ILLINOl8 POWER COMPANY 0982-L IP CLINTON POWER STATION. P.O. 80x 678. CLINTON. ILLINOIS 61727 October 27, 1983 Docket 50-461 Mr. R. A. Hartfield, Chief Management Information Branch Office of Management and Program Analysis U. S. Nuclear Regulatory Commission Washington, D. C.
20555
Subject:
Construction Status Report (NUREG-0030)
Reference:
USNRC letter dated 10/30/81, R. A. Hartfield to L. J. Koch, Illinois Power Company
Dear Mr. Hartfield:
The referenced letter requested Illinois Power Company (IP) to provide quarterly updates of the Construction Status Report (NUREG-0030) for Clinton Power Station.
Enclosed is an updated copy of the June 30, 1982 report indicating the status as of September 30, 1983.
Please note that the last Construction Status Report we received was for the period ending June 30, 1982.
As of September 30, 1983, construction of Unit I is esti-mated at 81.7% complete, with the target date for fuel load remaining at January 3, 1986.
On October 14, 1983 IP officially announced the cancella-tion of Clinton Unit 2.
The decision was based on electrical sales projections indicating that af ter Clinton Unit I is com-pleted no additional generating units will be needed until the 1990s.
Sin ely yours, P.
all Vice President Enclosure.
RPR/j t cc:
NRC Resident Office kDk4I 77 840606 KILLEF$8h-3sy poR
s C0N$TRUCTION 5TATU$
REPORT PAGE Nor 2-828
~
CL CTON 1 MUCLEAR POMER PLANTS STATUS AS OFs PLANT CHARACTERI$ TIC 58 KEY PERSONNELa DOCKET NO:
85808461 CORPORATE CONTACT:
W. C. GERSTNER, EXEC VICE PRESIDENT CP MO. 8 DATE ISSUED: CPPR-137/ O2-24-76 CORPORATE ADDRES$s 500 50UTN 27TM STREET CP EXPIRATION DATE:
DECATUR. ILLIN0IS 62525 APPLICANT:
ILLINOIS POWER PtANI LOCATION:
6 MI E OF CLINTON. ILL CORPORATE PHONE NO:
(217) s37-1111, EXT. 2811 IE KEGION:
3 AE2 SARGENT 8 LUNDY N555*
GENERAL ELECTRIC N 4&I444AN5 G. Haulaon Con 5TRUCTOR:
BALDWIN ASSOCIATE 5 NRC LPM:
IE PROJECT INSPECTOR:
M. M. WESCOTT REACTOR TYPEt SWR IE RESIDENT INSPECTOR:
M. LIVERMORE DER (t3JE):
8958 IPSPECTION STATU5:
FUEL L0AD DATE CHANGES TIME PERIOD AS REPORTED 8Y UTILITYr Anr. 1982 - Jun. 1982 REPORT MEW REASON FOR CHANGE REPORT BEG DATE END DATE DATE SCHEDULE REPORTED BY UTILITY Nt'MBE OF INSP.
OF INSL ss-et-77 e4-es-89 REEVALUATION OF CONSTRUCTION SCHEDULE.
8935 06-02-81 82-85-82 86-23-78 84-08-82 TIME LOST DUE TO SEVERE WEATHER CONDITIONS.
8284 02-16-82 83-31-82 8206 04-78-82 04-30-82 81-21-89 88-90-83 REEVALUATION OF CONSTRUCTION SCHEDULE.
8287 85-87-82 85-28-82 04-29-82 98-03-84 REEVALUATION OF CONSTRUCTION SCHEDULE.
82a9 e6-es-82 e6-ta-82 05.g4 83 01-03-86 Reevaluation of Conabtuction Scitedale.
Inspection Roperts are available at Iscal PDRs.
Status to be ptovided by tite NRC i
J l
L0 CAL PUBLIC D0CUMENi R 0 0 M:
VESPASIAN WARNER PUBLIC LIBRARY i
I?e WE51 J018H'.Mi SIFFET j
ClIH10te. ILLII4 DIS 61777 i
i
v-
~-...:- -...
.,n C0N5TRUCTION 5TATUS REPORT PAGE NO: 2-029 p,9-10-83
.R-CLItiTON 1 NUCLEAR POWER PLANT 5 STATUS A5 0F CON 5TRUCTION 5 T A T U 5:
APPLTCAMI'S CURRENT ESTIMATfD FUEL LOADING DATE:
6644 44-
- APPLICANT 5 CONSTRUCTION COMPLETION ESTIMATE A5 crPIICANT'S PRLVIOUS ESTIMATED FUEL LGP. DING DATE:
99-99 - DEFINED IN CP (EARLIEST) 10-01-88 APPLICAllt'5 ESIII;AICD ru[L LOAUlt;G DATE Al CP !$5UANCE:
88-se-80 (LAIE5T)
M 1-at-10-01-84 APPLICAtII'$ CURRLHT ESTIMA1ED COMr1ERCIAL OPERATION DATE: De-tt-se-II-01-86 CU8tREtil ESTIMATED PERCENT CONSTRUCTION COMPLFTE: 4 44- $!.7%
C0ir1[Nf 5 REGARDING CURRENT CONSTRUCTION ST ATUS:
ESTIMATED ACTUAL ESTIMATED ACTUAL ESTIMATfD STaaf 3LA CDMFLETIDM COMPLETION 1_EDDC1111 riostLIZE AND PREPARE SITE:
88 5 85-86-76 teet PLACE SIRUCIURAL CONCRETE:
82-25-76 41-ee-e>
08-05-83 test 10-15-79 lett IN', TALL REACT 02 FRE55URE VE5SEL:
10-06-79 INSTALL tAtcE s0RE fROCL55 PIrE 05-08-76 47-45-*>
if-01-84 tw 99, 3
l INSTALL LARGE BOPE PIPE HANGERS, RESTRAINTS AND SMUBBERS:
05-01-76 64-454> 02-01-85
- 9 2, 0 IN5I ALL SitALL aCI'E PIPE:
06-St-77 44-e s-*> 04-01 -8 5 tw 93, 9 INSTALL CABLE TRAY:
06-01-74 42-44-*> 04-01-84 tw 95, 7 l
IN5iAtt exposed METAL CONDUIT:
es-et-is 4a-ae-*> 10-01-8 5
- w 77, i I
l INSTALL P0ta[R CONIROL. INSTRUMENTATION AND SECURITY CanLE:
12-12-79
-44 05-65 10-01-85 3++
56 3
INSTALL ttEC RICAL TEcM! NATIONS:
e4-s -se e e-+> 11-01-8 5
+ee-4 7, 9 i
CONDUCT REACTOR C0tD NrDc0 STATIC TEST:
- :: as-Of-06-85 44-en-+> 02-08-85 et i
Cot:0UCT NOT FUNCTIortAL TEST:*
N/A N/A N/A N/A N/A CONDUCT PRECP AND ACCEPT ANCE TEST 5 NECESSARY FOR FUEL LOAD:
93-06-81
-ti-Re-+> J 2-! 9-8 5
-er 4, 6
PAGE N
-830 C0N$TRUCTIOO STATUS REPSRT STATUS A5 0F 90-50 CLINTest 2 NUCLEAR POMER PLANTS PLANT C N A R A C T E R I S T I C 58 KEY P E R 5 0 N N E L8 1
CORPORATE CONTACT:
W. C. GERSTMER. EXEC VICE PRESIDENT DOCKET 100 85800462 CP NO. 8 DATE ISSUED: CPPR-138/ 02-24-76 CORPORATE ADDRES5s 500 50'JTH 27TN STREET CP EXPIRATION DATE:
DECATUR. ILLIMOIS 62525 APPLICANTS ILLINCIS PeteER PLANT LOCAT10N8 6 MI E OF CLINTON. ILL CORPORATE PHONE NO:
(2173 937-1118 EXT. 2881 IE REGIOMs 3
fE8 SARCENT 8 LUNDY N5558 GENERAL ELECTRIC H. WRL-14H6 G. N@W0n C0se5TRUCT OR 8 BALDWIN ASSOCIATES NRC LPM:
IE PROJECT INSPECTOR:
M. M. WESCOTT REACTOR TYPE:
swa IE RESIDENT INSPECTOR
- M. LIVERMORE SEE (PteE38 0950
- IO5PECTION 5 T A T U 5:
PUEL L0AD DATE CNANGE5 TIME PERIOD A5 REP 0RTEO 8Y UTILITYs Aar. 19a2 - Jun. 19R2 REPORT NEW REASON FOR CHANGE REPORT BEG DATE END DATE DATE SCHEDULE REPORTED BY UTILITY Nurta[R OF INSP.
OF IMiP.
03-24-77 10-08-87 FINANCIAL CONSIDERATIONS AND UNCERTAINTY DERAL NUCLEAR GENERATION AND FUEL "N-91-20-81 N/S REDUCED LOAD GROWTH RATE.
SfAhts to be provided by MRC 10-14-83 Cancelled Reduced Load Growth Ra.te I
~
l L0 CAL PW8LIC D0CUMENT R00M VESPASIAN WARNER PURLIC LIBRARY 120 adEST JONNSON STREET CLINTON. ILLINCIS 61727
.g;;;.;.:
~-,;
m..
C0N5YRUCTION 5TATUS REPOET PAGE N08 2-838 CLINT8es 2 NUCLEAR POWER PLANT 5 STATUS A5 0Fs i
C0N5iRUCTION 5TATUSs APPLICANT'S CURRENT ESTIMATED FUEL LOADING DATE:
N/5 APPLICANTS CONSTRUCTION COMPLETION ESTIMATE A5 APPLICANT'S PREVISU5 ESTIMATED FUEL LOADING DATE:
10-08-87 DEFINED IN cps (EARLIEST) 18-88-83 APPLICANT'S ESTIMATED FUEL LOAOING DATE AT CP ISSUANCE:
10-08-83 (LATEST) 10-01-85 APPLICANT'S CURRENT ESTIMATED COMMERCIAL OPERATION DATE8 N/5 CURRENT ESTIMATED PERCENT C0015TRUCTION COMPLETE:
tR U8 TIT 2 T88tSfm.t cancEllLd.
has beel46 Lu.-.- !NSEPf9fM EtY.
CerW9ENTS REGARDING CURRENT CONSTRUCTION STATUS ESTIMATED ACTUAL ESTIMATED ACTUAL ESTIMATED START SIAR COMPLETION
{pMP_L EIJ DM U DEPtETEl l
MetILIZE AND PREPARE SITE:
10 5 03-86-16 sest I
PLACE STRUCTURAL CONCRETE INSTALL REACTOR PRESSURE VESSEL:
INSTALL L ARGE DORE PROCESS PIPE:
INSTALL LARGE BORE PIPE MANGERS. RESTRAINTS AND $400BBERS:
j INSTALL SMALL BORE PIPE:
INSTALL CAeLE TRAY:
INSTALL EXPOSED METAL C0060UITs INSTALL POWER. CONTROL. INSTRUMENTATION AND SECURITY CABLE INSTALL ELECTRICAL TERMINATI0005:
CONDUCT RE ACTOR COLD MYDaOSTATIC TEST:
C0060UCT NOT FUNCTIONAL TEST:
C88000CT PREOF AND ACCEPTANCE TESTS NECESSARY FOR FUEL LOAD: