ML20127D265
Text
.
AUBLIC SERVICE S M M STAU N Engineedng Office:
Company of New Hampshir*
1671 Worcester Road Fromingham, Mossochusetts 01701 (617) - 872 8100 1
November 3, 1983 1
SBN-577 T.F. B4.4.2 United States Nuclear Regulatory Commission Washington, D. C. 20555 Attention:
Mr. R. A. Hartfield, Chief Management Information Branch Office of Management and Program Analysis
References:
(a) Construction Permits CPPR-135 and CPPR-136, Docket Nos. 50-443 and 50-444
Subject:
Construction Status Report:
Seabrook Station Unit 1 and Unit 2
Dear Sir:
We have attached the Construction Status Report for the period ending September 30, 1983.
Very truly yours, YANKEE ATOMIC ELECTRIC COMPANY J. DeVincentis Project Manager MH0/dsm Attachment cc:
Atomic Safety and Licensing Board Service List 8504150153 840606 PDR FOIA KILLEFE84-367 PDR
- Will'iam S. Jard:n, III, E quira Brentwood Board of Salectman Harmon & Weiss RED Dalton Road 1725 1 Street, N.W. Suite 506 Brentwood, New Hampshire 03833 Washington, DC 20006 Roy P. Lessy, Jr., Esquire 3
Office of the Executive Legal Director Edward.F. Meany U.S. Nuclear Regulatory Commission Designated Representative of Washington, DC 20555-the Town of Rye 155 Washington Road Robert A. Backus, Esquire Rye, NH 03870
-116 Lowell Street P.O. Box 516-Calvin A. Canney Mancehster, NH 03105 City Manager City Hall Philip Ahrens, Esquire
'126 Daniel Street Assistant Attorney General Portsmouth, NH 03801 i
Department of the Attorney General Augusta, ME.04333 Dana Bisbee, Esquire Assistant-Attorney General Mr. John.B..Tanzer Office of the Attorney General Designated Representative of 208 State House Annex the Town of Hampton Concord, NH 03842 5 Norningside Drive Hampton, NH 03842 Anne Verge, Chairperson Board of Selectmen Roberta C. Fevear Town Hall Designated Representative of South Hampton, NH 03642 l
the Town of Hampton Falls Drinkwater Road Patrick J. McKeon Hampton Falls, NH 03844 Selectmen's Office 10 Central Road i
Mrs. Sandra Gavutis Rye, NH 03870 Designated Representative of i
the Town of Kensington David R. Lewis, Esquire RFD 1
- Atomic Safety and. Licensing Board East Kingston, NH 03827 U.S. Nuclear Regulatory Commission Washington, D.C.'20555 Jo Ann Shotwell, Esquire Assistant Attorney General Mr. Angie Machiros Environmental Protection Bureau Chairman of the Board of Selectmen Department of the Attorney General
- Town of Newbury One Ashburton Place, 19th Floor
-Newbury..MA 01950 Boston, MA 02108 Maynard B.-Pearson-Senator Gordon J. Humphrey 40 Monroe Street U.S. Senate
-Amesbury, MA 01913
. Washington, DC 20510 (Attn: Tom Burack)
Senator Gordon J. Humphrey 1 Pillsbury. Street Diana-P. Randall Concord, NH_03301 70 Collins Street-(Attn: Herb Boynton)
SEabrook, NH 03P/4 Richard E. Sullivan,~ Mayor Donald E. Chick City Hall.
Town Manage.
Newburyport, MA 01950 Town of Exeter 10 Front Street Exeter, NH 03833
4 C0NSTEUCTION 37ATUS REF0RT FACE NO. 2-120 m aa m STATION 1 NUCLEAR F0WER FLANTS STATUS AS OFs 464946 9-Jo-P3 C0NSTRDC7 ION 3 T A T U St AFFLICANT'S WERENT ESTINATED FUEL IAADING DATE:
09-30-84 AFFLICANTS CONSRUCTION CWIFLETION ESTIMATE AS DEFINED IN l
APPLICANT'S PREVIDIN ESTDIATED FML IAADING BATE:
11-30-43 CFs (EAELIEST) February 1979 AFFLICANT'S ESTDIATED FUEL IAADING DATE AT CF ISSUANW:
08-01-81 (LATEST) June 1983 l
AFILICANT'S CNRENT ESTDekTED CWRERCIAL OPERATION DATE:
12-31-44 GIBRENT ESTDIATED NSGNT CONSBNCTION COIIFLETE: gD CDIOSNTS MGARDING GIREINT CONSUCTICII STATUS:
ESTIMATED ACTUAL ESTIMATED ACTUAL ESTIMATED START START COItFLETICIf COMPLETION I COIEFLETE ISSILIB AND PREFARE SITE:
7-76 8-77 10 0 I FuCE SMDCTURAL CouCRETE:
9-77 8-83' 99 I l
IIISTALL MAC10E FRESSUE msEL:
5-81 5-41 100 I DISTAIL URGE BORE PROCESS FIN:
10-79 7-84 JW I INSTALL LAREE 805 FIN BANGERS. RESTRAINTS. AND SIlgBSERS:
10-79 844
.50' I IIISTAIL SIAIA acre FIN:
9-80 8-84
- 3 I 4 5
IIIsrALL CAE2 TRAY:
9-79 12-83 At Igg DISTALL REPOSED BETAL CDIEUIT 4-79 7-84 atI9@
IIISTALL FONER. COIITROL. INSTRIBElf7ATION ARID SECURITY CAM.Es 5-81 7-84 72 I INSTAIL ELECRICAL TERIIDIATICIIS:
6-81 8-84 At 1%
CONBUCT MAC104 COEA BTDRDSEATIC TEST:
4-84 4-84 0I COIBUCT NOT FUNCTICIIAL TEST:
6-84 8-84 0I ColmeCT PRNDP Als ACmFralIl3 TESTS NECESSART FOR FUEL IAAD 11-42 9-44 0I kRequest for esteestem of cemetracties pesuit latest constructies complettes detes sehoitted to App 11 cent Letter dated May 26, 1983. IIRC approval peedIng.
t 4
I l
t
o r
C0N5iRUCT !ON 5TATU5 REP 0RT PAGE N0s 2-100 SEABROOK I HUCLEAR POWER PLANT 5 STATUS A5 0Fs __ __
Q-30-f1 PLAHT CHARACTERI5TICSt KEY P E R S 0 H H E L8 g
pg,SIMM AND DOCKET H0s 05000443 CORPORATE CONTACT:
C.
L....-n.gCHIEF EXEC. OFFICER CP HD. 8 DATE ISSUED: CPPR-135/ 07-07-76 CP EXPIRATIDH DATE:
06-30-83
/
CORPORATE AODRE558 1000 ELM STREET APPLICANT:
PUBLIC SERVICE OF HEW HAMP5 HIRE PLANT LOCATIOHs to MI 5 0F PORT 5 MOUTH, NH MANCHESTER, HEW HAMPSHIRE 03805 e
IE REGIQHs 1
CORPORATE PHONE HO:
(603) 669-4000 AE8 UNITED ENG. 8 CONSTRUCTORS H5558 WESTINCHOUSE P
CONSTRUCTOR
- UNITED ENG. 8 CONSTRUCTORS NRC LPM:
tv=4dH64444.N. k M b REACTOR TYPE:
DER (MWE):
1598 IE RESIDENT INSPECTOR:
A.
C. CERNE IN5PECTION 5 TA T U 5:
FUEL L0AD DATE CHANGE 5 TIME PERIOD A5 REPQRTED BY UTILITY hy %
a_..
'^^2 - ^. * *M kJ'76MIE. co I'd o REPORT HEW REASON FOR CHANGE REPORT BEG DATE END DATE DATE SCHEDULE REPORTED BY UTILITY M]!1P13 0F TH5P.
OF INSP.
vi 09-06-77 09-08-82 DELAYS DUE TO EPA REVERSAL OF PREVIOUS
^2 ^^
05-04-82 p" - a 2 APPROVAL 0F ONCE THROUGH CIRCULATING 82-05 05-u6-C 82-o'
- - ci-s2 07-02-77' WATER SYSTEN & SU85EQ. HRC WITHDRAWAL OF
~
CONST PERMIT. 8 TINE REQ TO REMOBILIZE t1-08-78 01-08-83 SCHEDULE REEVALUATION.
04-04-81 11-30-83 SCHEDULE REEVALUATIDH.
Inspection Reports are avalIable at local PDRs.
Il3-08 s 83 5 - 2G -t3
- 3* ' 82 9'30'$4 $CH E1ksLe $CMLU@CH S3 -il 7-s - g3 7-g-E2 93'l7.
f-E-83 T RJ 93 - 13 9-a-83 t.u-93 y
93-14 g-55-83 9-19-83 L0 CAL PUBLIC D0CUNENT R00N EXETER PUBLIC LIBRARY FRONT STREET EXETER, NEW HAMPSHIRE 03883 E
, =, -
i C0N57EUCTION STATUS REF0RT FACE NO. 2-122
$ramat m STATION 2 NUCLEAR F0WER FLANTS STATUS AS OF 46 46 46 t-3o-Af C0N57RUC7 ION $ T A T U 5:
AFFLICANT'S QIRAINT ESTIMATED FUEL LOADINC DATE:
04-30-87 AFFLICANTS CONSTRUCTION CONFLETION ESTIMATE AS DEFINED IN APEICANT'S PREVIOUS ESTIMATED FUEL IAADING BATE:
12-31-86 CP: (EARLIEST) January, 1981 AFFLICANT'S ESTIMATED FUEL LOADINC DATE AT CF ISSUANCE:
10-01-83 (LATEST) October, 1984 W APEICANT'S CURENT ISTINATED COISIERCIAL OPERATION DATE:
07-31-47 CURRENT ESTIMATED PERMNT CONSMDCTION CONFLETE: jff %
COIRENTS MCARDDIC CURENT CONSTRUCTICII STATUS:
ESTIMATED ACTUAL ESTIMATED ACTUAL ESTIMATED START START COMPLETION GWIPLETICII I COMPLETE ISSILIIE AND PREFARE SITE:
7-76 8-77 100 I FLam STRUCTURAL COIICRETE:
8-81 5-86 jai 6Y INSTALL MAC10E PRESSUM VESSEL:
2-44 3-84 0I INSTALL IARGE SORE PROGSS FIFE 9-82 10-86 4I IIIETALL LARGE BORE FIN RAIICERS, RESTRAINTS, AND SIEURSERS:
9-42 11-86 2I 4
INSTA11 SMALL BORE FIFE 7-84 10-86
- IO IIISTALL CABLE TRAT:
1-44 1-86 0I INSTALL EIFOSED IETAL CONDUIT:
4-84 9-86
- IO IIISTA11 PONER, COIITROL, INSTRIMNTATION, AllD SECURITT CAELE:
9-84 9-86 01 INSTALL ELECTRICAL TERMINATIONS:
10-84 10-86 0I CONDUCT MAC10E COta NYDROSTATIC TEST:
11-86 12-86 02 CONDUCT IIOT FUNCTIONAL TEST:
1-87 2-87 0I COIIDUCT PREOF AIS ACmFTARICE TESTS IIECESSART FDE FUEL IAAD:
3-45 11-86 0I i
h um % a,, m3. me==w.
was i
9 O
O
C0H5TRUCTION 5TATU5 REF0RT PAGE N08 2-102 SEABROOK 2 NUCLEAR P0WER PLANT 5 STATUS A5 0F PER50HHELa g g PLAHT CHARACTERI5 TIC 5:
KEY DOCKET NO:
85000444 CORPORATE CONTACT:
M. ;. uman. PRESIDENT 4MD CP No. 8 DATE ISSUED: CPPR-136/ 07-07-76 CleMF Gwicunw OFF#d4 CP EXPIRATION DATE8 10-31-84 CORPORATE ADDRE558 1000 ELM STREET APPLICANT:
PUBLIC SERVICE OF HEW HAMPSHIRE MANCHESTER. NEW HAMPSHIRE 03105 PLANT LOCATION:
10 MI 5 0F PORTSMOUTH. NH IE REGIONI 1
CORPORATE PHONE H0s(603) 669-4000 AE8 UNITED ENG. 8 CONSTRUCTORS H5558 WESTINGHOUSE CONSTRUCTOR 8 UNITED ENG. & CONSTRUCTORS HRC LPM:
t-WMeetTR Y. N6 %Sd3 REACTOR TYPE PWR IE PROJECT INSPECTOR:
DER (MWE):
1898 IE RESIDENT INSPECTORS A.
C. CERNE IH5PECTION 5 T A T U 58 FUEL L0AD DATE CHAHGE$
744.71993 TIME PERIOD SEPT (atace l%3 A5 REP 0RTED 8Y UTILITYa REPORT HEW REASON FOR CHANGE REPORT BEG DATE END DATE DATE SCHEDULE REPORTED BY UTILITY NUMBER OF INSP.
OF INSP.
09-06-77 az s,
0 na-87 C ;;
09-08-84 DELAYS DUE TO EPA REVERSAL OF PREVIOUS i
APPROVAL OF ONCE THROUGH CIRCULATING va-ut-az
.; 0; 22 WATER SYSTEM & SUB5EO. HRC WITHDRAWAL OF CONST PERMIT. 1 TIME REQ TO REMOBILIZE 11-08-78 11-08-84 SCHEDULE REEVALUATION.
04-04-81 02-28-86 SCHEDULE REEVALUATIDH.
Inspection Reports are available at local PDRs.
Il*30*I2 81* 3 8. g4 ScHEWLE RgEV4LMDON
@-0) 9.g.g3 p g.g 83 - fo 7-gg.g3 g ac.g3 6 -Jo-83 4-Jo-87 ScHttuts desvat.uR7104 8 3 - 11 g-is-g3 g.q-g3 L0 CAL PU8LIC D0CUMENT R 0 0 Hs W
EXETER PUBLIC LIBRARY FRONT STREET EXETER. NEW HAMP5 HIRE 03883 9
N l