Forwards Updated Const Status Repts as of 830930.Info for Inclusion in NUREG-0030
ML20127D175
Person / Time
Site: 05000000, Harris
Issue date: 10/21/1983
From: Zimmerman S
CAROLINA POWER & LIGHT CO.
To: Hartfield R
NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
Shared Package
ML082170543 List: ... further results
References
FOIA-84-367, RTR-NUREG-0030, RTR-NUREG-30, RTR-NUREG-300 LAP-83-491, NUDOCS 8504150108
Download: ML20127D175 (5)


Text

,

1

  1. O

=

CP&L SERIAL: LAP-83-491 Carohna Power & Light Company OCT 211983 Mr. R. A. Hartfield, Chief Management Information Branch Office of Management and Program Analysis United States Nuclear Regulatory Commission Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT UNIT NOS. 1 AND 2 DOCKET NOS. 50-400 AND 50-401 CONSTRUCTION STATUS REPORT

Dear Mr. Hartfield:

Carolina Power & Light Company hereby submits, as requested for NUREG-0030 (Construction Status Report), the updated Shearon Harris Nuclear Power Plant construction information for the third quarter of 1983, to reflect the construction status data as of September 30, 1983 Yours very truly, S.

immerman Manager Nuclear Licensing & Special Nuclear Programs PS/kjr (6776 PUB)

Attachment cc:

Mr. B. C. Buckley (NRC)

Mr. Wells Eddleman Mr. G. F. Maxwell (NRC-SHNPP)

Dr. Phyllis Lotchin Mr. J. P. O'Reilly (NRC-RII)

Mr. John D. Runkle Mr. Travis Payne (KUDZU)

Dr. Richard D. Wilson Mr. Daniel F. Read (CHANGE /ELP)

Mr. O. O. Bright (ASLB)

Mr. R. P. Gruber (NCUC)

Dr. J. H. Carpenter (ASLB)

Chapel Hill Public Library Mr. J. L. Kelley (ASLB)

Wake County Public Library 0504150100 040606 LEF

-367 PDR 411 Fayetteville Street

  • P. O Bon 1651
  • Raleigh, N C. 27602 I

CONSTRUCTION STATUS REPORT PAGE NO. : 1 Malutl5 i NUCLEAR POWER PLANTS STATUS AS OF: 09/30/93 PLANT CHARACTERISTlCS:

KEY PERSONNEL:

D0DCET NO:

05000400 C0fFORATE CONTACT:

N. A. NCDUFFIE, SEN. V. PRESIDENT CP NO. & DATE ISSUED:

CPR-158 / 01-27-78 C0fFORATE ADDRESS:

MUCLEAR GENERATION CP EXPIRATION DATE:

06-01-84 411 FAYETTEVILLE STREET l

WPLICANT:

CAROLINA POSER & LIGHT RALEIGH, NORTH CAROLINA 27602 i

PLANT LG:ATION:

N8fHILI NC IE REGION:

Il C0fFORATE PHONE NO:

(9191 836-6663 AE:

EBASCO NRC LFN:

8. C. BUO(LEY l

NSSS:

uESTINGHOUSE lE PRIICIfRL INFECTOR:

CONSTRLCTOR:

D4NIEL INTERNATIONAL

-CONSTRUCTION:

REACTGt TYfE RtR

-TEST AND STAR 1DP:

DER 98WE):

900 IE RESIDENT INSPECTOR :

G. F. N AnfELL SCSPECTION S T A T U S:

FUEL LOAD DATE CHANGES A$

REPORTED BY UTILITY:

TseE PER100 REPORT NBf REASON FOR CHANGE REPORT BEG DLTE END 04TE DLTE SCHEDULE REPORTED BY UTILITY NUSBER OF INP.

OF INF.

05-07-75 06-01-83 REVISED CURRENT ENEIEY AND LOAD FORECAST.

09-08-80 06-00-84 LONER RATE Gt0 NTH IN CUSTO8ER DEMAND THAN PROJECTE11 12-16-81 12-00-84 loser RATE GROITH IN CUST08ER 094AND THAN IROJECTED.

09-30-82 05-00-85 12-31-82 06-00-85 LOCAL PUSLIC DOCUMENT ROON:

l Waste CG)MTY PUBLIC LIBRARY 104 FAfETTEVILLE STREET l

RALEIGH, NORTH CAROLINA 27601 (677tPtB )

CONSTRUCTION STATUS QEPOQT PAGE NO,: 2 NAfutIS 1 NUCLEAR PONER PLANTS STATUS AS OF: 09/30A3 CON 5TRUCTION 5TATUS:

APPLCANT'S CURRENT ESTMATED FUEL LOADB2 DATE:

06-00-85 JPPLICANT'S CONSTRCTION C0ePLETION ESTM ATE AS JPPLICANT'S f":EVIOUS ESTseATED FUEL LDADING DATE:

12-00-84 DEFINED IN CP: (EARLIEST) 06/01/83 APPLCANT'S ESTMATED FUEL LOADING DATE AT CP ISSUACE:

09-00-80 (LATEST) 06f01/84 APPLICANT'S OJRRENT ESTseATED COesERCI AL OPERATION DATE: 03-01-86 CURRENT ESTM ATED PERCENT CONSTMCTION C0eP LETE: 83.75 C3esENTS REGARDING QMRENT CCMSTauCTION STAiUS:

EST M ATED ACTUAL EST M ATED ACTUAL EST M ATED START START CCDPLET10N CCDPLETION 5 COBPLETE seOSILIZE AND RtEP4RE SITE:

01-14-74 01-14-74 01-28-78 01-28-78 1005 Pl. ACE STmCTURAL C0 CRETE:

01-28-78 01-28-78 02-01-84 975

  • INSTALL REACTOR ReESSURE ESSEL:

12-01-79 04-15-80 04-01-80 08-29-80 1005 INSTALL LAKE BORE PRG:ESS PIE:

04-01-79 04-01-79 08-01-84 8 65 INSTALL t.ARGE BORE PIPE MANGERS, RESTRAINTS AND SNLEBERS:

04-01-79 04-01-79 01-01-85 665 INSTALL SesALL BORE PIE:

04-01-79 04-01-79 08-01-84 8 35 INSTALL CABLE TRAY 04-01-79 04-01-79 04-01-84 955 INSTALL EXPOSED NETAL C0ellIT:

04-01-79 04-01-79 01-01-85 795 INSTALL POWER, CONTROL, INSTR:seENTATION AND SECURITY CABLE:

03-01-81 02-26-81 01-01-85 525 INSTALL ELECTRCAL TEstetNATIONS: (POWER Ae CONTROL ONLY) 01-01-82 06-15-81 01-01-85 225 rnuracT REACTOR COLD HYDROSTATIC TEST:

09-11-84 09-25-84 05 C06tCT NOT FUCTICDenL TEST:

12-12-84 01-11-85 05 CONouCT futEOP AND ACCEPTAaCE TEST NECESSARY FOR RJEL LOAD:

06-01-83 03-24-83 06-01-85 05

  • IFV set including CRDe solding and upper and Icaser internels alignannt.
    • The Report f or June 30, 1983 was I n error. The correct percent f or June 30,1983 was 63 percent.

l (677tPlB )

j

[

t ii.!i f

,f T

T.

N

)

33 T

T N

S S E

B A

E A A S

t D

B P

. 0 0

2 C C 0

E E N G

t O3 l

N /

S 6

R R A A

7 N

7 9

E 7

O O 8

9 A

6 E0 R

2 F F G

P D

M

(

R DD P :

T h A A R D

OOE A

F V

E t O

E L L 4 O

8 l

0 L

t R L S

t T O D0T N

0 S D

A E N S R 8

SO A

A A U N

C A

S E C Y Y I

L U

E. T L H 3

A GG N N

T I R T

6 Y L

O T

F E V R 6 E L

S Y Y

O R I

I A

I E

E O 6 L E

T N N H T

S FN T N ET EI E E T A

f DG T 6 K m

t E f

t C

E,

3 u A

GI

(

L C

d O

TT R D. n l

I E

A T N N e RY H 8

l N

A A G N L H U E E GE S I

l t

I

)

C R t T s

.EF I

Y R uE Co AL E

9 C F

A f

RB U

J T

E C l

1 C

L

. U A

9.

HT O

CQA J l

B G

F D R 0 D.

MN A R

(

CU E

DD t

E 4 N T E E RpD4 O R S S E N t I

f N R s S O E Y A P V

I oA P o V

t E E E E t HX n L

R N P T S R R R R ST E P UO UR E

T T O A

I C T RT T

N O

EC A C DD N

R T S N

PU T E

E N

CS R SP E

I I

T S

E 5 6 7 8

V 9 E

e O

A E I S eN DT L

8 0 8 8

E 8 O

T I

N R 0 PS Np O

N g I U

i 8

1 1

S Oo H

L O A AR D

1 T

E 0 0 0 0

R0 ET CA P

il S E mC T N OO 8

E -

R N EE E

8 H R

C 66 6 6

6 W 0 9 S 00 0 0

0 E

T T T :

C E D LP e

A A A A s I

T-E U

I P

R R Re I

S 5 0 0 8

2 0 i

S L O O O LR E

LR 7 8 8 8

8 8 PF P

P t

C T

8 UP f

f Y

O O 0 R E E

E R

7 0 8 6

0 I

1 OE 00 0 1

3 3 T

CC CN I

1 E

US PT 9

2 9 2 A R E A 5 1 K

F A RD 00 0 1

01 TE 5 N O

NP O

R I

T A CE UL RC TU S N m

s E

F.

s O

T O

A I

O D

I C

T B

H D

R G

L N F I

A E O 8

L N

S 7

O T

D I

C 7

T O

N 2

R 4

I E

I E

R E

e F.

1 I C EN E

T T

0 Ose S U P

A M

s P

M T D

a 0 N S

E l

U S

/

e 1

6 A t e

G e L pI U

a EF C

9 0 I

s 1

Os L T

BO 5 -

I s

i 1

LM C

E T

O 0

1 i

R

- 0O S T 6

t n0 A

D 7

R -

d A S e E

P 6 ReI BE A e 0 Y

2 s

A t

T 0 C 0 Cs E W Dm9 T

f e

I T R A

TL C

5 R E C

h W

O B WE e

I E l A

Pe D

E L R L f

R E

N R NL L

T 0 l

U E CSf I

A A

S T O

B S A L EC U

B L D

I H

I N

U L H O

T P

P I T E

C E G I

E r t T

t F

C YE G L I T

A :

0 Y :

T T I f

DT I

I T T

0 A T n

T T3 E

L 2

  1. &Rs Eo e

E 4 f

Ct E s t u

P A

GrmO N

A Lt I

5 T. P C s

8 ee C

TE

5 I

1 iS S

C F

A EoM I

l t

L o E L I R 55 c E

E I

4 L O

EI W

L Dt P A

5 E A R I

A 0A I

L E E 5>E I

PP l

E CCSPI A 1 A

N L

m1 R 8

CRD M

P I

I

'll!

,!l

CONSTRUCTION 5TATUS REPORT PAGE NO.: 4 MafutIS 2 NUCLEAR POWER PLANTS STATUS AS OF: 09/30A3 CON $TRUCTION 5TATUS:

APPLEANT'S CURRENT ESTM ATED FUEL LORDIts DATE:

06-00-89 APPLEANT'S CONSTMCTION CosPLETION ESTM ATE AS APPLICANT'S PetEVIOUS ESTseATED RJEL LoacING DATE:

06-01-88 DEFINED IN CP: (EARLIEST) 06A)l/85 APPLEANT'S ESTM ATED FUEL LomoleG DATE AT CP ISiuACE:

06-01-85 (LATEST)

O&O1/86 WPLICANT'S OmRENT EST BeATED CaesERCI AL OPERATlose DATE: 03-00-90 CunnENT ESTM ATED PERCE%T CONSTMCTION CorLETE: 45 CasaENTS REGARDissG OpmENT Cose5TMLCTIOes STATUS:

ESTM ATED ACTtAL ESTM ATED ACTIML EST M ATED START START Cosel.ETION COPLETION 5 COFLETE se0BILIZE AND MtEPARE $1TE:

01-14-74 01-14-74 01-28-78 01-28-78 1005 PLACE STmcTimAL C0 CRETE:

02-01-79 02-01-79 04-01-86 3 15 Iss5 TALL REACTOR MEES $URE ESSEL:

09-01-85 01-01-86 of IsE5 TALL LAfGE BORE PuttCESS PIN:

06-01-79 06-01-79 02-01-87 136 INSTALL LARGE BORE PIPE HANGERS, RESTRAINTS A40 SaaBBERS:

07-01-82 07-01-82 02-01-88 of INSTALL 984LL Bone PIPE:

06-01-79 06-01-79 02-01-88 45 INSTALL CASLE TRAY 04-01-85 10-01-87 05 INSTALL EXPOSED seETAL C0seIIT:

04-01-85 10-01-87 35 Ise5 TALL P(BIER, CONTROL. IsE5T8tteeENTATIOut AND SEQRITY CABLE:

06-01-85 03-01-88 05 Ise5 TALL ELECTRCAL TEltel4ATIonE5:

08-01-85 04-01-88 05 CosetCT REACTOR COLO HYDROSTATIC TEST:

11-01-87 12-01-87 05 C0sOCT NOT FUsCT10mmL TEST:

02-01-88 04-01-88 05 COsWUCT PREOP AseD ACCEPTAsCE TEST NECESSARY FOR RJEL LDAD: