Forwards Updated Const Status Repts as of 821231.Info for Inclusion in NUREG-0030
ML20127D310
Person / Time
Site: 05000000, South Texas
Issue date: 01/28/1983
From: Goldberg J
HOUSTON LIGHTING & POWER CO.
To: Hartfield R
NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
Shared Package
ML082170543 List: ... further results
References
FOIA-84-367, RTR-NUREG-0030, RTR-NUREG-30 ST-HL-AE-932, NUDOCS 8504150169
Download: ML20127D310 (6)


Text

_ _ _ _

d[tdP The Light H

~

mmPuy nee tee tis ties & re-er r.o.nex ivoo neestee.Te 77ooi <7is>228.e2ii a

Januar 28 1983 ST-HL-[E-93'2 File Number: G25 l

R. A. Hartfield, Chief Management Information Branch Office of Management and Program Analysis U. S. Nuclear Regulatory Commission Washington, D. C.

20555

Dear Mr. Hartfield:

South Texas Project Units 1 & 2 Docket Nos. STN 50-498, STN 50-499 Update to Construction Status Report Houston Lighting & Power Company has reviewed the entries for the South Texas Project in NUREG 0030, " Construction Status Report", dated October 1982. The report dated December 1982 has not been received. Attached are annotated corrected copies of those pages from the October 1982 report which require changes to update NUREG 0030 through the fourth quarter of 1982.

If you have any questions, please call Mr. M. E. Powell at (713)877-3281.

Very truly yours, J. H. Goldberg Vice President Nuclear Engineering & Construction MAM/mg Attachment 50606 69 PDE 8

9 f

Houston Lighting & Power Company Janaury 28, 1983 cc:

G. W. Oprea, Jr.

ST-HL-AE-932 J. H. Goldberg File Number: G25 J. G. Dewease Page 2 J. D. Parsons D. G. Barker M. R. Wisenburg R. A. Frazar J. W. Williams R. J. Maroni J. E. Geiger H. A. Walker S. M. Dew J. T. Collins (NRC)

H. E. Schierling (NRC)

W. M. Hill, Jr.

NRC)

M. D. Schwarz Baker & Botts)

R. Sordon Gooch Baker & Botts)

J. 1. Newman (Lowenstein, Newman, Reis, & Axelrad)

STP RMS Director, Office of Inspection & Enforcement Nuclear Regulatory Commission Nashington, D. C. 20555 G. W. Muench/R. L. Range Charles Bechhoefer, Esquire Central Power & Light Company Chairman, Atomic Safety & Licensing Board P. O. Box 2121 U. S. Nuclear Regulatory Commission Corpus Christi, Texas 78403 Washington, D. C.

20555 H. L. Peterson/G. Pokorny Dr. James C. Lamb, III City of Austin 313 Woodhaven Road P. O. Box 1088 Chapel Hill, North Carolina 27514 Austin, Texas 78767 J. B. Poston/A. vonRosenberg Mr. Ernest E. Hill City Public Service Board Lawrence Livermore Laboratory P. O. Box 1771 University of California San Antonio, Texas 78296 P. O. Box 808, L-46 Livermore, California 94550 Brian E. Berwick, Esquire William S. Jordan, III Assistant Attorney General Harmon & Weiss for the State of Texas 1725 I Street, N. W.

P. O. Box 12548 Suite 506 Capitol Station Washington, D. C.

20006 Austin, Texas 78711 Lanny Sinkin Citizens for Equitable Utilities, Inc.

Citizens Concerned About Nuclear Power c/o Ms. Peggy Buchorn 5106 Casa Oro Route 1, Box 1684 San Antonio, Texas 78233 Brazoria, Texas 77422 Jay Gutierrez, Esquire Hearing Attorney Office of the Executive Legal Director U. S. Nuclear Regulatory Commission Washington, D. C.

20555 Revision Date 12-20-82

C0NSTRUCTION STATUS REPORT PAGE NO: 2-106 SOUTH TEXAS 1 NUCLEAR POWER PLANTS STATUS AS OFs !! ;; ei ar-11-fJL, PLANT CHARACTERI$TICSt KEY PERS0NNEL8 DOCKET N08 05000498 CORPORATE CONTACT:

J. M. COLDBERG, VICE PRESIDENT CP MO. 8 DATE ISSUED: CPPR-f28/ 12-22-75 CP EXPIRATION DATE:

-0L '^ 0; /2-3/-67 CORPORATE ADDRESS:

P. O.

BOX 8700 NUCLEAR ENGINEERING 8 CONSTRUCTION APPLICANT 8 HOUSTON LIGHTING & POWER COMPANY PLANT LOCATION 8 12 MI SSW OF BAY CITY. TEX NOUSTON. TEXA5 77001 IE REGION

  • 4 CORPORATE PHONE NO:

(713) 486-3828 AEr BECHTEL M555:

WESTINGNOUSE CONSTRUCTOR:

EBASCO NRC LPM:

db Jbbbb6 #1. Sebif P li"i REACTOR TYPE:

PWR IE PROJECT INSPECTOR:

DER (MWE):

1250 d

IE RESIDENT INSPECTOR:

W. NILL IN$PECTION $TATUSt FUEL L0AD DATE CHANGES TIME PERIOD A5 REP 0RTED BY UTILITY Aor. 1982 - Jun. 1982 REPORT NEW REASON FOR CHANGE REPORT BEG DATE END DATE DATE SCHEDULE REPORTED _BY UTILITY NUMBEM OF fMSP.

OF INSP.

10-30-78 11-08-81 SCHEDULE REEVALUATION.

8205 03-30-82 04-02-82 01-18-80 09-00-83 SCHEDULE REEVALUATION.

8206 04-12-82 04-23-82 08-05-82 f2-00-86 CHANGE IN A/E AND CONSTRUCTOR.

8207 04-08-82 04-08-82 8208 04-01-82 04-30-82 8209 05-08-82 05-3t-82 Inspection reports are available at local PDRs.

L0 CAL PUSLIC D0CUMENT R00N MATACORDA COUNTY LAW LIBRARY

^

P. O. BOX 487 BAY CITY, TEXAS 77434

C0N5TQUCTIOO 5TATUS REPQRT PAGE N0: 2-107 SOUTH TEXA5 t MUCLEAR POWER PLANT 5 STATUS A5 0F3

  • '-?0 12.T/-N"0 -

L CONSTR4CTION 5TATUS APPLICANT'S CURRENT ESTIMATED FUEL LOADING DATE2 12-08-86 APPLICANTS CONSTRUCTION COMP M ESTIMATE A5 A*PLICANT'S PREVIOUS ESTIMATED FUEL LOADING DATE:

09-88-83 DEFINED IN CP (EARLIEST)

(,

APPLICANT'S ESTIMATED FUEL LOADING DATE AT CP ISSUANCE:

05-81-80 (LA1E51)

APPLICANT'S CURRENT ESTIMATED C0fTIERCI AL OPERATION DATE: 06-08-87

/A/.W/87, CURRENT ESTIf1ATED PERCENT C0ftSTRUCTION COMPLETE: g #12. 70

^,. AIi.anE. (ori$ ru C.b OM b=1 M C0fT1ENTS REGARDING CURRENT CONSTRUCTION ST ATUS:-^" - ""!

ESTIMATED ACTUAL ESTIMATED ACTUAL ESTIMATED START

} T. A RL COMf'L E T ION 10t1PLQ10J LCpMPL ET E MotILIZE AND PREPARE SITE:

09-00-75 12-00-15 toot PLACE STRUCTURAL CONCRETE:

84-90-76

-4+48 09 I-0J-85 NA INSTALL REACTOR PRES 5URE VESSEL:

91-88-79 89-88-79 130%

INSTALL LARGE BORE PROCESS PIPE:

18-88-78 N 2-os-gg NA INSTALL LARGE 80RE PIPE MANGERS RESTRAINTS AND SNUBBERS:

10-08-78 N,pos.g4 NA INSTALL SMALL BORE PIPE 10-00-78 86-85-86 NA INSTALL CABLE TRAY:

18-05-78 07 00 00 fZ-of-85 MA INSTALL EXPOSED METAL CONDUIT 87-90-78 0?-00 0; S-ci-8(

NA INSTALL POWER. CONTROL INSTRUMENTATION AND SECURITY CABLE:

89-08-83 A4.ee-se 6- 0 8-86 NA INSTALL ELECTRICAL TERMINATIONS:

.an-en-at,f.Cl-88l 10-08-86 NA CONDUCT REACTOR COLD NYDRDSTATIC TEST 86-08-86 04-44-ee f 86 NA CONDUCT NOT FUNCTIONAL TEST:

89-08-86 m /2-##-kle NA CONDUCT PRE 0P AND ACCEPTANCE TESTS NECESSARY FOR FUEL LOAD:

12-80-84 12-08-86 NA e

O

W=-

C0N$TRUCTION 5TATUS REPORT SOUTil TEXAS 2 PAGE NO: 2-104 MUCLEAR POMER PLANTS STATUS AS oft 66=&D-65 Is -A l-PLANT CNARACTERI5TICSt KEY PERS0NNEL DOCKET NO:

95008499 CP No. 4 DATE ISSUED: CrPR-129/ 12-22-75 CORPORATE CONTACT:

J. M. GOLDBERG, VICE PRISIDENT CP Eyr1P*T10M DATE:

++-44-09 /2-J/-dPP NUCLEAR ENGINEERING 4 CONSTRUCT 10M CPPl i t al.. -

NDUS10N LIGHTING 8 POWER COMPANY CORPORATE ADDRES$2 P. O. BOX 170s PLANI LOCATION

  • 12 MI SSW OF 8AY CITY. TEX NOUSTON, TEXAS 77001 IE REGION:

4 AEs BECHTEL CORPORATE PHONE NO:

(713) 486-3428 CS$$t WESTINGNOUSE CONSTRUCTOR:

EBASCO CEACIOR TfrEt PWR NRC LPM

. Leiii/dIcklerl#p KER (rWE):

1258 IE PROJECT INSPECTOR:

IE RESIDENT INSPECIOR:

W. MILL I Q S P E C T I O 88 $ T A T U St FUEL L0AD DATE CNANGES TIME PERIOD AS REP 0RTED BY UTILITY Aor. 19R2 - Jun. 1982 REPORT NEW REASON FOR CHANGE REPORT BEG DATE ENO DATE DATE SCHEDULE RFPORTED BY UTILTTY NM@_M OF IN E OF INSP.~

10-30-78 11-08-82 SCHEDUL E REEVALUATION.

8205 03-30-82 04-02-82 81-18-80 89-80-85 SCHEDULE REEVALUATION.

8206 04-12-82 84-21-82 98-85-82 12-08-88 CHANGE IN A/E AND CONSTRUCTOR.

8207 04-03-82 84-08-82 8208 04-BI-82 04-30-82 8209 85-01-82 05-31-82 Inspection reports are available at local PDRs.

L0 CAL PUSLIC 50CUMENT R00M NATACORDA COUNTY 8 eW LIBRARY P. D. BOX 437 BAY CITY, T EX*.3 77414 I

l l

l j

C0N5TRUCTIOM 5TATU5 REPORT PAGE NO: 2-109 I

SOUTH TEXA5 2 NUCLEAR POWER PLANT 5 STATUS A5 0F

?!"?"'

12-1/ Bk C0N5TRUCTION 5TATU5:

APPLICANT'S CURRENT ESTIMATED FUEL LOADING DATE:

12-08-88 APPLICANTS CONSTRUCTION COMPL ESTIMATE A5 APPLICANT'S PREVIOUS ESTIMATED FUEL LOADING DATE:

89-48-85 OEFINED IN cps (EARLIEST) /

APPLICANT'S ESTIMATED FUEL LOADING DATE AT CP ISSUANCE:

10-01-88 (LATEST) j,j APPLICANT'S CURRENT ESTIMATED COTW1ERCIAL OPERATION DATE: 06-00-89 7

CURRENT ESTIMATED PERCENT CONSTRUCTION COMPLETE:. MMC" /7,8

""n"^;;.(Arf 5htedIC" b5 Id COMr1ENTS REGARDING CURRENT CONSTRUCTION STATUS: "'" - "?'

ESTIMATED ACTUAL ESTIMATED ACTUAL ESTIMATED START

$1AR1 LOMPLETION

[gMPLETIQff % COMPLETE MOBILIZE AND PREPARE SITE:

09-co-75 s2-es-75 sect PLACE STRUCTURAL CONCRETE:

03-00-77

% J-of-8*7 MA INSTALL REACTOR PRES 5URE VE5SEL:

05-00-84 NS-Og.gal gg INSTALL LARGE BORE PROCESS PIPE:

N

$-08-81

;; efit-of-U HA INSTALL LARGE BORE PIPE MANGERS. RESTRAINTS AND SNUBBER 58

+P-44-43

//-of-8E

  • i ??-!! ( 0/-88 NA INSTALL SMALL BORE PIPE:

E-Of-8i O ;;

,L "i : @ (,-of-Id NA INSTALL CABLE TRAY:

SM

,f 2=/fegl

! * =^ != pg.d(-h7 NA INSTALL EXPOSED METAL CONDUIT J-4-g(43-44-ea u

a-yg gf gg gg INSTALL POWER CONTROL. INSTRUMENTATION AND SECURITY CABLE:

12-08-85

"" : C; (s DI-88 NA INSTALL ELECTRICAL TERMINATI0H58 12-08-85 W s o-of-88 NA CONDUCT REACTOR COLD NYDROSTATIC TEST 06-00-88 96-09-99 (,- O/-88 NA CONDUCT HOT FUNCTIONAL TEST 89-08-88 6 /2-d/-88 MA CONDUCT PRE 0P AND ACCEPTANCE TESTS NECESSARY FOR FUEL LOAD:

12-08-86 12-80-88 NA

.