Forwards Annotated Corrected Pages to Oct 1982 Const Status Repts Updating NUREG-0030 Through Third Quarter 1983
ML20127D279
Person / Time
Site: 05000000, South Texas
Issue date: 10/31/1983
From: Goldberg J
HOUSTON LIGHTING & POWER CO.
To: Hartfield R
NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
Shared Package
ML082170543 List: ... further results
References
FOIA-84-367, RTR-NUREG-0030, RTR-NUREG-30 NUDOCS 8504150162
Download: ML20127D279 (6)


Text

-

The Light m m P u y ><ees'ee ti n'i 8 8

& re er r.o.8e ivoo ><e s"e. Tex s77ooi(7's>228.o2i>

October 31, 1983 ST-HL-AE-1021 i

File Number:

G25 l

R. A. Hartfield, Chief Management Information Branch Office of Management and Program Analysis U. S. Nuclear Regulatory Commission Washington, D.C.

20555

Dear Mr. Hartfield:

South Texas Project Units 1 & 2 Docket Nos. STN 50-498, STN 50-499 Update to Construction Status Report Houston Lighting & Power Company has reviewed the entries for the South Texas Project in NUREG 0030 " Construction Status Report" dated October 1982.

The reports for December 1982, March 1983, June 1983 and September 1983 have not been received. Attached are annotated corrected copies of those pages from the October 1982 report which require changes to update NUREG 0030 through the third quarter of 1983.

If you have any questions, please call Mr. Michael E. Powell at (713) 993-1328.

Very truly yours, dw'.

J. H. Goldberg Vice President Nuclear Engineering & Construction SSR/cim Attachment k$k41f8h62840606 KILLEFEB4-367 pyg

October 31, 1983 cc:

G. W. Oprea, Jr.

ST-HL-AE-1021 J. H. Goldberg File Number: G25 J. G. Dewease Page 2 J. D. Parsons D. G. Barker M. R. Wisenburg R. A. Frazar J. W. Williams R. J. Maroni J. E. Geiger S. M. Dew J. T. Collins NRC)

A. Vietti NRC)

D. P. Tomlinson NRC)

M. D. Schwarz Baker & Botts)

R. Gordon Gooch Baker & Botts)

J. R. Newman Lowenstein,Newman,Reis,&Axelrad)

STP RMS Director, Office of Inspection & Enforcement Nuclear Regulatory Commission Washington, D. C. 20555 4

E. R. Brooks /R. L. Range Charles Bechhoefer, Esquire Central Power & Light Company Chairman, Atomic Safety & Licensing Board P. O. Box 2121 U. S. Nuclear Regulatory Commission Corpus Christi, Texas 78403 Washington, D. C.

20555 H. L._Peterson/G. Pokorny Dr. James C. Lamb, III City of Austin 313 Woodhaven Road P. O. Box 1088 Chapel Hill, North Carolina 27514 Austin, Texas 78767 J. B. Poston/A. vonRosenberg Mr. Ernest E. Hill City Public Service Board Lawrence Livermore Laboratory P. O. Box 1771 University of California San Antonio, Texas 78296 P. O. Box 808, L-46 Livermore, California 94550 Brian E. Berwick, Esquire William S. Jordan, III Assistant Attorney General Harmon & Weiss for the State of Texas 1725 I Street, N. W.

P. O. Box 12548 Suite 506 Capitol Station Washington, D. C.

20006 Austin, Texas 78711 Lanny Sinkin Citizens for Equitable Utilities, Inc.

Citizens Concerned About Nuclear Power c/o Ms. Peggy Buchorn 114 W. 7th, Suite 220 Route 1, Box 1684 Austin, Texas 78701 Brazoria, Texas 77422 Robert G. Perlis, Esquire Hearing Attorney Office of the Executive Legal Director U. S. Nuclear Regulatory Commission Washington, D. C.

20555 Revision Date 10-10-83

C0NSTRUCTION STATUS REP 0RT PAGE N08 2-106 SOUTN TEXAS 1 NUCLEAR POWER PLANT 5 STATUS A5 0F8 I~5 PLANT CHARACTERI$TICSt KEY PERS0NNEL8 DOCKET N08 05000498 CORPORATE CONTACT J. H. GOLDBERG, VICE PRESIDENT CP MO. 8 DATE ISSUED: CPPR-128/ 12-22-7 MUCLEAR ENGINEERING 8 CONSTRUCTION CP EXPIRATION DATE:

[2 CORPORATE ADDRESS:

P. D. BOX 178e APPLICANT HOUSTON LIGHTING 8 DWER COMPANY HOUSTON, TEXA5 77001 PLANT LOCATION:

12 MI 55W 0F BAY CITY, TEX IE REGION:

4 CORPORATE PHONE NO:

(713) 486-3828 AE8 BECHTEL M5558 WESTINGHOUSE CONSTRUCTOR 8 ERASCO MRC LPM:

. 3;iis [\\.'sfIEL T"1 t REACTOR TYPE 8 PWR IS PROJECT INSPECTOR

DER (FedE):

1258 IE RESIDENT INSPECTOR 8 O. ;;*il D, *T*QMQN $$

IN5PECTION STATU$8 FUEL L0AD DATE CHANGES I

TIME PERIOD A5 REPORTED 3Y UTILITY 8 Aar. 1982 - Jun. 1982 REPORT NEW REASON FOR CHANGE REPORT BEG DATE END DATE DATE SCHEDULE REPORTED BY UTILITY MUMBER OF IN5P.

OF INSP.

10-30-78 18-00-81 SCHEDULE REEVALUATION.

8205 03-30-82 04-02-82 88-18-80 89-88-83 SCHEDULE REEVALUATION.

8206 04-12-82 04-23-82 08-85-82 12-00-86 CHANGE IN A/E AND CONSTRUCTOR.

8207 84-08-82 84-88-82 82e8 e4-88-82 e4-30-82 8289 85-08-82 05-31-82 Inspection reports are available at local PDAs.

l L0 CAL PUBLIC D0CUMENT R 0 0 Ms MATAGORDA COUNTY LAW LIBRARY P. D. BOX 487 BAY CITY, TEXAS 774l4

~

s t, s s

~

1 C0NSTRUCTION 5TATUS REPORT PAGE 900 2-197

  • Q3 O L} "'

t A.-

SOUTN TEMAS S NUCLEAR POMER PLANTS STATUS AS OF CONSTRUCTION STATUS:

APPLICAllT'S CURRENT ESTIMATED FUEL LOADING DATE:

12-09-84 APPLICANTS CONSTRUCTION COMPLETION ESTIMATE AS A*PLICANT'S PREVIOUS ESTIMATED FUEL LOADING DATE:

09-08-83 DEFINED IN cps (EARLIEST) ll 'iL l - 6 a

APPLICANT'S ESTIMATED FUEL LOADING DATE AT CP ISSU400CE8 95-08-80 (LATEST) it Al - 9 APPLICANT'S CURRENT ESTIMATED COMrtERCIAL OPERATION DATE: 06-08-87 CURRENT ESTIMATED PERCENT CONSTRUCTIDIO COMPLETE -MR M.6% (Pwe NN 93d D

94-*-4009-evect*004.Esit.imaw comp. tion a+4 perced c.ompe.h COBOIENTS RESAR91916 CURRENT CONSTRUCTION STATUS:

l d'6t h Ye.pfese.nts block plus 30'P.

et ESTIMATED ACTUAL ESTIMATED ACTUAL ESTIMATED START

$1.8E COMPLETION COM_P_ LEI Lget 3._CDMPLETE N0sILIzt AMs PREPARE SITE:

09-00-75 12-00-75 test t

PLACE STRUCitfRAL CONCRETE:

84-09-76 NY

[

1 INSTALL REACTOR PRESSURE VESSEL 09-00-79 89-00-79 1002 INSTALL LARGE BORE PROCESS PIPET 10-00-78 b$ @

4ee-6g -

INSTALL LARGE s0RE PIPE MANoERS. RESTRArNTS AND SNUssERS:

to-se-78

!M'_@

    • - 16 I-INSTALL SMALL BORE PIPE 8 19-90-78

-904-22' TYD l

INSTALL caste TRAvs to-es-78 asa a -

i IMSTALL EXPOSES MEYAL CONOUIT Y

Y.

-gee- % ;

INSTALL POWER CONTROL INSTRUMENTATION ANO SECURITY CABLE 8 49-44 CS-C0 M k'T h

.ase-o2. '

INSTALL ELECTRICAL TERMINATIONS 8 N-sea.cl "

{

k Y.h CONOUCT REACTOR COLD NYDR0 STATIC TEST 06-08-86 NA CONDUCT NOT FUteCTISIIAL TEST 8 89-09-86 kN

.NA f

C00180CT PRESP AND ACCEPTANCE TESTS NECESSARY FOR FUEL LOAD 12-08-84 12-00-86 NA i

f f

i i

i i

i 4

C0N5TRUCTION 5TATUS REPORT PAGE NO: 2-1 g-3o-SOUTH TEXA5 2 NUCLEAR POWER PLANT 5 STATUS A5 0F8..-:: O.

PLANT CNARACTERI5 TIC 58 KEY PERS0NNEL8 DOCKET NO:

85000499 CORPORATE CONTACTS J. M. GOLDRERG. VICE PRESIDENT l

CP NO. 8 DATE ISSUED

  • CPPR-129/ 12-22-7 NUCLEAR ENGINEERING 8 CONSTRUCTION CP EXPIPATION DATE:

^; ; 0; 12-'31-OL CORPORATE ADDRE558 P. O.

BOX 1708 APPLILAhis NOU5 TON LIGNTING 8 POWER COMPANY NOU570N. TEXA5 77001 PLANT LOCATION 8 12 MI 55W OF BAY CITY, TEX IE REGION:

4 CORPORATE PHONE NO:

(713) 486-3828 l

AEs BECNTEL l

NS$58 WESTINGNOUSE CONSTRUCTOR EBASCO NRC LPM:

e. 32iii E4. Ng I E "r T 1 REACTOR TYPE:

PWR IE PROJECT INSPECTOR:

DER (ftWE) 1250 IE RESIDENT INSPECTOR:

e. WP.;

{}, T7byg g4 pg $j3,4 IQ5PECTION. 5TATU5:

FUEL L0AD DATE CNANGE5 TIME PERIOD A5 REPORTED 5Y UTILITY Aar. 1982 - Jun. 1982 REPORT NEW REASON FOR CHANGE REPORT BEG DATE END DATE DATE SCHEDULE REPORTED SY UTILITY NUMBEt OF INSP.

OF INSP.

8205 03-30-82 04-02-82 01-88-80 09-08-85 SCHEDULE REEVALUATION.

8206 04-12-82 04-21-82 08-05-82 12-00-88 CHANGE IN A/E AND CONSTRUCTOR.

8207 04-03-82 04-08-82 8208 84-01-82 04-30-82 8209 05-01-82 05-31-82 Inspection reports are available at local PDRs.

t i

L0 CAL PUSLIC D0CUMENT R00Mr MATAGORDA COUNTY LAW LIBRARY P. O. 00X 487 BAY CITY, TEXA5 77414

C0N5TRUCTION 5TATUS REPORT PAGE NO: 2-109 SOUTM TEXAS 2 NUCLEAR POWER PLANTS STATUS AS OFs f

l C0NSTRUCTION 5 T A T U 58 APPLICANT'S CURRENT ESTIMATED FUEL LOADING DATE:

12-St-88 APPLICANTS CONSTRUCTION COMPLETI STIMATE AS APPLICANT'S PREVIOUS ESTIMATED FUEL LOADING DATE 89-85-85 DEFINED IN cps (EARLIEST) 1*L-3 l-APPLICANT'S. ESTIMATED FUEL LOADING DATE AT CP ISSUANCE 8 te-et-st (LATEST) gg gg gg APPLICANT'S CURRENT ESTIMATED C0tW1ERCIAL OPERATION DATE: 86-08-89 CUNRENT ESTIMATED PERCENT CONSTRUCTION COMPLETE:

let Md Do Mofy c f

Mu e-a-MG9-4M5448g44 ion e d f*<" f Y

cert 1ENTS RECARDINO CURRENT CONSTRUCTION STATUS:

s tsy;msd w fgfttf$Crgh$ ;*>cdW YY Cn ESTIMATED ACTUAL ESTIMATED ACTUAL ESTIMATED START 11Atl._

C0fTL ETION COMPLETI3H E COMPLETE MOBILIZE AND PREPARE SITE 09-00-75 42-00-75 test PLACE STRUCTURAL CONCRETE 83-00-77

-40468 CA @

^^ ^^

89-90-84 MA INSTALL REACTOR PRESSURE VESSEL:

INSTALL LARGE BORE PROCESS PIPES DN 06-00-W2.

dI T

-464-t3 INSTALL LARGE BORE PIPE MANGERS RESTRAINTS AND SNUBBERS:

DP +e-es o7-oo 43 Y W '.@.

4en.o t INSTALL SMALL SORE PIPE:

N 11 - 0 0 - 8 ?_

-40 4 - O \\

l?_-OO-82,h: N' 4s4. M INSTALL CABLE TRAYt DN o3-DO-Z h-T

.asa_lQ INSTALL EXPOSED METAL CONDUIT 00-44 INSTALL POWER CONTROL, INSTRUMENTATION AND SECURITY CABLE:

12-00-85 NA Y;

a,-w-eh 10-08-8 NA INSTALL ELECTRICAL TERMINATIONS MA f

CONDUCT REACTOR COLD NYDR0 STATIC TESTS 06-80-88

^^ ""

N;"~2R-h.

CONDUCT NOT FUNCTIONAL TEST 8 09-08-88

^^

NA

)

CONDUCT PREOF AND ACCEPTANCE TESTS NECESSARY FOR FUEL LOAD 12-08-86 12-00-33 NA i