTS CONSTRUCTION COMPLETION ESTIMATE AS APPLICANT'S PREVIOUS ESTIMATED FUEL LOADING DATE:

/snee-0 0-MM DEFINED IN CP: (EARLIEST)

APPLICANT'S ESTIMATED FUEL LOADING DATE AT CP ISSUANCE:

12-00-73 (LATEST)-

APPLICANT'S CURRENT ESTIMATED C0f1 MERCI AL OPERATION DATE: 06-00-85 CURRENT ESTIMATED PERCENT CONSTRUCTION COMPLETE: M. pf f, COMMENTS REGARDING CURRENT CONSTRUCTION STATUS: STATUS IS NOT REPORTED FOR PIPING ON THE BASIS OF PIPE SIZE.

STATUS IS NOT RECORDED FOR CABLE TRAY OR EXPOSED NEIAL CONDUIT.

sMTMS E5 heeY-REco6GED FOK FLElb 1.ocArt-D PrPC &GEA S T

ESTIMATED ACTUAL ESTIMATED ACTUAL ESTIMATED

$ TART

$ T A R L, gr1P_L QIOf{

Q tjP_L E U M 3_CQt1P M MOBILIZE AND PREPARE SITE:

05-86-14 05-16-14 10-08-76 04-01-76 100:

PLACE STRUCTURAL CONCRETE:

04-01-76 04-05-76 ff-21-f3 m r**

INSTALL REACTOR PRESSURE VESSEL:

06-01-78 06-09-78 07-13-78 07-13-78 100%

qqr-**- 64 INSTALL LARGE BORE PROCESS PIPE:

04-01-77 04-08-77

- :" 0; M i?

y "so-44 INSTALL LARGE BORE PIPE NANGERS. RESTRAINTS AND SHUBBERS:

11-01-78 11-01-78 2.

1 C '.

JM9y INSTALL SMALL BORE PIPE 8 N/A N/A N/A N/A N/A INSTALL CABLE TRAY:

N/A N/A N/A N/A N/A INSTALL EXPOSED METAL CONDUIT:

N/A N/A N/A N/A N/A 04 00 =34 INSTALL PCWER. CONTROL. INSTRUMENTATIDH AND SECURITY CABLE:

08-01-78 08-21-78 40-et-99 pr! 72, INSTALL ELECTRICAL TERMINATIONS:

09-08-78 10-06-78

-tir: Ty CONDUCT REACTOR COLD HYDROSTATIC TEST:

OTAe500-h($3 6*d-I3 n-88' N X/ao

~

i CONDUCT NOT FUNCTIONAL TESTS (LpI-00-M93 N-Pf f3 W k

.M-teo

  • $= 00 44 CONDUCT PREOP AND ACCEPTANCE TESTS NECESSARY FOR FUEL IDAD:

N p(4f5

[

~T C0N5TRUCTION 5TATUS REPORT PAGE NO: 2-820 COTAWBA 2 NUCLEAR POWER PLANT 5 STATUS A5 0F 4

[].

PLANT C H A R A C T E R I 5 T I C 5:

KEY P E R-5 0 N N E La DOCKET NO:

85800414 CORPORATE CONTACT:

H. B. TUCKER. VICE PRESIDENT CP MD. 8 DATE ISSUED: CPR-st7 / 88-87-75 NUCLEAR PRODUCTION. DUKE POWER CO.

CP EXPIPAIION DAIE:

06-08-82 CORPORATE ADDRESS:

PB 33189. 422 S. CHURCN STREET APPLICANT:

DUKE POWER CHARLOTTE. NORTH CAROLINA 28242 PLANT LOCAIIGN:

6 MI NWA 0F ROCK HILL. SC IE REGION:

2 CORPORATE PHONE NO:

(704) 373-4531 AE DUKE F-0WER NSSS:

WES T IriGIIOUSE CONSTRUCTOR:

Dt!KE PouER NRC LPM:

K. JABSOUR REACTOR TYPE:

PW*

IE PROJECT INSPECTOR:

DER tit!E):

1845 IE RESIDENT INSPECTOR:

K. VAN DOORN IN5PECTIOH 5 T A T U 5:

FUEL L0AD DATE CHANGE 5 TIME PERIOD A5 REPORTED BY UTILITYa Apr. 198? - Jun. 198{

REPORT NEW REASON FOR CHANCE REPORY BEG DATE END DATE DATE 11H_EDULE REPORTED BY tfTitITY i

HEUP_RK OF INSP.

OF INSP.

89-27-74 08-00-81 CONSTRUCTION DELAYS DUE TO CRITICAL 8208 05-25-82 85-28-82 CONDITIONS EXISTING IN THE FINANCI AL 8209 04-26-82 04-27-82 MARKETS.

8210 04-26-82 05-25-82 05-00-77 08-08-82 REVISED LOAD FORECASTS.

8211 06-08-82 06-11-82 03-05-80 10-00-84 NO REASON GIVEN.

8212 06-08-82 06-88-82 08-00-80 02-00-85 MAJOR UNIT RESCHEDULE.

05-08-82 03-00-87 NO REASON PROVIDED.

Inspection reports are available at local PDRs.

08-00-82 10-00-86 REASSESSMENT OF SCOPE OF REMAINING WORK.

I L0 CAL PUBLIC D0CUMENT R00M YORK COUNTY LIBRARY 325 50UTil DAKL AND AVENUE ROCK llILI. SOUTH CAROLINA 29730

C0N5iRUCT I0N 5TATUS REPORT PAGE NO: 2-025 CATAl?BA 2 NUCLEAR POWER PLANT 5 STATUS AS OFI

" ;; ;$3 1 1 CDH5TRUCT I0N 5 T A T U 5

ArPLICAt:T'S CURRFMT ESTIMtTED TUrt LOADING DATE:

10-00-86 APPLICANTS CONSTRUCTIDH COMPLETION ESTIMATE AS ArrLICAN1'S PRLVIOUS F5117.l.IED FUEL LCACING Dr.TE:

02-00-85 DEFINED IN CP: (EARLIEST) firLICANT*5 ESTI*1ATED FUEL LOADING DATE AT CP I3SUANCE:

12-00-79 (LATEST)

APPLICUlT'S CURREMT ESTIMATED C0t E2CIAL OPERATION DATE: 06-00-87 CUR 2ENT ESTIMATED PERCENT CONS 1RUCTION COMPLETE: pn65%

COTZE;iTS REG 10DI:3G CURRENT CCNSTRUCTIO;I ST ATUS: STATUS IS NOT REPORTED FOR PIPING ON THE BASIS OF PIPE SIZE.

STAIUS IS NOT RECORDED FOR CABLE TRAY OR EXPOSED METAL CONDUIT.

$Q15$ TS Nor WWWh Fa62. F-ZE4O W D NL WGM $

l ESTIMATED ACTUAL ESTIMATED ACTUAL ESTIMATED

_MA R L_

ilARL C0!$P_LE U DH

{pDPLillQH 3,_{QMPLETE MOBILIZC AND FREPACE SITC:

05-16-74 05-16-74 10-01-76 04-01-76 100%

PLACE STRUCTURAL C0!!CRE1E 03-01-76 08-01-76 dyi-OO-305 Jhrt$ $

Ita! TALL REACTCt PRESSURE VFSSEL:

C1-05-80 01-18-80 04-15-80 04-15-80 100%

i

!!85T at t LARGE 20RE PCCCESS PIPE:

01-05-77 01-05-77 05-03-85 J45. 8$

I!:St all LAEG~ DnrE FIRE ilANGE25. RESTRAINTS AND SMU:5ERS:

07-01-81 06-10-86 yWr$1L l'tSTALL STtALL B000 PIPE:

N/A N/A N/A N/A N/A I!:5TELL CARLE TPAY:

ti/A N/A N/A N/A N/A I:43 TALL EXr05ED METAL CONDUIT N/A N/A N/A N/A N/A I:ISTALL F0:0;R. CC::I T O'.. INSIRUMENTATION AtID SECURITY CABLE:

11-01-79 11-08-79 11-18-85 J>tT4f 7 I :sf all EL ECTRICAL Tr:IIIt4 AT I0iiS :

11-15-79 11-19-79 12-08-85 57f1CE

' PMPt:CT PT*.CTD2 COLD H)DRCS1 ATIC TEST 01-00-86 01-00-86 0%

CrKOUCT If 0 f TU::CTIONAL TEST :

05-00-86 06-00-86 0%

CerTJCT P2:0P AND ACCEP1 AtlCE TESTS HECESSARY FOR FUEL LOAD:

10-00-86

,rTjI I

-