f g educt Georgia Power Company Post CNEco Box 4545 Acanta, Georgia 30302 re a s**=
Vogtle Project February 14, 1983 Chief, Management Infonnation Branch Office of Management and Program Analysis U. S. Nuclear Regulatory Commission File: X7BG48 Washington, D.C.
20555 Log:
GN-213
Reference:
50-424/50-425 Gentlemen:
Information is provided herewith for your use in updating the NRC Construction Status Report (yellow book). Should you have any questions pertaining to this report, please contact my office at (404) 526-7707.
Very truly yours, h
. Foster CWH/D0F/tlp Attachment xc: James P. O'Reilly, NRC Region II R. E. Conway D...E. Dutton R. H. Pinson L. T.-Gucwa-H. H. Gregory, III 1
t 8504150164 840606 PDR FOIA KILLEFE84-367 PDR
C0NSTRUCTION STATUS REP 0RT PAGE N0:
2-138 l UNIT1 t
NUCLEAR P0WER PLANTS STATUS AS OF:
12-26-82 PLANT C H A R A C T E R I S T I C S:
KEY P E R S 0 N N E L:
DOCKET N0:
05000424
~
D. E. Dutton, Vice President CORPORATE CONTACT:
CP NO. & DATE ISSUED:
CPR-108/06-28-74 Generating Plant Projects CP EXPIRATION DATE:
04-30-81 CORPORATE ADDRESS:
Georgia Power Company APPLICANT:
GEORGIA POWER COMPANY 333 Piedmont, Atlanta, GA 30302 PLANT LOCATION:
BURKE COUNTY / GEORGIA i
CORPORATE PHONE N0:
(404) 522-6060 II REGION:
II NRC LPM:
S. BURWELL AE:
SOUTHERN SERVICES /BECHTEL IE PRINCIPAL INSPECTOR:
NSSS:
-CONSTRUCTION:
CONSTRUCTOR:
GPC
-TEST AND STARTUP:
REACTOR TYPE:
W. F. Sanders DER (MWE):
1100 INSPECTION S T A T U S:
' FULL LOAD
TIME PERIOD REPORT BEG DATE END DATE REPORT NEW REASON FOR CHANGE NUMBER OF INSP.
OF INSP.
DATE SCHEDULE REPORTED BY UTILITY 09-27-74 NOT KNOWN CONSTRUCTION SUSPENDED FOR FINANCIAL REASONS 05-11-77 05-00-83 NO REASON GIVEN 01-09-78 05-01-84 OVERESTI!!ATED PROJECTED
~
NEED FOR POWER 07-17-80 11-00-84 NO REASON PROVIDED 11-18-81 09-01-86 SCHEDULE REASSESSMENT L0 CAL PUBLIC D0CUMENT R 0 0 M:
BURKE COUNTY LIBRARY 4TH STREET.
WAYNESBOR0. GEORGIA 30830
C0NSTRUCTI0N STATUS REP 0RT PAGE NO:
2-139 s
UNIT 1 NUCLEAR P0WER PLANTS STATUS AS OF:
12-26 -
C0NSTRUCTI0N S T A T U S:
APPLICANT'S CURRENT ESTIMATED FUEL LOADING DATE:
09-01-86 APPLICANT'S CONSTROCTION COMPLETION APPLICANT'S PREVIOUS ESTIMATED FUEL LOADING DATE:
11-00-84 ESTIMATE AS DEFINED IN CP:
APPLICANT'S ESTIMATED FUEL LOADING DATE AT CP ISSUANCE:
10-01-79 (EARLIEST) 04-01-80 APFLICANT'S CURRENT ESTIMATED COMMERCIAL OPERATION DATE: 03-01-87 (LATEST)
CURRENT E3TIMATED PERCENT CONSTRUCTION COMPLETE:
44.9%
DATE CONSTRUCTION STARTED:
08-01-76 CURRENT ESTIMATED CONSTRUCTION. DURATION.IN MONTHS:
126 COMMENTS REG 4RDING CURRENT CONSTRUCTION STATUS:
ESTIMATED ACTUAL ESTIMATED ACTUAL ESTIMATED START START COMPLETION COMPLETION
% COMPLETE MOBILIZE AND PREPARE SITE:
08-01-76 09-15-77 100 PLACE STRUCTURAL CONCRETE:
08-01-78 02-15-84 81.3 %
INSTALL REACTOR PRESSURE VESSEL:
02-01-83 03-15-83 0
INSTALLED LARGE BORE PROCESS PIPE:
09-01-80 05-01-86 24.6 %
INSTALL LARGE BORE PIPE HANGERS, RESTRAINTS AND SNUBBERS:
09-01-80 05-01-86 10.6 %
INSTALL SMALL BORE PIPE:
07-01-81 05-01-86 9.1 %
INSTALL CABLE TRAY:
08-01-80 04-01-85 4 S.49 %
INSTALL EXPOSED METAL CONDUIT:
11-01-81 01-01-86 8.6 %
INSTALL POWER,' CONTROL, INSTRUMENTATION AND SECURITY CABLE:
03-01-83 11-01-85 0
INSTALL ELECTRICAL TERMINATIONS:
05-01-83 01-01-86 0
CONDUCT REACTOR COLD HYDR 0 STATIC TEST:
03-01-86 04-01-86 0
CONDUCT HOT FUNCTIONAL TEST:
05-15-86 07-15-86 0
CONDUCT PRE 0P AND ACCEPTANCE TESTS NECESSARY FOR FUEL LOAD:
07-24-84 08-01-86 0
C0NSTRUCTI0N STATUS 41 E P 0 R T PAGE N0:
2-140 UNIT 2 NUCLEAR P0WER PLANTS STATUS AS OF:
12-26-82,
PLANT C H A R A C T E R I S T I C S:
KEY P E R S 0 N N E L:
DOCKET N0:
05000425 CORPORATE CONTACT:
D. E. DUTTON, VICE PRESIDENT CP N0. & DATE ISSUED:
CPR-109/06-28-74 GENERATING PLANT PROJECTS CP EXPIRATION DATE:
04-30-82 CORPORATE ADDRESS:
GEORGIA POWER COMPANY APPLICANT:
GEORGIA POWER COMPANY 333 PIEDM0NT, ATLANTA, GA 30302 PLANT LOCATION:
BURKE COUNTY / GEORGIA i
CORPORATE PHONE NO:
(404) 522-6060 II REGION:
II NRC LPM:
S. BURWELL AE:
SOUTHERN SERVICES /BECHTEL IE PRINCIPAL INSPECTOR:
NSSS:
-CONSTRUCTION:
CONSTRUCTOR:
GPC
-TEST AND STARTUP:
REACTOR TYPE:
S. F. Sanders DER (MWE):
1100 INSPECTI0N S T A T U S:
' FULL L0AD DATE CHANGES AS REP 0RTED BY U T I L I T Y:
TIME PERIOD REPORT BEG DATE END DATE REPORT NEW REASON FOR CHANGE NUMBER OF INSP.
OF INSP.
DATE SCHEDULE REPORTED BY UTILITY 09-27-74 NOT KNOWN CONSTRUCTION SUSPENDED FOR FINANCIAL REASONS 05-11-77 05-00-84 NO REASON GIVEN 11-02-77 05-00-85 OVERESTIMATED PROJECTED NEED FOR POWER 07-17-80 05-00-87 NO REASON PROVIDED 11-18-81 03-01-88 SCHEDULE REASSESSMENT L0 CAL PUBLIC D0CUMENT R 0 0 M:
BURKE COUNTY LIBRARY 4TH STREET WAYNESBOR0, GEORGIA 30830
~ ~ ^ ~
C0NSTRUCTI0N STATUS REP 0RT PAGE NO:
2-141 UNIT 2 NUCLEAR P0WER P L A N'T S STATUS AS OF: 12-26-82. -
C 0 N S T R U C T I O N-S T A T U S:
APPLICANT'S CURRENT ESTIMATED FUEL LOADING DATE:
03-01-88 APPLICANT'S CONSTR CTION COMPLETION APPLICANT'S PREVIOUS ESTIMATED FUEL LOADING DATE:
05-00-87 ESTIMATE AS DEFINED IN CP:
APPLICANT'S ESTIMATED FUEL LOADING DATE AT CP ISSUANCE:
10-01-80 (EARLIEST) 04-01-81 APPLICANT'S CURRENT ESTIMATED COMMERCIAL OPERATION DATE:
09-01-88 (LATEST)
CURRENT ESTIMATED PERCENT CONSTRUCTION COMPLETE:
14.4%
DATE CONSTRUCTION STARTED:
08-01-76 COMMENT $ REGARDING CURRENT CONSTRUCTION STATUS:
ESTIMATED ACTUAL ESTIMATED ACTUAL ESTIMATED START START COMPLETION COMPLETION
% COMPLETE MOBILIZE AND PREPARE SITE:
08-01-76 09-15-77 100 s %
PLACE STRUCTURAL CONCRETE:
08-01-78 08-15-84 52.1 %
INSTALL REACTOR PRESSURE VESSEL:
08-01-84 09-15-84 0
INSTALLED LARGE BORE PROCESS PIPE:
09-01-80 11-01-87 14.9 %
INSTALL LARGE BORF PIPE HANGERS, RESTRAINTS AND SNUBBERS:
09-01-80 11-01-87 l';.T.. %
INSTALL SMALL BORE PIPE:
'02-0,1-83 04-01-88 1.7 %
INSTALL CABLE TRAY:
08-01-80 10-01-86 6.5 %
INSTALL EXPOSED METAL CONDUIT:
03-01-83 07-01-87
.1; %
INSTALL POWER, CONTROL, INSTRUMENTATION AND SECURITY CABLE:
09-01-84 05-01-87 0
INSTALL ELECTRICAL TERMINATIONS:
11-01-84 07-01-87 0
CONDUCT REACTOR COLD HYDROSTATIC TEST:
09-01-87 10-01-87 0
CONDUCT HOT FUNCTIONAL TEST:
12-15-87,
02-15-88 0
01-24-86 02-01 88 0 %
CONDUCT PRE 0P AND ACCEPTANCE TESTS NECESSARY FOR FUEL LOAD:
-