'Z'I M M E R N U 'C L E A R p0WER STATION SCHEDULE ANAL-ysIs N O V E M B E-R 7,

1978 A*V*C*

~

g41g58 840606 j

p KILLEFE84-367 PDR l

AVC CHANGES SillCE LAST REVIEW 1.

REACTOR INTERNALS - Installation of the reactor internals started last week, when it was decided to defer the shroud head seismic pin work to a later date.

2.

PRE 0PERATIONAL TESTING SCHEDULE - A review was conducted last week by E,,P.D. and G.E.D., during which several major logic and duration changewere made. *These changes have been incorporated into the Project Schedule.

3.

SUPPRESSION POOL - K.E.I. has prepared a detail schedule covering remaining work in the suppression pool, including replacement of the safety relief valve (SRV) piping and installation of quenchers.

This schedule allows for a " window" during the month of December, when the suppression pool is to be made available for functional testing of the ECC Systems.

4.

DRYWELL STRUCTURAL STEEL - K.E.I. has recently issued a schedule covering rework of the drywell structural steel and must analyze physical interference problems to determine if preoperational testing will be affected.

Estimated manhours..for the rework.has Craf t msnpolier,0.00, _in September, 'to the current 30,000 manhours.

grown from 14 requirements lo~pe Hirm this %ork'will peak'this month, at approximately 50 men and completion is not expected until March,1979.

5.

ELECTRICAL CABLE TESTING - Electrical cable testing was 39% complete, as of 10-27-78.

Testing has averaged 1.15% weekly, over the last approx. 16 weeks.

This is below the necessary sustained rate of 2.76%.(weekly), thaMisDe maTntajncOnTo'rder to' complete'by

,AyrilJ._1979.7n additional Multi-Amp engineer will be on site this weeli to handle determination requests, and it is expected that this will be an aid in expediting cable testing.

6.

PRIMARY CONTAINMENT TESTING - Currently waiting for receipt of

" graph-oil" packing to begin testing of the first ten (10)

Primary Containment (PC) isolation valves. All testing is required to be complete to support the integrated leak rate test (I.L.R.T.)

w

WM. H. ZIMMER NUCLEAR POWER STATION UNIT 1 SCHEDULE ANALYSIS PROJECT SCHEDULE REVISED PROJECT MILESTONE-DATE SCHEDULE DATE CURRENT STATUS MSSS FLUSH COMPLETE COMPLETED N/A M/A R.P.V. HYDRO COMPLETED N/A N/A SECONDARY CONTAINMENT TEST (COMPLETE) 3-09-79 3-05-79 15 DAYS LATE INTEGRATED LEAK RATE TEST (I.L.R.T.)

3-22-79 3-05-79 45 DAYS LATE REACTOR INTERNALS COMPLETE 5-14-79 5-09-79 145 DAYS LATE FEEDWATER (FW-1) PREOP COMPLETE 6-14-79 6-14-79 30 DAYS LATE LIQUID RADWASTE SYS. (LR-1)

PREOP COMPLETE 6-14-79 6-14-79 40 DAYS LATE VITAL BUSES (AP-5) PREOP COMPLETE 5-16-79 5-18-79 6 DAYS LATE FUEL LOAD 6-15-79 6-15-79 49 DAYS LATE COMMERCIAL OPERATION.

N/A N/A N/A 1

11-07-78 AVC l

1978 wrvi H. ZIMMER UNIT MO 1_

1979 11/yfyg gg

(

l l

l DESCRIPTION c

g mr"5%31"*-

cm trw c ' t*

"M "

5 g *f t -H )',

u.7.a,t. O*"L"f an=ared usuus LOW PRESSURE CORE SPM i

n h

U

'C h,

j 0" 7"MK j HIGH PRESSURE CORE SPRAY,

1 w o ts.a e

is.,,,,

,e csytru e i

_ __.{aurart=_umas i

  • e me

^"""s n

9

, g j j - tq e RESID. HEAT REMOVAL g

3 l

' 8#

f,sa, m. m.Ima p"" "r"i"7g' as tsn a c es. mesq-i e

Rx. CORE ISOLATION COOL.

y g.3,3

,s i

\\_.t vy

/k _ ' 1""

. [)

l l

v SUPPRESSION POOL e

t-= >

, 8-8'5, m,,,1 i

g_

. wr i

A cs.e e coars a

  • Seu emewan a me amm un om estne_

i i

l I T- - --- - l 1

-.- -(3 '

costru e.t e. wmms i

\\

r v%

L'

  • a c s. uset nes. museas j

RE ACTOR INTERNALS i

1m 3

,,,,,,,s_..

inn m

.t el

.,,,/ A__,eg, g,,_,,, (y,,4 i

r-me mw w.nu c

.a I

t-rst CONTROL ROD DRIVE [RD-21 L a.s_am are m_ n ascentras

-.-__j - mim. g_as._smute e om._s_,, A7_u.

s w

( y T

' um me a e ~ ~

'3_(*l

__[paen

  • 4,""

l g

i i

r '".8_4 " "" ]

o a men T

3 m_i_ eure _. q, smene an=r. ust 4-i

( _ *)

e.. mn= en mi.

i I

asstm a mn answne i

-_.-__4 L.

1

  • me m,,sne ta, e

i L

. 1 l

on) t amn un mm

.=w.__a ra nm[ma mi wus tamp __.).i c

cmmemumwrw

n. tan nura

__._.(~

,4 m,

RE ACTOR RECIRCULATION,i

____4 4

&#3 l

t.e>

- - me m m nu am mns.

-.{ )i w__(

a, s m,

_, -s j

we ara CONTMT. PENET. TESTING !,

1, g3 gm s.=>

\\

I g,j e-a sure

(*

i CONTROL ROD DRIVES

" Min mam, _-_._ _

.4, -) j

=>

me me o

IRD-1 & RD-38 mescTem 9

v ex E3 MAIN STEAM f_

imm__ t__n (3o q -

,m_ _____ s T j mn mim a mn mann e)j mwn mm HD/ES/DV SYSTEMS r-a m erne u mn

--4 v

v t

t-mi j

mo me per r) m =, g-33 y,

' a cmrmano ma me. tax fy

-. - (~'s,

.u m n FEEDWATER

' g i

4 WI

?

e *=* ='*"" " b Ol m

sm.,mi. a swr im CONTMT. COess. CAS CONTROL

-- y

..-.m===='=

a=' =;;; p

...a

._s i>+ =

g E M*Y 85 P't?

sftrifver aggris t SIPrj

-. ~ _

o a

Nf9

/*!nn d

hoe lJwk l An lt(P l OG

_l J:se f Fs3 f man f MG l 99M l Jes f'8 b

o l % Q" t

e os b t

h talvesg APR fVf s

{

9 a4 33 4 i

mC-I E

y g fany

} __ ( __

se

__ _ i o...

h

. so, gy

. P e "1 1

- * [f f

)

,l

=

I I

i,... m_

_ 1 6

fp I

/

I S., n 1--

,gy,,

_I am -

1_

ca i

1 y

1.

Y Y

m,9

  • . a ta

~*

,G s/ e s

%g y

a sts.

-3

&g, e

s e

a..

^

U_***

_m 2,

1 a

a 3

J

_1 <.. e q

l s

,;g

~

p

i th 6 A-Ep$ia u_

mm.raww

-- w '

', !n 5

a I

y,.

o3 2

I

__g

  • P'y - __

i s

i pg f

j I

.1N'*

I

.; - ~~

...W i

[

.-t a

1 p

e I

g g,,

_1_

i n-f l

gg

[

,.,.u 2

1___ -

_ e_

,7 P, G,_

f pg _

4e.44 -_ i -_ __

f I vu i

y, ;

e g_

- - %_-1

. 1 s

1 M

t+?

._ 5..gn_

.n y

1 _ __

_ _1

. m.-. +

g_

l

- ht 1

~

90 Int. _

-_ ' in t I

f.

} g b;,,;l, m,

i

, f'4_

l

-__-P'd*"

{

n L,._,

3!

-_ --- M e i

u_a=

1

}

er t

/

. LG

.>14 n w iv e.

i

[aML LL.

_1

__.s-y Io g

_1 [ -__. Aeg*f '_ f l

I

-L LD

  • * * * =

kw 1

_I A iw 1

-q f_

=

._I - w m.

es-.s

. ~ ~

.u Oc,

~

e u,,,y n._ r i

w_

. < 91

.1

__ i Pl _

i,

  1. 9 _

I

_._ ] e 7

]I

seL, i.w r=..s.. J

_A.a A

<.,1,,.j.

1 PL i

l' _ Lea,n I __

i 1

i

=

D.,,1Z _ ~

1 p

y

  • __. m.y,ga n m1

[

_E _ ~_.

r.

T._

9t 1

1 1

a etm

_1 b.

p (,a

,,4 3. j t,,,g...,

, fr_

?L,,.

I i'/,r".d[ _I

_ ! _ 1 5 19=

.L t

I I

I I

g v'

Ptt,__

n m. A ei <*, = sen Wa_ Mi i._.I'

. e n : e M. m. M._

. AL.,

_.--2W :C- _

I nwa a

at,_

/

pMS NQ Ph 'S k

_1 l

  1. 1

' **d

_ _1 p

.jee i

ne _ m.,g

,.o io.e%

__i,m, m.

p.a_

,....I E_

F y y

,P' W'<>

__ I

'l8l 16

= emu I

_E_!

x u,,

_E_

I#4 y%

+.. (

._A_

.iIt j '.

=

L i

n 1

u.

r -; _

Y} gllt y

_ T-Av

'9_

n_

e

. n -_1-.

{ }ll p

. t_

1

___ -- unca ft

+-

.-(%

.st p,gfg i g

f 1q N,g.

_.e i

. n i.,-

4 n

- - k. F**

x

..s h

r w

.74.-

O "

g (),,

1 l.I m

r w

=

v2 G

fe

_ wl _

V_* <v W_.m h

h' t

F 3(Q};" S j lh o[5; j 1

VAf t *0

-g

  1. .e h w-o y

~

r

.vp 6

. n --

__ L ____.

  • gI('

t_

I

._. _ T ~ J ~M,_

u n.m __r-t (g (

A

(

n

_ :., s

___r -

_ Wi w

m t

,g

et

.e(___

_~~_

_ 1 vu gg a.

. f t_

  • vap4 f

X

.64

?",,

V 4_

gng P3 _

t """

'.T.*v"

  • __ _ _ _ _

yj g a

."E s.

se

_ & met Pk M-f__ _

w,. I u

e MM wee ~

n FL yt o

~ _ _ _

o y

go KL,,,,,,,

.se

%y

. WL -

kelad_- - _

Idr.

L g

g l

e o,

wL nay,&[

l h

h W1

+*l_

_ _ ~

d,1),

=

w._@*4,.

! : g f, un PL et A= 4 a q.~.e q.a - --

(J J

1 Q

II g-M. ~w O

E O

O W

h

'.s.,'t.$.

I e

c jg y

1 sgr;._____p.

w gey----

N

~

k i~

"n o

EQ rf ggs

- --p

$g.

b ll@

'Es e

l gs E

cle Ei@

b Y-

)

  • -G_s@i -..

sie

  • e, b

E 2

5!@

Y a:

s.Q )i W

-s 96 Q---qlQ-Sj a

e-- N S

i

-\\

l 59 e o

e E

e s!

Ei n

g i !b if 1.

le g_04 gg agi e.i


_______A t

195 x,js E

g 4

" 040 0

i d

h gGa ki.

o n

EI

$&up ![

p e

'lolE 4

net,.

)

hod ldr,r>>

3-na

=e u

i g-

I.

l; i

2

.C l

f.

n r1 -l h

t:

'?

In:

ja 14 II N

t hI I

i; k,1

_I

"~

3

_,_ ji li;

,___________,s3,

(

g-g l

.h ;

i$

-*- l

@___q

,g".

nii; y

i ha

_.g l

ld n

': 'i

,Ia 7

l y1T Ili,lll. "U 4

II 3!ll{i 1

1 1

P{

j jn.

i a

j j

b l i i

I,I r

I.

l I'j H

u -

( ~'l l!*:

iH,,I.. _ L _ _ _ _,. _ _ _ _ _ _ _.

g i

i

!E e

ilil i

s_____,

.i pr 4

> ' ;I, _ _ _ _ _ _ _.c _.c _ _4 I

l d2r l

$'@jl; l

i l

l l

b H !?

r i,._

c.

i j

ll*

1r

1 f

ll lh

'l l

l '

l i i $ $,'

'$l y

l 4,

u y1:

t >;

i

.ii f.a llit i

a E b. i ; i f) l f,

j

\\

I j l I,' h' ll e

+i Mkhg!

3g i tdr l o

I l

9 li g

?

l I

.', s I, l ?.

i s

~

f r

@.e]

l I

j l

l'

,l l

i I

1 l

4 i

n l

.gh!,!si.lafja

.! t I

ji t

v il a

i

.i e

,,4- _

.o.

I rf i

a i

i

~

a 4-!

h

}f l

l

'f/

1 h

~

4

\\

7 QD E

r

~

f 39-

$~

Y ~

1 t.

l, n!

i' 4(KKCCO !I i

i o

i i...

.t;,.{~~

n.

L il

  • si i

t; s )ja 4

i l

e

. y -- -

~

" ;)

~

a r:,,

l

.}

J,fD

siii!

-l,.

Ii,.

r h- >p

}.i :

h! ]

$!ih er h iiii tu

's

.[b-4 iir nii!

Ei!

ht i

hI ~

I'.]

t,,

i 1*s.

~

695 f

,,:::c;;:::

i i

1

! 31 4

, s. } g@n,<

i i

Ws; 1

g-3r -

}'3 >L3 f,. 4W d k)[-

j a

,f j

3 IId,!l10h.

@ d,g%;<ip',- x-m-- j..;;

i i

t r

"e da !!,WB :japffjk

!' t j

I a

I r.

l t

i

. bi n 9

+s i.

-l:

3 g, i lq;g p. '

'g

-t

d i

8;

.g-g 4 z a pg I

!ll4h 3lifIS N'

1 11 m

i j [,.'

i 9@- 0

>! ';c f

e

,l

.y
.

l p{

1

.i n

'p i

l y13!

r i

n".r.

,n, i

fi M f d s'r!bhltri@

! yg gg'

!@i hi

'b3 svci g

p 'l t,

-44Np :

..E fd-


4 ---------,

I w

L I

l ji g


__- 2

@, - -, -,, y J

,a

! t l

--Tr-- '

'l

,.@ t-1 1

j l

c?.

l t,.p.t l

l l

i m

t l

I g !., g la!

l l bl)

~

I I

['-

e V

- gy pt-lllllll l 1

=

l,D,@ dD

%}3 h'a l.h{f gpl Ep 4.b 9

3 l9 r,

i 3!

3 j! ~ i, 6 ib b S k l'f,kl$

f'I 31'I 3-3 i

}

II i t e

g p

13 ee s

i A.

((KKKMill a

i t

u i

-t-N..

. ~.,

g s

l

-____g 1

7__

i

Q)

.1

.9*f ;

i g

%i

../

lhhi!

!lb

@a v!

g j!

4 ' 3 g i-j jj e.

A1 -

rsf; g Ft Af M l1, m pr; i

j Ly

!!f; id-p n

i g: :p ge.. :e n

i i3 n -#

psp p----5,'!_l;;j#_,

a g

Q

:5 i

<- 7-1 i f, LU.LLh,o i

'L l

4 it,<

ji,'

un g

I ki!!.h).!

2

j..,,

%.,. j.

n n

i

,3

:a t

i, I

h;,! f i kid @) l! l lji, f i !'3 l)p '

$m q i

' li Di@ W ^4r,r@ :

i J _

'Gt-6 l

i i0 al 1M 5

3..m-er-Q o

,j l.

! ! i I!d!ks.yh h i L i ;

,, li$I;, 9 9p :

pp O

!!3 e

~

fl

! ! llh N I'~~~

f e:

I w n wa :

a I

a e.

H l!

l it T:

ih 3 lr - '3 ! i i, i

l i

l ji w

i J

e;

! o, r i t !i$

I.'pii' 1 i!. l l

L a;Ie I'

i i

if 14 e t-- H e.. q 1

t-w:

3

!nt t i ;i t t-j,3 i

i

d i

Ja f

t i,

l1 i g(34, - :

, jF '
j. l i

i l

1 e!

ri

@4 i

i

( 3-

l i -;$

n -..,3 lh y,;

d t

! A}4p ll 1%%6)~~',-~Is-fl}.

)

.l f i

k bieI

-g ' ?

I itioii ii l 1ll h

Q

-r';. il

"~~' i. $] !<

i u

oii L

}j j

'Ti i

l {i i

.i; 4

ii.I..

~[

-,h 7-_

--j ---_-~~ 2_-,l


4l il l,

-_ _ _ ___ - g7 -- >

q )

i

%p3;; g y E

is t

g on i.

GKKXKM r

L l.s

W

  • , *.o. y* 6 :,. '. ~ -~r _ _.

-).

_y

__ 3.,,

-l o

l o

t o

[ib

. ~] 9 r

~

s 1

L g

g q,----- --.

e t ?t, l

1 ! ;lv! $

t t f

li g -

} -

l

?@'

T@

ist d

m l

i i

i i

Rt ut l

i l

s

..- - -..,. - - -. - - - - -,i

$4 t p

>. a-3 t@

l i

m l:

i

'i j

U s e ll

'I t

i, i

i l

l h'k lI h;G i

j

'8 @

11 tfIi O gi i

le,\\ ! 14 lf!8 l

l (sl I

I i

1 g

b i ttt i,i

rw i

i II

[) t Ii f-~~ T - ~ ~ ~ S3.){ j14p l{@ 'fi.M' I j i $1 iD l It; jIl l !,! ~ l ,l s i lId ~Il [ O.b(If, NE.k}T It')f f h }@l ~ I IdD' jj i 8 it !;~1 .@ l I l t@ !s[ l1 5 t . t i g G,/, - - - s- -,l e i l .t kg it l i~ j 'l 3 t@ 18 h l@ l ll{ J4% .j' ~ ii e 'e i i i t l torrip

  • 03P h
  • 1 N b f

i >mg p i te lg994 m !_ 26 g *f t [s }I N l j !g [. Ik i t fb i I a t@ i 1@ [f 1 t t@ t@ QD o t@. gi@g t@j%j 7 f i

  • W g

lk - ,o ll d!' 'qq l} ~ s q{, k { 0, i a i

  • KK 00 11 i

i. i o. zi i

~ f -o -(. OPilMA 1500 3R102

  • 9 1 1M E L I5 i 1.4 6. * *
  • PAGE 1 0F 40 PROJEC T MAN A6E ME NT SYSTEM TIME NOW t 240CT78 1754 or 2880 ACTIWlilES.. TinC UNIT DAv 18APR80 NE IWORM 050EC77

(* OAIE' 00N0V78 NEIWORk 3.ZIMMER NUCLEAR POWER S T A T I ON UNIT I SELECTED OlPav7A 18APR50 ' CRITICALITY REPORT e o e e o e e e e e.. e o e o e e o e e o e o e e o e e e e o e o e e e o e e e o e o e e e e. .. e e e. .e o e e o e e. A Ci I V I I Y ACTIVITV. E A N L I E 5 i L 4 1 E5 T-P FLOAT ( ACIIVITY, 0E5CR 1P 1 I ON TIME CL 5 FART FINISH S T A R I' FINISH. 5 101 F# IDE NilF IC A f l04 (*'Nfft: SO ":: ;02 007-- - : 2000 ? ?;;i 7: WR500lvR5003.P.Re COMPL. HVAC CONTROLS 40 1 240CI78 190EC78 15AU678 100CT78 5 -99 0 WE5003VR9201 DUMMY 0 1.200EC78 110C 178. -49 0 Il th920lVR9203 CST TESTING VR SV5 21 1 200EC78 19JAN79 110C178 0840V78 -49 0: I h9 30 l I N9 303 IN-1 0.w. PNEUMATIC PREOP 43 1 22JAN79 28 MAR 79 09NOV78 IlJA479 -49 0 Wh9203vR9301 OUMMT 0-1 22JAN79 09hovis -49 0 '1 Wh930llN9301 DUMMY 0 1 22JAN79 09NOW78 -49 0 1NY303Nu9307 DUMMY 0 I 22 MAR 79 12JAN79 -49 0 ' K69 307Ne9309 NS-2 PRE OP 46 1 22 MAR 79 24MAV79 12JA479 16 MAR 79 -49 0 f1 C69 30'9t C9 3 H I OC/FCT LC-1 21 1 25MAY79 25JU479 19 PAR 79 16APR79 -49 0 LC9 30 LLC 930 3 MSIV LEAN CONTL LC-1 PREOP 42 1 26JUNT9 23AU679 17APR79 14JUN79 -49 0 .LC9 303Rv9845 DUMMY 0 1 244U679 35JUN79 -49 0 FI

  1. b9145RW9147 FUEL LOAD 1 1 24Aub79

.244U6791 15 JU N 79 15JUN79 -49 0 '0V9A45pv9145 DUMMY O 1 24AUG79 15 JUN 79 -49 0 SPODUISPOUG5 Sol RELEASE TO Cui 54W PIPING 3 1 240C17A 260CITA 16AUG78 38AUG7A -48 0 (J SP00405P0045 [5T. dEOUIRIMENTS/PREPAPE FOR FILL 25 1 240C178 28NOV #8 - 16AU678 235E P 7 8 -48 0 SPOD 605P0065 COMPL. HAN6ER INSTL,

  • SIEEL kORR 25 1 240C178-28N0V78 1680678 205EPf n -

-4 p ' O SP013%5P0140 5+L RELEASE !$i SRV PIPING 5 1 240CT78 300C178 16AU678 22AUG78 -48 0 () 5P00055P0010 m. Eel. START. REMOVAL OF SRV PIPING 17 1 270CI78 20NOV78 21AU678 135E P 7 8 -4p 0 SP08405PO!45 DELIVER LAST 12" 5RV PIPING ^ 48 l'310C178-09JAN79 23AUG78 300CTim -48 0 5F0010$POU25 DUMMY 0 1 21NOV78 14 5E P 78 -me 0 () 5POO255P0030 REMOVE SCAFF. & CLEAN SUPPRESSION POOL. O 1 29N0V18 215E P 78 -48 0 5 1 21NOV 78 28NOV78 145EP78 205E P 7 8 -4P O SP00305P0045 UDMMV SF006b5P0045 00nMY 0 1 29hov78 2 5 5E P78 -48 0 (i SP004>5P0050 FILL POOL 2 1 29 N 0 W 78; JAMgv74 215E P T A 225EP78 -48 0 SP0050NI9301 DUMMY 0 1 DIDEL78 255FP78 -48 0 $P0050RH9301 DUMMY 0 1 010EC78 255fP78 -en 0 ff SP005 BHP 9301 OUMMY 0 1 OIDEC78 255EP78 -48 0 SP005ULP9301 OUMMV O 1 OIDEC78 255EP78 -44 0 LP 9 30lLP9302 ST ART LP-1 FUNCT. Test 10 1 OIDEC78 14DEC78 255fP78 060LT78 -48 0 (A HP9 30!HP9302 5 T AE T HP-I FUNCT. TESI 10 1 DIDEC78 14DEC7F 255fP78 060CTTA -en 0

  1. 19 30lRI9302 S T ART RI-I FUNCie TEST 10 1 UIDEC7A 14DE C 78 255FP78 060C178

-4 R 0 RH930lRH9302 SIARI RH-1 FUNCT.if 51 10 1 DIDEC78 14DEC78 25 51 P 78 0600T78 -48 0 (: LP9 302LP930 3 COMPL. LP-! FUNCle TEST 11 1 15DEC78 02JAN79 09 0C 178 2300178 -4R 0 HP930?HP9303 COMPL HP-1 FUNCie TEST II 1 150EC78 02JAN79 090C178 230CT78 -48 0 pl9 302R19 303 COMPL e RI-! F UNC T. TESI 11 1 15DEC78 02JA N 79 0*0C178 230CTF8 -44 0 () RH9302RH9303 C OMPL e pH-1 FUNCf. TEST ll 1 15DEC78 02JAN79 090C178 230C17A -4R 0 R193035P0l#0 DUMMY 0 1 03JAN79 2400i78 - 4.n 0 RH9 3035 Pols 0 DUMMY 0 1 03JAN79 240 CIT 8 -48 0 fI HP93035P0180 DUMMY 0 1 03JAN79 240C174 -en 0 LP93035P0180 DUMMY 0 1 03JAN79 240C178 -48 0 $P01R05P0ln5 DRAIN SUPPRf5% ION POOL 5 1 03JAN79 09JAN#9 240EI?8 300Clyn -e n 0 $P014b5P0200 OUMMY 0 1 10JAN79 3100178 -48 0 g. SP018b5P0200 DUMMY D 1 10JAN79 310CI78 -4P O ()

.0PTINA 1800 3R102 e o e i 1 M E L I5 1 1N 6 e e o PAGE '2 Or 40 P&OJLCT M AN AGE ME N T SYSTEM IIME NOW s 240CT74 1754 0F 2880 ACTIVITIES. Time UNIT DAV hETWORE. 050fC77 18APRAD DATE 08NOW78 hETu0Ph : 2]MMLR NUCLEAR'P0utR S T A TI ON UNIT I SELECTED DIMAV78 18APR80 CRITICALIIV REPORT-A. s.............................................................. ACTIVIiv A C T I v1 1 Y ACTIvlTV E A R L I E-5 i LA TE 5 i P FLO41 IDE tt !F IC A T ION 'DE 5CR IP i 1 0N TIME CL START . FIhISH ,51AR FINISH 5 TOI FR .........____.._____..__.....__......_____..____._______..._______...._...___..._____.....__....__.__'i,___........________..... SF02005P0205 5[i M41'L IN SUPPRESSION POOL 5 I IOJAN79 16JAN79 3I0C178 06NOV78 -4A 0 SPU20h5P0210 OUMMY 0 1 17J A N 79 07N0VV8 -44 0 SP02l0$PD215 CLOSE SUPP. POOL ACCESS HAICH 25 1 17JAN79 20F E P 79 07NOV78 120EC78 48 0 I O l' 21FE8 79 130ECTA -tp 0 SP0215VP0009 DUMMY . COOLER 20 1 21F E B 79 20 MAR 79 130ECIS IlJAN79 -te 0 WP*009VP0011 SET L COMPL LAST ORVWELL WP00llVP0007 DUMMY 0 I ?! MAR 79 12JANI9 48 0 WP000 7VP0008 F LU5H & IE ST LOOP 8 15 1 2tMAR79 10APR79 12JAN79 OlFER79 .-48 0 WPOOO8vP9301 PRE OP VP LOOP R 15 1 IIAPR79 OIMAV79 02FE879 22FE879 -48 0 WP9 30lvP9303 VP-01 PRIM CIM PREOP 5 3 02MAV79 CSM A Y 79 23FEHT9 OIMAR79 -4A 0 WP9303RW9329 DUMMY 0 1 09MAV79 02 MAR 79 -48 0 OV9 329R V 9 3 31 1.L.R.E CONTMI. 5.I.T.15T 10 .I 09MAv79 22M A V 79 02 MAR 79 15 MAR 79 -44 0 GV9 33 8 RV9401 DUMMY 0 1 23MAV79 16 MAR 79 -48 0 / CV9totRV9403 INTEG-WTR. IE S T

  • DRAIN RVP 5 1 23MAv79 30MAY79 16 M A R I9 22 MAR 79

-4n 0 WV9403RV9405 INSTALL vlBRAT. INSTRU. 6 1 31MAV79 07JuN79 23 MAR 79 30 MAR 79 48 0 dutt05RW9407 FILL rep.V. AND INSTALL HEAD 2 1 08JUN79 IlJUN79 02APR79 034PR79 -4R 0 -dV9C07RR932U DUMMY 0 1 12JUN79 04APR79 -48 0 F CR9320RR9322 NEC1R. SYSTEM IHOTI IEST 21 1 12JUN79 IIJUL19 044PR79 02MAY79 -44 0 8R9322Rv9333 DUMMY 0 1 12JUL79 03MAY79 -48 0 C V9133RV9135 DRAIN VE55EL' 3 1 12JUL79 16JUL19 03MAY79 07MAV79 -en 0 '34911bRV9837 INSTALL INCORE S 5 1 17JUL79 23JUL79 OnMAV79 14MAV79 -en 0

  1. V9137RV9339 F ILL RX. VL55EL 2 1 24JUL79 25JUL79 15MAY79 16MAV79

-4A 0 CVD339Rv9341 INTEG. ECC5 PREOP. 5 1 26JUL79 0140679 17pAV79 23MAY79 4n 0 (' WV9311RV98 4 3 L O AD SOUACE S - 5 1 02AUG79 08AUG79 24MAV79 31MAYF9 -44 0 CV9t*3RV9145 MEET PREP.F.L. 10 1 09AU679 2280G7* Ol JUN 79 14JUN79 -48 1 Gb940bNYD013 DUMMY 0 1 ORJUN79 03APR79 47 0 L MV0013XVUO15 6.E. VESSEL INTERN. INSPECT I 1 08JUN79 08JUN79 03 APR 79 0 34PR 7 9 -47 0 N100lbHR9320 DUMMY U ! IlJUN79 04APR79 -47 1 019 330RI9301 RCIC OIL FLUSH 0.5.CP 25 1 240CT7a 28NOW78 18AUG78 22$EP78 -46 2 ( SPOD 90$P0095.5+L 155DE GUIDE DESIGN 25 1 240CT78 28NOV78 28AU678 255EP 7 8 -45 0 PL9310PC9312 TVPE PLC PEhET. IESTING 135 1 240CT78 03MAY79 2tAub78 OIMAR79 -45 0 DV9803PC9310 DUMMY 0 1 240CI78 28AUG78 -45 0 t SPOU955P0100 PROCURE /F AH GU10E5 25 1 29NOV78 04JAN79 265fP78 300CT78 -45 0 5P01005P0200 DUMMY 0 1 05JAN79 310CT78 -45 3 PC9 312R V 9329 DUMMY U 1 04MAV79 02M AR 79 -45 3 ( a (PilMA 1800 3R102 i IM E L I5 T IN G PAGE 2 0F to PR0sELT M AN AGE MLNi SYSTEM 11ME NOW s 240CT78 1754 0F 2580 ACT IV IT IES. TIME UNIT DAY NETWURM 05DEC77 = IRAPR80 DATE 03NOV78 NEtwoku : ZIMMER NULLEAR P0mER STATION UNIT I SELECTED DIMAYTR 18APRan ] CR !ilC AL IIV. REPORT ACIIVIIY A C i IV I T V. ACTIVITY E A RL IE 5 i L A T E5 i P FLOAV h> IDE NilF IC A T ION DE 5CR IP I 1 0N TIME CL STARI FINI5H STARI FINISH $ Toi FR ts n ant. son sne esv ..e6

n. e..a s.n e...... a.. a.

~ - -... -

5P0210500 0LC5L SUPP.'P&tL ACCESS HAICH 25' 1 17Jak?* ' 20F E 3 FD G7Nov78 120tC70 0 ' 5 P321 bvP06. a DuMPV O-1 21F E P 79 -130EC78 -4 0 VPC039tP00ll SEI L COMPL LAST ORY% ELL CCTLER 23 1 21F E 8 74 20MA#70 13DFC78 I l J L47 0. -tR S VP30llVPROO7 DUMMY 0 1 21RAR79 12J%279 -44 0 WP0bO7vP0008 Flush & IE ST LOOP S 15 1,21 MAR 79 10APR79-12JAN79 OlFEB79 -th 0 y WPOD0DVP9301 PRE OP VP LOOP B 15 I IIAPR79 OIMAV79 02F E 8 79 22 FEM 79 -ta 0 VP0 30lvP9303 VP-01 PRIM CTM PREOP 5 1 02MAv79 08MAY79-23FEuf9 DIMAR79 -48 0 EP9303Rv9329 DUMMY 0-1 04MAV79 U2 M AR 79. -4n 0 j GW9329Rv9331 I.L.R.& CONIMT. 5.1.T.T51 to 1 09 MAT 79 22MAv79 02 MAR 79 15 MAR 79 -48 0 QW933tRv9401 DuMMV O '! 23MAV79 16 MAR 79 -48 0 N w940lRv9403 INTEG-b1R. T[5T + DRAIN RVP 5 1 23MAv79 30MAY79 16 MAR 79 22 MAR 79 -48 U ~Rv1403Rv9405 INSTALL VihR4T..INSTRU. 6 1 31MAv79 07JuM79 23 PAR 79 30 MAR 79 -me O Qv940tRv9407 F ILL R.P.V. ANu INSTALL HEAD 2 1 04JUN79 IlJuM 79 - 02APR79 03APR79 -48 0 SW9407RR9320 OuMMY 0 1.12JuN79 04 APR79 ' -48 -O CR9320RR9322 RECIR. SYSTE M ' IHot t TEST 21 1 12JUN79 !! Jut?9 04APR79 02MAY79 -48 0 G@0322Rv9133 DUMMV 'O-1 12JUL79 03MAY79 -4m 0 DV9133Rv9135 DRAIN WESSEL-3 1 12JUL79 16JUL79 03MAV79 07MAV79 -4A 0 Gv1135Rv9837 IN51ALL'INCORES 5 3 17JUL79 23JUL 7* On M A Y 79 14MAV79 -ta 0 QWDl37Rv9339 FILL RE. VESSEL 2 1 24JuL79. 25JUL79 15MAV79 16MAV79 -m8 0 RW9339pve341 INTEh. ECC5 PREOP. S':1 26JUL79 014UG79 17MAV79 23MAV79 -44 0 Rv7341Rv9 843 LOAD SOURCES 5 1 02Ach79 08 AU6 79 - 24MAV79 3tMAV79 -48 0 '#W1843Rv9145 MEET PREP.F.L. 10 1 09AUG79 22AU679. OlJUN79 14JuM79 -4A 1 GW1405NV0013 DuMMV O 1 OnJuN79 03APR79 -4 7 - 0 XV0013MY0015 6.E. WESSEL INi[RN. IN5PECT I 1 08JUN79-08JUN79 034FR79 03APR79 -47 0 MVall59R9320 DUMMY-0 I IlJUN79 04 APR 79 -47 I-C19 330R19301 RCic OIL FLUSH 0.5.CE 25 1 240CT78 28N0978 IsAUh78 225EP78 -46 2 SPE090$P0095 $*L 155uE Eul0E DESIGN 25 1 240CT78 28Novie 2140678 255EP78 -45 0 PC9 310PC9312 i VPE RLC PENET. TESTING 135 1 240C174 03MAY79 21Ap678 OIMAR79 -45 0 Rv9903PC931n neeMMV O I 240CT78 FIAUh78 -45 0 5PHO*~ =F0100 PROC URE /F AS GUIDE S 25 1 29NOW78 04JAN79 26 5E P78 300CT78 -45' O 4 SPol005P0200 DUMMY O 1 05JAN79 310CI18 -45 3 P C9 312 R v 9 329 DUMMY 0 1 04MAV79 02 MAR 79 -45 3 'IV37561v3956 PREA55EM6LE CONTROL R005 10 1 240C178 06NOV7A 228U678 055EP7A -44 0 .Iv34561v4556 DuMMV., 0 1 07Nov78 065fP78 -44 0 1945561v4756 COMPLETE CRD' INTERNALS A55'V 5 1 07NOW78 13NOV78 06 5E P 78 125EP78 ' -44 0 4 IW97561v4956 INST'lHERMAL SLEEVES 5 1 14NOW78-20NOV78 13 5E P 78 195EP78 -44 0 IV49561v5156 INSTALL ORIVE5 13 I 2tNOW78 08DEC78 20 5E P 78 060CT78 -44 0 IW5156919302 OuMMY 0 't IIDEC78 090CT78 -44 4 ( Iv5956HP9302 DUMMV O 1,llDEC78 090C 178 -44 4 'lV5156LP9302 DUMMY 0 1 IIDEC78 090CT78 -44 4 IW5156RH9302 DUMMY 0 1 Il0EC78 090C178 -44 4 ( SPG020$P0025 EST. REOUIREMENTS FOR CLEANING 5.P. 15 1 240CT78 13Nov78 2380678 135EP78 -43 5 s t

w a .CPilMA 1100 3RIO2 i !M E-L15 i IN G-e e o PAGE '3 Of 40 PROJE C T MAN AGEMENT. 5YS T EM ilME NOW 3 24 0Ci 78 1754 0F 2880.ACTIvlilES. TIME UNIT DAY hE TWORm - 0$DEC77 ISAPRRO DAll 00N0V7R. NETWORK 2IMMER NUCLEAR power STATION UNIT I SE LEC TED ORPAY74 - IgAPRnD CR!ilCALITY REPORT-j'. ACTIVITY A C T 'I V I 7Y ACTIVITV E A RL !E5 i L A I E5 1 P' FLOAl' ' I DE hil F I C A T ION OE5CR IP i I ON TIME CL START FIhl5N S T AR T FINISH $ 101.FR 161 .Sv4000RW9054 OuMMY 0 1 240CT78 2340678 -43. O I W4 7563 v9020 DUMMY - 0 1 14NOV78 19 5( P 78 -43 0 .ittb2GIV9022 INSTALL TOP GUIDE 4 1 14Nov78 17NOV7A 19 5E P 78 19 5E P 7 8. -43 0 -Itt0221v4956 DUMMY 0 1 20NOV78 205E P 78 -43 I RW9135MY0069 puMMY 0 1 17JUL79 15 MAT 79 -43 0 'nVEC69Rv9837 OuMMY 0 1 17JUL79 15MAY19 -43 5 1 M5310lM53665 DEL M5 HANGER 5 8 1 240Ci?8 02NOV78 2440G78 055EPT A -42 0 M53665M537h5 CONTINUE IN5f ALL HANGERS tl ! 0 3NOV 78 03JAN79 06 5E P 78 OINOV78 -42 0 M 53 765M5 3965 INST MS-3 HGR$ 20 1 04JAN79 33JAN79 02NOV78 30NOW78 -42 0 ? -n53965N89301 OUMMY 0, 1 OlFE879 010E C 78 -42 0 Nbe30lN89303 N555 N8-1 PREOP START IR 1 OlFEB79 26FE R 79 C10EC78 27DEC74 -42 0 th9303NN9305 N555 N6-1 PREOP COMPL 45 1 2 7F E 879 30APR79 200E C 78 D! MAR 79 -42 0 Nb9305R49329 DUMMY 0 1 DIMAv79 02 MAR 79 -42 6 AP920BAP9301 AP A.C. POWER OC /F C T 22 1 240CT78 22NOV18 258U678 265EP78 -el 0 AP9 301&P9303 AP-2 4160V A.C. PREOP 39 1 24NOW78 19JAN79 2 7 5E P78 20NOW78 -el 0 ) AP9301AP9315 UUMMY 0 1 24Nov78 275EP78 -41 0 AP9315AP9317 AP-3 480V A.C. PREOP 63 1 24h0W78 20FE879 275EP78 230EC78 -48 0 AP9303AP9305 AP-1 6900V A.C. PREOP 22 1 22JAN79 20F E 879 2tNOV74 210EC7 8 -41 0 AP9305AP9307 AP-4 PREOP 63 1 21FEB79 18MAY79 22DEC78 22 MAR 79 -41 0 AP9 317 AP9305 00MMY 0 1 21F E 8 79 220LC78 -41 0 SP930FGC9304 00MMT o 1 28MAV79 21 MAR 79 -41 0 ) 6C930!GC9303 GCal.2L3 GLN AUN PREOP 59 1 2IMAY79 138UG79 23 MAR 79 14JUN79 41 0 0 GC9303RV9145 DUMMY 0 1 14AUG79 15 JUN 79 -41 8 SP0(i705P0075 5+L !$5UE OUENCHER SUPPORT DESIGN 15 1 240CT78 13Nov78 244U678 185EP7 8 - -40 0 ) N2070lul0601 REC. RADWA5TE CONCENT CONTROL PANELS 17, 1 240CT78 15NOV7A 2940678 20$EP78 -40 0 t SP00755P0080 PROCURL #f A8 OUENCHER SUPPORTS 30 1 14NOW78 270EC78 19 5E P 78 300CT78 -40 0 U1060lW21075 IN51 ALL R ADW ASTE CONCENT CONTROL P ANELS 10 1 16NOV78 30NOV78 215E P 78 040CT78 -40 0 ) Wild 75W24973 DUMMY / 0 I G10EC78 05 0C T 78 -40 0,- i W24473W25173 PULL + TE RM.F NL.C A B LE S 15 I OICEC78 210EC74 050CT78 250Cf78 -40 0 W2335tWZ3551 CG+E TEST EculPMENT 5 1 22DEC78 290E C 78 260ff78 OlNOV78 740 0 ) U25173k23351 OUMMY O' I 220EC78 260C178 -40 0 t SP00805P0200 OuMMY 0 1 280EC78 310C178 -40 8 W2355tW29201 DUMMY 0 1 02Jah79 02h0W78 -40 0 t W2920lWZ9301 WZ CHEM. WASTE OC#FCT 63 I 02JAN79 29 MAR 79 02Nov78 OlFEn 79. -40 0 i ~ W2930lW29302 ST AR T W2-1 PREOP 26 3 30 MAR 79 04MAY79 02FER79 09 MAR 79 -40 0 W29 302WZ9303 COMPL' W2-1 PRE OP 21 1 07MAY79 0$JUN 79 12 MAR 79 09APR79 -40 0 ) tE9303WY93Ol DUMMY 0 1 06JUN79 10APR79 -40 0 ( i - b V9 30lWY9303 W V LAUNDRY DRAINS PREOP 47 1 06JUN79 1080679 10APR79 14JUN79 -40 0 WJ9 303WE9303 OuMMY 0 1 06Juw79 luAPR79 -40 0 &l9303WV9301 ouMMV O 1 06JUN79 10APR79 -40 0 ( bV9303Rv9145 DUMMY 0 1 13Aub79 15JUN79 -gG 9 IW41561v4356 PRLA55'8 FUFL SUPPORT CASTING 5 1 2400T78 300CT78 29auh78 055EPFA -39 0 I W9 3561 v 4 556 0UMMY 0 1 310CT78 06 5E P 78 -39 5 .Qt932vuv0009 DUMMY 0 1 04MAV79 !$ MAR 79 -39 0 b k

s. $PflMA !!00 3R102 I IM E L I5 i IN6 PAGE~ 4 0F to PE0JEC T MAN AGE MENT SYSTEM TIME Nov 240CT78 1754 or 2880 AC ilVITIE S. TIME UNIT DAY NEth0Rm 050CC77 18 APR8 0. Daft DBNOV78 NEiwoRE s 2 I MME R NUCLEAR POWER STATION UNIT I SELECIED O!MAV78 18APR50 CRulICALITY PEPORT . e......... e...................................................... 'ACTIVIIV A C i Iy I.T Y AcilVITV E A R L 1E 5 i L 4 i E5i P FLOAT IDE NilF IC A T ION OE 5CR IP i I ON TIME CL STANT FINISH START FINISH 5 101 FR ) .NV0009NV00ll IN SENVICL ' INSPECTION 1 1 09MAV79 09MAV79 15 MAR 79 15 MAR 79 -39 0 NYUOllRV9331 DUMMV 0 1 10MAY79 16 MAR 79 -39 -9 HD)375HU6575 SET PNLS.E' MOUNT IN51RU. 47 l'240Cf78 29ptC78 3040678 0340V78 .5 -34 0 HO6575HO6766 INSTALL INSTR. PIPE AND TUSING 5 1 02JAN79 UBJAN79 06MOV78 10NOV78 -3a O h D8 766H06966 COMPL.INSTRU. PIPE & TUBING 55 1 09JAN79 26 MAR 79 13 NOV 78 31JAN79" -38 0 HD3971HD417) COMPL.CONDuli TO EOUIP.. 5 1 27 MAR 79 02APR79 DRFEu19 07FER79 ' -38 0 Hbe%66HD3973 DUMMY 0 1 27MAE79 DIFEb79 -3m 0 HD4171HD4973 DunnV-O I 03APR79. 08FE h 79 -38 0 - HD9 973HD58 73 PULL & TERM.FNL. CABLES 5 5 034PR79 09APR79 anFE 8 79

14rEny, 3A 0

HD5173HD9201 00MMY 0 1 104PR79 15F E 8 79 -38 0 HD920lHD9203 HD OC/FCT 20 I 10APR79 . 0 7M AV 79 15FE879 14 MAR 79 -38 0 H04203HD9301 DUMMY 0 1 08MAY79 35 MAR 79 -38 0 l) ' HU'730lHD9303 HD/E5/DV-1 VENT /DR/SIM PR 6% 1 08MAV79 0880679 15 MAR 79 I4JUN79 -34 0 HU9 303Rvv845 UUMMV O 1 09AU679 15 JUN 79 -3n II RHOD 0!RH9301 COMPL. CODE !

  • 2 ITEMS 16 1 240CI78 14NOV78 33AU678 225EP78

-37 11 Rv4010RV9010 UUMMV O I 240CI78 31Ap678 -37 0 RV9005RV9010 DUMMY 0 1 240C178. 31AUG78 -37 0. [ Fm460lFw6603 DE LIVER 5/5 FITTINGS 5 1 240CT7n 300C I 78 05 5E P 78 Il5EP78 -35 0 '} IN200llN2003 5&L ISSUE ONES. FLEN. CONNECTIONS 15 1 240CT74 13NOv78 055EP78 255EP78 -35 0 Feat 03Fwn?F5 DUMMY 0 1 310CI78 12SEP78- -35 0 IN01691NO369 B6N.FLD.ENG.5M.80RE PIPE 5 1 14NOV78 20NOV78 265EP78 020CT78 -3% 0

)

IN2003]N0169 DUMMY O I 14NOV78 265EP78 -35 0 t IV902/IV9024 DUMMY 0 1 20NOV78 020CI78 -35 0 Iv1024IV9026 INSTALL SLADE bulDES 5 1 20NOV78 27NOV78 020CI78 060CiFA -35 0 ) . t h0 369IN04 69 INSTALL PUMP 5 1 21NOV78 28NOW78 030C178 090CT78 -35 0 I A03691N0565 F AB.& INSTL.5M.40RE PIPE 5 1 21NOV78 28NOV78 030C178 000Cf74 -35 0 IV90261V5156 DUMMY 0 20NOV78 09 0C 178 -35 0 t Ikut691N6003 DUMMY 0 1 29NOV78 100C178 -35 0 INU565tN6003 OUMMW. O I 29NOV78 100CT78 -35 0 INbt'03IN6C05 COMPL. 'IN5tRue TUP / PIPING 10 1 29NOV78 12DIC78 300Cf78 230C178 -35 0 ,8 INGD03145005 COMPLETE CONDUIT 4 1 - 130E C 76 18DE C 74 24 0C 178 270CT78 -3% 0 4 IN20051N500 3 DUMMY 0 1 13DE C 78 2400T78 -35 0 IN4003IN4005 COMPL. CAPLE5*1ERN 3 1 190fC78 21DE C T A 300C T 78 OlNOV78 -35 0 i 1250051N4003 DUMMY 0 1 19DEC78 300C178 -35 0 IN4005IN4UO7 IN Sv5. OC/FCT 5 1 22DE C 7M 290E C 7 8 0?N0v78 08NOV78 -35 0 IN40071N9301 DUMMV O 1 02JAN79 09Nov78 -35 14 1 NB9203Nh*307 OC/FCT NS-2 21 1 OlFEP79 OlMAR79 320EC78 IlJAN79 -35 le Nb930lNB9203 DUMMY 0 1 OlFER79 120EC18 -35 0 LR9 30lLR9303 LR-l LIOUID R AD PREOP 42 1 06JUN79 03AU679 17 APN79 14 JUN 7 9 -35 0 U29303LR9301 DUMMY 0. 1 06JUN79 ' 35JUN79 -35 14 17APR79 -35 0 i LP930 $Rv9845 DUMMY O 1 064U679 RIOLO3RI0005 ConPL. RI-I PUNCHLIST 13 1 240C178 09NOV78 065f P78 22SEpF8 -34 0 F C3 3 51F C 3 351 DELI VE R SPE NT F UL L kACM 5HIMS & BOLT 5 7 3 240CT78 O!NOV78 06 5F P78 145LPip -39 0 Iv3556IV4556 DUMMY 0 1 240CI78 065EP78 -34 10 m m

EPIIMA !!00 3R102 e e e i !M E L 15 1 IN 6 e o e PAGE 5 0F to P29 SECT MANAGEMENT SYSTEM TIME NOW s 240CT78 1754 0 F. 2880 ACTIVIllES. TIME UNIT DAY NEtkops. OSPECF7 18 APR80 SSTL 08hov78 NElwoph ZIMMER NUCLEAR POWEk ST ATION UNIT 1 SE LIC TED DiMavi8 - 18APR80 CNITICALITY REPORT ACllvilY A CI I V I T Y ACTIVITV E A R L 1E 5 i LAT E5 I P-FLO48 .lbENilFICAll0N DE 5Cb IP T 1 oN TIME CL START FINISH. St#RI flNISH 5 101 FR FC335tFC3551 JNST SPENT FUEL RACM 37 1 02Nov78 27h0V78 155f P 78 090CT78- -34 0 + O ! 10NOV78 255tP78 34 14 alOOObR19301 DUMMY 21 1 21 MAR 79 18APR79 Olffb79 OlMAR79 34 34 RV932cRV9329 ORYWELL HV AC B AL ANCE WF0013HV9326 DUMMY 0 1 28 MAR 79 OlFEB79 -34 0 M5330lM54365 DEL SNU8bERS 132 1 240C178 30 APP 79 0 7 5( P 78 14 MAR 79 33 0 .Uk000lVR9301 5/C C OMPL.5V5. INSTAL.VR 45 1 240CT78 270EC78 0 7 5f P 7 8 - Oahov78 5 -33 16 M5436bM54565 INSTALL SNUPHIRS 25 i OlMAV79 0$JUN79 15 MAR 79 18APR79 -33 0 M54565M59201.0UMMY 0 1 06JUN79 19APR79 -33 0 M5920lM59301 MS-1 OC/FCT 10 I 06JUN79 19JUN79 19 APR 79 P2MAV79 -33 0

  1. 59301M59303 MS-3 MAIN STEAM PREOP 30 I_20JUN79 014U6 79 01MAV79 14 JUN 7 9

-33 0 M59303Rv9845 DUMMY 0 1 02AU679 15JUN79 -33 16 SPol255P0130 DELIVER L AST "T" OUENCHfRS 35 1 240CT78 120EC78 125tP78 300CT78 -30 0 l F W8 775F W8966 COMPL INST IN51RU PIPE & TURE 10 1 240CT74 06Novi8 12 5f P 78 - 255EP78 5 -30 0 1985081NF503 DELIVER IN SV5. VALVES 10 1.240CT70 06NOV78 125tP78 255EP78 -30 0 FW5171FW5371 COMPL CONDUIT INST 5 1 07NOV78 13NOV78 26 5t P 78 020Cffe -30 0 F s8 966Fw5171 DUMMY 0 1 0 7NO V 78 265EP78 30 0 'IN9503IN8505 COMPL. L.B. VALVES 5 1 07NOV74 13NOV78 265tP74 020C178 -30 0 F m5 37 tFw5 7 7 3 DUMMV O 1 14Nov78 03UC178 -30 0 F h5773F W5973 PULL & TERM FINAL CA85 5 1 14NOV78. 20Nov78 03DCT78 090CIFA -30. O IN8505!NO369 DUMMV O 1 14NOV78 03 UC 178 -30 Fb5973FW9301 OUMMV O 1 21NOV78: 1000I78 -3D 0 t Fm930lFw9303 F W-l' PRE OP - LOGIC. 80 1 21hov78 15 MAR 79 100C178 DIFER79 -30 0 i $ Pol 305PU200 DUMMY 0 1 130EC70 - 310C178 -30' 18 WW930lVR9303 UR-DI RM VENT PREOP START 17 1 22JAN79 13F E B 79 070fC78 02JA479 -30 0 9 V6930!VG9303 VG-01 586T & SEC CTM PREO 29 l 14F E8 79 26 MAR 79 03JAN79 12FER79 -30 0 V29303VG9301 DUMMY 0 1 14F E B 79 03JAN79 -30 0 F U9303F W9305 F W-1 PNEOP IPART ll 52 1 16 MAR 79 28MAv79 02F E B 79 164PR79 -30 0 W69303V09301 DUMMY 0 1 27 MAR 79 13FE879 -30 0 VU930lV09303 V0-01 PC PURGE P RE 00 13 1 27 MAR 79 12APR79 13FER79 OIMAR79 -30 0 V09303RV9329 DUMMV O I 13APN79 02 MAR 79 -30 18 F m*305F W9310 DUMMV O 1 30MAV79 17 APR 79 -30 0 F e9 3 3 0F w9 312 F w-l PR[0P IPART 29 42 1 30M A V 79 27JUL79 17 APR 79 14JUN79 -30 0 F m9312hW9 8 45 buMMV O 1 30JUL79 15JUN79- -30 19 -[ e HPOCOlHP9301 LOMPL. CODE I

  • 2 ITEMS 8

1 240CT78 02NOv78 135f P 78 225EP78 -29 19 2' ITEMS A I 240CI18 02NOV74 13 5F P 78 22SEP78 29 19 LP000lLP9301 COMPL. CODE 1 + HD&%6bHD920I DUMMY 0 1 27 MAR 79 15FI879 29 10 6 HP3971HP45 7 3 DUMMY 0 1 240CI78 185(P78 -26 0 HP5372HP4573 OuMMV O 1 240C178 18 5t P 78 --26 0 VtS00lVC5003 P.N. COMPL. HVAC CONTROL 5 80 1 240CI78 15FER79 185fP78 10JAN79 5 -26 0 6 VC5003VC9208 DUMMV O I 16F E b 79 IlJAN79 -26 0 VC920lVC9203 COMPL REMAND CST VC SV5 45 1 16F E 8 79 19APR79 IlJAN79 14 MAR 79 -26 0 WC0021VC0023 C51. TL5 TING - WC SYST EP 20 1 20APR79 17PAYT9 15 MAR 79 13APR79 -26 0 i VF9203VC0021 DUMMV O I 20APR79 15 MAR 79 -26 0 vt0023VC0303 DUMMY 0 IRMAY79 12APR79 -26 0

)'

~

( ~ PAGE-6 0F 40 CPilMA 1100 3R102

1. I M L L 15 f1N6' e *.
  • TIME UN11 OAV P E 0 aE L T M A N A 6E ME N T SYSTEM TIME NOW 3 240C178 1754 0F'2880 ACTIVITIES.

NETWORu 05DfC77 18 APR80. CATE 08Nov78 'NEtwopu : 21MMER NUCLE AR P0bER 5T A TI ON UNIT 1 SELECT [O ORPAY74 18 AppSO CRITICALIIV REPORI ACT,...t A C i I V I T V ACTIVliv E A R L.1 E 5 T-L A1 E 5 i P FLOAT I DE N TIF I C A T I ON DE 5CR IP 1 1 0N TIME CL START. FINISH START FINISH. 5 101 FR VC9 303VC9305 WC-01 POLOP MAIN CONT RM 45 1 14Mav79 23 JU L 79 12APR79 -14JUN79 -26 ~ 0 0 1 24JUL79 15 JUN 79 -26 23 WC9 305RV9845 DUMMY FtS573Fa5773 TERM REMAIN PCC CABLES. 10 1 240C178 06NOV78 195EP78 020C778 ' -25 5 F b7 372F d557 3 DUMMY 0 1 240C178 19 5E P 78 -25 0 F kT372FW7572 PULL REMAIN PCC CABLES 10 1 240Cife 06NOV78 19 5E P 78 020Cf78 -25 0 F m757dFw5773 DUMMY 0 1 07NOW74 03DCT78 -25 5-M6b265H60465 UEL. PIPE & VALWE 52 1 240CT78 08JAN79 205EP78 ORDEC78 -24 0 H6be6bH60565 IN51 LARGE BORE PIPE E VALVES 20 1 09JAN79 05FEB19 04 DE C 78 02JAN79 -24 0 .HG0565HG9201 DUMMY 0 1 06FEu?9 03 SAN 79 -24 0 I Hb420!HG9301 OC/FCI H6-1 22 1 06F FA 79 07 map 79 03 SAN 79 OlFER79 -24 0 H6%30lH69303 FLAM CONTROL H6-1 PREOP 94 1 OAMdk79 19 JU L 79 02FEp79 14 JUN 7 9 -24 0 .) 'Hb9303RW9845 DUMMY 0 1 20JUL79 15 JUN 79 -24 25 s2g 77 3W249 73 C ON T.iERM.CNTRL.* PWR.CBL. 10 1 240CT78 06Nov74. 285EP78 040C174 -23 17 4 v25772h25972 C0HI. PULL P,C+I CARLES 10 I 240CT78 06N0V78 2 3 5E P 78 040CT78 -23 0 m25472w24973 DUMMY 0 1 07NOW78 05 0C 178 -23 17 ih FtD00lFW2365 56L REDE516N 138 HANGERS to 1 240C178 06NOW78 225FP78 050C774 -22 0 LU200lL O2003 ' IHLRM AL DE SIGN REVIEW 42 1 240CT75 21DECTR 225EP78 20Nov78 -22 0 P5400lP54003 INSTALL INSTRU. PIPE / TUBING 6 1 240CT78 310C T 78 225E P 78 295EP78 -22 0 I) EF4 772wF9972 BE6. PULL PLC C ABLES 17 1 240C178 15NOV78 225EP78 160CT7a -22 0 'P54003P54005 COMPL. IN51PU. PIPE /fD81NG 2 1 OlNOV78 02Nov78 02 0C178 030C178 -22 0 P53003P53005 COMPL, CONDUIT INSTALLATION 2 1 03NOV78 06kOV F8 U4 DC I 78 050CT T A -22 0 ,.f) P5400bP53003 DUMMY- ' O 1 03NOW78 040C178 -22 0 F W2 365F W2565 IN5I FW-3 H6R5 2 1 07N0V78 08Nov78 060Cf78-090CI78 -22 0 P52DO3PS2005 COMPL, CABLES & IERMIN. 3 1 07NOV78 09Nuv78 060CI78 1000T78 -22 0 ! !). PS300SP52003 DUMMY 0 1 0 7No v 78 060C178 -22 0 F 62 56bF W9 301 DUMMY 0 1 09NOW78 100CI78 -22 4 PS2005P59201 DUMMY 0 1 10NOW78 IlcCT78 -22 0 ,g.() P5920lP59301 P5 5V5 OC/FCT 15 1 10NOV78 ORDE C 78 110F178 330Ci7e -22 0 P59301P59302 P5-1 PARTIAL SYSTEM PRE OP 10 1 04DEC78 15DEC78 DINOW78 14NOW78 -22 0 P59302WE9201 UUMMY 0 I l#DEC78 15NOV78 -22 0 ,*) ut 920 l WE 9301 wt [0UIP.DRA.PROCE OC/FCT 42 1 IPDEC7e 15 fem 79 15NOW78 16JAN79 -22 0 LD0369LD0565 FAB & INSTL.5M.eR. PIPE 60 1 220EC78 19 MAR 79 2tNOV7A 15 FEM 79 -22 0 L U200 3L DU 369 DUMMV O I 22DEC78 2RNOW78 -22 0 i ,1 wE9 30lwC9303 ut-IL2 EQUIP DR. PROC PREO 59 3 16FEB79 09MAv79 17JAN79 09APR79 -22 18 Lbb565LO3001 DUMMY 0 1 20 MAR 79. 16FEB79 -22 0 Lb300!LD3003 INSTALL 5.8. HANGERS 5 1 20 MAR 79 26 MAR 79 16FEB79 22FE879 -22 0 LD3003LD4003 DUMMY 0 1 27 MAR 79 2 3F E d 79 -22 0 Lb4003LD4005 C OMPL. INSTRUMENTS 5 1 27 MAR 79 024PR79 23f EH79 01 MAR 79 -22 0 i LO400SLD6003 DUMMY 0 1 03APR79 U2 Map 19 +22 0 LD6003LD6005 COMPLETE CONDUIT 5 1 03APk79 094Pp79-02 MAR 79 DAMAR 79 -22 0 LD6005LU7UO3 DUMMY 0 1 20APR79-09 MAR 79 -22 0 Lb7003LD7005 COMPL. PULL & TERM CARLES 5 3 10APR79 16APR79 0* MAR 79 15 MAR 79 -22 0 LD7005LD9201 DUMMV O 1 17 A P N 79 16 MAR 79 -22 0 LD920lLD9301 OC/FCI LD-1 22 1 17APR79 16MAY79 16 M A R 79 16APR79 -22 0 ! a6

b T: (PIIMA 1500 3R102 e-o e i I M E L I5i IN E e e

  • PAGE 7 0F 40 P&tJECT MANAGEMENI SYSTEM llME NOW s 240CT78.

1754 0F 2A80 ACilVIT IE S. TIME UNii DAv IP APR80 NETWORN 05DEC77 0 Alt 08NOV78 NETWORM 1 2IMMER NUCLEAR POWER S T A TI ON U411 1 SELfCi[0 OlMavi8 18&PR40 CR IT IC ALI TV REPORT ' n............................................................... ACilVliv 4 C i IV I 1 Y ACTIVIfy E A R L IE5 i L A i E5i P FLOAi IbthilFICATION OE 5CR 1P i ION TIME CL

START, FINISH SIAkt FINISH 5 101 FR LC930lLD93U3 LE AR DECTION LD-R PREOP 42 1 17MAY79 17JUL79 37APR79 14 JU47 9

-22. O LD9303RW9845 DUMMY 0 1 18JUL79 15JUN79 -22 27 PS$00lP55003 INSTALL IN51RUMENTS 5 1 240CITO 300L174 255fP78 295LP78 -21 0 P55003P55005 COMPL. INSTRUMENTS 2. 1 310CI78 DINOV78 020C178 0300T78 -28 .0 P55005P53003 DUMMY 0 1 02NOV78 040C178 -21 1 P59 30lw29208 DUMMY O 1 040EC78 02NOV78 -21 19 F h9 20lF W9301 OC/FC T F w-l to 1 240C17A 06NOV78 26 5E P78 -090Cf7M -20 10 -IN900lIN7003 COMPL. L.B. PIPE 5 1 240CT78 300CT78-265EP79 020CT7A 0 IN800lIN8003 COMPL. L.B. HANGERS 5 1 240CT78 300CT74 265fP78 020CT78 -20 0 IN800lIN4603 CONTINUE INSTRU. INSTALL 5 1 240CT78 300CT78 265EP78 020CT7A -20 0 IN870llNP703 DEL. LAST IN51ROMENTS 5 1 240CI7A 300C17R 265EP78 020CT7A -20 0 RD0001RD9308 COMPL. RD 1 CODf I

  • 2 ITEMS 12 1 240CI78 08NOV78 26 5E P 78 180CT78

-20 0 W1040!w20601 DELIVER LAST INSTRU. O I 240Ci?8 26 5E P 78. 0 U2060lw26966 DUMMY 0 1 240C178 26 5E P 78 -20 0 Wi&566WZ 7166 C OMPL. INS TL

  • N. INSTRU. PIPE 2 1 240Ci?8 250Cf78 265EP78 275EP74

-20 0 v23978W24171 COMPL.C0400li TO Ecu P. 5 1 260C178 01NOV78 285EP78 040CT78 -20 0 W2fl66w23971 DUMMY 0 1 260C178 285EP78 -20 0 INf003INO369 DUMMV O 1 310C178 0 30C I T S -20 15 o IN0003INO369 DUMgv 0 1 310C174 03CC178 -20 15 IN0 6031N8605 C OMPL. INS TRU. INSTALL $ 1 310CI78 06N0V78 030C178 090CT78 -20 0 IW8 7031N9603 DUMMr 0 1 310C178 030CT78 -20 0 {'- -W24171W24973 DUMMY O 1 02NOV74 050Ci78 -20 20 IW860blN6003 DUMMY 0 1 07NOV76 g 100CT18 -20 15 ' RD9 30lRU9303 R s.M AN.CONIL.PD-R PRE 0P 43 1 09NOW78 ! ! J A.N 79 120CT78-12DEC78 -20 0 (1 RD9 303ND9307 UUMMY 0 1 12JAN79 13DfC18 -20 0 RD9307R09309 N00 SEO. CONTROL RD-3 PRTO 129 1 12JAN79, 13JUL79 IIDfC78 14JUN79 -20 0 RD9309RV9845 00MMY 0 1 16JUL79-15JUN79 -20 29 { PS1031P5tOO3 INSTALL EOUIPMENT 5 I 240Ci78 300C178 275EP78 030CT78 -19 0 VL000lWG0002 5/C F INISH CSI WG 25 1 240C178 .28NOV7A 2 75E P 78 310C178 5 -10 0 J P51003P53003 DUMMY 'O 1 310C17A 04 0C T 78 -19 3 ( V60CO2VG9305 DUMMY O .I 29h0V7A 01N0V74 -19 0 VL9305VE9301 E5148 INIT CONDITECOMPL. CST. TE ST I N6 '42 1 29NOV7A 29JAN79 OlWOW78 02JAN79 -19 il unU(Olwx0003 SEL ISSUE wR DSN. CHANLF ?! ! 240CI?8 2INOV78 295EP78 260CT7A -la 0 1 wa0003WX0005 COMPL. LASI WW CON 51HUCT. 21 1 22NOV78 21 DE C 78 2700178 27NOV78 -1A 0 us000bWX9208 UOMMY 0 1 220EC78 29NOV74 -18 0 uz920 lux 9301 WX SLUb6E HANDL. OC/FCT 63 1 220EC78 22 MAR 79 2nNOV78 26FEB79 -18 0 WP9303VR*305 WR-01 RE VENT PREOP COMPL 17 1 14FE679 08 MAR 79 19 J A N 79 12FEH79 -18 0 VN9305V09301 DUMMY 0 1 09 MAR 79 13FEH79 -18 12 j Ux9 30lWX9 303 WX-2 SLUDGE HANDL. PNf0P 34 1 23 MAR 79 09MAV79 27FEB79 13APR79 -IA 0 f-uz9303ws9305 mX-1 SuL10 RAD =AST PREOP 43 1 10MAV79 llJUL79 16APR79 14JUN79 -18 0 N39 305RW9s4 5 DUMMY 0 1.12JUL79 15JUN79 -lR 31 M52 765MS2965 F AB L INST PE M AIN LC SMALL BORE PIPE 6 HANGERS 44 1 240C17A 26DLCTA 295fP78 30NOV7A -17 0 'P5300!P53003 INSTALL CONDUli 3 1 240C17A 260CT7A 20 5E P 78 030CT7A -17 5 P56L0lF5600 3 DEL. LAST INSTRUMENTS I i 240C178 240CTIA 295tP78 295EP7A -17 0 4

~ i epi 3MA !!00 39102 _

  • e T ] M E L 15 I IN s e e e PAGE-

' s DF 40 PROJEC T MANAGE ME NT SYSTEM TIME NOW 3 240Ci?8 1754 0F 2880 AC TIVIT IE S. TIME UNIT DAY NElbONE 05DEC77 18APK80 SAIE 08NOW7A NETWORE 3 21MMER NUCLEAR P0wtR STATION UNIT I SELE CTED OlM AY78 ISAPROD CRITICALIIT REPORT ACTIVITV. A C i'I W IT Y ACTIVITV. E A R L1E5 i L A i E5 i P FLOAT IbEhilFICATION DE5CR IP i I ON TIME CL' STARI FINISH START ~ FINISH 5 101 FR P16003P55003 DUMMV O I 250CI78 02eC178 -17 4 K52965Nue301 UUMMY u 1 270EC78 OICEC78- -17. 25 Uk9303LR9301 DUMmv 0 1 10MAV79 17 App ?9 -17 18 Ih4DOIIN4003 CONIINUE CAPLE5.iERM-20 1 240Ci78 20NOV78 020CT78 270CT78 -16 '!9 PS200lP52003 PULL & TERIMINATE '4 1 240CI78 210CT78 .020C178 050C77A -16 6 th07511N0951' INST AIR COMPRESSORS 5 1 240CT78 300C 178 030CT78 090CTF8 -15 0 lb09511N6003 OUMmv 0 1 310CT74 100C 178 -15 20 ef ol65bF0365 FLD RUN L AST 2/3 58 PIPE 43 1 240C178 220E C 78 040C178 04DECys -14 0 EFJ36bWF9301 DUMMY 0 1 26DEC78 05 DE C 78 -14 0 ef 9 30lur930 3 WF-1,2&3 FLOORLEU.DR PRE O 88 1 26DEC78 27 APP 79 05DE C 78 09 app 79 -14 0 Ef 9303hW9301 DUMMY O I 30APR79 10 APR 79 -14 26 ~C8930lCX9303 CM PREOP-CONTIN.CHECMS 153 1 240CT78 30MAY19 050CI78 10MAY79 -13 0 5Poleb5P0190 CONT. SUPPRESSION POOL W0pm 5 1 10JAN79 16JAN79 20DEC78 27DE C 7 8 -13 0 SP02055P0l*0 OUMMV O I 17JAN79 28 DE C 78 -13 0 5001905P0195 C OMPL. SUPPRESSION POOL work 40 1 17JAN79 13 MAR 79 24 DE C 78 22FER79 -13 0 SP02355P0220 FINI5H MONO TUut C RAIL 15 1 21F E 8 79 13M A R 79 02FE879 22FE879 -13 0 AP9317HG9301 DUMMV O 1 21FER79 02FEh79 !! SF01955P0220 DUMMY 0 1 14 MAR 79 23FEs79 -13 0 [J. SP02205P0225 F NL CLE ANINE C FILL SUPPRE SSION POOL 5 1 14 MAR 79 20 MAR 79 23FT879-DIMAR79 -13 0' 580225RV9329 DUMMY 0 1 21 MAR 79 02 MAR 79 -13 35-039303Cu9305 DUMMY 0 1 31MAV79 11pAV79 13 0 () C19 305CX9 307 E OD WORTH MIN. CN-2 PREOP 24 1 31MAV79 03JUL79 11M4779 14JUN79 -13 0 L'39 30 7RV98 4 5 DUMMY O 1 05JUL79 15JUNT9 -13 36 IA6COIIN6003 INSTALL' INSTRU. T U B/P IP IN G 1 1 240Cift 240Ci?8 09 0C T 78 090CT78 -11 24 () Wa l 365WR1565 C OMPLE TE HANGER IN51ALLIN 35 1 240Ci?8 12DIC78 09 0C 178 27NOv78 -11 0 es9199ws9200 Papil AL COMPLE TION FOR RI PRE OP 35 1 240C178 12DEC78 09 0C i ? 8 2740V78 -Il 0 unl565wx9201 DUMMY 0 1 13DEC78 29 h0V 7A -13 7 [? U59200WX9201 DUMMY 0 1 13DEC78 28N0V78 -I l 7 5PollSSP0120 DELIVER FIRST "i" OUENCHERS 15 1 240CT78 13NOV78 100C178 300CT 7 8 -10 0 FL375tFW9301 DUMnv 0 1 240C178 100C178 -10 20 () Ft9101Fm9301 DUMMY 0 1 240C178 100Ci?8 -10 20 F b9110F w9112 F.w. IUR8.UIL SYS. 0 1 240C178 10 0C 178 -10 0 Ft9812FW9301 DUMaV O 1 240CT78-100C 178 -10 20 Fs9 82bFd9110 DUMMY 0 1 240 CIT 8 100C 178 -10 0 SP01205P0200 DUMMV O 1 14NOW78 310EI78 -10 3m AP9308]N9308 UUMMY 0 1 24NOW78 09hov78 -10 39 WI5972WX6172 CONilN PULL P.CEI CABLE 28 1 240CI78 O!DE C79 110C178 17NOW78 -9 0 W25173wn5}73 PULLLTERM FINAL CARLES 5 1 040EC 78 080ECfA 20NOV78 27NOV78 -9 0 WX6172mM5173 UUMMY D 1 04DE C 78 20NOW78 -9 0 UM5373WX9201 DUMMV-0 1 IIDEC78 29h0V78 -9 9 F FDD02F P5030 RE LE A SE HOLD CM BLOCnWALLS 10 1 240C178 06h0V78 120C178 250CT7a -4 0 009 3010C9303 DC-3 2 4 /4 8 V D.C. PRf 0P 29 1 240CT78 04DE C 78 120C178 FINOW7A -8 0 DC9 3010C9309 DUMMY 0 1 240CT78 120 CIT 8 -8 0 DC9 3090C9 5 t l DC-2 250V D.C. PNEOP 29 1 240C17h 04DECTA 120 CIT 8 7tNOW7A -s 0 j ()

A ? - (PilMA 1100 3R102 e o e T ] M E. L 15 i I N.E e-e e PAGE 9 0F. '40 PE8JF C T MANAGEMENT SYSTEM TIME NOW 240CT78 1754 0F.2880 ACilvtilES. TIME UNil Day NEINORm- 05DEC77 IS APD AO . BATE 08Nov78 NETWORn : 21MMER NUCLEAR POWER S T AT I ON UNIT I SE LEC TE D O!M AY78. 18APR80 t CRli!CALIIV REPORT e e'. ACilutiv A C i I viI Y ACT!v!7V E A R L IE5 i; L 4T E 5 i P' FLOAl IDENilFICall0N 0E 5CR IP 1 1 0N 11ME CL START .FINI5N STARI FINISH 5 101 FR ' e 55 70 lw S 580 8 DELIVER LAST INSTRUMENTS 20 1 240C178 20Nov78 120C178 0RNov78 -8 0 us3951WI4853 CONTINUE CONDUlf 22 1 240CI78 22h0V78 120C178 1040V78 -8 0 F P5 03DFPS2 72 INSTALL mEST PLOCNwALL-i 15 'I 07Nov78 28Nov78 260C 178 15Nov7s -4 0 e55h0lW58766 dummy 0 1 21h0v78 09hov78 4 0 ^ U53 766W58 966 C OMPL INST INSTR PjPE L IUB 15 1 21N0v78 12DEC78 09mov78 30Nov78 -4 0 stC151uM4353 COMPLFTE CONOUIT INSTLTN 5 1 24Nov78 30Nov78 13Nov78 IFN0v78 -R H-FP5272FP5472 DESIGN ELE C T C 48LE-W WALL 30 1 29N0v78 IlJAN79. 16Nov78 290EC78 -n 0 Us4358ut5173 UUMMY 0 1 DIDEC78 20Nov78 -A 1 009303DC9305 DC-1 325v D.C. PREOP 18 1 0$DEC78 290EC78 22Nov78 18DEC7A O a ' DC9331DC9303 DUMMY 0 1 0$DEC78 22Nev78 -8 0 D5551tW55671 COMPL CONDUli 5 1 13DE L 78 190EC78. DI DE C 78 07DEC78 -4 0 U58966m55571 DUMMY 0 1 13DEC78 OIDf C 78 -A 0 mS5675mS7573 UUMMY 0 1 200EC78 OR DE C TS -8 0 i US1573W577 73 PULL L TE RM FINAL CA8tES 10 1 20 DEL 74 04JA479 08DfC78 210EC T A -8 0 lT. DC9305N#9303 DUMMY 0 1 02JAN79 190EC78 -m 0 Nh9303NR9305 1RM NR-2 PREOP 23 1 02JAN79 30JANF9 190EC78 IAJA479 -8 0 v57773W59308 DUMMV O 1 0$JAN79 22DEC78 -8 0 0593DlW59303 W5-IL2 Stew!CE WIR. PREOP 63 1 05JAN79 034PR79. 2201C78 22 MAR 79 -8 0 21 1 12JAN79 09F E R 79 02JAN79 30JANF9 -4 0 FP5472FP6172 DEL. CABLE WEST WALL -i Ch930bRP9301 DUMMY 0 1 31JAN79-19JAN79 -A 0 SP930!Rv9307 OUMMY 0 1 31JAN79 19JAN79 -R 0 )., N v9 307pv 9309 C R0 PRE OP-vE Ni&5 TROM DRS 90-2 30 1 31JAN79 13 MAR 79 19JAN79 OIMAR79 -8 0 e ' FP6172FP6372 CONT PULL PCLI CABLE 33 1 12FEb79 28 MAR 79 3ldAN79 36 MAR 79 -R 0 av9309Rv9329 UUMMT 0 1 14 MAR 79 02 MAR 79 -A 40 ) ' FP5373FP5573 PULL ETERM FINAL CABLES O I 29 MAP 79 19MfR79 -m y e FP5573f P9301 DUMMY 0 1 29 MAR 79 19 MAR 79 -A 0 FP6 372FP5373 DUMMY 0 1 29 MAR 79 19 mar 79 .a o f) F F9338FP9303 F P-1 FIRE PROTECT PREOP 63 1 29 MAR 79 26JUN79 19 MAR 79 14JUNF9 -A 0 e ' oSO303bC9301 DUMMY 0 1 04APW79 23 MAR 79 8 33 F F9 30 3kv9645 buMMV O 1 27JUN79 15JUN79 -n el ) 000004068372 DELIVER DE vlCE 5 5 1 240CI78 300CT78 130C178 190C17A -7 0 1 - 060808D60673 DELivE R DE vlCE S 5 1 240CT78 300077A 330Cf78 190CT78 -7 0 Db35650G3765 RM A-IN51. FINAL NANGERS 10 1 240Ci78 0640V78 130C178 260Cf74 -7 0 ? D68751DG8958 WENDOR ACCTPT. A E B UNil5 10 1 240CT78 06Nov78 110C178 260Cf74 -7 0 i. Ekl00lNRl003 DEllutR REMAIN. INSTRU. 5 1 240C178 300C178 330Cl?8 190C178 -7 0 Rh2b0lNR2003 INSTALL INSIRUMENTS 5 1 240C176 300CIFA 130C178 tv0C178 -7 0 ) - Rh40GINR4003 CONIINUE CAPLF5 & TERMjN. 12 1 240C178 08NOv78 1300178 300CT78 -7 0 t 060673060b73 RM 8-COMP PULL E TERM FINAL CABLES 5 3 310Cl?8 06Nov78 200C 178 260CTin -7 0 003372068573 RM C-COMP PULL & TERN FINAL C ABLE S 5 I 310CT78 06Nov78 200C I 78 260CT78 -7 0 CHROO3NR2003 DUMMY 0 1 310 C17s 200E178 -7 0 i NR2003NR2005 COMPL. INSIRUMENTS 5 1 350CI78 06NOv78 2000i78 260CT78 -7 0 EbOR73DG9401 DUMMV O I 07N0V78 270CI78 -7 0 Db3 765Db920 8 DUMMY 0 1 07Nov7a 2700178. -7 0 Db3951DG9201 DUMMY 0 1 07N0v78 27 0C 178 -7 0 0

G?f1MA 1500 3R102 I I M E L I5 1 I Pt b PAGE 80 ph 40 F69 A C I M AN AGE MENT SYSTEM VIME Now 24 PCT 78 1754 0F 2880 ACTIVITIES. T I ME UNIT-DAY 38APR80 NE INORn 05DE C 7 7 BA E 8 7A NI O# IMM R NU L R PO N ST SR8i10ALTIT-REPORT E EC E D 01 A 7e 18 PR80

e....................................................................

dETIVITY A C 1 Iy I T Y-ACTIVITV E A P L IE 5 1 LA T E5 T. P-FLOAT I DE NT I F I C A T ION OE 5CR IP i I ON 11ME CL START FINISH START FINISH. 5 101 FR C69&O1069303 DG OL/FCT 20 1 07hov76 050EC74 2700178 24Novie -7 0 Ck2L0bwR3003 DUMMY 0 1 07NOV7p 27pC178 -7 0 - CR3LO3NR3005 COMPLETE CONDUIT 2 1 07Nov78 08Novi8 270ET78 300CT78 -7 0 . CW3005N#4003. DUMMY 0 1 09mov78 3ISCT78 .-7 0 Ck9003NR9201 COMPL. CABLES C IERMIN. 5 1 04Nov78 15N0v78 310C178 06N0V 7 8 - -7 0 ' -7 0 C&920lNR9301 WR SV5 OC/FCI 10 1 16hov7e 3DNov78 07N0V78 20NOV78 C29 30lNR9303 SRM. NR-1 PREOP 19 1 01DEC76 280EC78 21NOV78 18DE C 7 8 1 i 6b9301069302 S T ARI D6-1 Ol[SEL GEN. PREOP 66 1 060EC78 09 MAR 79-27hov78. 28FE8 7 9 -7 0 . 069 30/06930 3 C OMPL 0E-1 DIE 5EL GEN. PREOP != I 12 MAR 79 29MAe79 OIMAR79. 20 MAR 79 -7 0 AP9304AP93tl AP-5 VITAL SUSL5 PREOP 43 3 30 MAR 79 25MAV79-28 MAR 79 16MAV79. 7 0 CG93034P9309 DUMMY 0 1 30 MAR 79 2tMAR79 7 0 APS 351R V 93 39 DUMMV O 1 24MAV79 17MAY79 _7 41 Cb 3 30lN8 3566 MOUNT M8-2 IN5ie 30 1 240C 178 05DE C 78 16DCIFS 27NOV78 -6 0 . WLOUO!VC9201'WC SV5. PRELIM. OPERATION 60 1 240CT78 18JAN79 160ET78 10JAN79 5 -6 20 Of61?bwF6366 COMPL. INSTU. PIPE /TURING 15 1 240CT78 13NOV74 160C178 03Nov78 -6. O CF3566NH3666 COMPL. Nb ELECT. 10 1 060CC78 190EC74 24NOW78 IIDECFA -6 0 Kb3t66N89203 00MMV O 1 200E C 78 12DE C 78 29 ( lE500!!N5003 INSTALL CONDUIT 5 1 240CT78 300CT78 17bCT78 230C T 7 8 -5 30 LD0169 LOO 369 BGN.FLD.ENb.5M.8R. PIPE 25 1 240CT78 28NOV78 17CC178 20NOV 7 8 - -5 17 OIOC0lRT9301 COMPL. CODE 1 + 2 11[M5 65 1 240CT78 25JAN 79 AgNOV78 18JAN79 5 -5 0 (- SF01405P0150 00MMV O 1 310C178 240CT78 -5 0 SPO!505P0155 DELIVER IST 12" SRW PIPING 5 1 310C178 06Nov7a 24DC178 300CT78 -5 0 SPol555PO200 DUMMY. O I 07NOW78 310Ci?S -5 43 1 QT930lRv9307 OUMMY 0 1 26JAN79 19JA479 -5 3 WI930lRi9303 Ri-1 PREOP 30 1 26JAN79 00 MAR 79. 19JAN79 OIMAR79 -5' U CT9303RV9329 DUMMY 0 1 09MAH79 0?MAH79 43 9 d HV0151HV0351 SUPMORT TO HVAC -DUCT.ETC 108 1 240C178 27 MAR 79 19 0C 178 21 MAR 79 -4 0 Hv0 351V-93Un DUMMY 0 1 28 MAR 79 22MAH79 4 0 W-930!V-9303 V HEPA& CHAR FIL IST PREOP 60 1 24 MAR 79 20 JUN 79 22 MAR 79 14 JuM 79 _4 0 V -9 30 3R v 914 5 DUMM V O 1 21JUN79 15JUN79 -4 45 WVUbalvvv301 5/C COMPL.5V5. INSIAL.VY 45 1 240CT78 27DE C 78 190CT78 210EC78 -3 0 VV500lVV5003 P.R. COMPL. HWAC CONTROL 5 45 1 240Ci?8 270ECFR 190CT78 210EC78 -3 0 ( SIO465kRII65 STAPI INSTALL H6H5 62 1 240C178 22JA479 190C178 17JAN79 -3 0 WV5003vY9301 DUMMY 0 I 2RDEC78 220fC78 -3 0 ' WV930lvY*310 WY-DI C505 COOL PREOP 19 1 2 4DE C 74 24JAN79 220E C 78 19JAN79 -3 0 s Call 65wRl701 DUMMY 0 1 2 3J A N 79 14JAN79 -3 0 Ekl70 LWR 1965 COMPL NGk INSTALLAlloN 64 1 23JAN79 20APR79 leaAN79 17APR79 -3 0 WY9310VV9312 VV-01 LPC5 PRIOP 5FCT 7.3 8 1 25JAN79 05FE879 22JAN79 33JAN79 -3 0 L WV9310tV9320 DUMMY 0 1 25JAN79 22JAN79 -3 0 WV9320VV9322 VV-01 RHR PREOP SECT 7.2-87.3 a 1 25JAN79 05FE R 79 22JAN79 3tJAN79 -3 0 W V9 312RV9301 DUMMY 0 1 06FE879 OIFfh79 -3 0 ( W V9 322 N v 9301 U tim M Y U 1 06fte79 OlFEu?9 -3 D OW930lRv9303 COMPL. ECCS PREOP 5 21 1 06F E b 79 ObMAR79 01FEH79 OIMAR79 -3 0

  1. 99303RV9329 DUMMV O 1 07 MAR 79 02M AW 79

-3 45 ( l

1-CPilpA 1500 3Rl02 I IM E L I5 i IN 6 PAGE 11 of 40 Pk3 SECT MA NA GE ME N T SYS TE M IIMr Now : 240CT78 1754 or 2a80 AC11VITIES. TIME Unli DAY NEINORK 050tC77 18APR40 CATL 08MOV78 NETWORK

  • ZIMMER NUCLEAR POWER S T A T I ON UNIT I bELECTED DIMAY74 18APR80

. CRITICALITY REPORT .'.J.k. . ~.............................. -.. e e e...... ......... e. _. ACT!vliv A C 1 1 V I T y ACTIVITY 'E A R L 1E5 i L A i E5 i ~ P FLOAT' IbE211FICall0N DE 5CR I P T,I ON IIME CL START FINI5H STARI FINISH 5 101 FR CPIv55=R9301 DUMMY 0 1 23APR79 14APN79 -3 0 ub930 lwr 9303 wp-l RbCCW PREOP 41 1 234Pk79 19JUN79 18 APR79 34JUN79 3 0 v29333RV9845 DUMar 0 1 20JUN79-15JUN79 -3 46 Chol 69CM0369 DGN.FLD.[N6.5M. PORE PIPE 45 1 240Cl?8 2 7DE C 7 A 200C f 78 22DEC78 -2 0 Dh5755D65965 RM A-COMP INSTL-58 PIPE CLASS C 5 1 240Ci?8 300CT78. 200C178 260Cf78 -2 0 CS2631008603 REHVDRO L INE S 5 I 240C178 300CT74 200C178 260Cf78 -2 0 M56404M56406 MOUNT' INSTR 0 1 240C178 '200CI78- -2 0

  1. 56406M59066 BEG IN51 INSTR PIPE & IUNE 14 4 200CT78 10NOV78 200CI78 0840V7A

-2 0 CCA103DG9201 OUMMY 0 1 310CT78 2 7 0C 178. -2 5 005515D69201 DUMMY 0 1 310CT78 2700178 -2 5 M59016M5906 7 C OMPL INST INSTR PIPE & TU8E 15 1 13NOV78 04DEC78 09 NOW 78 30NOV74 -2 0-MS%D$7NB9301 OUMMY 0 1 05DFC78 OlbEC78 -2 to Ch0 319CM0565 F 48.L ' INS T L.5M.8 0RE PIPE 44 8 28DEC78 28FE079 26 bE C 78 26FEB79 -2 0 CC056bCMIU05 00MMY 0 1 DIMAR79 27FI D 79

  • 2 0.

Chl003CM1005 COMPL. INSTRU. TUS/ PIPING I I OIMAR79 OlMAP79 27FEB79 2 7FEB 7 9 -2 0 Chlbo5CM3003 DUMMY O 1 02 MAR 79 28FEB79 -2 0' -CH3003CH3005 COMPLETE CONDUIT 5 1 02 MAR 79 08M AR 79 2nFEb79 06 MAR 79 -2 0 Ch 30 5CM400 3 DUMMY. 0 1 09h4N79 07 MAR 79 _2 0 Ch%003CM4005 COMPL. C AHLES+ IERM 5 1 09 MAR 79 15 MAR 79 07 PAR 79 13 MAR 79 -2 0 t Ch4005CM9201 DUMMY 0 1 16 MAR 79 14Pau?9 -2 0 ChD201CM9301 CM SYS OC/FCT 15 8 16 MAR 79 05APR79 34 MAR 79 03APRF9 -2 0 Ch9301CM9303 CH-1 CONIMI MONITOR PREOP 51 1 06APR79 18JUN79-04APR79 14JUNF9 -2 0 ( Cb9303RV9845 DUMMY 0 1 19JUN79 15JUN79 -2 47 WH8310VH9311 VH-01 FAN 5 NEED ONLY -PMP 124 i OIMAV7A 2400179 100C I 78 23 DC T F 8 5 -1 0 Hl000tHD0002 DELIVERY OF ADDED VALVES 65 1 240C178 25JAN79 2300178 24JAN79 -l 0 (: sF3773mF4173 CONT. TERM. PLC CABLES 15 1 240C178 13NOV7A 230C178 10NOV78 -1 0-l Wh9J12W59301 DUMMY 42 1 250CI78 22DECF8 2400178 210LC78 -1 0 Wh%3tlVH9312 E st as. PREREO & COMPL. TE511NG -VM O I 260EC78 22 bE C 78 -l 7 (' { Vt93tOWY9330 OUMmv. 0 1 2SJAN79 24JAN79 -l 0 t U1931uvv9340 DUMMY - 0-1 25JAN79 24JAN79 -1 0 VT9330VV9332 VV-01 HPC5 Pkt0P SECT 7.5 6 I 25JAN79 OlFER79 24JAN79 33JAN79 -1 0 ( V V9 3%UV 79 34 2 V Y-01 RCIC PREOP SECT 7.4 6 1 25JAN79 ORE B 79 ' 24JAN79 33JAN79 -1 0 H00002HDIT65 DUMMY O I 26JAN79 25JAN79 -3 0 Hbl75bHD0004 COMPL. VALVE INSTALLATION 5 I 26JAN79 OlFEP79 25JAN79 31JAN79 -1 0 ( V t9 35sRV9301 DUMMY 0 3 02FEH79 O!FEp?9 -l-2 Ut9344RW9308 DUMMY 0 1 02FEb79 O R FE H 79 -l 2 Hb000%HD3971 UUMMY 0 1 02FLB79 OlFEH79 -I 37 C M A0 343MA0343 HOLLou CONC BLOCu 4320 380 1 240C178 Is4PR80 0 0 MbO7&%N60969 hEG FIELD ENG SH PIPE O I 240CT7n 0 0 th7070N87071 COMPL. CONDUII 16 1 240CT78 14NOV78 0 0 ( kk3LOINR3003 CONIINuf Cohouli IN5ft. 3 1 240C178 2600T78 0 7 P3084LPID346 PAINilNG.56ECIAL CTG 46EN 380 1 240CI74 IRAPR80 0 0 .VP000lVP000 3 V P SYS MAJOR C5T COPPLETE 35 1 290CT75 12pE C 78 5 0 0 f Wh7P7tN96972 DUMMY 0 1 15Nov78 0 0 b i

CPlina 1100 3R102 i I M E L I 5 i IN G PAGE. 12 0F 40 Pb3dE C T M ANAGE ME NT SYSTEM ilME NOW s 2400T78 1754 0F 2e80 AC TI vl T IE S. -TIME UNIT DAV NETWORE 050EC77 18APR80 UATE 08N0VFR NETWORh : ZIMMER. NUCLE A R POWE R STATIDN UNIT 1 SELICIED O!MAYin' 18APR80 CRITICALITY REPORT ACilvily A C i I W IT V ACTIVITY EA R L IE 5 i L A i E51 P FLosi ILE NilF IC All0N. OE 5' C R IP i I ON TIME CL START FINISH. SI AN T. FINISH $ 101 FR SP0003vP0009 DUMMY 0 1 13DEC78 0 48 PS?302P59303 P5-3 PRE OP PROCESS-5AMPLING SYSTEM 126 1 1ADEC74 14JUN79 0 0 P57303RW9 8 45 DUMMT D 1 15JUN79 0 49 KA0343220003 OUMMY 0 1 25APN80 0 0 P t0 316220001 DUMMY O' I 21APRPO O O 220031220003 0-1 21APkno 0 0 @@2475002675 RM C-CUMP IN51 INSTR & INSTR P!PE D 'l 240CT78 26 0C 178 5' 2 0 C292DIRR9203 OC/FCI RR-! 21 1.240C178 21NOV78 260CI78 24NOV7A 2 0 219tDIRR9201 DUMMY 0 1 240CT78 260C178 2 0 uS2315W50565 COMPL FA8 L INST W5 SM to I 240CTFS C6Nov7n 260C178 08Mov78 2 0 .USOt0lWIO708 DELIVEk LAST INSTRUMENTS 0 1 240C178 26 0C 178 2 0 D 80 70 l W M 7 8 66 DUMMY 0 1 240CT78 26 0C i 78 2 0 WS6966Wa7166 COMIEN IN51 INSTRu P.T U 1 240CT78-260C178 2 0 WS7846Ws7366 COMP INST IN51Ru PIP &TuS 12 1 240C178 08hov78 260Ci78 10Nov7R '2 0 Wl335lW23351 OuMMY 0 1 240CT78 26 0C178 2 42

  1. 50515W58766 DUMMY 0 1 07N0V78 09N0V78 2 ~ 10 -

8, U R 7 336WRel51 DUMMY O' 1 09NOV78 13NOW 78 - 2 10 C39203RR930 3 LOGIC 151. RR-1 21 1 22NOV78 FIDE C TS - 27hov78 260EC78 2 0 E"930lWN9303 COM8INE FCW 1E511N6 15 1 220EC78 15JA479 27DFC78 17JAN79 2 0 t RC9 303RN93 31 RR UNCOUPLED TESTING 10 1 16JAN79 29JA479 19JAN79 31JAN79 2 0 WSD331kR9333 RR LOW SPEED TE STING 21 3 30JAN79 2 7F E B79 O!FE679 OIMAR79 2 0 CN9333Rw9329 DUMMY' O I 2 AF E879 02 MAR 79 2 50 C DL9 30 l DG9201 DUMMY 0 1 240C178 270C178 3 10 OG28730G9201 DUMMY 0 1.240CT78 2 7 0C I T A 3 10 D629&hD63165 RM p-IN58. FINAL HANGERS O 1 240C176 270CI78 3 0 (j Df3675069201 UuMMY 0 1 240Ci78 2700178 3 to Dh436bD64465 IN5tL SM BORE HERS HM 18 0 1 240CT78 270Ci78 3 0 CS5165DG9201 DUMMY 0 1 240C178 270C178 3 la C s Dbb4SSOG9201 DUMMY 0 1 240C17R 270C178 3 10 Dw6565D69201 DUMMY 0 1 240C178 270C178 3 '80 -DIO71bbG92DI DUMMY 0 1 240CI7A 270C178 3 10 53 002165069208 DUMMY 0 1 240CI78 270C178 3 to 0@3165DG9201 UHMMV O l-240CI78 2700178 3 10 Dbit75004675 RM A-LOMP INST INSTR & INSTR PIPE D 1 240C178 270CT78 5 3 0 C 305365DG9208 DuMMT 0 1 240CI78 270CI78 3 10 0 1 240C176 2700178 3 10 0371730G9201 dummy _ 0 1 240C178 270CI78 3 0 L M5640bM58772 DUMMY M58 772M58972 00MPL POLL PC L I CA8tES 19 3 240C178 17Nov78 270CI78 ??N0v7R 3 0

  1. 5056bW5*201 DUMMY 0 1 07NOV78 10NOW78 3

0 US?20!W59301 W5 SERVICE WIR OC/FCI 29 1 07Nov78 18 DE C T A 10Mov78 FIDEC78 3 11 'C . p57673M5n! 73 PULL L TERM FINAL CABLES 5 1 20NOW78 2 7Novi8 - 24Nov78 3DNOW78 3 0 M58972M57973 DUMMY 0 1 20NOV7e 24Nov78 3 0 M54173NB9301 OUMMY 0 1 2mhov7A D I DE C 78 3 45 C VH1382VH9314 WH-01 w5 SIRULPMPS PRFOP 14 1 26DEC78 15JAN79 290fC78 1RJAN79 3 0 b

CPTIMA 1800 3R102' I I M E L I5 i IN 6 4.. e PAGE. 13 0F 40 Ph$JE C T M AN46E MENI SVSIEM i!ME NOW t 240Ci7A 1754 Or 2880 AC TIVITIE S. TIME UNIT DAY NETWORN 05DEC77 18APR40 08tt 0840V78 NEikOPm : 2 I MME R NUCLEAR POWER S T A T I ON UNIT I SE LE CIE D OIMAv78 - 18aPR80 CRITICALIiv REPORT ACilVITV aC i Iy I iY ACTIVITY E A R L IE 5 i L A i E 5 i P FLOAT IbECilFICATION OE 5CR IP i 1 0N TIME CL STARI FINISH SIARI 5 10I _FR ........................................................................................................... FINISH Cu9 301Cw9303 CW-3 C1PC wiR PPEOP 42 1 16JAN79 14 MAR 79 19JAN79 19 MAR 79 3-0 V H9 314 C w 9301 DUMMY 0 1 16JAN79 19JAN79 3 0 C89301F w93 3 0 C A-1 COND VACUUM ppF0P 20 1 15 MAR 79 IIAPRF9 20MA N 79. 16APR79 3 33 Cw9303C A9301 DUMMY 0 1 15 MAR 79 20MARF9 3 0 R F 0 D0 ! R F 8 366 DEL. LASI IN5tRUMENT 10 1 240CT78 06MOV78 300 CIT 8 10NOV78 4 0 F Ct j 71F C 4 3 71 CONT CONDuli INST 55 1 240C178-IlJAN79 300CITS-17JANF9 4 0 FC6173FC6373 IENM NEMAIN PC-E I CABLES 60 1 240CT78 18 JAM 79 300CI78 24JAN79 4 0 M40543MA0743 SOLID CONCNEIC BLOCM 4330 160 1 240C178 08JUN79 300(178 14JuM79 4 0 kb9303NB9201 DUMMY 0 1 240C178 300CI78 4 0 Ch920!NB9301 GC/FCI W8-1 23 1 240CT78 24Novie. 300CITS 30NOV78 = 46 RF0365NF0565 COMP F AOLINST SM ALL BORE 10 1 240CT78 06NOV78 300CI78 10NOV78 4 0 RF6173RF6373 CON IERM CONTROLEPOWER 20 1 240C178 20NOV78 30 0C i ?8 27NOW78 4 0. RF 7 3 72PF 7372 C ONT PutL PCLI CABLE 20 1 240C178 20NOV 78 3000174-27N0v78 4 0 / CRul65R20465 DEL HYDRAULIC CONT.5P VALVES 150 1 240CI78 24MAV79 300C178-3]MAY79 4 0 IF2354TF2551 SET & ALIGN E0ulPMENT 15 1 240Ci7h 13NOV78 330C178 17NOV78 4 0 'IF4573IF4773 CONilN. TERM PCC CABLES 20 1 240C178-20NOV78 300Ci74 27NOV78 4 0 ? . If 5572iF 5 7 72 C ONI. PULL Powt R 4 CLI CAS 20 1 240Cifb. 20NOV78 310CI78 27NOV78 4 0 Ef !565bf 2351 F LOOR DRAIN SUMP PUMP 5 15 1 240C178 13Nov74 300CIF8. 17Novi8 4-0 RF0565RF8366-DUMMY U 1 07N0v78 13NOV78 4 0 Cf 8 366RF8566 COMPL INSI IN5fpuMi IUBNG 10 1 07NOV78 20NOV78 13NOV78 27NOV78 4 0 if 1765IF1965 COMPL LANGE BORE PIPE O I 14Nov78 20NOV78 4 0 e. If l 965fF 3771 OUMMY 0 1 34NOV78 20NOV78 4 0 It1965fFb766 DUMMf 0 I 14NOV79 20NOV78 4 0 If2558tFl?65 OuMMY 0 1 14NOV78-29N0V78 4 0 b II 3 771TF 3971 COMPL CONDull TO EQUIP 5 1 14NOV78 20NOV78 20NOV78 27NOV74 4 0 i Pf 5 35tWF5551 COMP CONDUIT TO EOUIPMENT 0 1 21NOV78 28NOV78 4 0 hf5551NF6373 DUMMY. 0 1 21NOV78 24NOV78 4 0 Cf 6373RF6573 PHLL & TERM FINAL.CA8tE5 5 1 21NOV7b 28NOV78 28 N0V 78 040EC78 4 0 CF7372RF6373 DUMMY 0 1 21NOV78 26N0V78 4 0 RF 8 56bRF 5 35 8 puMMY 0 1 21NOV76 24 NOV 78 4 0 IF 397 tiF47 73 DUMMY O I 2tNOW78 28N0V78 4 0 TF9 773TF4973 PULL E TERM FNL CABLES 5 1 2tNOV78 28NOV78 28N0V 78 04DEC78 4 0 IF 5 772iF 47 7 3 DUMMY 0 1 2tN0vi8 28NOV78 4 0 CF6573mF9301 DUMMY 0-1 29how78 05bfC78 4 18 TF4973hF9301 DUMMY 0 1 29NOV78 05DE C 78 4 In F L4 37 3 F C 45 71 COMPL CONOUIT TO EQUIP S 1 12JAN79 18JaN79 18JAN79 24JAN79 e 0 F 04 571F C6 3 7 3 OuMMY 0 1 19JAN79 25JAN79 4 0 F C6 373F C65 7 3 PULL & TERM FINAL CABLES 5 1 19JAN79 25JAN79 25JAN79 31JAN79 4 0 ft6573FC9301 DUMMY 'O 1 26JAN79 UlFE879 4 0 5 $ C#30lFC9303 F C.I F uE L POOL COOL PREOP 28 3 26JAN79 23FEH79 OR FE B 79 O! MAR 79 9 0 s F 09 303RV9329 DUMMY 0 1 26 FEN 79 02 MAR 79 4 52 C20465RRllb5 INSTALL HVD CONTROL VALVES 10 1 25MAV79 08JUN79 OlJUN79 14JUN79 4 0 N 40 74 34V9145 DuMM Y - 0 I IlJUN79 15JUN79 4 53 kR126SRVe845 DUMMY 0 1 IlJUN79 15JUN79 4 53

CPilMA 1300 3R102 i I M E L I5 I IN 6 PAGE 14 0F to Ph3sFLI MANAGEMENT $VSTEM TIME Now : 240CIFA 1754 Or 2880 ACittITIES. TIME. UNIT DAV NElbORK 05DEC77 InAPROS DSI! OsmoW78 NElw0Rn s ZIMMER huCLE AR POWER STATION uNii ! SEttCIED DIMAV7m 184PR80-CRITICALITV REPORT e e........ e e e........ e e. .............. e e e e e e. e e............ e... '... ACIlvlIV A C i IV I T V ACilvlii E A R L IE 5 i L A T E5i P FLOAT IIt hilF It a l10N OE5CR IP i 1 0N 11ME CL STANT FIhtSH SIAR1 FINISH 5 701' FR -UJ7866W29201 UUMMY . O I 260C170 02Nov78 5 45, 'VP0003VP0004 FLU 5HETEST LOOP A 15 1 13DEC78 04JAN79 200EC78 IlJAN79 5 0-VPC004WP0005 PREOP WP LOOP A 15 1.05Jah79 25JAN79 12JAN79 OlFE879 5 0-GP3005vP0008 OUMMY 0 1 26JAN79 02 FIB 79 5 53 011751019301 DUMMY 0 1 240CT78. O l ho v 78' 6 0 9147660i9301 DUMMV O I 240CI78 DINOW78 6 0 SI9301109301 DI-! BEAR OIL TRANSF PRFOP 22 1 240Ci78 22NOV7A OlNPW78 DIDLC7n 6 0 N54$54mS4501 DUMMV O I 240C178 Olhov78 6 0 T@9301109303 10-1 TuRB.Olt PRE 0P STARI 21-1 24NOV78 220E C 78 04 DE C 78 03JAN79 6 0 191303T59301 T0-3 fueb.0IL PREOP COMPL 21 1 26DEC78 24JAN79 04JAN79 OlFE879 6 0 159 30 l E H9 301 IS-1 TUR8.5DPIRWISOR PREOP '30 1 25JAN79 D7M AR 79. 02FIS79 15 MAR 79 6 0 EH430lEH9303 E H-1 IURB. EHC PREOP 64 1.08 MAR 79 06JUN79 16 MAR 79 14JUN79 6 0 E H1303Nv9845 DUMM Y 0 1 07JUN79 1%JUN79 6 55 Ubl00lV09301 C OMPL. PUNCHLIST' 5 1 240CI78 300CT78 02h0W78 08N0v78 7 0 AE0165ACO365 INSIALL 5'8 HANGER 0 1 240CT78 02h0W78 7 0' A LO 365 w29201 DUMMV O 1 240CT78 02hov78 7 47 EHil6*N81366 COMPL INSTR PIPE E Tune 27 1 240CT78 30NOV78 02hov78 II DE C 7 8 7 0

  1. F0165WFU965 START IN51 ALLe HANGER $

22-1 240CI78 22NOV78 02h0478-040EC78 7 0 2

  1. t0165ddOJ65 INSTALL SMALL BORE PIPE 6 1 240CI78 310Ci 78 02h0V78 09Nov78 7

0 Wil965u29201 DUMMY 0 1 240Ci?8 02Nov78 7 47 VP930lvo9303 VD-pl D/6 PREOP START ll 1 330CT78 34NOV78 0940V78 24N0978 7 0 f et0365mS9201 DHMMY 0 1 OlNOW74 10Nov78 7 4 0D1303069301 DUMMY 0 1 15NOW78 27hov78 7 14 BF0565WF9301 UUMMY 0 4 24Nov78 050FC78 7 21 C91366N8*203 DUMMY 0 1 010FC78 12 DE C 78 7 42 M58966W5930I DUMMY 0 1 13DEC78 220EC78 7 15 VPDLO3VP9201 DUMMY 0 1 13DE L 76 26DEC78 8 0 WP920lWP9301 WP CHILL 10 CON TL D.W. IMP 42 1 130E C 78 12F E B 79 260rC78 22rEe79 8 56 CC9305N89307 DUMMV O 1 02JAN79 12JAN79 4 57 FL5172FC53 72 PULL PC L I CASLES 5 1 240C178 300CT74 OANov78 10NOV78 9 0 hHI565N#1665 COMPLETE HbR INSTALL 25 3 240Cl?8 28hov78 06Nov78 I I DE C 7 8 9 0 18'5 366105566 C OMP INSTR PIPE LTUBIN6 to 1 24DCT78 06Novia 06hov78 17NOV7m 9 0 VP0869WP0369 B GN. F L O. E N G.5 M.B ORE PIPC 15 1 240CITR .33NOV74 06hovi8 27NOV78 6 0* WY015tvv0358 Set DE536N*DELW 0$M0515 E0P 40 1 240C178 190LC78 06NOW78 03JAN79 9 0 i F E537/FC5572 PULL REMalk PC E I CA8LES 50 1 310C178 IlJAN79 13hov78 24JAN79 9 0 lb2771102871 COMP COND"If 10 EOUIP 5 1 07h0W78 13NOV78 20NOW78 27NOW78 9 0 105b661D2771 UUMMV O 1 07NOW 76 29hov78 9 0 T b2 h 71 T D35 7 3 DUMMY 0 1 14N0w78 24h0V78 9 0 1035731D3 7 73 PULL 61ERM FINAL CAPLE5 5 1 14NOV7s 20NOV78 24NOV78 04DECTR 9 0 WP0 369VP0565 F AueL INSTL.54.BURE PIPE !! ! 14h0V78 29NOV78 2Ph0V78 12DEC78 9 0 lb3773hr9301 DUMMY 0 1 21hov7k USDFC78 9 23 481665N8920 3 DUMMV O 1 29NOW78 12DEC78 9 44 VF0565tP0003 DUMMY Q ! 3ONOW78 13 DE C 78 9 9 WVol65mV0365 BEG.FLD kUN SR PIME D I 20DEC 78 04JAN79 9 0 )

~_. E' + 'CPflMA 1100. 3R102 i 1M E L.I5 1 1N h

s *
  • PAGE 15 0F 40 d

Ppo JE LI M A N A GE ME N T SYSTEM' TIME Now 240CT78 1754 0F 2880 AC T IV IT IE S. TIME UNIT OAV -NCIWORM '050EC77 IpAPR80 BATE DANOv78 NEiwoem : 2IMMER NUCLEAR power STATIFN UNIT I SELECTED plMAVTR. - IS APRSO CRillCALitV REPORT ? AClivlly-A C i i V I iV ACTiv!TV E A R L 1E$ i L.A i E5 i-P FLOAT I DE N T IF I C A T ION OE 5CR IP T I ON -TIMC CL START FINISH START FINISH 5 10T FR 3' WV0 351wv08 65 DUMMY 0' I 200EC78-04JAN79. '9 0 WVQ36bwV0565 COMP.FLD RUN 58 PIPE 43 1 200EC7A 20F L P 79 04JAN79 05 MAR 79 9 0 l F05572FC6373 00MMV O 1 12JAN79 .25JAN79 9 5 . t uYO565hT63t6 DUMMV O I 21F E b 79 06 MAR 79 9 0 [ uY6366mV6566 COMP INSTR. PIPE /TURING 15 1 21F E B 79 13 MAR 79 D6 MAR 79 26 MAR 79 9 0 UV3371WV3b78 COMP. CONouti 70 EQUIP. 5 1 14 MAR 79 20 MAR 79 .27 MAN 79 02APR79 9 0 f4 UV6566mV3371 DUMMY 0 1 34 MAR 79 27 mea 79 9 0 WY3571WV4373 OUMMY 0 1 21 MAR 79-C3APR79 9 0 WY4 373mV4573 PULL & TERM FNL CABLES 5 1 28 MAR 79 27 MAR 79 03APR79 09APR79 9 0 '(* UV4575mV9301 DUMMY O 1 2AMAR79 10APR79 9 49 RR7265RR7465 DEL.-SNUBBER MANGERS 14 1 240CT78 10Mov78 07NOv78 27NOv78 10 0 itiO I2 51G012 7 m.E. I. INS T ALL SUPPORT 20 1 240C178 20Nov78 0740V78 05DEC78 30 0 (' uw0 765Wdu965 INST ALL LANGE BORE PIPE 3 1 240Cf78 260C T 7a 07Nov78 09N0v78. 10 0 l XVDUlTWR9301 Rot A T. PE O. OPER. UNDER RPu to 1 240CT78 D6hov78 07Nov78 20Novin 10 17 IV00lvsV0025 TIP fus UND RPv-INST

  • Cu.

10 1 240C17A 0640v78 07N0v78 20Novia 10 0 .( W=096bwS*201 DUMMY 0 1 270C178 10Nov78 10 7 N YOC21NR9301 DUMMV O I 07N0v78 21Nov78 to 17 RR7465RR7665 INSTALL SNUB 8ER HANGERS 20 .1 13Nov7M-Il0EC78 24 hov 78 26DEC 7 8 10 0 C. Eb6972N87172 C UMPL PULL PC L 1 CABLLS '29 1 15N0v78 270LC78 30h0v78 IlJAN79 10 0 160127160129 SET hv-PA55 ACCUMALATORS 5 1 21N0v78 28Nov78 06DFC78 12DEC7s to 0 1b0329TG0133 IN51L.BY-PA55 PIPE 10 ACCUM. 10 1 29Nov78 120EC78 I IDE C 78 27DEC F A 10 0. (). RR7665RR9301 DUMMY 0 1 12DEC78 27DFC78 le 8 T601331G0157 DUMMV O 1 13DEC78 28DEC78 10^ 0 160157T60159 PREPARE FOR FLUSH 5 1 130EC78 190LC7A 2 R DE C 78 04JAN79 10 0 ( II,0159 T G0161 COMP. EHC CONTL.5V5 & FLUSH 10 1 200EC78 04JAN79 05JAN79 18JAN79 to 0 k07172N89307 DUMMY 0 1 2RDEC78 12JAN79 10 59 '1b0077160079 l uNb.6E NE R A TOR OPERAT10N I I 05JAN79 05JA N79. 19JAN79 19JAN79 10 0 4 (> 1001681G0077 00May 0 1 05JAN79 19JAN79 30 0 160079TG9301 DUMMY 0 1 URJAN79 22JAN79 IO O Ib9 30l GC9301 16-7(3 TURe AUa PRE 0P 44 1 08JAN79 08 MAR 79 22JAN79 22 MAR 79 10 51 {} F P9 30l vC9303 OUMMY 0 1 29 MAR 79 12APR79 10 36 CV4503CV4765 INST L8 U A L vE 5 15 1 24UCT78 13Nov78 08N0v78 29NovFP ll 0 Hb0165H00365 F LO.RUN LAST 2/3 5.8.P. 3 1 240C176 260C178 09hov78 10Nov7a II O (J ME0465MCll65 INST MC HGR$ thuLMI 15 1 240C17e 33Nov78 Unhov78 29Nov78 II 0-r 100069160091 COMPL. SIM. CHESI CONikOLS 5 1 240CT78 300C178 UAhov78 14N0v78 il O i HbO 365H06766 DUMMY - 0 1 270 CIT 8 13Nov78 il 49

ij 160059160061 CALIB. SUPERuls.INSTRUM.

10 l 310C178 13N0v 78 15Nev78 29N0v7A II O 10C093IGOU59 DUMMY 0 I 310CT78 35Nov7s It O C V4 7650V9201 OuMMY 0 1 14Nov78 30Nov78 11 0 CV9201CV9301 CV CVC CUNOFN. OC/FCT 23 1 14Nov78 15DE C 78 30NOv78 03JA479 11 0 MLII63CV9201 DUMMY 0 1 14Nov78 30hov78 II O IFl%651F2751 DUMMY 0 1 34Nov78 30Nev78 il O IF2E53fF2751 DUMMY 0 1 14h0V78 30Nov78 It O IF 2 75 t IF 2951 FNL ALIGNMI 66 ROUT f00l> 3 1 14Novie 16Nov78 30Nov78 040EC7e II O kh I

,tD CPTIMA 1100 3R102 o e e i 1 M E L I5 i1N G e o e PAGE 16 0F 40 PE0JELT M A N A GE ME N T SYSTEM IIME NOW r 240C174 1754 0F 2500 AcilVITIE S. TIME UNIT DAY hEl>0RR 05DEC77 18APR80 SATE 08NOV7A hETWORE I flMMER NUCLEAR POWER STATION UNIT I SEEICTED OIMAv7n 16APR80 CR11]CALITY REPORI e............................................................... ACilviiv A C i i V 1 iV Acilv11v E A R L 1 E5 i L 4 i E5 i P FLOAT IDE>TIFICATION DE 5CR 1P T I ON IIME CL '5 TART FINISH SIARI FINISH 5 101 -FR 100061160062 INSTALL HP COUPLING 5 3 34NOW78 20NOV78 30h0V78 06DEC78 11 0 IF2951WF9308 DUMMY O' I 37h0V78 05DE C 78 il 25 Th00621GDub3 ASSEM.LCLOSE PEDESTALS 3 1 21NOV78 24h0V74 070EC78 IIDEC78 11 0-I600631 GPS *9 DUMMY 0 1 27NOv78 12 DE C 78 Il 0 It0064Tr U65 START TURN 1h6 GEAR I I 27NOV78 27kovia 12 DE C 78 120EC78 It O 100065fG0191 DUMMY O 1 2nh0V78 13bIC78 Il-0 T608911G0393 ADJUST SEAL clL CONTROLS 5 1 2Ph0V78 04DEC78 13 bE C 74 190EC78 II O 16018 big 0lP7 &lR TEST GENLRATOR 20 1 050EC78 03JAN79 20DIC78 18JAN79 II O 160193160185 DUMMY 0 l-05DEC78 200 ECTR 11 0 C V9 301CV9303 C V-1 CVC CONDEN. PREOP 20 1 190EC78 16JA N 79 04JAN79 31JAN79 ll 0 160147160077 DUMMY 0 1 04JAN79 19aAN79 Il I C Y9 30 3F C9301 DUMMY 0 1 17Jah79 ORFEh79 11 7 ex73ebux9201 DUMMY 0 1 09NOV76 2Ah0V78 12 30 160063160198 DUMMY 0 IL27h0V78 13DF C 78 12 1 HP9303Rv9307 DUMMY 0 1 03JAN79 19JAN79 12 20 LP9303RW9307 DUMMY 0 1 03JAN79 19JAN79 12 20 CH9303Rv9307 OUMMY 0 1 03JAN79 19JAN79 12 20 Rl*303RV9307 DUMMY 0 1 03Jah79 19JAN79 12 20

  • ]

AF0951AFil51 SET & FINISH ALIGN MECH EQUIP 16 1 240Ci78 14NOV78 10kOW78 04DEC78 13 0 Ch9203W59201 DUMMY 0 1 240C178 10hov78 13 10 SF2 307pF2507 COMPL H ANGER INSTALLATION 16 1 240C178 14NOV78 10h0V78 04DEC78 13 0 I4 RR7365RR7565 IN51L RR-2 & 3 HANGER 5 10 1 240CT78 06h0V78 10NOW78 24NOV78 13 0 1092011092G3 10 OCT/FCI 15 1 240C17a 13NOW78 10NOV78 O R DE C 7 8 IS O skT575wR7766 BEG.IN51L INSTRU PIPE / Tube 85 1 240C178 22FER79 Inh 0V74 13 MAR 79 5 13 0

L e54954ws9208 OUMMY 0 1 240C179 10N0V78 13 10 W56973mS9204 DUMMY 0 1 240C178 10hov78 13 10 pk75659R9300 OUMMY 0 1 07NOV78 27h0V78 13 0

[ Rk7565RH9305 DUMMY O 1 07h0V78 27h0V78 13 0 ER9300RR9302 SYS. HYDRADEIC T[5fthG 21 1 07NOV7s 06DE C78 27h0V78 26DEC7M 13 0 Gk9305kR9307 FVC CEI PREOP 21 1 07NOV78 C6DE C 78 27NOW78 26DLC78 13 0

  • J 169203109301 DUMMY 0 1 leh0V7M 04DEC78 13 7

AF I l51WF 9301 DUMHV 0 1 15h0V78 05 DE C 78 15 27

  1. F 2507WF 9 301 DUMMY 0 1 15h0V78 D50EC78 13 27 R39302RR9301 DUMMY 0 1 07DEC78 270EC78 13 11 WR9307RR93cl DUMMY O I 0 7DE C 78 2 7DE C 78 33 18 WN7766WR7966 COMPL INSTNU PjPE/IUbihG 15 1 2 3F E 9 79 35MApT9 14 MAR 79 03APR79 13 0

Kb9303RV9401 DUMMY 0 1 2 7FIH 79 thMAW79 13 61 sp4771mR4973 COMP CONUUIT TO LOUIP 5 1 16 MAR 79 22 MAD 79 04APR79 IGAPR79 13 0 hkT966kR4771 DUMMY 0 1 16 Map 79 04APR19 13 0 ER4971kR6573 DUMMY 0 1 23 MAR 79 ISAPR79 13 0 h26573WR677 3 POLLLIERM FINAL. CABLE 5 1 23 MAW 79 29p A R 79 !!aPR79 17APR79 13 0 ER6773WR9301 DUMMY 0 1 30 MAR 79 18APW79 13 36 HD2365HU6766 00MMY u 1 240CI78 33NOV78 14 52 HD700lHD7003 DELIVER REMAIN INSIRHMINT5 0 1 240C178 13NOV78 14 0 0

_ ~ s CPilMA 1100 3R102 i-1 M E L 15 i i N 6 PA6C 17 ir 40 o Ph9 SECT M A N AGE ME h 1 SV51LM TIME.NOW 240CT78 1754 of 2880 Ac if ulTIE S. TIME UNIT DAv hEIWORK 05DE C 77 ISAPRSO l' DaTE 08NOV78 hElwupu a DIMMER huCLEAR P0htR STATION UNIT I SELECTED OtPavin 18APR50 CRITIC Alliv R(PORI .' e

  • e e o e... e o e e e e e e_'e e e e e e... e e e e e._ e o e e e e' e e e e e. e e e e - o' e o e o e o e e..

ACIIVIiv A C i I W I T Y ACTIVITV E A R L 1E 5 1. L A TE $i.. o e e e P FLOAI I DE hilF IC o lI 04 DE 5CR IP i I ON TIME CL START FINISH 51Aki FINISH 5 IDT.FR ........................................................................................................................n...... HD7003HD6766 DUMMY 0 1 240C178 33Nov78 14-52 - #F 3 765NF 2965 DUMMY 0 1 240CI78 13h0v78 14 0 '9f4551RF2965 00MMY 'O 1 240C17h 13 NOV 78. 14 0 sf 5 372wf 48 73 DUMMY 0 1 240C178. BINov78 14 0 Da2365wat!51 DUMMY 0' 1 240CT78 13h0V78 14 22 cm4973sN517 3 C ONIN IERM CONTROLLPOWER S I 240CI78 300CT78-13hov78 17NOV 7 8, 14 23 WF6366mF9301 OuMMY 0 1 34NOV78 05 DE C 78 le 28 WV035thv2978 DUMMY 0 1 200EC78 IlJAN79 14 0 .WV2971WY3371 INITIAL CONDUIT INSTL. 0 1 200CC78 IlJ8N79 14 0 DV3171WV4972 DUMMV O 1 200EC78_ llJAN79 14 0 F09120RD92U5 DUMMY 0 1 240CT78 14h0V78 15 0 Ph2137PW2337 WHIP RESTRAIMis 3910 75 1 240C178 08FE879 14h0v78 'ORMAR79 15 0

  1. D9205RD9307 OC/FCT RD-3 20 1 240CT78 20NOW78 14Nov78 120E C 7 8 15 35 1 D4172104 3 72 PULL PCEI C AUL E 6 1 240CI78 310CITS 14NOV78 23NOV78 IS 0

TF 01651F0365 COMPL f ab&lNST ALL 58 PIPE 4 1 240Cl?8 270C T 78 14hov78 17NOV78 15 0 IF0 365IF6766 OUMMY 0 1 300Ci?8 2HNOW78-15 0 103373T03573 CONT TERM PCLI CA8LE 3 I OlNOV7b 03NOV78 22Nov78 27NOV78 35 6 Ip1372iD3373 DUMMt 0 1 OlNOW7e 22NOv78 15 O Pw2 33 7pv9329 DUMMV U 1 09F E B 19 02 MAR 79 15 63 CT3ColCV9201 INSTALL 4 ADDED CA8LES.ETC. 10 1 240C17e 06NOV78 15NOV78 29NOV78 16 5 j AF l 57 5 AF 177 3 C ONDUli IN51ALLATION 3 I 240CT70 260C878 15NOW78 17NOV78 16 0 i-ht0365MC0565 F AS & INSI LAST 2/3 NC 58 10 1 240Ci?8 06h0V78 15Nov78 29NOV78 16 0 e kW5773NW6I73 CONT TERM PC & I CAHLES 29 1 240C178 04DEC78 15hovie 27DEC78 lb. 0 'P477th86972 BEG PULL PC & I CaptE O 1 240C178 15Novi8 lb O h y Pk38,0lPR3003 IN5 FALL INSTRUME Nf 5 10 1 240C178 06NOV78 15hov78 29NOV78 16 0 'PE4CORPR4003 DELIVER INSTRUMENis 10 1 240CT78 06Nov78 15Nov78 29Nov78-16 O CD3573RD3698 DUMMY 0 1 240C178 15hov78 16 0 ) SD4051RD9201 DUMMY 0 1 240C178 15Nov78 - 16 0 6 BD7165WD9201 DUMMY 0, t 240C178 15Nov78 16 0 PD9803FD9201 DUMMY 0 1 240CT76 15how78 16 0 0 Suvl65WU9203 DUMMY 0 1 240CT78 15Nov78 16 0

  1. D920lRD4210 DC/FCi RD-1 7 1 240Ci7s Oth0V78 15N0v78 24MOV78 36 0

Ebt965RD9201 DUMMY 0 1 240CT18 15hov78 16 0 AE S 351 E 9203 DUMMY 0 1 2400178 1%NOV78 16 3R i IERT651E2751 Dunny 0 1 240C178 15Nov78 16 0 TE2551TE1765 DuMMV O I 240CT78 15Nov78 16 0 IE 2 55 t IE 2 751 DunMV O I 240C17n 15Nov78 l6 0 il2951WE9201 OuMay 0 8 240C 178 15hov78 lb 34 WE3373WE9201 DUMMY 0 1 24UCT78 1%Nov78 16 38 l Aft?7IAF3172 DUMMV O 1 270CI7e 20Nov78 16 0 e Rb9210NR9203 UUMnv 0 1 02Nov78 27Nov78 16 14 ECG565CV9201 DUMMY 0 1 07NOV78 30Nov78 lb 5 Pp3003PR3UO5 C OMPL. IN 5 f puME N T S 10 1 07N0v7a 20bov78 30hov78 33DEC78 16 0 P64003PR3003 puMMY 0 1 07Nov7e 3Hhov78 16 0

J ,1 I $PTIMA 3500 3R102 1 1 M E L I5 1 1N6 PAGE. 18 0F - 40 PFSJ(LI M AN AGE MEhl 5V51EM TIMI NOW 3 24 0C T 78 1754 0F 2880 ACIlvlTIES. TIME UNII DAY hE lbORn 050EC77 IAAPR80 BATL 08N0478 hfTWO9u s, 21 M ME R huCLEAR PourR S T A T I ON UNIT I SE LFC TE D O!MAV78 IPAPP80 CRlilCALiiv REPORT ACilv!TV A Ci 1y 1iV ACilvlTV-EA R L IE 5 i L A T E.5 i P FLOAT 10E h11F IC A T 10N OE 5CR 1P I I O h TIME CL '51ARI FlWISH START FINISH 5 10I FR I) Pk2003PR2005 COMPLETE C0h0Uli INSTALL ~ 5 1 21h0V78 28Mov 78. 14 DE C 78 - 200EC78 16 0 0 1 21No v 7 8. 14DEC78 16 0 -Ppj005PR2003.UUMMY & ifRMIN. 5 1 29N0V78 05DLC78 21DEC78 2PDEC78 16. O PhlD03PR1005 C OMPL E1E CAPLES Pkf00$PR1003 DUMMY 0 1 29hov78 21DfC78 16 0 kH4873N89303 DUMMY 0 1 05DEC78 24DEC78 16 58 Phl00bPR9201 DUMMY 0 1 06DEC78 29Df C 78 16 0 ( PE920lPH9303 PP OC /F CT 18 1 06DEC78 02JAN79 29 DE C 78 24JAN79 16 0 Pp930!PR9303 PR=1 PRE OP Pk-2 CST 1.0. le 1 03JAN79 26JAN79 25JAN79 19F E R 7 9 16 0 P69303PR9305 PR-2 PREOP PR-3 C57 T.O. 13 1 29JAN79 14F E R 79 20FEb79 08 MAR 79 16 0 [ PW9305PR9307 PR-3 PREUP PR-9 CSI T.O. 17 1.15F E H 7 9 69 MAR 79 09 MAR 79 02APR79 16 0 Pb9307PR9309 PR-4 PRE 0P PR-5 CST T.O. IS 1 12 MAR 79 30 MAR 79 03APN79 23APR79 16 0 PP9 309PR9311 PR-5 PREOP PR-6 CSI T.O. 15 1 02APR79 20APR79 244PR79 14MAY79 16 0 [*. PW9331PN9313 PR-6 PEEOP 22 1 2 3 APN 79 22MAV79 35M4V79 14JUN79 16 0 PP9313Rv5345 DUMMV O 1 2 3M AV 79 15 JUN 79 16 65-

  1. H5 772RH5373 OuMMY 0 1 240CT78 16Nov78 17 0

[$ Ib3176160177 AIR TEST HYDRO. COOLER 5 10 1 240CI78 06Nov78 16 Nov 78 ' 30Nov7A -17 0 160177I60179 UNil EhCLOS. EENERATOR 8 1 07N0v78 16Nov78 OlbEC78 120EC 7 8 - 17 0 100379160181 OUMMY 0 1 17N0v 78 13b(C78 17 0 [' 1601881601n3 COMPL. GENERATOR ASSEM8LY .5 1 17hov78 24Novis 11DE C 78 190EC78-17 0 1b0383160185 OUMMY 0 1 27hov78 200fC78 17 6 CW5573CW5773 CONT 1[RM PC&l CA8LES 37 1 240C178 190EC78 IFNov79 IlJAN79 18 0 h CN#30lMY0039 buMMY 0 1 240Ci7s 17hov78 18 0 GC0965RR0265 INSTALL SMALL 80RE HANGER 5 1 240 CIT 8 300C178 17Mov78 74NCv78 18 0 100333160817 DUMMY 0 1 240CT78 17N0v78 in 0 (3 1b9117160119 INSTL.bV-PA55 INTERNALS 27 3 240C178 30N0v78 17h0 Vie 27DEC78 In 0 NYCL39XYD043 RP15 21 1 240CT78 21Nov78. 17hov78 180EC78 18 0 RN0265RR9305 DUMMY -0 I 310C178 27Nov78 le 5 [. RYGD41xv0043 PROBE CHECMOUT 21 1 22Nov78 21DEC78 19DEC78 18JAN79 18 0 T60319160157 DUMMV O 1 ORDEL 78 - 2 Abf C 78 in a C tS 7 73C uS9 7 3. PULL ~ CIERM FINAL CARLF5 5 1 15DEC78 280EC78 32JAN79 19JAN79 18 0-(* Cb5973CW9301 OUMMY 0 1 22DEC78 19JAN79 14 15t XV3043Rve307 DUMMY 0 1 220EC7F 19JAN79 18 26 - AF2373 AF2573 PULL AND TERM FINAL C AstE S 10 1 240CI78 C6hovi8 20Nov78 04 DE C 7 8 19 0 I CV376bCV0965 INST DELv 'O LB H ANGERS CV-2 7 3 240C 178 Olhov78 20 No v 78 29N0v78 19 0 1D096510l!65 DUMMY 0 1 240C178 20Nov78-19 0 l RF0365RF 0465 INST ALL SM ALL HORE HAN6fR 10 1 240C178 D6h0v 78 20hov78 04DEC78 19 0 t+ 1D1165T01365 COMP IN51 LP HAN6ER$ to 1 240C178 06N0v78 20hov78 040EC78 19 0 ID257110277) DUMMY 0 1 240C178 20h0v78 19 10 TF0965tFl!6b UUMMY 0 1 240CI78 20hov78 19 0 1 TFil6SIF1365 COMPL HER IN51L. 10 1 240C17e 06Nov78 20hov78 04DEC78 19 0 IF357tTF3771 DUMMV O 1 240C178 20h0V78 19 15 TF6466TF3771 DUMMY 0 1 240CI78 20NOv78 19 15 T60165160167 S LL RELOC. (HC ACCUMULATORS 14 1 240C17m 10Nov78 20h0V78 UADEC78 1* O Ib920ll692D3 1/6 OC/FCT,fLECTRICAL 15 1 240Ci?6 13Novi8 20h0v78 IIDEC78 19 0 $) I

(PIIMA !!00 3Rl02 I IM E L I5 i IN G

  • e PAGE 19 0F 40 PhD A LI MA N AGE ME N T SYSTEM 7 IME NOW g 2g0CT78 1754 0F 2880 ACTIvlilES. TIME UNii DAY NETWORn 0 5DE C 7 7 18APN80 DA$E 08N0v78 NETWOPM 3 ZIMMER NUCLEAR POWER SIA1 ION UNii i SE LE CTE D O!MAV 78 18&PR80 CRITICALIIV REPORT

. s.............................................................. ACIlvlTV A C7 IvI I V Acilvliv E A R L IE 5 i L A i E5 i P-FLDAT I DE Nil F I C A T ION DE 5CR IP i 1 0N 11ME CL STANI FINISH STARI FINISH' 5 TOI TR CV0965CV9201 OUMMY 0 1 02N0v78 3DN0v78 19 .8 Af2573WF#301 DUMMY 0 1 07NOV78 C50EC78 19 33 EFd465mF9301 DUMMV 0. 1 0 7Nov 78 05DEC78 19 33 Nt0!65wr9301 OUMMY 0 1 07Nov78 C5DEC78 19 33 lul365mF9305 DUMMY 0 1 0 7N0 v 78 05 DE C 78 19 33 TD5566kF9301 DUMMY 0 1 07N0v78 05DE C 78 19 33 IFl365mF9301 DUMMY 0 1 07Nov78 05bEC78 19 33 lbdl671bOI69 IN5fL EHC ACCUM. PIPING 32 1 13Nov78 29Novi8 !! DE C 78 27DEC78 19 0 ~Ib4203160064 DUMMY 0 1 14Nov78 12DEC78 19 8 ICf2031G0064 DUMMY 0 1 14Nov78 12DEC78 19 8 TCdl69tG0157 OuMMY 0 1 30Nov78 2 n DE C 78 19 9 859304G55308 DUMMY 10 1 05DEC78 18DEC78 0 3 JAN 79 16JAN79 19 0 CE9303A59301 DUMMY 0 1 05DEC78 03JAN79 19 0 DL9303HG9201 DUMMY 0 3 05DEC78 03JAN79 19 43 G54 30lIG9310 65-l GL AND STE AM PREOP 23 1 190EC78 22JAN79 17JAN79 16 FEM 79 19 0 T bt 310 C 4 9301 16-1 TURB GL AND PREOP 21 I 23JAN79 20F E R 79 19 F E 8 79 19 MAR 79 19 16 uv3566mV9303 DUMMY 0 1 14 MAR 79 10APR79 19 59 Ch2IO3Cw2305 METERING STRUCTURE ACID LINES 0 1 240C178 2th0V78 20 0 p Cz2 505CW210 7 PROCURL & INSTALL LINING 20 1 240CT78 20N0v78 21hov78 190E C 7 8 20 0 10 1 240C178 06Nov78 2tNov78 05DEC78 20 0 650 301656575 5E T P ANELS IU81NG 64 1 240C178 24JAN79 2 8 t10 v 78 FIFER 79 20 0 IA27663A2973 INSTALL IN51RU. L [f ' ELOI65MC0465 INSTALL SMALL BORE HANGER 6 1 240CI78 310C I 78 2tN0v78 29Nov78 20 0' RH140lRH7566 DUMMY 0 1 240C178 2thov78 20 0 8 h2 76bNH4 7 7 3 DUMMY 0 1 240CT78 21Nov78 20 0 [: 3H1971kH6172 DUMMY-0 1 240CT78 21Nov78 20 0 RH5972RH6172 DUMMY 0 1 240C178 21hov78 20 0 RHf 766pH4 7 71 DUMMY 0 1 240C178 2tNov78 20 0 [f WP386svP0565 5EI L ALIGN PUMPS, CHILLER 5 15 1 240Cl?8 13Nov78 2tNov78 120EC78 20 II wiO265wi9201 DUMMY 0 1 240CT7h 21h0V78 20 0 WiU36SWT9201 DUMMY 0 1 240CI78 2thov78 20 0 ) Wil565Wi2571 DUMMY 0 1 240C178 2lN0v78 20 0 Wil565wiSI66 DUMMY 0 1 240C178 2tNov76 20 0 UT215tWI9201 DUMMY 0 1 240C178 2tNovi8 20 0 WI2200Wil365 DUMMY 0 1 240C176 21NEv78 20 0 UT2 773 w13373 DUMMY 0 1 240Ci?8 21N0v78 20 0

  1. 13573WT9201 OUMMY 0 1 240Ci?8 2thov78 20 0

UI5366mi2571 DUMMY 0 1 240Ci?8 21N0v78 20 0 U 15 366W19201 DUMMY 0 1 240CT78 21Nov78 20 0 ~ c1920lui9301 wi IHCCW OC/FCI 46 1 240Ci?8 28DEC78 21F0v78 26JAN79 20 0 MCU465CV92DI DUMMY U 1 OlNov78 30Nov78 20 9 65557bb57575 DUMMY 0 1 07Nov78 U6DIC78 20 0 G5T575657766 IN51L.0F INSTRU. PIPE C TURING 0 3 07hov78 06DEC78 20 0 G 57 766G 5 7966 COMPL.INSTL'N.INSTRU. PET 63 1 07Nov78 06FEB79 D6DE L 78 P6 MAR 79 20 0 Cw2307Cu2201 DUMMY 0 1 21Nov78 200EC78 20 0

D

__m d $PilMA 1100 3RIO2 'T IM E L I5 i IN 6 PAGE 20 0F 40-PROJE C T M AN AGE ME N T $75 FEM TIME h0w : 24nCT74 1754 0F 2880 ACTivIT IES. T I ME UNIT DAV hE160Rn 05DEC77 18 APR4 0 DATE OAhov78 NETWORn : IIMMER hUCLEAR POWER S T A TI ON UNI T I SELICIED OlMAVTA 18APR80 CRITICALITY REPORT e.......................... _...................................... ACilvlIV A C 7 1 vi7 Y ACTIVITV E A R L 1E 5 i L A: T E5 i P FLOAT IDEhTIFICATION OE 5CR IP T I ON TIME CL SIART FlhiSH SIART FlhtSH $ 101 FR Cb2201CW2203 HVDRO malER 80nE 5 10 3 21hov78 05DE C7 A 20 DE C 78 - 04JAN79 20 0 Cb2203CW9201 DUMMY 0 1 060EC78 05JAN79 20 0 Cb9203Cm9303 CW OC/FCT. 30 - 1 06DEC78 190EC78 05JAN79 18JAN79 20 -17 f' e193Olvi9303 wi-l T8CCW PREOP 36 1 290E C 78 -19F E 8 79 29 sam 79 19M AR 7 9 - 20 0 th2973343173 IERM PCLI C ABL ES 20 3 25Jah79 21F E B 19 22FE 8 79 28 MAR 79 20 0 w&UposWP9301 DUMMV O 1 26JAN79 23FE8 79 20 68 - f $$3971654371 COMPL.CohDUIT TO EOUIP. 5 1 0 7E E 8 79 13F E 8 79 '07 PAR 79 13 MAR 79 '20 0 617966653971 DUMMY 0 1 07F E 8 79 07 PAR 79 20 0 654173654973 DUMMY 0 1 14F E B 79 14 MAR 7v 20 0 (' 614973655173 PULL & TERM.FNL. CABLES 5 1 14F E 8 79 20F E 8 79 14 MAR 79 20 MAR 79 20 0 . k19 30 3C A9301 DUMMY 0 1 20FE879 20 MAR 79 20 37 615875659201 OUMMY 0 1 23FE879 28 MAR 79 20 0' (' 659208659203 65-OC/FCI 15 1 21F E 8 79. 13 MAR 79 -21 MAR 79 IDAPR79 20 0 i 143173189201 OUMMY-0 I 22F E 8 79 22 MAR 79 20 0 IA920llA9301 15 lh5TRN AIR OC/FCT 23 1 22FEB79 26 MAR 19 22 MA W 79 23APR79 20' O (' G19203f60040 OUMMY 0 1 14 MAR 79 IIAPR79 20 0 16004b160041 blowdown $5 15 1 14 MAR 79 03APR79 IRAPR79 OIMAV79 20 0 I493081A#303 14/54 IN5tRUL5ER AIR PE0 37 1 27 MAR 79 16MAY79 24APN79 14Juk79 20 0 (3 1G0041160042 RE510RL 65 15 1 044PR79 24APR79 02MAY79 22MAYF9 20 0 10004216D061 DUMMY 0 1 25APR79 23MAV79 20 0 760081160003 VACUUM Oh UNIT 16 -8 25APR79 16MAY79-23MAV79 14JUN79 20 0 () IA9303RW9845 DUMMY 0 1 17MAY79 15Juh79 20 69 160043I60004 DUMMY 0 1 17MAY79 15JUN79 20 0 1600841600n5 TURRIht READV TO ROLL 0 1 17MAV79 15JUN79 20 0 ( Ib008bev'145 DUMMY 0 1 17MAV79 15 JUN 79 20 69 WHil0!vH9308 COMPL. PUNCHLIST '9 1 240CT 78 03Nov78 2240W78 05DEC78 21 0 Ctol65CV0265 INSTALL SMALL BORE MANGER 5 1 240CI78 300C178 22hov78 29Novia 21 0 (J SC31785C4773 DUMMY 0 1 240C178 22Nov78 21 0 l SC39735C4773 00MMV. O I 240CT78 22hov74 25 0 SC4 7735C9973 PULLETERM FlhAL LABLES 5 1 240CT78 300CT7a 22Nov78 29Nov78 28 0 '() 1600091G0088 COMPL.A55EM.iURNINE GEAR '80-1 240C174 06N0v78 22h0W78 06DEC78 21 0 160853160355 COMPL. EHC PIPIN6 24 1 240CITR 27NOW78 22h0W7A 270LC78 5 21 0 Cv0265CV9203 DUMMY 0 1 310C178 30hov78 21 to f SC49735C9201 DUMMV O I 310C178 30hov78 25 0 SC92085C9301 OC/FCI SC-1 42 1 310CITS 29DEC78-30h3v78 30JAN79 21 0 t 4 WH930lVH9303 VH-02 CW STRUEFP WEN PREO 30 1 06h o v 78 180LC78 060EC78 IPJAN79 21 0 ') T60031160062 DUMM) 0 1 07hov78 0 7 DE C 78 21 10 16015b160157 OUMMY 0 1 2nNov78 2RDfC78 21 Il VH9 303Cm930 8 DUMMY 0 1 19DFC78 19JAN79 21 18 (i 509303 5C9303 bbLC SC-1 PREOP 21 1 02Ja h 79 ' 30JANI9 3tJeh79 28FE879 21 0 HP9303RV9301 OUMMY 0 1 03Jah79 OlFFH79 23 24 LP9303Rv9301 DUMMY 0 1 03JAN79 OIFib79 28 29 OH9 30 3R v9 30 8 DUMMY 0 1 03JAh79 OlFEb79 21 24 Rl9303RW9308 DUMMY O I 03JAN79 OlFE 8 79 28 24 1

C).

'I EPTIMA 1100 3R102 e e. T I M E t 15 i 1N G e e o PACE 23 0F 40 P60 SECT MANAGEMENT SYSTEM TIME NOW ; 2400178 1754 0F 2880 ACIlvlTIES. TIME UNIT OAV-NE TWORM DSDE C 7 7 IAAPpSO CATE OhMOV7P hETwokn : 21MMEe NUCLE AR PoufR STATION UNIT I SELELIED OIMAvia 18APR80 CR IT IC AL I T Y REPORT ACTIVliv A C i I V I T Y ACTIvlTV E A R L I E5 i L A-T E5 i P FLOAI IDENTIFICall0N OE 5CR 1P i 1 0N 11ME CL STANT Flbl5H START FINISH 5 10I FR 5L93035C9J04 WESSEL INJECT. Tf5T EJCI I I 31Jah79 3tJAN79 OlMAR79 OlMAR79 21 0 SC9304RV9J29 DUMMV O I OlFEb79 02 MAR 79 23 69 'r, CMD00lCMOD03 SLL 05N. 5.B. PIPE & INSTP. ?! ! 240CT78 21NOV78 24NOv78 22DEC74 22 0 M57773M57973 BEG IERM PC L I CABLES O I 240C174 24NOV78 ~ 22 19 PCILDIPRICO3 CONTINUE CAHLES L TIRMIN. 19 1 240CT78 ITNOV78 24Nov78 200E C 7 8 22 6 $W847tRNM672 INSTALL WR MOTOR 5 6 1 240CT78 310C174 24h0V78 OI DE C 7 8 22 0 V1000lVT9201 5/C COMPL. VT 575 OUCTwoRK 45 1 2400178 27DLC74 24h0V 78 29JAN79 22 0 PW4672kR A 772 PULL kp MOTOR CABLES +IERM 10 1 DINov78 14h0W78 04 DEC 78 15DEC78 22 0 CPA 774RR9303 COMelNED FCV TESTING 21 1 15N0v78 14DEC78 18DIC78 17JAN79 22 20

t C MO D03C M0369 DUMMY 0 1 22NOV78 26DE C 78 22 24 VI920lVT9206 DUMMY O ! 28DEC78 30JAN79 22 0

Vl9206VT9208 E SI PREREcul5I TES FOR SYS 21 1 290EL78 26JAN79 30JAN79 27FER 7 9 22 0

(

Vl*20mVl9301 DUMMY 0 1 29JAN79 28FEb79 22 0 Vl930lvi9303 vi-01 T/h VENTIL PRECP 34 1 29JAN79 15 MAR 79 29FE879 16APR79 22 0 vi9303Fu9310 DUMMY 0 1 16 MAR 79 17APR79 22 52 ( CVl56bCv27DI DUMMY 0 1 240C178 27Nov78 23 0 C V2 701CY296b COMP INST LR H ANbERS 3-1 240CI78 260CT78 27h0V78 29Nov74 23 0 HC920lHC9301 HC Rb CRANE OC /F CT 47 1 240CT78 290EC78 27NOV78 OlFEB79 23 0 ,P 200003R0930 7 COMPL. RD 3 CODE I

  • 2 11 EMS 12 1 240CT78 08NOV78 27N0V78 12DEC7P 23 43 C2046bRp9203 DUMMY 0 1 240C178 27h0V78 23 21 CN8 766RR93UO DUMMV O I 240C178 27NOV78 23 10

( nC8 766kR9305 DUMMY 0 1 240C178 27h0V78 23 10 V6500lvG5003 P.R. COMPL. HVAC CONTROLS 25 1 240C178 28MOV7C 27NOV78 02JAN79 23 0 CV2465CV9201 DUMMY 0 1 270Ci7s 30N0v78 23 12 '( VG5003VG9301 DUMMY 0 1 29NOV78 03JAN79 23 53 DC9 305HG9 301 OUMMY 0 1 02JAN79 02F E 8 79 23 47 HC9 30lHC9303 HC-l Rb CRANE PREOP 41 1 02JAN79 27FER79 02F E 8 79 30 map 79 23 0 "( mi'303GC9301 OUMMY 0 1 20FEB79 23 MAN 79 23 64 ~ Ht9 303RV9405 DUMMY 0 1 2RFEb79 02APR79 23 73 Nk7%66WR93DI DUMMV O 1 16 MAR 79 IRAPN79 23 26 ( ML250lMC2765 IN51 MC Lb VALVES 2 1 240C178 250CT78 29NOV78 29NOV78 24 0 PC5577RR5672 PULL REMAIN P0mER L CCI 15 1 240CI76 13Nov78 2 Rhow 7F 18DEC78 24 0 RN5577RR6373 DUMMY 0 1 240C178 -24NOW78 24 0

(

G36373RR6573 IENM NEMAIN CONTL L POWER 15 1 200C178 13NOW78 2ANOV78 18DEC78 24 0 m>0265mav201 DUMMY 0 1 240CT76 49NOW78 24 42 un056$hE9201 DUMMY 0 1 240CT78 2MNOW78 24 42 (, Mt2765CY%201 DUMMY 0 I 260C17p 3DNOW78 24 13 CW5672RR6573 UuMMY 0 1 14NOV 7e 190fC78 24 0 RW6573RW6773 PULL L TE RM FINAL CABLES 5 1 14Nov78 20NOV78 190EC78 26DEC78 24 0 'l 026773RR9308 OUMMY 0 1 2tNOW78 27DEC78 24 22 IP920llP9301 OC/FCI TP.I 19 1 02Jah75 26JAN79 05FEb79 OlMAR79 24 0 IP93081P9303 IIP IP.1 PRf0P 47 1 29JAh79 03 app 79 02 MAR 79 07MAV79 24 0 IP9 303Rv98 35 DUMMY U 1 04 APP 79 08MAY79 24 72 $P01055PO!!O DE1 ERMINE PAINT RE0'MI & PAINT 20 1 240C174 20NOV7A 29Nov78 270LC7n 2% 0

2 'CPIIMA 1100 -3R192 i IM E L I5 i IN G e

  • e.'

PAGE 22 0F-40 PR$ SECT M A N A GE ME N T S Y51E M TIMF NOW 240Ct7A 1754 0F 2880 ACTIVITIES. T I ME UNIT Dev NETWGPn 05DEC77-16apen0 Seit OnNov78 NETWORm : ZIMMER NUCLEAR POWER STATION um!T I SEttCTED DIM AY78 18APR50 CRITIC ALI TV REPORT ACIIVITV A Ci I y IiV ACTIVIIT E A k L IE 5 i L A 7E 5 i P FLOAT 3DEhTIFICA110N DE 5CR IP I I O N IIME CL START. FINISM S T ANT. FINISH 5 101 FR CF3865AF0265 INSTALL SM ALL S ORE HANbE R ' 4 1 240CI78 270CI78 '29hov75 04DEC78 25' 0 af 0 865 AF0365 F IELO puu SM SORE PIPE 4 1 240CT78 270CiF8 29N0v 79 - 04DEC7a 25 0 HD5772H05982 Comi. PULL PWR.6 CNTPL.C8L. 49 1 240Ci?8 03JAN79 29hov78 07FE879 25 0 AIO265mF9301 DUMMY 0 1 300C17A 05D(C78 25 39 A F 0 365 mF 930 I p uMM V O I 300CT78 05DfC78 25 39 TF 0365mF 9 301 DuMMV O I 300CT78 05Df C 78 - 25 39 SP3 31GSPol*0 DuMMV O 1 2tNov78 240FC78 25 38 Hb55 2HD49 73 uuMMV - O I 04JAN79 . 08Ff b 79 25 63 1 CLULOICLODU2 COMPL. CODE I

  • 2 ITEM 5 16 1 240C178 14 NOW 78 3160578

?!DE C 7 4 26 0 CF9203CV9201 DUMMY 0 1 240CITS 30Nov78 26 15 CVB365CV9208 DuMMV O 1 240CT78 39hov78 26 15 CV3466CV5771 DUMMY 0 1 240CT7s 30N0v78 26 0 CV2466rV9201 DUMMY 0 1 240C17a 3DNov78 26-15 ntS$66CV9201 DuMMV 0-1 240C178 3nhov78 26 15 PN200lPR2003 CONTINu! CONDuti INSTALL 10 1 240C178 06Mov78 30Nov78 13DEC7P 26 10 SC63665C9201 DuMMV O I 240C174 39Nov78 26^ -5 SC91125C9208 puMMY 0 1 240CT78 30Nov78 26 5 ef0165mF0265 I NS T A LL SMALL MORE MAN 6ER 3 1 240C178 2600178 33Nov78 040EC78 26' O

  1. 5697Jw57573 CONI 1[pH PC E I CahLES 6 1 240C178 310C178 30Nov78 07DEC74 26 34 eT000!wie308 COMPL. CODE I
  • 2 ITEMS 40 1 240CT7h 190EC78 3Ohov78 26JAN79 26 6

stC265=F9301 DUMMY 0 1 270C178 UgufC78 26 40 CLCD02W59301 DUMMY 0 1 15Nov7n 22 pE C 78 26 34 CA3773CA9201 DUMMY 0 1 240C178 Olbt C 78 27 0 C89201C A9301 C A-1 OC /FC T 75 1 240C17h 08F E B 79 O R DI C 78 19 MAR 79 27 24 E56965M56365 wH INST Tup. pV. PASS VALVE O I 240C178 O l bf C 78 27 0 M55 36bNh9301 DUMMV O l-240CI?8 O R DE L 78 27 69 M5910lRH92UI buMMY 0 1 240C178 Ol bE C 78 27 0 chb 373pM9201 DUMMY 0 l 240CT78 UlDfC78 27 0 CHwl03RH9201 DUMMY 0 1 240CT7n OlofC78 27 0 EH120!N89301-DuMMV O I 240Ci?8 OI DE C 78 27 69

  1. 5116bh51365 COMPL INST OF W5 HGR5 15 1 240CITA 13Novie OlDfC78 21DEC78 27 0

.tS2565wS5571 DuMMV O I 240C17e O R DE C 74 27 35 N58 365v593ut DUMMY 0 I 14Nov78 22DEC78 27 35 SPolRs5P0865 DUMMY D 1 10JAN79 16FEB79 27 0 $rol655 Pol 10 INSTALL 00eNCOMER BLIND FLANGES to 1 10JAN79 23JAN79 16Ftb79 DIMAR7e 27 0 f SP3170Rv9329 DUMMY 0 1 24JAN79 02 MAR 79 27 75 A5920!A59202 AS-I OC/FCI 20 1 240CT7t-20Nov7e 040fC78 02JAN79 2a O Ctol65NE0265 INSTALL 5M ALL HORE HAN6tp 30 1 240CT74 050tCrn-04DIC78 16JAN79 24 0 vb0l65v60365 INSTALL L b HANGERS 20 1 240CT78 20Novf8 040tC78 02JAN79 24 0 vH920!vH9301 VH FANS NELPED ONLY 2 1 240CT7A 2500178 0401C78 050EC78-28 7 859202A59301 DuMMV O 1 21Nov76 03JAN79 24 9 WLQ 365vG9 30 8 uuMMV O 1 21Nov7A 05 SAN 79 28 58 CIDi65WE*301 DUMMY 0 1 06bEC76 17JAN79 28 50 656501657301 DfLivtR IN51NuMINIS I 1 240CT78 240Cife 050fC78 050EC78 29 0 )

CPTIMA 1100 -3R102 1 1 M E L I 5 T IN G e *

  • PAGC-23 0F 40 Pk3 JE C T MANAGEMENI SYSTEM IIMF NOW t 240CT78 1754 0F 2m80 ACITVITIES. TIME UNII DAv NE lb O Ru 05DIC77 18 aP9 0 0 CATE- 08NOV78 NE i worn s 2IMMER NUCLE AR P0 HEN.5T ATION UNII I SELEC TED OlMAY78 18 APP 80 CRITICALITY REPORT ACTIVITY A C T IV I T Y ACTIVITV E A R L IE 5 I L A T E 5 I P.

FLOAT IDE CT IF IC A T ION DE 5CR IP I I O N TIME CL STARI FINISH START FINISH 5 101 FR Gt455tdF4753 OUMMY 0 1 240CT78 05DFC78 29 0 ifov66mF9308 DUMMY D 1 240Ci?8 05DE C 78 29 43 b53565W53765 F IN AL W5 VALVE DEL 8 1 240C178 02NOV78 G5DEC78 14 DE C 7 4 - 29 0 657101657301 DUMMY 0 1 250CT78 06DEC78 28 0 G5730!G57575 MOUNT IN51RUMENTS 0 1 250CT78 06DIC78 29 9 B5 3 765W 5 3965 INST h5 VALWL5 5 1 03NOV78-09NOV 74 150EC78 210EC78 29 0 b53f65=59301 DUMMY 0 1 10NOV78 22DEC78 29 37 CC0303G593DI DUMMY 0 1 05DEC78 17JAN79 29 to $42765DV0965 ST ART IN51L. HANGERS 40 1 240CT78-190tC78 06DEC78 DIFE879 30 0 HD4773h04973 CONT. TERM.CNTRL.C PWR. CPL. 44 1 240C178 26DEC78 06 DF C78 07FERI9 3D 68 Et0065DVIS01 DUMMY 0 1 20DEC78 02FE B 79 30 0 b Vl 50lDV l 765 C UMPL.NGR. INS T L. 9 1 20DE C 78 03JAN79 02Ffh79 14FEB79 30 0 ) hvlI65DW9201 DUMMY 0 1 04JAN79 15ftB79 30 0 SW920lM09 301 DV-1 UC /F C I 20 1 04JAN79 31JAN79 15 F E 8 79 I4 MAR 79 30 68 FCCOO3FCil65 DELIVER 44 FC HANGER $ 8 3 240CT78' 02Nov78 0 7 DE C 78 18DEC78 31 0 CDS172Cw6972 CONT PULL PCCI CA8LE 24 1 240C178 27NOV78 07DEC78 IlJAN79 31 0 i hhol65N80365 INST LB PIPE 3 1 240Ci?8 260CTF8 07DEC78 IIDEC78 31 0 CGS *F5067366 BEGIN INSTR PIPE LTUBING 45 1 240 CIT 8 27DEC78 07 Dt C 78 09FEH79 5 31 0 ) kh0 365NH9203 DUMMY 0 1 270C178 12Df C 78 31 66 F Cll65FCl365 COMPL SC HANGERS 30 1 03NOV78 15DEC78 190tC78 31JAN79 31 0 CUS972Cw5773 DUMMY 0 1 2ANOV78 12JAN79 33 13 b bt9303CW93DI DUMMY 0 I 05DEC78 19aAN79 31 28 bC9311Ri9301 DUMMY O I 05DEC78 19JAN79 34 36 F Cl 365FC9301 DUMMY 0 1 18DEC78 UlFEbi9 31 27 P59 302 F C9 301. DuM MY 0 1 180FC78 OlFf079 31 27 tb78660G7366 COMP INSTR PIPE CTUPING 15 1 2 ADE C78 18JAN79 12FEH79 02 MAR 7* 31 0 CG39780G4171 COMP CONDUIT TO EQUIPMENT 5 1 19JAN79 25JAN79 05M8979 09 MAR 79 31 0 E Eb73660G3971 DUMMY O I 19JAN79 05 MAN 79 31 0 Eb9873069973 DUMMY Q l 26JAN79 12 MAW 79 31 0 6609730G5173 PULL CIENM FINAL CABLES 5 1 26JAN79 OlFLp?9 12 PAR 79 16 MAR 79 31 0 7 E65373069301 DUMMY O 1 02F EW 79 19 MAR 79 33 0 EG93030G9303 OG.I 0FF.GA5 PREOP 63 1 02FEB79 O!MAY79 39 MAR 79 .34JUN79 31 0 669303RV9145 DUMMY 0 1 02MAY79 35 sun 79 31 PU W 58 365 W 504 65 IN51ALL SMALL BORE HANGER 10 1 240C179 D6NOV78 USDE C 78 21DEC78 32 0 b50465mS*301 DUMMV O I 07NOV78 22DEC78 32 40 tD9301CD9303 CD/CH-1 PREOP 21 1 29DEC78 29JAN79 14 FE B 79 14 MAP 79 32 0 b i9 301 C O* 301 DUMMY Q R 290EL78 I4FEB 79 32 0 CDD303HU93DI DUMMY 0 1 30JAN79 15 MAR 79 32 70 hP9 310MP9312 MP3 PHE -OP 21 1 02APR79 30APR79 16MAY79 14JUN79 32 0 hPv 312RV9845 DUMMY 0 I OlMAY79 15JUN79 32 81 110020110022 G.E.F NL.51 AR IRE C Sys.0ESIGN 15 1 240CT78 13NOV78 1101C78 02JAN79 33 0 bHID0lVH9332 COMPL. PUNCHLIST 9 1 240CT78 03NDV78 IIDEC78 210EC78 33 34 bell 370W1337 PENfiRATIONS 3770 57 1 240C178 15J AN 79 I I DE C 7e DIMAR79 33 0 hE!*65pt2165 COMPLETE HANGIN INSTALLIN 25 1 240C17h 28NOV78 110( C 78 lbJAN79 33 0 ) 4 4

..~. 4 OPflMA !!00 3R102 i 1M E L I5 i I N' 6 PAGE 24 OF to d P E 0 JE C T M A N a r,E ME N T SY51Le TIME NOW 3 240CT7R 1754 0F 2880 ACilVlilES.. TIME UNIT.DAv NEiboom 050EC77 laAPN80 DATE ORNOW78 NETWORK ll M ME R NUCLEAR POWIR S TA TI cN UNIT I SELICIEQ O!MAY78 18APRs0 LRITICALIIV REPORT ACilvilY A CT I V I I V ACTIvlTV f A R L IE 5 i L 4.1 [ 5 i P FLOAT IDE NilFIC A110N DE 5CR 1P I I O N IIME CL SIAWT . FINISH SIARI FINI$M 5 101-FR t hE 3 373mE 35 7 3 CONT.IE RM P L'C CABEES 20 1 240C178 2pwov74 I I DF C 78 09JAN79 33-01 mE4372mE4572 CONT. PULL P & C CABLES 20 1 240C178 20Nov 78 iltrC78 09J4479 -33 0 fl0022 TID 024 6.E. APPROWF E SLL 155.0wG M001F. 23 1 14Novia .35DEC78 03JAN79 02FEB79 33' O t' ut 3573dE 37 73 PutL L TERM. FNL CABLES 5 1 23NOV7M 24WOV78 10JAN79' 36JAN79 33 0 wf 4 572=E 357 3 DUMMY 0 1 21NOW78 10JAN79-33 0 RE2865kE9301 DUMMY U I 2*Nov74 17JAN79 33 55 (. 913773mE9308 DUMMY. O I~ 29NOW78 17JAN79 33 55 f 10U0 3 f 10005 C OMPL 11 SY5ff M INSTALLATION 30 1 I SOE C TS 30JAN79 05FEa79 16 MAR 79 33 0, flOU24110003 DuMMV O ! IADEC78 05Fre79 33 0 Owl 337pv9329 DUMMY 0 3 36JAN79 02 MAR 79 33 el f10005110012 DUMMY 0 1 3tJAN79 19 MAR 79 33 0 ' fl0012TIODl4 INSTALL & C ALIBR ATE COMPUTER 63 1 3tJAN79 27APR79' 19 PAW 79 14JUN79 33 0 '( $10014Rvel45 OuMMY 0 1 30APR79 15JuM79 33 82 cm000lCw0002,5LL REL HOLO OWG. 21 1 240C174 21Nov78 12 DE C 78 IlJAN79 3e O EPULOICP9301 COMPL. CODE l'* 2 ITEM 5 27 3 240Ci?8 30Nov78 12DEC78 19J4479 34 '0-(' Ob6 70 8 0G6ec t SEI PANEL 5 E M0 pW I INSTRUMENTS 42 1 200C178 210EC78 120E C 78 09FEB79 34 0 GR5 773 RR59 7 3 C OMPL CONDuff 10 Ecu!P 5 1 240Ci?8 300CT78 12 0t C 78 In0EC78 34 0 CEA166RR5771 DUMMY 0 1 240C178 12 DE C 78 38 0 () 4R5473RR6573 DuMMV O I 380CT78 190f C 78 34 10 CR7565RR9301 bbMMY 0 1 07Nov78 270f C 78 38 32 !J C.000/Cm5773 DUMMY 0 1 22NOV78 12JAN79 34 16 Cl CP930lC09301 CP-1 CONDFW POLISH PREOP 17' I 010EC78 260ECTA 22JAN79 13FEB79 34 2 (66t080G7166 OuMMY -0 1 220fC78 12FEB79 34 3 OL93051G9310 DUMMY 0 1 02JAN79 19FE879 34 15 ('. dV0565mV9301 DUMMY 0 1, 21 F E B 79 10APR79 34 74 FlubO!FCO365 SLL ' ISSUE DOC 3527 10 4 240C178 06N0v78 13DfC74 270EC78 35 0 HGon69HG0360 h f>N.F L D.[ N b.5M.R OR E PIPE 5 1 240 CIT 8 300C17A 13btC78-190EC78 35 0 (.' CD9103229063 DUMMY O I 240CI78 13 DIC 78 35 0 CD9165xx9063 DUMMY 0 1 24bCI78 130f C 78 35 0 E39L63XX9065 LOMPL. RL l '$ F LU5H-CPO'S 0 1 240CT7p 13uf C78 35 0 () XE9t:65R09307 DUMMY D' I 240Ci7A 130f C 78 35 55 HbO369HG0565 F AB.E INSIL.5M. PORE PIPE M I 310CI7N 09N0478 20DiC78 02JAN79 35 59 Cbo3030G9201 DUMMY 0 1 29 DEL 74 19FFH79 35 0 "I 0692010G93OR Ob-1 OC /F CI 20 3 290EC78 26JAN79 19FIH79 16 MAR 79 35 4 pp9303Rv9?2v 0 1 12JAN79 02MapT9 35 83 E 54 5 7 3E54 3 73 CONI.iERM.CNIRL.L PWR. CPL. 3R 1 240C178 15DEC78 1408C78 07FE679 36 0 (* 10930lG59301 OUMMY c 1 24Nov78 17JAN79 36 17 f54373E54573 PULL L TERM. FINAL CABLES 5 1 IPDIC78 220tC78 O AFF H 79 14FER79 36 0 [54573E59201 DuMMV O

1. 260EC 78 15F E B 79 36 0

t E5920lf5*203 E5 OC/FCT 20 1 260L07s 23JAN79 15 tic 79 14 MAR 79 36 0 E59203H09301 DUMMY 0 1 24JAN79 15 MAR 79 36 74

  1. RA672RR0001 DUMMY 0 1 OlNOW78 261.f C 78 37 0

CR000!RR0002 compt. RP 5.B. PIPE 16 1 DINov78 22Nuv7A 26DFC78 17JAN79 37 0

  1. p0002RR9303 puMMY-0 1 24Nov78
18JAN79, 37 35

()

m t ! $PflMA 1100' 39102 e e e i IM E L I$ i IN6 PAGE 25 nF 40 Ph&JEC T MA NAGL ME NT SV51EM TIME NOW t 2400iFA 1759 Or 2680 AC TIVITIE S. TIME UNIT DAV -NEikopa 05DE C 77 18 4PR8 0 ' -@AIE 08hov78 NtiWOpa : ZIMMER NUCLEAR POWER STATION UNIT I SELECTED DIMAV7s RAAPR80 CRITICALITY #EPORT AcilvlIV A C 7 I V 1 i V ACTIVITV E A k L IE 5 i L A T E5 i P FLOAT

IDECTIFICAll0N 0E5CR IP i 1 0N IIME CL STApi FIN 15H SIART
FINISH, 5 TOT FR 200002#00004 COMPL. RD-2 PUNCHLISI 12 1 240C178 OPN0v78 14DEC78 04JAN79 39 0

Cw750lCW7766 mount IN5tRUMENTS !? I 240C176 08NOV78 18 Df C 78 04JA479 -5 '39-0 VI250lvi5003 50 1 240CT78 04JAN79 180f 0 78 27FE879 34 0 4 ObH004Rv9305 DUMMY 0 1 09N0W78 05JAN79-3a O CD4971CW4771 COMP CONDuli TO E00lP 5 1 09NOV78 15NOW 78 05JAN79 IlJAN79- '38 0 CN7166 cup 566 DUMMY 0 1 09hov78. 05JAN79 34 0 Ch6566CW4766 COMP -INSTR PIPE EiuplNG 0 1 0*NOW78 05JAN79 3m O Cwe f 66Cw45 71 DuMMV O 1 09NOW78 05JAN79 3R 0 R U9 3059 V 9306 C.R.D. PRE OP F.C. ST A T ION 10 1 09N0V78 22NOW79 05JAN79 IPJAN79 3R 0-S '. Cut f 71CuS773 DUMMY 0 1 16NOW78 -12JAN79 38 20 SW9306Pv9307 DUMMY 0 1 24NOV78 19JAN79 38 46 &P9303Cw9301 DUMMY 0 1 24NCV78 19JAN79 34 35 V15003VI9301 DUMMY 0 1 05JAN79 24FE879 38 16 FL7375FC7566 WEG INST INSTR PIPE & TDBE 5 1 240CT78 300Ci78 190EC78 260EC78. 5 39 0 ML5566MC3171 DUMMY 0 1 240CI7R 190fC78 -3

  • O F 07 b66F C7 766 CUMPL INST INSTR PIPE & TU8E 15 1 310C178 20NOW78 27DE C 78 17J AN 7 9 39 0

F L7 766FC4 3 71 DUMMY 0 1 21Nov7A 19JAN79 39 35 AP93tTLL9301 DUMMY 0 1 23FE879 17APR79 39 0 b LL930lLL9303 SIANOBV & EMEPGEN..LTG. PREOP LL-1 42 1 21FEb79-194PR79 17APR79 14JDN79 39 0 LL9303RW9145 DUMMY U 1 20APR79-15JUN79 - 39 88 EH920!EH9203 EH SV5 TEM, OC/FCT 10 1 240C178 06NOW78 2nDF C 78 04JAN79 40 0 E 55372E 55572 CONT. PULL PwR.& CNIRL.CBL. 34 1 240CITA II DE C 78 20 DE C 78 07FE879 40 0 EH9103160159 DUMMY 0 1 07NOV7e 05JAN79 40 30 ' F h9 301CW9301 DUMMY 0 1 2tNOV76 19JAN79 40 37 F C3 55 tFC9 301 LE AR TEsi SPENT FUEL POOL 5 1 28NOV78 04 DE C74 25JAN79 31JAN79 40 36 E 55572E 54373 DUMMY 0 1 I?DEC78 08FEs79 40 Nb9305NR9307 APRM NR-3 PREOP 56 3 31JAN79 18APR79 29Mak79 14JUN79 40 0 .Rh9307RW9145 DUMMY 0 1 19APR79 ISJUN79 40 89 110001110003 START II SYSTEM INSTALLATION 30 1 240C178 050EC78 2 3 CE C 78 DFF E 8 7 9 41 P A57566A55uit DUMMY 0 1 240C178 2tDFL78 41 0 ) .LD700lLO7003 PULL L TE RM CABLES 54 1 240C178 10JAN79 210tC78 OnMAR79 el 63 IE3371TE3571 CONIINbE CONDuli 13 1 240C178 09NOW78 2101078 IUJANTO 41 O it%IT2tE4873 DUMMY 0 1 240CI78 210tC78 48 0 TL3578iE3771 COMP. CON 00!i 10 EOUIP. 0 1 10NOW78 IlJAW79 el U ' IE 3 771TE 45 73 DUMMY 0 1 10NOW74 IlJAN79 el O IE4573 5E4 773 PULLL JERM FNL CARLES 4 1 10NOW78 15NOW78 IlJAN79 16JAN79 48 0 ) 'TE4773mE9308 DUMMY 0 1 16N0V78 17JAN79 48 63 .667366069301 DUMMY 0 1 19JAN79 19 MAR 79 el 10 Cu0003rw0004 DELIVEN ANODES 8 1 240CI78 02 N O V 7 8.. 220EC78 04JAN70 42 0 Ch0004CWUUU6 INSTALL CW SYS. ANODES In 1 D3NOV78 16NOWFA-0$JAN79 18JAN79 42 0 Cwo00bCW'301 DUMMY 0 1 17N0V78 19JAN79 42 39 It 0165 f E 0 365 ( OMP.F A B & IN51 58 PIPL l0 1 240CT78 06N0V74 26DEC78 09 JAM 79 43 0 Il03651E6566 DUMMY U ! 07NOW78 10JAN79 43 0 TE65661[6766 C OMP INSTR PIPE /TuMING I I U7NOW7H 07NOW78 10JAN79 10JAN79 43 0 ) i

p.,[='/{ ]l [ y 'f i,. j. ; ,; - j,..., ,,4C~ -l ,y. f s g, y 3 c .3 g,. ,, y }.. ; y j,,{. ~ J i. OPilMA 3500 3R302 I I M E L I5 I IN G PAFE 26 0F to PPOJELT M A N A GE ME N T SYST[M IIMF NUh : 240CT78 1754 or 2880 ACTIVITIES. TIPE UNji DAT NFTWORn 050tC77 IBAPR80 Daft UnNov7a NEiwoRn : 2IMMER NUCLE AR P0hth STATION UNIT 1 SELECl[D DAMAv78 18APR80 CRITIC AL Iiv REPORT ACilvliv A C 1 I V I i y AcilVliv E A R L 1E 5 I L 4 1 E 5 i P FLOAT IDEbiiFICATION DE 5CR IP i 1 0 N TIMF CL START FINISH SIAH1 FINISH 5 10i FR It 6766T[3578 DUMMY 0 1 OPNov78 IlJAN79 43 2 CP930lw293OI UUMMY 0 I Ol0EC18 02 FIB 79 43 83 [52365E52565 COMPL.LG.80RE PIPING 10 1 240C17e 06NOV78 2 70f C 78 10JAN79 44 0 Ft060lFC0701 Of51GN CHANGE By hAISFR INSTRU. 0 1 240CT78 27DEC78 44 0 FL210lF C2201 DE LIvf k NEMAIN INSTRUMENTS 0 1 240L178 27DEC78 44 0 MC 3 37 t MC # I F3. DUMMY 0 1 240Ci?8 2 70t C 78 44 0 RbHf6bRR9301 OuMMY 0 1 240C178 2 7DE C 78 44 42 E52565E56366 DUMMY 0 1 07Nov 76 IlJAN79 44 0 f5636bf56566 COMPL.INSTRU.TUPING 15 1 07NOW78 28NOV78 IlJAN79 3]JAN79 44 0 E53371(53573 COMPL.CONDult TO EQUIP. 5 1 29NOV78 059EC78 UlFfb79 07FEB79 44 0 E 56566E 5337 8 DUMMY .0 1 29NOW78 OlFEB79 44 0 E 53578E 543 73 DUMMY 0 1 060F078 04 FIB 79 44 8 + F LOj69FC0365 DUMMY 0 1 240C178 24DF C 78 45 0 RT0565RT7566 DUMMY 0 1 240C174 28 DF C 78 45 0 kil 40lpT 7566 UUMMY 0 1 240C178 24Df C 78 45 0 RIF20lNI7566 DUMMY U 1 240C17s 280f C 78 45 0 ( A55074A55573 UUMMY 0 1 240CT78 29 DE C 78 46 0 A55573 A55773 PULL & TERM FINAL CABLE 2 1 240CT78 2500178 2*DIC78 02JAN79 46 0 1 455f73A59301 DUMMY 0 1 260CI78 03JAN79 46 27 CM1001CMluG3 INSTALL INSTRU. TUB / PIPING 40 1 240C17a 190EC78 02JAN19 26FEB79 47 49 Rt7566RE7766 COMP IN51Ru PIPEEIUBING 1 1 240C178 2400178 02JAN79 02JAN79 47 0 I WC0007vC0013 OUMMY 0 1 240CI78 02JAN79 47 0 ( kt%566hE5766 C ON FL. IN5fEu PIPE /TURING ] 1 240CI78 240C778 02JAN79 02JAN79 5 47 0 ef630luE55t6 OUMMY 0 1 240CT78 02aAN79 47 0 i RtF76bRE4571 DUMMY 0 1 250Ci7M 03JAN79 47 0 8 ut2571WE2771 COMPL CONDUIT 10 EQUIP. 5 1 250CT78 310C178 03JAN79 09JAN79 47 0 bl576bwE2573 UUMMY 0 1 250Cl?8 03JAN79 47 0 ht 2 77 3 WE 35 73 DUMMY 0 1 01NOV78 10JAN79 47 14 i + CA930liG0121 DUMMY 0 1 ISMAR79 2twav79 47 0 1603211G0123 WACUUM PUMP RUN-IN 2 1 15 HAP 79 16 MA R79 23P4779 22MAvi9 47 0 e IbO!231G00ml DUMMY 0 1 19 MAW 79 23Pav79 47 27 ( A51!65A51765 OUMMY 0 1 240C178 03JAN79 48 0 A51%65459301 DUMMY 0 1 240CI76 03JAN79 4R 29 A57566459301 DUMMY 0 1 240C178 OlJAN79 MP 29 t Hbu951HG05b5 OuMMY 0 1 240C17e 03JAN79 en 72 RL 4 771RE55 7 3 OUMMY 0 1 240CT7h 05JAN79 en 0 1-Rt 5573RE57 73 PULL LIEPM FINAL CABLES 5 1 240C178 300CT74 63JAN79 09JAN79 44 0 RE6574RE5573 DunMy 0 1 240C178 03JAk?9 48 0 RW9325WG9303 OUMMY 0 1 240C176 D3 jag 79 to 73 550132550332 MISC SIEE L 3210 136 3 240CT7A 06AppT9 03JAN79 14JuN79 en 0 ( It0165TE02b5 INSTALL SMALL BORE H ANGE R 10 1 240C17M 06Novin 03aAN79 16JAN79 44 0 WP5001VP5003 P.H. COMPL. HWAC CONTROLS 23 1 240C178 21NOW78 03JAN79 38JAN79

  1. P O

RtS773RE5873 E.D.I.D TEST CAPLES 5 1 310C178 06HOW 74 10JAN79 16JAN79 4M 0 ( RL5873WE9301 DUMMY 0 1 07Nov7n 1 7s AN 79 en 70 f b I m,.,.. ~...t.y ^ s.1

3. w.,. '. p; n.
-s-+ -r.

,p -.c > m. -+m a - +=. ~<.y.! ' -74. e-w'~n

  • +

.- ; -c ~% '- '~ 4'

CPIIMA 1100 3R102 l 'I M E L i5 i IN 6 PAGE 27 0F 40 PPSJELI MANAblMENT SYSTEM IIMI NON : 240CT7E 1754 or 2880 AC TIVITIE S. 11ME UNIT DAY Ntiboom 050EC77 InAPpho DafE 04Nov78 NEINORn : IIMMEP NUCLEAR F0bER STATION UNii i SELECTED O!MAvis 18APRs0 .CR111Catliv REPORT e e........ e..................................................... ACIIW11Y 'A C i IV I i Y ACilV11Y E A R L I E $ I L A IE 5 i P FLOAi IDE NT IF IC A T ION OE 5CR 1P i I U N .ilME CL STARY FINISH START FINISH 5 TOI FR IE d265mE9 301 DUMMY 0 1 07NOV7A 17JAN79 44 70 ED930lRv9307 UUMMY 0 1 09NOW78 19JAN79 ma 56 Ce8 766Cw930 8 DUMMY 0 1 09NOW78 19JAN79 44 45 VF5003Rv9326 UUMMY 0 1 22NOW78 OffE879 48 82 APO30lHC9301 DUMMY 0 1 24NOW78 D2FE879 49 25 APO30lHG9301 OUMMY 0 1 24Nov78 02fEB79 nr 72 553332Rv9145 0 1 09APR79 15JUN79 48 97 FC0002FC4371 RESOLVE BLOCKN ALL. ATT ACHMT5 10 1 240C178 06NOW78 04JAN79 I?JAN79 49 45 Ct0 365CuG565 C OMP FIELO ENG $8 PIPE I 1 240C178 240CT78 04JAN79 04JAN79 49 0 H0 3 30lHD1501 F NL.HGR.DELIVE RY 5 1 240C178 300C178 OgJAN79 10JAN79 49 0 MC4373CV9301 UUMMY 0 1 240CT78 04 JA N 79 49 3a RE240lRE3165 FINAL VALVE DELIVERV RE049 4 1 240C178 270CT78 04JAN79 09JAN79 49 0 T F4 3731E457 3 C ONT. TE RM PCC CABLE 5 8 240C178 300C178 OgJAN79 10JAN79 49 8 1853721E4373 OUMMY 0 8 240CT78 09JAN79 49 0 XVdD05XY0007 INSTALL BLADE GU10E5 I I 240C178 240CT74 04JAN79 04JAN79 49 0 'Evol03xY0005 DUMMY 0 1 240C17H 04JAN19 49 0 C=0565Cw8566 DUMMY 0 1 250CT7N 05JAN79 49 11 CwuS6bCue201 DUMMY 0 1 250CI78, 05JAN79 49 29 P' av0007RV9305 DUMMY 0 1 250CT78 05JAN79 49 Il RE 316SRE 3365 I NSI ALL VALVES 5 1 300C178 03NOV18 10JAN79 16JAN79 49 0 HDl50lHolT65 COMPL.L.B. PIPE & HANGERS 10 1 310Cl?R 33NOV78 IlJAN79 24JAN79 49 50 () R E 3 365w E9301 DUMMY U 1 06Nov78 17JAN79 49 71 F C 7 766FC93OI OUMMY 0 1 21NOV78 UlFEB79 49 45 RP920lRP9301 RP OC/FCI lo 1 240C178 06MOV7A 05JAN79 18JAN79 50 58 (* 312565RT3971 OUMMY 0 1 240C178 05JAN79 50 0 Di776bRI3978 ouMMY 0 1 240C178 05JAN79 50 0 X V000lNYUD03 CONDE N5ER AVA]LABLE O 1 240C178 05JAN79 50 0 (, av0003Rv9305 puMMY 0 1 240CI78 05JAN79 50 12 M53765M54365 DUMMY 0 1 04JAN79 15M AW 79 50 83 Ib016tEH9301 DUMMV O I 05JAN79 16 MAR 79 50 44 (,; C h2 70 l CW 2901 flNAL LB VALVE DELIVE97 8 1 240C178 02NOV78 ORJAN79 17JAN79 51 0 Cb29010w3165 INSTALL LR WALWE5 1 1 03Nov78 03NOV18 18JAN79 18JAN79 51 0 Cm3165Cm*301 UUMMY 0 1 06N0W78 19JAN79 51 44 R 14

  • 7 4R16173 puMMY 0 1 240CT78 09JAN79 52 0

V00004t09301 5 /C COMPL.SYS. IN51AL.v0 25 1 240CT78 28N0V7A 09JAN79 12FE879 52 82 WO500lv05003 P.R. CDNPL. HVAC CONIPOL5 25 1 240C 178 28Nov78 09JAN79 12FER79 52 0 V05003vo9301 DUMMY 0 1 29Not?M 13FE879 52 82 ) DE9305H0930I DUMMY 0 1 02JAN79 1sMAR79 52 90 R19303xv0045 DUMMY 0 1 03JAN79 16 MAR 79 52 0 RH9803xY0045 DUMMY 0 1 03JAN79 16 MAR 79 52 0 HP9 3031Y0045 OuMMY 0 1 03JAN79 16 MAR 79 52 0 LF9 303XY0045 DUMMY p 1 03JAN79 16 MAR 79 52 0 E v0t'4 5 X YOU4 7 N E MOV E BLADF GUIDES 5 1 03JAN79 09JAN79 16 MAR 79 22 MAR 79 52 0 21004TRv9403 DUMMY 0 1 10JAN79 23 MAR 79 52 100 )

.-.. ~ - ~ bFilMA 1100 .3R102 e e e T-1 M E L I 5.T IN F, e e o PAGE-28 DF 40 >kO JE C I M A N AGE MENT ST5IEM -11Mt NOW.I 240CT78 5754 0F 2880 AC TIVIT IE S. T I ME UNIT DAY-NElbORM 05DECI7 18 APR8 0 BATE ObNov78 NETWORM ZIMMER NUCLEAR PowfR STATION UNIT I SELE CTED plM AV7A 18 APW8 0 CRIllCALIIY REPORI 'ACIlvlTV A C T. I - V I I Y .' A CT IV I T Y E A N L I E 5 I-L A TE 5'I P' FLOAI IDE NT IF IC A TI ON DE 5C# 1P i I O N IIME'CL START FINISH STARI FINISH $ 10f. FR

t-hve 77/DW4972 CNT. PULL Php.E CONT.CRL.

21 1 240C178 21NOv74 10JAN79 07FER79 55 0 E 50 363E 50565 F LD.NUM LAST 2/3 5.8.P. I I 240CITS 240C178 10JAN79 10JAN79 55 0 'Ifl965fE6566 DUMMY 0 1 240C178 - 10J AN 79 53 to '( 150565E 56366 DUMMY n 1 250C178 IlJAN79 $3 9 ND150lHu l 701 COMPL. HANbER INSTALLATION. .28 8 380C174 29Nov78 17JAN79 14FER79 53 0 bl5773sE9303 DUMMY 0 1 3IoCT78 17JAN79 53 75 t.) DV4173DV4373 PULL L TE RM. FINAL CABLES - 5 1 22N0v75 29Nov78 04FEb79 14FE879 55 0 D64972Dv4173 DUMMY 0 1 22Nov78 08FEb79 53 0 hv4373Dv9201 DUMMY 0 1 30Nov78

15 F E b 79 53 23 (i

hbl10!HD9208 DUMMY O I 30Nov7n 15FEb79 51 91 bE 9 30$E H9 301 DUMMY 0 1 U2JAN79 36 MAR 79 53 47 152003E56366 DUMMY 0 1 240Ci?8 IlJAN79 54 10 (" i s7 375E 56175 DuMMV O 1 240C178 IlJAN79 Sg O. HOU465HDl501 DUMMV O 1 240C178 IlJAN79 54 5 IEl965IE3571 OuMMV O .I 240C178-IlseN79 54 13 -(I IE5572TE4573 DUMMV O I 240C178 31JAN79 54 33 9E0015VC9201 DUMMY 0 1 240C178 IlJAN79 54 80 E56566E59201 DUMMY 0 1 29N0v78 15Fibi9 54 IS (T RP930lRP9303 RP5 RP-1 PREOP 42 1 3tJAN79 29 MAP 79 17 APR 79 14 JUN 7 9 54-0 HP9303Rv9645 DuMMV-0 1 30 MAR 7V 15JUN79 54 103 C00165C00365 FIELD RUN SM RORE PIPE 34 1 240CI79 IIDECTS 12JAN79 2aFEB79 55 0 ()- Ct920lN69307 DUMMV O I 240C178 12JAN79 55 104 O v347 3Dv417 3 CNI. lERM. CONI. AND PWR.CBL. 19 1 240CT78 17Nov78 12JAN79 07FE879 55 2 R19871RI6373 DUMMY 0 1 240Ci78 12JAN79 55 0 (f R15172Ri63 73 DUMMY 0 1 240CI78 12JAN79 55 0 1b0073159201 DUMMY 0 1 240CI7s 12JAN79 55 0 159201159203 15 OCT/FCT. ELECTRICAL 15 1 240CI18 13Nov74 12JAN79 ORFEB79 55 0 (: 159203154301 DUMMY 0 1 14Nov78 02Ff879 55 49 C00 365DG9302 DUMMY 0 1 12DEC7R DIMAR79 55 62 0b0165060365 COMP INST SM RORE PIPE 20 1 240C17s 20N0v78 15JAN79 09FER79 Sb O (: A11365R11704 DUMMY 0 1 240CT78 15JAN79 56 0 mE!955mE2151 CGLE TEST E0ulP 2 I 240C178 2500178 15JAN79 16JAN79 56 0 WE215thE9301 DuMMV O I 260C176 87JAN79 56 78 (j 0603650E7166 DUMMV O 1 2tNov78 12Ffb79 56 25 CliS 966 C D 4 96 6 DUMMY 0 1 240C179 16JAN79 57 0 [51701E51965 COMPL.hGR.IN51L. 22 3 240C178 22Nov78 16JAN79 14FER79 57 0 (f HY0169HV0369 BbN.FLD.LNb.5M.80RE PIPE 12 1 240C178 08N0v7A 16JAN79 3]JAN79 57 0 HV200lHV2003 NELOCATE VALWE STATION POUR PAD D 1 240C178 16JAN79 57 0 HY2003HV0169 DUMMV O 1 240 CIT 8 16JAN79 57 0 58 0 32 35F 032 3 F ORMmehu.w ALL5 2310 77 1 240C178 12F E M 79 36JAN79 02Mav79 57 0 Wl 5 766WE 9 30 8 puMMV. O I 250CI78 17JAN79 SV 79 HV0369HY0565 FAU.L INSTL.5M. BORE PIPE 53 1 09Nov78 25JAN79 OlFEH79 16APR79 57 0 E51965E59201 DUMMY 0 1 24NOW78 15FEk79 57 21 W V0 35 t W V l 101 DUMMY 0 1 200EC78 13 MAW 79 57 0 b RN

(PilMA 1800 3R102

    • e T.I M E L 15 i I N 6
    • e PAGE 29 0F to-PRO JE t t MANAGEMENT SYSTEM IIMF NOw g.240CT78 1754 0F 2880 ACilvlilES. TIML UNIT OAV NtlWORM 05DEC77 18APR90 8'

DAIL DA40V78 NETWORN 8 2 I MME R NUCLEAR POWER S T A T I ON UNIT 1 SELICIED OlMAV78 18APR80 CRIllCALITY RfPORT. ACilvlIV A C i I v1 i V ACTIVliY E A R L 1 E5 I L A i E5 i P FLOAT IDtNTIFICAllow 0E 5CR IP I I ON TIME CL STARI FINISH SIARI FINISH 5 10I FR (' evi!0!Wyl365 COMP. b6R INSTALLATION 20 1 200FC78 IAJAN79 11 PAR 79 09APR79 57 0 DV1365WV9301 DUMMV O 1 19JAN79 30APW79 57 97 .HV0565HV0798 CON 57.1[$I HV la 1 26JAN79 08FE P 79 17APW79 10APR79 57 0 ,t H10798Hv9301' DUMMY 0 1 09FE879 OlMAV79 57 0 HY930lHV9303 HV/C0 hvDR/CO2 Ch-Oui PRE 32 1 09FEb79 26 MAR 79 URMATI9 14JUN79 57 0 S F D 32 35 F 132 3 0-I 13F E b 79 03MAY79 57 0 ( 5f l 3235FI523 CONCRETE WALLS 2340 30 1 13F EH79 26 MAR 79 03MAV79 14JuN79-57 0 HV9303RV9845 00MMY 0 1 27 MAR 79 15JU419 57 106 Sil523RW9145 0 1 27 MAR 79 15JUN79 57 106 "f C#745tC827bt OHMMY 0 1 240C178 17JAN79 54 0 EED565hE9301 DUMMY 0 1 240C178 17JAN79 58 80 RE 3951RE 2565 OuMMY 0 1 240C176 17JAN79 58 0 .( TE1365kE9301 DUMMV O 1 240C17b 17JAN79 58 80 mEb%65mE9301 00MMY u I 240C178 17JAN79 SR 80 F CO 365F C0565 COMPL FAB & IN5i FC 58 1 .1 07N047h 07h0V78 3)JAN79 3tJAN79 SP O (' FC0565FC9301 DUMMY 0 1 04Nov78 Dif f B79 SR 54 BC93056C9301. DUMMY 0 1 0?JAN79 21MA R 79 ' 5P 99 SP08605P0165 PROC / FAB DOWNCOMER BLING FLANGE 5 21 1 240C178 21h0V7A 18JAN79 15FE879 59 32 (% Cm0365Cw0465 INST ALL SMALL BORE HANGE R I I 240CT78 240C178 18JAN79 18JAN79 59 0 WV5072WV5172 CONilhut PLC 28 1 240CI78 Ol0EC78 14JAN19 26FEB79 59 0 Ct0465Cn9303 DUMMY 0 1 250Ci?8 19JAN79 59 56 (, ) xv0007Rv9307 OuMMY 0 1 250C178 19JAN79 59 67 NYS!?2WY5372 COMPL. PULL POWER + C+] 25 1 040EC78 09JAN79 27FEB79 024PR79. 59 0 wv537/wv4373 DUMMV O I 10JAN79 014PR79 59 50 ( CLl765Cn9301 UUMMY 0 3 240CT78 19JAN79 60 57 CL355tCwv301 DUMMY 0 1 240CI78 19JAN79 60 57 CL4178CL5573 DuMar O' ! 240Cif8 19JAN79 60 0 ( CL5773CW9301 DUMMY 0 1 240C17n-19JAN79 60 57 CL6372CL5573 DUMMY 0 1 240C178 19JAN79 60 0 CL7%66CL3971 DUMMY 0 1 240C178 19JAN79 60 0 () CL7466Cw9301 DUMMY 0 1 240CT78 19JAN79 60.57 C392OIRW9307 OUMMY 0 1 240CITA 19JAN79 60 68 HP910lRV9306 DUMMY 0 1 240C178 19JAN79 60 22 f. Ebbe65pvv307 uuMMY 0 1 240Ci?H 19JAN79 60 68

  1. 10465R39301 DUMMY 0 1 2400178 19JAN79 60 65
  2. 10565Ri9304 DUMMY 0

1 240C178 19JAN79 60 65 f,

  1. 19965RI9301 DUMMY 0 1 240C17e 19JAN79 60 65 W16573Ri9308 DUMMY 0 1 240C178 19JtN79 60 65 RII166RI9301 DUMMY 0 1 240C178 19JAN79 60 65 RIB 005kv9306 DUMMY 0 1 240Clio 19JANI9 60 22 MYOU27XV0029 ONE MILLION GAL.DEMIN.wfR 0 1 240CI78 19JAN79 60 0

1 RV002%RV9307 DUMMY 0 1 2400176 19JAN79 60 68 j CF0265LP9308 uuMMY 0 1 240 Clin 22JAN79 61 27 CP036ECP5766 00MMY 0 1 240C174 22JAN79 61 0 Q t

._m (PilMA 1100 3R102 e = 4 i I M E L 15 1 1N b o *

  • PAGE 30 0F 40 PpaJEt t MAN AGE MENT SYSTEM IIME now : 240Ci7A 1754 0F 2s00 AC TIVIT IE S.

TIME UNii DAY hEIWORK 05DE C77 IsAPpaa OAll DeNOW7a httwopp Z I M mE R hDCLEAR POWE R STATION UNIT I SELECTED O!MAY78 16APPs0 CR111CALITY REPOR1 CCIIVITV A Ci 1V I T V ACTIVITY E A R L IE 5 i L A i [ 5 i P FLOA1 IDE hilF It a l10N DE 5CR IP T I ON ilME CL STANT FIh15H START FlhISH 5 101 FR CPOT65 cpl 503 DUMMV O I 240CI78 22JAN79 61 0 CPlf65LP9301 DUMMY 0 1 240CT78 22JAN79 6l 27 CF2365CP3371 DUMMY 0 1 240Cife 22JAN79 61 0 CP2 365tP5766 DUMMY 0 1 240C17s 22JAN79 61 0

CP2652CP9J01 DUMMY 0 1 240Ci78 22JAN79 68' 27 CP3971CP4175 00MMY 0 1 240CI78 22JAN79 61 0

cpg 373CP9301 DuMM Y O I 240C178 22Joh79 61 27 CF4%72CP4373 DUMMV O I 240C178 22JAN79 61 0 CP5T66CP 3371 DUMMF G 1 240C17a 22JA479 61 0 CP5C66CP9301 UUMMY 0 1 240C178 22JAN79 61 27 CP6566CP5575 UUMMY O I 240C17s 22JAN79 61 0 L D500 lLO6003 INSTALL CON 00li '29 8 240C178 04DEC78 22g8N79 O! MAR 79 el 83 C655720G5772 PULL PCEI CABLE 4 1 240Cf78 270017s 22JAN79 25JAN79 61 0 St9D05CPol65 DUMMV O 1 240C178' 22JAN79 61 0 QVVUO5CP0765 DUMMY 0 1 240C176 22Jah79 68 0 WV1005CP1501 DUMMY 0 1 240C178 22JAh79 bl O SG5 7720G59 72 DUMMY 0 1 300C178 26JAh79 61 0 - s - 6659720G6172 CONT PULL PC&I CABLE 31 1 300 CIT 8 12DEC78 26JAh79 09 MAR 79 61 0 E 60 365069201 DUMMY 0 1 21NOV78 19FEB79: 61 26 Sbbl720G4973 DUMMY 0 1 130EC78 12 MAR 79 bl 30 CD0001CD9301 COMPL CODE 1 4 2 ITEMS 16 3 240CT78 14NOV78 23JAN79 13FEPF9 62 30 d DY335tWYI901 OUMMY 0 1 200EC74 2048R79 62 0 ^8 WY190lWV2151 5ET L ALIGN [0UIP. 10 1 200 E C 78 04JAN19 20 MAN 19 02APR79 62 0 UV215tWY2353 DUMMY 0 1 05Jah79 03APR79 62 0 ) DV2 353 WY255 8 F NL ALIGN L GROUT ME EO. 5 1 05JAN79 IlJAN79 03APR79 09APR79 62 0 hv2558dV9301 UUMMY 0 1 12Jah79 10APR79 62 102 CbO 365CH6 3 66 UUMMY 0 1 240CI7m 24JAN79 63 0 i CB3165CB0365 DUMMY O 'l 240C178 24 Jah 79 63 0 CPSC66Cbbl66 DUMMY O I 240Ci?8 24JAN79 63 0 C eb 366 C B 3 37 8 DUMMY 0 1 240CI78 24JAN79 63 0 b CPbT66CB6166 DUMMV O 1 240C178 24JAN79 63 0 i F (9 303RW9341 DUMMY 0 1 26FEB79 24MAV79 63 Ill UP5dO3WP9301 DUMMV O I 22NOV78 23FF079 64 112 CP4UDICM4003 CONTINUE CAkLE5* TERM 28 1 240C17e OIDEC7n 26Jah79 06 MAR 79 65 67 i CG4773064973 CONI IERM PrLI CABLF 31 1 2400I78 060EC78 26JAN79 09 MAR 79 65 34 DV4173WV4 373 CONT.T ERM PEC CABLES 19 1 04DEC7h 29DEC78 07 MAR 79 02 APP 79 65 56 eVS172WV4173 0 1 04DE C 7e 07 MAR 79 65 0 ( WYO365v10465 INSTALL SMALL BORE HANGIR 12 1 20DEC78 08JAN79 23MapT9 09 ape 79 65 0 UTUt65vT9301 UUMMY 0 1 09Jah79 10AfR79 65 105 G55772655972 CONT. PULL PWR.L CNTRL. CPL. 31 1 240C178 060EC74 30JAN79 13 MAP 79 67 0 t Vs0009We00ll REC ADPE D P AMPE RS 45 1 240CI78 2 7DE C 7P 31J8 4 79 02APR79 67 0 kk%371wp4571 LONT.CONUUIT IN51L. 5 1 240017s 300CT7A 30JAN79 05FE079 67 0 EE4575mH5572 DUMMY 0 1 3I00176 06FE B79 67 0 ukS572wR6872 PULL REMAIN P0wrHLCEI CAB 46 1 3tUCI78 05JAN79 06FEh79 10APR19 67 0 )

GPTIMA !!OO 3R102 i 1M E L I5 1 1N 6

  • e PAGE-33 0F.

40' PkbJE C T MANAGE MENT SYSTEM TIMF NOW 240C17P '1754 or 2400 AcilvlTIE S. TI ME ' UNI T DAY NEIWORn 050EC77 IMAPR80 Salt 08Nov78 NETWORn. ZI MME R NUCLEAR POWER STATION UNIT I SFLFCTED DIMav78 18APR80 CRITICALITY REPORI e............................................................... + ACilvliv A Ci I V I T Y ACTIVITV L A R L IE 5'1 L.A i E5 i P FLOAT' IDtN11 FICA 110N DE 5CR 1P i 1 0N TIME CL STARI FINISH- .$IARI FINISH 'S 101 FR f 65$972654973 UUMMV O I 070E C78 14MAH79 67 47 cv3171WY3373.ouMMY-0 1 200EC7s 27 MAR 79 67 58 'Wa0CO3WW9201 COMPL WW SYS DAMPERS .50 1 28DEC18 IlJAN79 03APR79: 16APR79 67 0 7' VwoollV=0003 OUMMV O I 2m0ELin . 0 3 AP R 7 9 67 0 FH920lFH9301 DUMMY 20 l 02JAN79 29JAN79 05 app 79 02MAV79 67-O thblT2WR6573 DUMMY 0 1 08J AN 79 II APR 79 67 54 [] vb920lVW9301 EST. 515. PRE R E OUI 51 T E S 10 1 12JAN79 25JAN79 17AFR79 30APR79 67 0 Wo430!tw9303 yw-01 R/w BLD6 VENT PREOP 20 1 26JAN79 22FER79 OIMAV79 28MAY79 67 O Fh9 301FH9303 F UEL HANDL.FH-1 PREOP-START I5 1 30JAN79 19FEH79 03MAY19 23MAY79 67 0 {i FFLI72FPf602 DUMMV O 1 12FEbi9 16MAY79 67 0 FP0602FP8603 GRINNELL COMPL. T/G FP 5 1 8 2F E B 79 16rtnT9 16MAY79 22MAv79 67 0 F086031G0081 OUMMY ~0 1 19FE879 23MAY79' 67 47 11 FH9 303FH9305 FUEL HANDL FH-1 PREOP COMPL 15 1 20FE879 12 MAR 79 24MAV79 14JUN79 67 0 Fh9 303Rv9341 DUMMY 0 1 20FE879 24MAV79 67 !!5 0 va930JVw93IO DUMMY 0 1 2 3F E8 79 30MAV79 67 0 o 3' Ub9 310VW9 312 V W-02 00N TL~~ PREOP 12 1 2 3F EB 79 12 MAR 79 30MAY79 14JUN79 67 0 RM FH9305RV9145 DUMMY 0 1 13 MAR 79 15JUN79 67 116 've9312pV9845 00MMY 0 1 13 MAR 79 15JUN79 67 Il6 i CF2951C84373 DUMMY 0 1 240C178 31JAN79 68 0 CO3571C84373 DUMMY 0 1 240C178 31 J A N 79 68 0 CP4372CH4373 DUMMY 0 1 240C178 slJAN79 68 0 3 Ce5172CH4373 DUMMY 0 1 240C178 3]JAN79 64 0 CB5966CB4373 UUMMY 0 1 240C178 31JAN79 on 0 Ce&966Ch4173 OUMMY 0 1 240CT78 31 SAN 79 68 0 1, CH3EiO*CM4030 S&L DE51GN CHANGE 15 1 240CI78 33NOV78 31 SAN 79 20FEB79 68 0 FP5972FP6172 PULL PCEI CARLE O I 240C178 3tJAN79 6n 76 CM2(03CH2005 INSTALL LAST IN51RUMEN15 4 1 14NOW78 37NOV78 21 FIB 79 26FER79 68 0 1; Cp4010CM2003 UUMMY D 1 14Nov7n PlFIp?9 68 0 CH200SCM1003 DUMMY 0 1 20Nov7e 27 F E B 79 6n 70 D=38730V3371 CUMPL.CONDuti 10 EQUIP. 5 1 240CT7s 2n0CT78 Ulf f b79 07FE879 69 0 1, [56175E53371 DUMMY 0 1 240CITP OlFEE79 69 25 F C0465FC9301 DUMMY 0 1 240C178 OlFfB79 69 65 F L9103FC930 3 00MMr 0 1 240CI?8 OlFr e 79 69 65 HD2 365H039 71 DUMMY O I 240C178 Ul Fi s 79 69 107 (; HP910lFC9801 DUMMY 0 1 240CT78 OlFfp79 69 0 CH1201FC9301 DUMMY 0 1 240CI78 OIFIH79 69 65 1/ Dv337tDv4173 DUMMY 0 1 310 C178 DeFFb79 69 16 N21075W29302 DUMMY 0 1 UlDEC78 12 MAN 79 69 109 DW15010dl501 FINAL HGk. DELIVERY 0 1 240C17h 02FFB79 70 4U CM1LO!CM3003 IN51ALL CONDUIT 17 1 240CT78 15Nuv78 05Ffh79 27 FEM 79 78 73 C 39 3011P9201 buMMY 0 1 240C178 05FfB79 71 47 H00165HD0265 INSTALL SMALL BORE HANGFR 8 1 240CT7A 02NOW7A 05 Fib 79 14FEH79 75 0 C0016bObO265 INSTALL SMALL BONE H ANGE R 10 1 240CI7A 06NOW78 05FEo79 16FEB79 78 0 HbO265H09201 UUMMY 0 1 03mov 7e Isrtp79. 78 109 0

.dpTIMA 1100 -3R102 e e o i IM E L I 5 i IN 6

  • e e PAGE 32 0F 40 Pp3sELT M AN AGE ME N T SYSTEM TIME NOW 3 240CT78 1754 0F 2m80 AC T Iw !T IES. TIME UNIT DAv NtibORu 05DEC77 18 APR80

-@STE 08 MOW 78 NEiwCRK s ZIMMER NUCLE AR P0mER STATION UNIT l-SELICIED DIMAY78 IFAPR80' CRITICALI17 NEPORI e e e............................................................... ACTIvliv A C i 3V I i Y ACilvliv E A R L 1E 5 i L 4.1 E'S i P FLOAT I DE NT I F IC A T I ON DE 5 C.R IP i I ON 11ME CL START FINISH 51 ART FINISH $ 10T FR l' CCO2350G9201 DUMMY' O 1 07NOV76 19FEb79 Il 36 C D3335C 05166 00MMY 0-t 240CT78 06FEB79 72 0 CD22d3CD0165 DUMMY - -0 1 240CI78 06FEo79 72 0 CD5 336CD23 71 ' DUMM Y 0 1 240CT78 06FE8 79 72 0 EWO335WR0565 COMPL F ABLINST ALL 59 PIPE 26 1 240C178 29N0W78 06FEB79 13 MAR 79 72 0 t h0 5tS WR 7 766 DUMMY 0 1 30NOW78 14 MAR 79 72 59 C 00 735 C 00965 INSTALL L8 HANGERS 16 1 240C178 14Nov78' G7FEB79 28FER 79 73 0 FP8ed4FP8605 DELIVER HANGER $ 25 1 240Ci?8 28Nov78 07Ff879 13 MAR 79 73 0 654773654973 CONI. TERM.CNTRL.E PWR.CRL. 25 1 240Ci78 28NOV7A OTFEB19 13 MAR 79 7J 53 CO29) bob 9302 LUMMY 0 1 15NOW78 OlMAR79 73 80 FF5272FP6901.DUMM) 0 1 29NOV78 14 MAR 79 73 0 F P&93tf P7 8 66 MOUNI INSTRUMINT5' 1 I 29Nov78 29Nov78 14 MA R 79 14 MAR 79 73 0 F P3605FP8606 CadLE SPREAD ROOM FP 21-1 29NOV78 28DE C 78 14 MAR 79 IIAPR79 73 0 F P 7146F P 7 366 SE6]N INSTR PIPE LTUSING 1 1 30NOV78 30NOV78 15 MAR 19' 35 MAR 79 73 0 F P 7 36bF P 7566 COMP INSTR PIPE ETUBING~ l ! OlDEC74 ORDECTS 16 MAR 79 16 MAR 79 73 0 F P4 37 3 F P4 5 71 COMPLETE CONOUIT TO EOUIP - 0 I 040EC78 19 MAR 79 73 0' FF4b78FP5373 DUMMY 0 1 04DEC78 19 MAR 79 73 81 F P 7 516F P 4 3 71 DUMM Y 0 1 04DEC78 19 MAR 79 73 0 I - F P751bf P9301 00MMY 0 1 04DEt?S 19 MAR 79 73 81 FP3406tC9303 OUMMY 0 1 290EC78 12APR79 73 99 Hb3A0!H03351 RfC.LINSTALL 5 HAFT COUPLING 5 1 240CT78 '300CITA 00FFB79 14 FEM 79 74 0 HWDS$5Hv0765 $UPPORI 10 HWAC-IN5UL 30 1 240CI78 05DEC7A 08FFB79 21 MAR 79 74 0 Hb3 351HD3551 F NL. All6N.E GROUT OF EQUIP. 0 1 3IOCT78 15 F E B 79 74 0 HD355)HD9201 DUMMY 0 1 310CI78 15FF879 74 Il2 HW37&SW-9301 DUMMY 0 1 06DEC78 22 MAR 79 74 7s LD4L'31LO9003 INS T ALL INSTRUMENIS 10 1 240C178 06NOW74 b9FfuT9 22F(M79 75 97-L&500lLD5003 DELIWER LAST INSTRUMENTS 10 1 240C173 06N0V78 09ffB79 22FE879 75 0 i RW9123XVG057 DUMMY 0 1 240C178 09 FE B 79 75 0 XV0057MYOU59 INSTALL MIRROR INSULATION 35 1 240CT78 13Nov78 09FEB79 OlMAR79 75 0 LL5E03LD400 3 UUMMY 0 1 07Nov78 2 3F E B 79 75 97 SW932 7RV9329 DUMMY O I 14NOV78 02 M A R 79 75 123 ITU059RW9327 DUMMY 0 .1 ItNOW78 02M AR 79 75 0 D C 930 bLL 9301 DUMMY 0 I U2JAN79 17APN79 75 36 FPOColFP9201 RE.PIPEECOMPL. ELECT. 5 1 240C178 300C778 12FEbi9 16FER79 76 0 C$18010G1101 DEllw[p 6EMAIN]NG INSTRUMINTS 0 1 240Ci?8 12f E H 79 76 0 Chil01067166 DUMMY 0 1 240CI78 12FEH79 76 45 Hbu365HD9201 DUMMY 0 1 270C178 15 F E R 79 76 314 F F92GI F P9 301 FP-1 OC/FCI 20 1 310Ci?8 28Mov78 19FFR79 16 MAR 79 76 84 FPS 272FP0165 OUMMY 0 1 29NOW78 19 MAR 79 76 0 Cb257)CD3373 DUMMY 0 1 240C17n 13FEs79 77 0 CD4172CD3373 DUMMV O I 240C17n 13Ffb79 77 0 sh62DinR6301 DEllWER LAST IN51RuMENis 21 1 240CT78 21Nov78 13FEB79 13 MAR 79 77 0 6657720G9201 DUMMY 0 1 300C178 19 FIB 79 77 42 Ekb30 LWR 7766 D UM M Y 0 1 22NOW7e 14 MAR 79 77 64 4

e EPilMA 1100 3Rie? T 1M E L l's i i N 6 'e PAGE 33 0F 40' PkS JE C T M A N A GE ME N T SYSTEM .TIMF Now : 24nC178 3754 0F 2P40 AcilvillES.- T I ME UNIT DAV NETWORm 05DE C 77 IMAPR80 , SATE 08N0v78 ^ NETWORE 21MMER NUCLEAR Pow ( R S T A T I ON UNIT I SILICIED OlMAVTA' .lsAPRSO CRITICALIIV REPORT 'o e... Stilvlif A Ci IV I' T T' ACilvliv E A N L 1E 5 i L A T E5i P FLUAI IDE hliF IC A I!ON DE5CR 1P i 1 0 N TIMF CL 51 ART' . FINISH START FINISH 5-101 FR AP930lHU9308 OUMMY 0 1 24Nov7A sl5 MAR 79 77-135 CH3s&5C09308.UUMMV 0 1 240CI7m 14FEb79 79 46 CD1965C09301 UUMMY 0 1 240C17A 14 FIB 79 78 46 Cb4573CD930) DUMMV O 1 240C174 14FfB79 in 46 CBS366C09301 DUMMY 0 1 240C17# 14FEB19 Fa 46-CP7C54CD9301 DUMMY' O 1 240C17h 14FEu79 74 46 CD0265C09301 DUMMY 0 1 240CT78 14 F E h 79 79 46 CD0j65CD9301 DUMMV' O I 240CI7v 14FIh79 74 46-CDIT65C09301 OUMMV 0 1 240C17A 14FE879 78 46 Cb3573C09301 DUMMY. 0 1 240CT78 14Ffh79 in' 46 Cb5366C09301 OUMMV O I 240CI78 14 FIB 79 78 46 CP0265C09301 DUMMY -0 1 240Ci78 14F[879 74 46 0V9803C81565 DUMMY 0 I 240CI7s 14Fis79 7A 0 f Sh93035H9305 5H-03 STAT HT CONT PREOP 20 1-240Ci?8 20Nov78 14FIp79 13 MART 9 78 0 -vs000!vn9208 INST ALL L AST FIRE DAMPER W HE N REC'O O 1 240C178 14FEu?9 78 0 va2005vu0007 INSTALL FLLI CONN. E FILIERS 35 1 240C178 120ECTA 14Fis79 03APR79 is 0 ( va5003va9201 OUMMY 0 1 240C178 14FIuT9 7A 0 WE920lvX0005 OUMMY 0 1 240C178 14FEH79 7e O ES2565L59201 DUMMY 0 1 250CI78 15FfB79 77 42 Sh93055M9307 SH-01 STAT Hi COMP. PREOP 6 3 21NOv78 29Nov78 14 MAR 79 21 MAR 79 7A 0 Sh?307v-9301 DUMMY 0 .I 3DNov78 22 MAR 79 7P 82 8 V72007v30015 DUMMY 0 1 130EC78 04 APR 79 7s 0 ( v30015vn0017 CSI. TESTING-VM ST5 FEM EREFRI6. CH ARGI NG 10- 1 130E C 7 s 270E C 7m .04APR79 17 APR 7 9 7P O vmoulivs9302 OUMMY 0 1 2 80EC 78 18APR79 73 0 Un9302v19303 UN-DI 5WGR HT REMOVAL PPEOP: 23 1.28DEC78 26JAN79 34APR79 16MAV79 TP O I Uz9303Nv9339 UUMMV O 1 29JAN79 17MAV79 in 126 IP0010FPOOI2 RELOCATE J0CMff PUMPS 2 1 240C178 -2500178 15FEu?9 16FEa79 79' O F P2 765F P2965 IN%I YAPD PIPING 2 1 240C178 250CT78 15Ftd79 16FE879 79 'O t- + hD2 365 H03351 UUMMV O 1 240C178 15Ff879 79 5 F P003 2 FP 9201 DUMMY 0 1 260CI76 19FEB79 79 3 F P2965FP9201 DUMMY 0 1 260C178 19Ffb79 79 3. ( F bO 30 lHD93Ol DUMMV O I 21Nov7a 15 MAW 79 79 11 7 130010110012 G.E. DELIVER SIARIRfC COMPUTER 21 1 240C178 21Nov7R 16FfB79 16 MAR 79 80 47 th5973WRe573 IERM REMAIN. PLC CARLE 38 3 240C17s 1508078 16 FIB 79 10APR79 80 67 F PO%65FP1501 DUMMV O 1 240CT78 19FFB79 el 0 FP2365FP3753 UUMMY 0 1 240C176 19FEB79 at 0 FP5173FP5373 CONT.1ERM PCLI CARLES 20 3 240C178 20N0v78 19FIh79 16 MAR 79 83 89 t, Db21010G2103 Rf05N. REvtR5E OSMOSIS EQUIP. O I 240CI78 10FfB79 83 0 062103069201 DUMMY 0 8 240C17b 1*Ftb79 81 46 C63551069201 DUMMV O I 240CI78 19 F r e 79 al 46 CM2t'01CM2003 DEL. LA51 IN51RUMENTS I I 240C178 240CI78 20F E H 79 20FE879 82 14 C00165C00265 INSTAtt SMAtt FORE HAN6fR 7 1 240CT78 01N0v78 20FtB79 28FEB79 82 0 i C00265DG9302 uuMMV -0 1 02Nov7e CI MAR 79 82 89 0V932 7E70065 UUMMY 0 l 14NOV76 14 MAR 79 83 0 ) . b5

_.m t CPilMA 1100 39102 1 I M E .L I5 i IN G e... -PAGE' 34 0F ' 40 Ph0 JECT MANAGEMENT SYST[M TIME Now : 240CT 78 - 1754 or 2880-ACTIVITIEse - IIME UNIT DAv 4 NEiwomm 05D[C17 18APR80 DATE 08NOW78 NEiwoRn 2IMMER ' NUCLEAR P0mER STATIPN UN!? 1 SE LEC TED DlPAY78 18APRA0 CRITICALITY REPORT o e e o e e o e

e. e o e o e e e e e e e o e e e e o e e e e o e e o e e o e o e e e e

.e o e e o e o e o e o e o e o e o e o e e ACTIVIIT A C 1 I V I i y ACTIVIIV E A RL I E 5 i L A I E 5 I P FLuAT IDthi3FICAT104 DE 5CR IP I s 0N ~ TIME CL. START FINISH STARI FINISH 5 TOI FR .............................................e.................................................................................. I EV0065NvD067 ISI I NSPE C IION 2 1 34NOV18 . 3 5NOV 78 I4 MAR 79 15 MAR 79 43 0 E v 0L'6 7RV 93 31 UUMM1 0 I 86N0V78 16 MAR 79 83 131 L 1017 7L IO 37 7 INST ALL L IGHilNG 80 .3 240C178 15FER79 22Ff879 14 JuM 7 9 84 0 i LIO377pv9145 OuMMY 0 1 16F E B 79 15 JU4 79 84 133 D3tLDIDR1003 CST. FufL RECEIVING SLO 6. 63 1 240CT74 23JAN79 2 3F E 6 79 22 M A Y 7 9' Sh 0 I t6 75 41 V6951 IN$1 NLh FutL IN5PECIN STAND 5 1 240C178 300C I 78 2 3F E 8 79 OIMAR79 85 -0 '#v982SUP9301 OuMMY 0 1 240C178 2 3FE 8 79 85 133 SF 4 32 75F 4 32 7 10PPINb SL APS-EMeEOS 2 730 39 1 240C178 18PEC18 23FFM79 18 APP 79 85 0 Iv69531V7151 INST FUEL PREP MACHINE 12 1 310 C178 15NOV78 02 MAR 79 19 MAR 79 85 0 t IVfl5tlV7353 INSI $[RV PL A TF ORM CSUPPORIS 12 1 16NOV78 04DEC78 20M AR 79 04APR79 85 0 I w t 35 t F H9201 DUMMY 0 1 05DEC78 05 APR 79 85 -18 SF 4 3275F 452 7 0 1 190E C 78 19 APR 79 85 0 (' 58 4 52 75F 4 7 27 10PPING SL APS,CONCRT 2740 to 1 190EC78 14F E P 79 19APR79 14JuM79 85 0 DC9 305HV93GI DUMMY 0 1 02JAN79 DIMAv79 85 28 l Oppl650R0365 ROOF DRAINS C PLUM 83NG 16 I 24JAN19 14FE879 21MAY79 14JUN79 85 0 (3 Okl003DR0165 DUMMY 0 1 24JAN79 23MAY79 85 0 DE0 365RV9 8 45 DUMMY 0 1 15F E b 79 15JuM79 85 134-55 4 72 7RV98 45 0 1 15FEb79 15 JUN 79 85 134 ~( % - Cel 365Colb65 COMPL E TE LB PIPE 3 1 240CT78 260CT78 26FER79 2FFE879 -86 .0 (015650G*302 DUMMY 0 1 2 70C 178 OIMAW79 86 93 EP920lMP9301 MP OC/FCI 30 1 DINOV78 130E C 78 06 MAR 79 16APR79 86 0-(J MP9 30lMP9303 MP-1 345m V PREOP 21 1 140EC78 15JAN79 17APR79 15MAY19 86 0 MP9 303MP930$ MP.2 69mv PRLOP 21 1 16JAN79 13F E h 79 16Mov79 14 JUN 7 9 86 0 EF9 305RV9s45 DUMMY 0 1 14FEP79 15JUN79 86 135 (s SH05655H7766 00MMV O,1 240CT78_ 27Ffh79-87 0 .5H31655H7766 UUMMV O 1 240CI18 27FE879 87 0 E3017vtID379 IN5 FALL ELLCT INSTAL 76 1 240 CIT 8 09FEH79 2RFEB79 14JUN79 8P O '{- E10379RV9345 UUMMY O 1 12FEB79 15JUN79 88 137 C04373069302 OuMMY. O I 240C17A DIMAW79 89 96 HC0151HCO351 IN51 REMAIN HOISIS 75 1 240C178 08FE R79 OlMAR79 14JUN79 89 0 (* IA3*T2IA4172 PULL PCCI C Aut E .35 1 240C178 13NOV78 OIMAR79 2 3 M AR 7 9 89 0 C6236h062565 COMP LG BORE PIPE 2 1.240C178 250C 178 OlMAR79 02 MAR 79 89 0 VL0004WC0019 DuMMV O 1 240C178 OlMAR79 89 0 ( vtoc19tC0021 REFWIGe CHAEGING VC SV5 to 1 240C178 06NOV78 OlMAR79 14 MAR 79 89 115 Sb256 bob 3978 OuMMY 0 1 260CI76 05 M A R 79 89 58 18417;149201 DUMMY 0 1 14N0 v 7 h ?? MAR 79 89 69 4 Ib930lFue320 DUMMY 0 1 2tN0v7P 29 MAR 79 89 0 Ft932bru9322 Fw-2 PNEOP 55 1 21N0v78 08FE R 79 29 MAR 79 14 JUN 7 9 89 0 4593011600e0 DUMMY 0 t Of0EC78 IIAPR79 89 69 4 F m9 322RV9645 DUMMY 0 1 09F EB 79 15JUN79 89 138 Ht0351RV9645 nuMMY a 1 00F E p ?9 15Juh79 89 138 H1079afG0084 uuMMY 0 1 0 9F E H 79 15JUN79 89 69 F 5'6 70 lF P6901 DELIVER INS TRUMF Nis. 8 .I 240C178 02NOV78 02 MAR 79, 13 MAR 79 90 17 46176S06196S C OMP LH HANGER IN5i Il 1 240CITH 07Nov78 0?MAH79 16MA079 90 0 i m m m e

~- L PAGE 35 0F 40- -CPilMa 1800 3Pl02 T-1 M E L I5.i IN 6 P#3 JE LI MANAGEMENT SYSILM IIMF NOW 24 0C I 78 1754 Or 2sso ACilvillE5. TipC UNii Dav' IsaPHs0 ' NE lWORE - 05DE C 7 7 .t IsaPRRO - SELELIE0 OtraV7p ~ 98t[. UPNow?R Nftwopa : 21MMER NUCLEAR P0hER 5T ATION UNIT 1 CRiflCaLITV REPORT e...................................... '......................... - ? AClivliv aC i I y I T Y aCT!vlly E aR L I E 5-I L aiE 5 i P F Leaf IDthTiF! Callow -DE 5CR 1P I 1 0N IIME CL. start FINISH $ 1aW T FINISH 5 101 FR 0 8 OAhov78 19 MAR 79 90 59 861965069J08 OuMMY 0 1 16JaN79 23MsV79 91 71 CbO!0lI600ml puMMY 0 1 06N0v78 19Ma#79' 92 100 wh9301FP9301 00MMY 0 1 240C174 07 MAR 19 93 2e UV397 3WVel ?3 BE6.IERM. PLC CABLES 0 1 240Ci?8 07 MAR 79 93 .0 . Ov5072h f 39 73 Lif 00 LLC 7003 F ULL L TLRMIN. CARLES 12 3 240CT78. OmNovTA 0* nan 19 26Ma479 95 0 LL7bO3LC9201 COMPLE. PULL & TERM Ca8LES $ 1 09hov78- .3 5Nov ie 27 pan 79 02apR79 95 0 30 1 16hov78 3DNov78 03nPR79 16aPR79 95 144 LE920 LLC 9301 L C 575. OC/FCi 11 1 240C178 07Nov78 12 MAR 79 26 MAR 79 96 0 ,vt100lvL9308 C OMPL. PuMCML IST en 1 240CI78 30JaN79 12 par 79 14 JUN 7 9 96 0 . aF 0465aF 0665 LaWGE haNGES OSNLINSTALL 27 1 240C174 3DNov 7e 12 man 79 17aP479 96 99 ub92016W93DI mR RBCCW OCTF C T .33 I OpNov78 27N0v74 27 MAR 79 12aPR79-96 0 vL930lvL9303 VL-On LauGR HvaC PREOP 44 1 2mNov78 30JAN79 13aFR79 14JuM79 96 0 f L t930!LE 930 3 LE-1 La8 E0ulP PRESP 0 1 2sNov7s llaPR79 g e, O v t9303L E9 30 3 OuMMY 0 1 31JaN79 15 JuM 79 96 14 5 af0865Rv9845 puMMY 0 1 31JAN79 15JUN79 96 145 LLO303Rv9845 OUMMY O 1 3DNov75-ImaPR79 97 100 uutS65wd9308 puMMV 0 1 OnJaN79 23MaV79 97 77 1600797600nl DUMMY Sedal50w0315 DEwaT[ RING 15Na 66 1 240C17a '26JAN79 14 mar 79 14JUN79 98 0 5 1 240CI78 300C i 7e 14 pa R 79 20 mar 79 9a 0 E52951653151 CGLE TE57 E0ulPMENT 5mD1365mus36 UENT STALM 3610 3 1 240Ci?8 260LT7A 14Pak79 16 MAR 79 gn 0 0 1 270C178 19 mar 79 9A 67 [) 5m03360G9301 0 1 330CI78 28 MAR 79 9e 7P 553151659201 OUMMY 0-1 120EC7p' OlMaV79 98 el C 00 365HV9301 OuMMY 0-1 29JAN79 15Juh79 99 14 7 C1 OuG 3tSEv9145 uuMMY -0 1 240C17M 15 MAP 79 99 0 MS 3 365MS 3565 INST M5-1 HERS O I 240C178 15 mar 79 99 132

  1. 53565M54365 OuMMV 65 I 240C178.

25JaN79 15Ma479 14JuM79 9e u (t P1930lPI9303 PI-I PERSON MONIT PPEOP 25 1 240CT7A .2sNovie 15 Maw?9 .inaPR79 99 0 5F97235F0923 RE 51E EL,. ALLS 2320 10 1 29Nov78 120LC74 19APk79 02MaV79 99 0 SF 04235F t123 E rst bMLeis, WALLS 2330 0 1 13DE C 78 utMav79 99 42 [] $Fil235F1323 A 1 16JaN79 25JaN79 05 JuM 79 14JuM79 99 0 %hS 314 v M93 3 6 wh-01 Mb PuPPS 0 1 26JAN79 15JUN79 99 14 9 Pl@303Rv9445 DUMMY 0 1 26JaN79 15JuM79 90 14A CHD386Pvo!45 uuMMY 12 1 240C178 08hov74 16 M A R 79 02aPR79 300 0 Sh23015H2565 COMPL.h6P.INSIL'N. Ut0003vt0201 00451. TEST WL 5V5 FEM 7 3 240C178 OlNOV78 lbPak?9 26 MAR 79 100 0 0 1 240CI7P 16PapT9 ILO 148 xv1063Rv9333 OUMMY 0 1 240C17e 16 mar 79 100 48 stD30!NV0045 OUMMY 0 1 02Nov7a 27 map 79 100 0 DLO20!vL9208 OuMMY vt920lvL93Ol vL kEFRI UNii W. fan PREOP O 1 0?Nov7s 27MsR79 100 4 0 'l 09N0v79 034PH79 100 0 Sh92015H9203 PR0wlDE SH FOR WINTER HI O I 09hov78 U3aPR79 100 0 i Shl5655H9201 OuMMY 5H)2035H9205 CONT INut SH Tr511NG 10 1 09N0v7F 22N0v78 03aPH79 16aPR79 100 0 U 1 2=Nov7e 17aPwi9 100 33 Sh9205vww201 puMMY Q

~ CPIIMA 3100 3Rlo2 I IM E L 15 I IN G PAGE 36 0F' 40 CFOsELI M A N A GE ME N T SYSTEM ilMF NOW 240CT78 1754 0F 2880 ACIlvlilES. TIME UNii DAV NElbopa 050EC77 .lAAPRAD Cell OsNow7P NEikopa Z I M ME R NUCLEAR POWER STATION UNIT I SELfCIED cl>Av74 188PR80' CRITICalliv REP 0ki e *............................................................... (CilvlIV A C i i V I iY ACTIVITV E A R L IE 5 i L A I C 5 i P FLOAT iDEbi!FICATION OE5CR IP i 1 0N TIME CL START FINISH SIART FINISH 5 TOT FR FP!765FP9308 DUMMY 0 1 240C178 19 MAN 79 103 109 C00 30 3 CN9 30 3 CN-1. 00MMUNIC A T SYS PREOP 62 1 240CI78 22JAN79 20 MAW 79 14JUN79 102 0 SH31655H4971 ObMMY 0 1 240C17A 20 MAR 79 102 O SH47715H4973 dummy 0 1 240C17e 20 MAR 79 102 0 SH49715H5171 COMPL. CONDUIT TO [0 DIP. 5 1 240C178 300C178 20 MAR 79 26 MAR 79 lb2 0 SH79665H4971 DUMMY 0 1 240C178 20 MAR 79 102 0 ft0LOlvw0003 5/C FINISH CST. ww SYSTEM 10 1 240C178 06Nov78 20 MAR 79 02APR79 5 102 35 5H5til5H5973 DUMMY 0 1 310C178 27PAH79 102 0 CNO303kv9845 DUMMY 0 1 23JAN79 15sDN79 102 151 AP9203AR9201 DUMMY 0 1 240CI78 21MAk79 103 0 AP9201AR9301 OC/FCT AR-3 21 1 240CT78 ?!Nov7s 28 MAUT 9 38APR79 103 0 65370lb5896S COMPL.HGH.IN51L*N._ 0 1 240C178 28 MAR 79 103 0 1LC0501b0052 COMPL. GL AND SIM.L DETURN PIPING 15 1 240C178 13NOW78 21HAR79 10APR79 103 0 1b0052160040 UUMMY 0. I 14NOV7A ItaPu?9 103 83 A>9303AR9303 AR-1 PREOP 40 1 22Nov78 19JAN79 198PW79 14JUN79 103 0 A E9303Pv9845 OuMMV O I 22JAN79 15JUN79 lu3 152 Ss3565IA9208 DUMMY 0 1 240C178 22 MAR 79 104 84 CC03tlM59301 DUMMY 0 1 05DEC78 03 PAY 79 105 138 W L O 796 W L9301 DUMMY 0 1 240Ci?8 27MARI9 107 11 VLSL@3vL9203 DUMMY 0 1 240CT78 27 MAR 79 107 7 IG3037160039 IN51L.HP GLANDS to 1 240C178 06NOV78 2 8 M8H 79 IDAPR79 108 0 360039T60040 DUMMY 0 1 07Now76 I S APR 79 104 88 LLDISSLC0365 INSTALL L b HANGER 5 13 1 240CI7d 09N0V78 29 MAW 79 16 APR 7 9 109 0 i WhilS5FMIT65 DUMMY 0 1 240C17h 29 MAR 79 109 0 LCO355LC9301 DUMMY 0 1 IONOW78 17APR79 109 158 5F09235F1323 0 1 29NOW7A 03MAv79 109 52 Ek290luR 3101 F IN AL V ALVL DE LIVERY 8 1 240CI77 02NOV7A 30 MAW 79 30APR79 110 0 Ek310 LWR 3365 INSTALL VALVES 5 1 03NOW 78 09NOW74 II APR79 17APR79 110 0 db3365wH9301 puMMY 0 1 10NOW7A 38APR79 130 13 3 1563511v6553 INST RLFuELG PLAIF BRIDGE 3 1 240CT78 260CT78 028PW79 044PRT9 lll 0 SF 3 32 75F 352 7 10PPING SL APS-FONMmm 2710 13 1 240C178 09NOV78 02APR79 18APR79 Ill O IV5558FH9201 OUMMY 0 1 270C17h 05APN79 Ill 44 SF 352 75F4527 0 t lor 40W76 19APR79 til 26 5H25655H9201 DUMMY 0 1 24uci?A 038PH79 112 12 SM79C65H9201 OuMMY 0 1 240C178 03APR79 112 12 SH92fb5H9201 DUMMY 0 1 240C178 03APH79 132 12 Vafel3vz0015 DUMMY 0 1 240C17b 04APH79 113 35 CP9210RR93IO OC/FCI RP 17 1 240C178 15NOV78 05APR79 27APR79 !!4 0 019104RR9710 DUMMY 0 1 240C178 USAPp79 lit 0 SF 3 72 75F 392 7 IOPPING SL AP5.NE 51 LEL2 720 10 1 240CI74 06NOV74 05 APk79 ISAPD79 134 0 5F 392 75F 452 7 0 1 07Now?6 19 AFR 79 114 29 C21310kR9 3 3 2 RW FLOm LINE RIAS.NR-5 33 1 16NOW78 04 JAW 79 30APR79 14JUN79 114 0 039312Rv9845 ouMMY Q l 05JAN79 15JUN79 114 163 IA09311A1165 C0MP tb hah 6ER INST 12 3 240C17M 08NOW78 06APR79 23APR79 Ils O

+.. _ - - . _ - ~ ~. ~. - -. - .. _. - ~ 1 CPitna 1800 3Rl02 e e

  • 1 1M E L!$ i !N G PAGE 3 7 0F to PR3sELT M AN A6EMENT SYSTEM TIMF NOW 240C17#

1754 0F 2meo ACilvlT IES. ' TAME UNIT DAY NElbORm 05DEC77 laAPago 031E Demov78 NFTw0pm 2IMMER NUCLEAR poker STAilch UNIT I SELEC TED DIMAV7R. - !s4PReo CR IT IC ALIIV REPORT .........~.............. e e......................................... ACTIVITY A C i I y I i V ACTIv!TV E A R L - ! E 5' I L' A i [ 5i P FLOAT IDLhilFICATION OE 5CR IP i 1 0N TIME CL START START FINISH. 5 101 FR ......_____..._______.__.___________...__......_______..........____...____________.___ FINISH IAllSSIA93HI DuMMV O 1 09how7e 24 4P k 19 115 95. E163137tE0084 OuMMY 0 1 04JAN7V 15 JUN 79 115 95 t Cub 965HV9308 DUMMY 0 1 15Nov78 OIMAV79 116 59 .N)Dt5tHV0951 INSI PULE HV 14NES 5 1 240C178 300CT79 10APR19' 364PR79 117 0 I I Abl65140265 INSTALL $ MALL RORE HAN6EN to 1.240C17A 06kov78 IQAPR79 234PR79-lif G 4 100365I40365 COMP INST SM RORE PIPE -10 1 24DC178 0640W18-10APR79 23APR79 !!7 0 nV207Jav0075 5V5.'M10#0 & AIR FLU $H

5 1 240C178' 300CI7s luaPR79

'16APR79 117 0 (' 4 .HDb95tNYO565 buMMY 0 1 310C17e 17APR79 117 60 NV*D75EC9308 uuMMY 0 ,I 310CITS 5 7 APR 79 117 166 labi65IA93ul DUMMY 0 1 07NOW78 24APR79 117 97 r" l IKD 365I A93OI DUMMY 0. 1 07NOW74 24 APR 79 117 97 CH9 303WN93D5 WH-02 LLONIN PM. PREOP 6 .1 190E C 78 27DEC78 07JUN79 14JUN79 819 0 . CHD 305b W 914 5 D uMM Y 0 1 28DE C 78 15JUN79 lie 16e t' mAba65tR9301 DuMMV O 1 240CT78 Is AFR 79 123 126 i .EEbl7CEE0378 INSTALL MISC ELECTRIC 40 1 240CT7s 190EC78 19 APR 79 14JUN79 124 0 I .M53545N59201 DuMMV- -O 1 240C17e 19APR79 124 157 -F M55 735M592pl DuMMV O I 240CT78 19APR79 124 157 R$6365M55565 DUMMY 0 1 240C17e 194PR79 124 0 R$4503M59201 DUMMY 0 1 240 CIT 4 19 APN 79 124 157

  1. h420!N89301 OC/FCT rem 19 1 240C178

.3740V7e 194PW79 15MAV79 124 0 . 5Lbl A 15LO3el SURF ACE L AVOUT 40 1 240CT7e 190LC78 19 APR 79 14JUN79 124 0 i ShD331ER9303 RPM PREOP 21 1 20Novin 190EC7s 16MAY79 14JUM79 124 .0 f! Ef A37sRv9145 buMPV O I 20DEC78 15JUN79 124 173 Ct9333Rv9t45 DUMMY O I 20DEC78 35Juh79-12* 173 SL332tRv9145 DUMMY 0 1 200CC7A 15JUN79 124 173 %) C00265HV9301 DuMMV 0. 1 02N0v78 OlMAY79 125 64 ,vD4333WD9305 WD-01 D/6 PREOP COMPL 2 1 15Now78 1640v78 15MAV79 16MAV79-126 0 3 i

  1. E4335Rv93 39 DUMMV O I 17mov7s 17M8V79 126 174

() SH4337Vu9310 DUMMY 0 1 3DNov7e 30MAV79 126 59 i WJ0 t'05 WJ000 7 IN51ALL N0005 FEEN CONN & FILTERS

15 1 240CT78 13NOV78 24APuT9 14MAY79 127

.0 1 w=LDolve5003 P.R. (OMPL. HVAC CONIROL5 5 -1 240C174 300C 17s 24 4PR 79 30APR79 127 0 ( 'UbO159WG0369 BLN.FLD.EN6.5M.n0RE PIPE 12 1 24uC17e 0840v78 24APw79 09MAV79 127 0 j We $ L'0 3 V d 9301 DUMMY 0 1 310CI7s ulMAV79 127 60 BbO359kG0565 FAB.L IN5fL.5M. BORE PIPE 15 1 09Nov78 3DNOW78 10MAV79 3tMAV79 127 0 t. DJOLulWJ0009 PERF0km FILTER TEST -vJ 5V5 7 1 14Nov78 22No v 74 15MAY79 23MAV79 127 0 WJUD3%WJ93tl DUMMY 0 1 24NOW78 24MAV79 127 0 WJD 3t lWJ9313 ACCEP T 1( Si VJ-03 MACH SHOP. 15 1.24NOW74 140E C T A 24MAV79 14JuM79 127 0 t. i Nt05s5bGU79s CON 51.1EST w6 to i Ulpff7m 14PEC74 OIJuw19 14JuM79 127 0 WJD313Rv9145 DUMMY 0 1 15DEC7P 15JUN79 12 7 176 vb3793kven95 09MMY 0 1 15DEC7n 15JUN79 127 176 ( EP9 30*NP9 310 MP 3 UC# F L T 15 1 240C17e 13Nov7R 2% APR79 15MAYF9 128 96 4 I VJSCO3WJ9310 UUMMY 0 1 240CITM 2%AFR79 128 0 vJ4 31uvJe3t l ESI AP INIT roNDIT. PRov. SUPP FOR SPE C MACH SHOP T51 21 I 240C178 .2thov74 '2%APR79 23MAY79 124 1 (

  1. 10thskl0365 MISC PP6 eMcHACv6himG0I 25 1 240CT78 2Ahov78 2h APR 79 31MAY79 129 0

NP r L

CPilMA 1800 3#102 1 1 M E L I5 i IN G e o e PAGE 38 0F 40 Ph3 JECT M A N A GE ME N T SYSTEM ilME NOW : 240CTye 1754 or 2880 AC11eITIES. 11ML UNIT DAV NE TWORn 0$DE C 7 7 18APR80 18APR80 DSIL 08Nov78 NE1WUEu 2IMMER NUCLEAR POWra 5fAlloN UNIT 1 SELECTED O!Mavis CRIllCALITY REPORT KClivliv A C i I V I T y ACTIVIIT E A R L I E 5 I L A i E5 i P FLOAT I DE ET I F I C a t I ON DE 5CR IP i I ON TIME CL Siaki FINI5H START FINI5H 5 10I FR tpI565Hv930I OUMMY 0 1 270 CIT 8 O!MAv79 329 72 h1236S 60565 DUMMY O I 29N0v78 OBJUN79 l2e 2 b2312eDWD322 CONTAINMENT PENE1 GR 2233 33 1 240C17e 040EC78 39APR79 14JUN79-131 0 ( PLLLO!PC6003 DELlvER IN51RUMENTS to 1 240Ci78 0640v78 30 APR 79 IIMAyy9 135 0 153133550333 GALLERY 51 EEL 3310 33 1 240C17e C8DE C 78 30 APu 79 - 14JUN79 131 0 PC5LD3PC5005 COMPL. INSIPuMENTATION 7 I U7Nov78 15Novi8 14M8779 22MAv79 131 0 WL68'0 3*C500 3 DUMMY 0 1 07Nov78 14MAY79 131 0 >C 3003PC3005 COMPLE TE CONDU11 1 I 16Nov78 16N0 vie 23MAvi9 23MAvi9 131 0 PLSLOSPC3003 DUMMr 0 1 16Nov7# 23MAv79 131 0 PL3L05PC4003 DUMMV O 1 17NOW78 24 MAT 79 131 0 >L9003PC4005 COMPL. C ABLE S AND TERMIN. 5 1 17Nov78 24NOv78 24MAv79 38MAv79 333 0 DC3565PC0794 CON 5i.1E51 PC 10 1 27NOW78 00DLC74 OIJUN79 14 JUN 7 9 131 0 PL4005PC0565 DUMMY 0 1 27N097N OlJUN19 131 0 b=0322Rv9845 UUMMY 0 1 Il0EC78 15JUN79 131 180 FC070sev9845 DUMMY O 1 !!DEC78 15JUN79 333 140 550335pvol45 0 1 IIDEC78 15JUN79 131 10 0 CD1373Mv9301 UUMMY 0 1 240Ci?# OlMav79 132 75 $H12055H9301 CONIINUE 5H TE511NG 10 1 24N0vi8 070EC78 OlJUN79 14JUN79 132 0 k Sh330lRv9845 00MMY 0 1 04DEC78 15JUN79 132 181 150131550338 Rn STRUCT STEEL 3110 30 1 240C178 050 ECTR 03MAvi9 14JUN79 134 0 $50331Rv9845 0 1 060EC78 15 JU N 79 334 183 %CO369tC0565 FA8.L IN51L.5M.BORC PIPF 18 1 240C178 16hov7A 07Mav79 31Mav79 136 0 vtC565WC0798 CONST. TEST VC 10 I 17NOV78 010Er78 OBJUN79 14 JUN I 9 136 0 WEO79hRv9845 DUMMY 0 1 040EC78 15JUN79 136 185 bk3144DR0344 000RS 5PECIALiv,ETC 44EE 26 1 240Ci?R 29N0v74 09MAY79 14JUN79 338 0 FE 0 851FE0353 MI SC FUPN & EOUIP 12 1 240CI78 08hov78 09pAv79 24MAv79 138 0 F P36Dif P4602 GRINNELL 518RI T/G FP 5 1 240C178 300C174 09MAv79 15MAvi9 138 71 1600151G0037 UNIT ENCLOS. LP CVLINDEP la 1 240CT74 06N0v78 09Mav79 22MAvi9 138 0 1G00171G0041 DuMMV O I 07hov78' 23Mav79 13e lie F E 0351vs9301 DUMMY 0 I 09N0b78 25MAv79 13a O %5930lv59303 v5 ACCEP1ANCE TEST 14 1 09Nov7s 29NOv78 25MAv79 14JUN79 138 0 r b29394Rv9145 DUMMY 0 1 30Nov78 15JUN79 139 18 7 b59303Rv9845 DUMMY 0 1 30NOW78 15JUN79 338 187 $39308519303 51-1 SEISMIC IN51RU PPEOP 23 1 240CI78 24NOV 78 14Mov79 14JUN79 tel 0 119303pv9845 UUMMY 0 1 27h0W74 15JUN79 141 190 PC4LDIPC4003 PULL & IE RMIN. CABLES 7 3 240C178 OINov7R 15M8v79 23MAvi9 342 II % lod 65voll65 IN51ALL L h MANGERS 12 1 240CI78 08Nov 78 I5MAY 79 31Mavi9 142 0 %00565v00798 C ON51.1E S T v0 10 1 09NOW78 22N0v78 OIJUN79 14JUN79 142 0 %21165v00565 DUMMY 0 1 09Nov7p OlJUN79 142 0 tt3798E v9a45 buMMY 0 1 24Nov7a 15 JUN 79 142 198 053129950329 C ADmELOS 2920 21 1 240C17m 2tNOV78 16MAYT9 14 JUN 7 9 14 3 0 R5332*Pv9845 DUMMY 0 1 22Nov78 15JUN79 14 3 192 (F012eEF0326 F0WMm0Hu ECHIP FO 2610 10 1 240CT7e 06Nov To 17MAv79 31MAv79 144 0 f t 0 32eE F il26 Ut#MMY 0 1 07NowTP DlJUN79 144 0 )

m _ _ _ _. ~ ~ _ _. 4 a: 1 C&fina 1800 3 ele 2 T I nE L 15 i IN s' PAGE 39 0F. '40 PS0JtCI MANAGEnENT Sv 51E n -linf Nom 2400T74 1754 0F 2480 ACT]v! TIES. Tint UNIT DAV NElwe## 050tC77 Isapps0 @Sft Sphov78 NElw0na a 2 inner - NUCLE AR P0wfR STATIPN UNIT I SELECTED Olnav7e Ip4Poso CRITICAL))v REPORT e e o e e e e e e e o e e e o e e e e e e e e e e o e e e o e e e e o e e o e e.. *

  • e e e o e e o e e o e e e.. e o e e.e e

,EClivliv 4 C1 Iv1 i y 4071v177 -E A N L IE 5 i L4 1 E 5 i P FLc4I ) IDEhTIFICATION D E.5 C D 1P i 1 0N Tint CL SIApt FINISH SIANI FINI$H 5 101 F e E f i l 26E F 1326 C04CkElf.E0 HIP FD 2640 10 1 07mov78 20Nov74 O I JuM 79 14JuM79 144 0 I C502025n9301 uunny 0 1 2Nov7e 15 sum 79 144 12 EF1326Cv9345 Dunny 0 l'2tN0v74 15euM79 144 19 3 P E 300lP C 300 3 INSTALL CONpuli 3 1 240CT78 200CT78 leMAv79 22nav79 les 14 4 6%I)65r.1565 ConPL. VARD PIPING 19 .I 240CT7A 17hov78 18MAv79 14 JuM7 9 145 0 ' unt St5199s45 Dunny 'O. I 20Nov78 15Jum?9 145 194 5b0324560322 SieuCTueAL secuTING 2255 18 8 240C17e 16Nov78 2inav79 14JuM79 -14 6 0 .')- 4 l 568324Cv9145 Dunny 0 1 17hov7n 15JuM79 146 195 90lu0lWA9303 ConPL. PUNCMLisi 5 1 240C17s 300CT78 22PAv79 2SnAY79 147 0 f USO308cA9303 WA-Cl Aun bL OG P RE OP 12 1 350CT75 15Nov78. 30nav79 3 4 JuM7 9 - 147 0 f) voo303:v9845 Dunnv 0 -I 1640vre 15JuM79 34 7 1,6 CE5127CE5327 ENCa5EnENIS 2770 15 1 240C174 13#0 v 78. 24nev79 14 JUN 7 9 I49 O E F C523 E F 0726 WE51 EEL EeulP FD -2620 5 1 240C178 300CT70 24MAv79 33mAvi9 149 0 ()' Ef 0924E F il26 E nutDnNTS toulP FD 2630 5 1.240Cife 300C i78 24PAv79 31mAv79 149 5 Pt t 003PC1005 ConPLE TE 5.9. PIPE 5 1 240C178 '300CT78 24nav79 33navi9 149 0 PL2uC3PCIDO3 Ounny 0 1 240C17e 24mav79 149 0 () avfC7 7 A v0079 F UEL PO OL F utt 0 1.240CT75 24MAv79 149 0 ) av!b79:v9341 Dunny 0 1 240C17s 24nav79 149 1,7 i 4 E v"03 t M v00 A3 F LC. H00NE D INTO 52n

  • CAL 0 1 240C178 24MAv79 149 0

~ () ] sv50334v9341 Dunar O .1 240C178 24mav79 - 149 197 4 E f 0726FF il26 Dunny 0 1 350Cifs OlJum79 I49. 5 FCID05PC0565 Dunny 0 1 310C17e OlJUN79 149 18 () Ct 5 327Pvel45 Ounny 0 1 1440v7e 15JuM79 149 19e 950565459308 Dunny 0 1 240CI74 25nAv79 ISO 12 En0 855:n0J65 F AB.L INSTL.5n.90eE PIPE O I 240CI74 OlJUN79 154 0 () i En0335Dn0598 COW 51.1EST DN 10 1 240CT78 06Mov78 OlJuh79 14JUN7' 554 0 960734%N0934 Ducimoku 3410 10 1 240CT78 06N6v78 01J0N79 14 JuM 7 9 154 0 U l#5'S59 f D 794 C OW51. I E S T vi 10 ! 240CT78 06Mov70 OIJUN79 14 JUN 7 9 - 154 0 () En05090v9845 Dunny 0 1 07mov78 15JUN79 154 203 i Do@S34Rv9145 Spany 0 .I 07m0v78 15JuM 79 154 203 WI27D20v9e45 Dunnt 0 1 07Nov78 15JUN79' 154 203 () ] GW31088R0341 SUIL1 DP #00 Fin 6 ello 7 1 240CI7a plP0v7A 06JUN79 14JUN79 157 0

CW33419v9145 Dunny 0 1 02NovTa 15Juh79 157 206
CD013>n00335 nETAL DECulN6 3510 6 1 240CT78 310Ci7e 07JuM79 14 JuM 7 9 15n 0

() KI.0 33 57 v 914 5 0 1 Olhov78 15 SON 79 I5M 207 j Hv3312nv0312 SfRv!CE DulLDING GRT 1235 2 3 240C17s 250CT78 13 JUN 79 I4JUN79 362 0 i mv3 3123v98 45 punny 0 1 260CT73 35Juh79 162 281 () t $ En19653v9645 punny 0 1 240C17e 15JUNI9 164 213 -p Oc3559 all65 Dunny 0 1 240CI78 15Juw79 164 0 4 .UT92033v9845 0 1 240C17n 15 sum 79 164 213 () 09019722C001 Dunny 0-1 27AuG79 FlaPN40 166 166 G53739#50869 Dunnv 0 1 240CI7n 31JUL 79 194 0 j OU12089vl501 Dunny 0 1 240C17s 39JbL79 194 0 vb93332v9129 bunny 0 3 27 MAR 79 2 t APH80 273 273 .I %F l' i

+ OPT IM A 3100 3R102 1 1 M E L I 5 T IN 6

  • e PAGE 40 Of "40 PDOsE L i MANAGEMENT 57518*

IIME Noh : 240CT78 1754 0F 2880 AcilvillE%. TIME UNIT Dat hribORn' 050E C 7 7 Ib8PR80 18APR80 b21E - 08Mov7A hETWOPu : ZIMMER huCLEAR P0mFk STATICN UNIT I SELfCIED DIMavia CRITICALITY REPORT e................................................................ Atilv11V A C i 1 V I T Y ACTIVIIV E A R L I E5 i L A 1 E5 g P FLOAT IDE CT IF IC A T ION O E-5 C R IP 1 1 0N 11ML CL START Flkl5H START Flh15H 5 101 FR 5F21235F 2323 RE5f EEL,5L A45 2520 80 1 240C17e 15 FEM 79 2= REC 79 15APR80 29 7 0 SF2 3235F 292 3 0 1 16F E 8 79 16APN80 297 0 $f2C235F3123 CONCRETE.5Lah5 2540 3 1 16FEB79 20F E R 79 16APHPO IRAPR80 297 0 $53523220008 DUMMY 0 3 21F E B 79 21APRAD 297 29 7 $fCalg5CO334 LANDSCAPING,pAChFILL 19N2 56 1 240CT7b 12JAN79 OlfEB80 1RAPR80 324 0' 180314220008 OUMMY 0 1 15JAh79 2tAPWno 124 324 Sf 25235F2723 E MbE OME NIS.5L A b5 2530 50 1 240CT74 04JAN79 06 FE B 80 15APR80 327 0 $F 2 72 35F 2923 0 1 05JAN79 16APHPO 327 30 SF17235Fl923 F ORMh0NM,EL.5L AB5 2510 30 1 240CT78 050EC78 CSMARPG 15APR80 34 7 0 $F IC235F 292 3 0 1 060EC78 16 APun0 347 50 LL20blLC2003 CLOSE CSI. OPFN EL. 503 10 1 240CT78 06Mov78 I?MAReo 25MARnD 352 0 LC2003LC2005 luSTALL L.B. PIPE 5 I 07hov78 13hovia 26MANPO DIAPR80 352 0 L L2D;5LC 3003 puMMY 0 1 14N0v78 02APRp0 352 O LC1L33LC 3005 COMPLE TE 5.P. PIPE 5 1 14Nov7n 2040 Vie 02APRp0 08 APP 80 35 2 0 Lt3t%5LC5003 DugMy 0 1 21hov7n 09APNn0 352 0 L C5033LC5005 CUMPLE TE th5TRuMENT 5 1 21NOV78 28NOV78 09 APR 80 15APR80 352 0 LC5005LC6003 OuMMY 0 1 29hov74 16 APRRO !$2 0 LLCC33LC6005 COMPLETE CONDuti 3 1 24howTA Ol0EC78 16 APR80 18 APR8 0 352 352 P 5930 t hT 920 3 DUMMY 0 1 040EC78 25APRnD 352 352 vt9303v a9 301 DUMMY 0 1 2RN0v78 2tAPhPO 356 356 LC300 LLC 3003 IN51ALL 5 8. PIPE 5 1 240C17e 30 DC 178 26 MAR 80 OIAPR80 362 10 LC400lLCeuG3 INSTALL 5.8. PIPE 5 I 240CT78 300C178 26 MAR 80 OIAPPb0 36 2 0 e LE5tDILC5003 INSTALL IN S T RUME NT S to 1 240C178 06NowT4 2bMAnt0 08APR80 36 2 10 LCCl+03tC3003 OuMMY 0 1 310C178 02APRfD 362 10 58 0 322220001 OuMMY O I 17h0v78 28APRm0 362 362 Ct@lth&LO348 ROOF vtN15 & CEILING 4748 l$ 8 240 CIT 8 13Nov78 3IMARA0 IRAPR80 365 36 5 LEol0lLCb003 CONPUIT IN514LLA110N 5 1 240C178 300LT78 09APRRO 15APR80 372 20 CO3LD3009201 DUMMY 0 1 310C17p 2tAPR80 375 375 QcuS43 Mall 43 bt A2LD BLOCu 4340 3 1 240C178 260CT7A 16 APR80 18APR80 377 0 Call 43220001 DUMMY 0 1 270C178 21APWp0 377 377 hP9803HP9201 uuMMY 0 1 240CITb 2tAFR80 38u 390 i tF930TMP9208 DUMMY 0 1 240CT78 2tAPR80 380 380 BC5356Rv9325 DUMMY 0 1 240C178 21APRe0 3RD 38 0 LPC203LP9230 OuMMY 0 1 240C178 21AFRRO 38 0 3n0 t C53 76%M51565 DUMMY 0 1 240C17# 2t APRe0 380 380 C DD 80 3 R v 9201 DUMMY 0 1 240C178 21APNr0 380 38 0 Of0203RI*205 OUMMY 0 1 240C178 21APW80 380 38 0 t if046SmF9201 DUMMY 0 1 240C178 2taPRAD 380 340 58EP.L cpl!MA 1100 3R102 III AN0v 78-2 3 :08 :24) 72d7* 1. LEnthF HL A 0 t hG l * * * *1 / J L 1511 hbe * *

  • l 12dE*

2. P Ar,E 512E 8 44 3 72u9* 3. ERLLbOE FIh]5MEDIALLl g 7210e 4. 50WI ACTIDlil fill

  • 5.

bulPut ACI T AHLE s it Mf t 1511Nb t

s _q>.,, n.+a.3A_>.-.* ~ - +.. * ~ <, - + a r. -. ~, - > - ~ - -~.# .q.m~. .. _w..-s-. --.,. - -. _, - -.. - -. +,, -..,. -n. .,-..e > -.... ~ ~.3.. .~ e...-~_ ' ' -. _ ~ ~ 7.{. &,-', ~ s 0., , c ( .'e .f' l) ,.f J,? ' 3 r 3 _c .f.' { ,J n r + 1. 't El's n /r f E i t ? .h +. }', h 5 <a 4 5, i h {.

f..

4 h l 4 I t'.' +.. s 'S '4 r / am. = = - 4 9 OO 4 OO ' e 3 -' q; - gg r_ y-j .i d .ee j' ' p sue ee- . -tem ta. - 4. gg i' am .I =w ) 4 g i O', 6 e Oe s t l' .i! r ae: mm 10 $ f s.

== .if. t[. as i ma-4 es t 33 en. I OO N-1 i e-t c i a i R. .N

== g. i tA tA e } '.- .t, 'ag s,um oe , aa o_ ee La f' ww e. i o j en N.o .o . N. }- en Is _N-g. e e. i J l~ J4 pt j eS .g.' Jt f 3.~k eo a \\ e: -.C ,q. r' s Oe 3e .o c g,= g,. ' EO t' f. .w Sr en = e e - em 'ee-q '. 4g' l 'e9- - y a3 l,' ~ i I ..s.. ....m, .,,_,,,_~,,,_.,_,%.-,__,,-.,._,__.,,...,__..,,.y., .-_,_,-...__....~.,,r r %4 ~w----~~,

~. _. - -. u -~ GPil33 1500 38102 i I M E L I5 i I N G PAGE la OF to PEOsE C T M A N A 6E ME N T ST5 FEM 11MF NOW 3.240CT78 1754 0F 2800 AClivlllES. TIME UNii DAY hETWo#m U SDE C 7 7 IpAPPe0 Oste CaNov78 NETween : J IMME R NUCLEAR PO*ER STAT 10# UNIT I SELECl[D OIMAv74 leAPRe0 'l^

        • 1 /J LISTING ****

. e,,.....................................'........... ACilVITV A C7 I V l-7 Y ACTiv1TV E A RL IE5 i L A 1 E$ 1 P FEGAT IbtnIIFICall0N DE 5CR IP i 10N 11ME CL START FINISH SIARI . FINISH 5 101.. F # N6 3b61Nb9203 OuMMY 0 .I 200EC7e 12DIC78 -6 ~ 29 Nt S 77 3de617 3 C ON I TE RM PC C I CARLES 29 1 240CT7h 040EC18 15NOW78 27DEC7a 16 0 Ne3173Ns9303 DUMMY 0. 1 05DEC7a 2 A DE C 75 16 5e C73774%B6972 web PULL PC L I CABLE O 1 240C178 15Nov78 Ib 0 tbs 97sNS7172 COMPL PULL PC & I CABLE 5 29 1 15N0v78 27DEC78 30Novis llJA479 to 0 Ne737028 707 8 COMPL. CONOUIT 16 1 240Cf78 14NOV7A 0 0 Eb7L78 N#6972 DUMMY 0.I 15NOW78 0 0 CG7172f a9307 DumMT 0 1 28DE C 78 12J4479 10 59 C3OlG3fe9208 DuMMV O 3 240CI78 300C178 4 0 Nt023tNs9308 OC/F C T Ns.1 23 1 240C17s 24NOV78 300C i 7e 3DNov 7 m 4 to NbO233Nt9307 OC/FC1 No.2 21 l_OlEEb79 ORPAR79 12 pf C FS !!JAN79 35 le i Nt9 30lme9203 OUMMT 0 1 OlFEB79 12bEC78 -35 0 OkO30lfp9303 N555 N8 3 PREOP ST4RT In 1 DIFEB 79 26F E B 19 O R DE C TS 27DEC78 42 0 ?- . tko303%B9305 N555 ND-l PPEOP COMPL 45 1 2 7F E b 79 30 APP 79 28 brC 78 OIMAR79 -42 0 NPO 5030v940 8 DUMMY 0 1 2 7F E B 79 16 MAW 79 11 68 MbO3052v9329 DUMMY 0 1 UIMAV79 02 MAR 19 -42 6 C39307#893u9 NS-2 PREOP 46 3 22 MAR 79 24MAv79 12JAN79 36 MAR 79 -49 0 Cb230;LC9301 OC/FCI LC 8 21 1 25MAv79 25Juh79 19 MAR 79 16APR79. -99 0

    1. lD01NR1003 DELIVER REMAIN. INSTRU.

5 1 240C178 300CITA 130C17e 190CT75 -7 0 8 Ek!D03N#2003 DUMMY 0 1 310CT78 200 CIT 8 -7 0 272CulNR2003 INSTALL INSTRUMENTS 5 1 240C17e 300C174 130C178 190C17n -7 0 CW2003N#2005 COMPL. IN5TeuMEN15 5 8 310CI7s 06MOV78 200C178 260CT78 -7 0 CF2b05CR3003 DuMMW D I 07h0W78 2 70C178 ' -7 0 ek3028tR3003 CONTINu[ CONDuti IN51L. 3 1 240C17a 260C178 o 7 C33 D03N# 3005 C OMPLE TE CONeuli 2 1 07Nov78 OsNOW78 2 7 0C ile 300CT78 -7 0 t I -7. 0 GQ30354R4003 DUMMY 0 1 09Nov7e 350CT78 l 024008tR4003 CONilNu[ CAPLES L ItaMIN. 12 1 240Cl?8 OSNOV78 130CT75 300CT78 -7 0 Cu* D03%R *201 C OMPL. CABLES & TERMIN. 5 1 09hov78 15NOV74 310C17e 06Nov7s -7 0 '.) cs9208tu9301 NR 575 OC/FCI to 1 16Mov74 3uMov7a 07Nov78 20Nov78 -7 0 i Ek930l#R9303 SkN NR-1 PREOP 19 1 DIDEC78 280LC7n 2tNOVis IADECTS -7 I tb9303NR9305 IRM NR-2 PREOP 28 1 02JAN79 30JA479 19DEC78 19JAN79 -A 0

  • )

C39305NN930 7 APRM NR.3 PPEOP 56 3 31J A N 79 leAPR79 2eMAR79 14JuM79 40 0 i-Eb93051P9301 OUMMV O I 31JAN79 IgJAN 79 -h 0 tbs 30 72v914 5 DUMMY 0 1 19 APP 79 15JuM79 40 49 ( 0628tS060265 INSTALL SM Al t s0RE MANGER 10 1 240CT78 06NOW 74 05FE B 79 16FER79 73 0 C61455060365 COMP INSI $4 BORE PIPE 20 1 24CCi78 20NOW18 15JAN79 09FE979 56 0 EG226506920 8 D uM M V O I 07NOW74 19FEH79 71 36 . ) 06236506 7 4 66 D uMM V O I 23Now7n !?FE879 56 25 060 365069204 DUMMY 0 1 2tNov7a 19 FIB 79 bl 26 868001061101 DELIVER R[MAINING IN51kuMENTS 0 1 240C17s 128Eb79 76 0 4 e ChitTIC67166 DUMMY O I 240CT78 32FEh79 76 45 06171506196 5 C OMP L6 H ANGER INSI 13 1 240Cf7a 07NOV78 02 MAR 79 16 MAR 79 90 0 6b1465069308 OUMMY 0 1 OANew78 19 PAN 79 90 59 s E42138062403 RE054. REVERSE 05M0515 E culp. O I 240Ci7s 19Fie79 at 0 bP 1 i

n. CP11M4 1100 3R302 i i M E L I5 I IN 6 PAGE 19 0F to PEOstti M AN AGE ME NT SYSTEM TIME NOW 240C178 1754 0F 2880 AcilvlTIES. ilME UNIT 0A9 NElbORK 050EC77 ISAPR80 @2TE 08Novie NE l w C RM.

  • 2I M ME R NUCLEAR P0mER ST A T I ON UNIT I SELECT [0 OIMAv78 18 APR8 0

/J LISTING **** AC18vl1T .A Ci Iv1i V ACilv!TV. E A R L IE 5 i L A'T E 5i P FLOAT ILEh18FICAfl04 DE 5CR IP i I ON TIME CL STAR 1 FIN 15H START FINISH 5 ICI FR C02103069201 DUMMY 0 1 240C178 19 FEN 79 81 46 062 365062565 COMP LG SORE PIPE 2 1 240CT78 250CT78 OlMAR19 02 MAR 79 89 0 Ob2 56506 39 71 0 0MM Y O 1 260C178 05Mak79 89 58 C03554069203 OUMMT 0 1 240CI78 1*fEb79 81 46 C63078 064 3 71 COMP Ct40UIT TO EQUIPMENT 5 3 19JAN79 25JAN79 05 MAR 79 09 MAR 79 38 0 060873064973 DUMMY 0 1 26JAN79 12 MAR 79 31 0 064 7730649 73 CONT IERM PC&I CABLE 31 1 240CI78 060E C 78 26Jak79 09 MAR 79 65 34 ' C64C7 30G5173 PULL LTERM FINAL CABLES 5 1 26JAN79 OlFEB79 12 MAR 79 36 MAR 79 33 0 C65tF30G9301 DUMMY 0 1 02F[879 19 MAN 79 31 0 Cb5$720G5772 PULL PC&l L A6LE 4 1 240CT78 2700178 22JAN79 ^ 25JAN79 61 f Cb57720G5972 00MMY 0 1 300CI78 26JAN79 61 'J 0b57720G9201 OuMMV O 1 300CI78 19 F E 8 79 77 42 565072066172 CONT PULL PCLI C88LE 31 1 300CI78 120EC78 26 J AN 79 09 MAR 79 68 0 C609720G4973 OuMMY 0 1 2 3DE C78 12 MAR 79 el 30 Cb5705066801 SET PANEL 5 EMOUNI INSTRUMENTS 42 1 240CI78 210E C 78 12DfC78 09FE879 34 0 ObS808067366 00MMY 0 1 220EC78 12F E s 79 34 3 OGS07506 7166 8F61N INSTR PIPE ETU8ING 45 1 240CT78 270EC78 07 DE C 78 09FE B 7 9 -5 38 0 067166067366 COMP INSTR PIPE ETUBING 15 1 240EC78 18JAN79 12FEB79 02 MAR 79 31 0 Ob7366063971 OUM=v 0 1 19JAN79 05 MAR 79 31 0 ob7 36 BOG 9301 DuMMT 0 1 19JAN79 19 MAR 79 43 10 C602010G9301 06-3 OC7FCT 20 1 290EC78 26JAN79 19FEH79 36 MAR 79 35 4 Cb35080G9303 OG-1 0FF-GA5 PREOP 63 1 02F E b 79 OIMAvi9 19 MAN 79 14JuM79 31 0 tj 060303Rv93 45 OUMMY 0 1 02MAv79 15 JU4 79 31 80 0117510I9301 DuMMT 0 1 240CT78 Olhov78 6 0 033766089303 OuMMY 0 1 240CT78 OlNOW78 6 0 08030lfo9308 01-1 DEAR OIL TRANSF PREOP 22 1 240C178 22NOV78 01N0578 010EC78 6 0 PLC565PC0798 CON 51.1EST PC 10 1 27Nov78 040EC78 OlJUN19 14JUN79 131 0 PC9798RW9145 OuMMt 0 1 Il0EC78 15JUN79 131 180 ..i PCIG03PC1005 00MPLETE 5.P. P2PE 5 1 240CI78 300C178 24MAvi9 3tMAv79 149 0 PCIDOSPC0565 00MMT 0 1 310CT78 OlauM79 149 In Pt2003PC1003 OUMMY 0 1 240CT78 24MAvi9 149 0 t ) PL300lPC3003 INSIALL CONDUIT 3 1 240CT78 2600T78 leMAv79 22MAvi9 345 le PC3D03PC3005 COMPLETE CONOUIT I I 16Nov78 16 h 0 V 78 2 3Ma v 79 23MAY79 331 0 PE 3005PC4003 OuMMY 0 1 17how78 24MAY79 131 0 t_ PCOUDIPC4003 PULL E TE RMIN. CABLES 7 1 240C178 O!NOV 78 15MAv79 23Mav79 142 !! FLCLO3PC4005 C OMPL. CABLES AND TERMIN. 5 1 17NOW 78 24h0V78 24MAY79 38MAv79 131 0 PiiOOSPC0565 00MMY 0 1 2 7NOV 7e OlJUN79 131 0 L.) Pt5003PC5005 COMPL. IN51RUMENTATION 7 1 0 7NOV 78 15Nov78 14Mav79 22Mav79 131 0 PC5005PC3003 DUMMY 0 1 16how78 2 3M Av 79 131 0 PCSD0lPC6003 OfLIVER INSTRUMENTS 10 1 240C178 06NOV78 30APR79 llMAv79 IJI O 1) PCSUO3PC5003 dummy 0 1 07Nov76 14Mav79 131 0 >L9310PC9332 TYPE H&C PENET. TE5flNG 135 3 240C178 03M8779 21AU678 OlMAR79 -45 0 PL9 312R v9 329 puMMT 0 1 U4MAv79 02 MAP 79 -45 3 bl9)DIPI9303 PI-I PE RSON MONI T PREOP 65 1 240 CIT 8 75JAN79 15 MA W 79 14JUN79 99 0 tw

.. ~.. . ~ _.. 0P1530 1100 3Rio2 i IM E L I5 ~ T IN 6 PAGE 20 0F to C ROJECT M ANa6E MEN 1 SYSTEM TIMF New : 240CT78 1754 0F 2680 ACTIvlTIES. TIME UNIT Day hCIWORK 05DE C 77 leaPRs0 BAIE 084097P NE1 WORM 2IMMER NUCLEAR PONER STATInk UNIT I SELECTED OIMaV70 ItAPR40 eee*I / J LISTIN6e*** actIvlIV A C 1 IV I 1 Y ACTIVIIV E-A RL 1E 5 I , L' A TE 51 P FLOAT IDEhilFICATION D E.5 C R IP T ion IInE-CL START FINISH SIARI FINISH $ 10 f ' FR Pl3333Rv9845 DuMnv 0 1 26JAN79 15 JUN I9 .99 140 P3100lPet003 CONT 1NUE CasLEs C TERMIN. 19 1 240CT76 17Nov78 -24N0v74 200EC74 22! 6 Poll'03PR1005 ConPLE T E C ABLES C T ERMIN. 5 1 29hov75 050E C 75 21 DE C TS 280EC78 ~ 16 0 l P:SuG5PE9208 Ounny 0 1 060E C 78 29 DE C 7 A 16 0 Pf2028PR2003 CON 11Nu[ CONDuli INSTALL 10 .I 240C17e 06Nov78 30Nov78 130E C y a 26 10 Pf2tG3PR2005 ConPLE TE CONOUIT INSTALL 5 1 2tNov74 2aN0v78 14 DE C 78 200EC74 '36 0 PC2DOSPR1003 Dunnv 0 1 29mov78 21 bE C 74 16 0 PP300lPR3003 INSTALL INSTRUMENTS 10 1 240C178 0640V78 15 Nov 78 29Nov78 16 0 PC3to3PR3005 ConPL. IN51RuMEN15 10 1 07N0v7a 20Nov7s 3nNov7s 130EC7e 16 0 PD3005PR2003 DunMY 0 4 21Nov74 14 Df C 78 16 0 i PO400lPR4003 DELIVER INSTRUMENTS 10 1 240C174 06Nov7e 15Nov78 29Nov74 16 0 PO4D03PR3003 Oun#T 0~ l 07NOWT8 30Nov78 16 0 PD92GlPR9303 PR SC#FCI 18 1 060EC78 02JAN79 29ptC70 24 jam 79 lb O P603OlPR9303 PR-1 PREOP PR-2 C51 T.O. IS 1 03JAN79 2bJA479 25JA479 19FEP79 16 0 P20 503PR9305 PR-2 PREOP PR-3 CST T.O. 13 1 29JAN79 IgTER79 20F E W 79 OnnaR79 16 0 P9 305PR930 7 PR-3 PREOP PR-4 C5T i.0. 17 1 15FEs79 09 pap 79 09 par 79 02aPR79 16 0 PO330FPR9309 PR-4 PREOP PR-5 051 1.0. 15 1 12 MAR 79 30 MAR 79 03APR79 23APR79 16 0 P20307Pe9311 PR-5 PREOP PR-6 CST T.O. 15 1 02aPR79 204P R 79 24 APR 79 14Mav79 16 0 PR3 3t lPR9 513 PR-6 PEEOP 22 1 23aPR79 22MAY79 $$nav79 14JuM79 16 0 P2033JRv9845 OumMV O I 23MAY79 15Jum79 16 65 P5100lP51UG3 INSTALL E00!PMENT 5 1 240C178 300C 178 275E P 7s 030C17a -19 0 P53 CO3P53003 Dunny 0 1 350CT78 0400T?e -19 3 PS200!PS2003 PULL C ILRIMINATE 4 1 240CI74 270C T 78 020Ci?8 050CT74 -16 6 I PS2c21P52005 ConPL, CABLES & TERMIN. 3 1 0 7how 78 09Nov7A 060C i 74 100CT7A -22 0 1 PS2bOSP59201 DuMMV O 1 50Nov7s lloCT78 -22 0 ~ P51031PS3003 INSTALL CONOUIT 3 1 240Ci7s 260CT75 29 5E P 7a 030CT7a -17 5 P5 3 D0 3P5 3005 ConPL. CON DuIT INSTALLATION 2 1 0 3No v 74 Obwowie 040C174 050C17A -22 0 P53025PS2003 Dunny 0 1 07hev78 060(17s -22 0 ( P5;DOIP54003 INSTALL IM51RU. PIPE #TUSING 6 1 240CT78 380CT78 22 5E P 78 295EPTA -22 0 PS1003P54005 COMPL, IN51PU. PIPE /TuSING 2 i OlN0v78 D2Novia 020C178 030CT78 -22 0 P10E@SP53003 Dun #v 0 1 U3Nov78 040E178 -22 0 P5500!P55003 IN51 ALL I N STRumE NT S 5 1 240C170 300C T 78 255EP78 29 5E P7 8 -28 0 955003P55005 ConPL. INSIPunENIS 2 1 310CT7s Olm0v78 020Ci7e 030C178 -23 0 P55005PS3003 Dunny D I 02NMV7s _040CT74 -21 1 PSSC28P56003 DEL. Last IM51RunEN15 I I 240CI78 2400178 295f P 78 295E P 7 8 -17 0 P5600!P55003 DunNv .0 1 250 CIT 8 020C17e -17 4 P5920lP59303 P5 575 OC/FCT 15 8 10Nov78 O R DE C 7 A Il0CT78 310CT78 -22 0 P54331P59302 P5-1 PARTI AL SYSTEM PPE OP 10 1 040EC78 15DEC7e Olhov78 14N0vi8 -22 0 P54 30!wF 9201 D unny 0 1 04DEC74 25aPRRO 352 35 2 P59331WZ9201 DuM4v 0 1 04DEC7d U2h0v78 -28 19 P59302FC9301 Dunny 0 4 180EC7P plFEb79 31 27 P54302P59303 P5-3 PRE OP PROCESS SanPLING Sv5 TEM 126 1 190EC78 14JUN79 0 0 P54302WF9208 punMY 0 1 18DEC75 15Nov78 -22 0 P54303Rv9145 DUMPY 0 1 15Juh79 n 49 j Gd t

~ k OPinMa 1100 3R102 i ! M E L I5 1 1N 6 e e o PaGE I 0F 40 Ph0JFL1 MamaGEMENT Sv51EM 11Mt Nuw : 240C17e 1754 or 2a80 aC13 vlilE5. TIME UNIT Day NElbopu 050tC17 In PRnD a Caff C8hov78 Ntiwupu 3 2IMMER NUCLEAR PowfR 51all0N UNIT I SELECl[0 plMaV78 38 APE 80

        • I

/ J LI5 TIN 6**** stilvliv aC i i V 1 i y stilvliv 't aR L IE 5 8 L aT E 5 i P FLeai ILENTIFItail04 0E 5CR IP T I ON IIME CL START FINISH 518k1 flNISH 5 101 FR eta!65aCO365 IN5 tall 5 8 HANGER 0 1 240C174 02Nov7F 1 0 C(9365w20201 OUMMY 0 1 240Clis C2kot?8 7 47 CFS165aF0265 IN5 tall SM at t 80RE HaNGEP 4 1 240C17e 2 TOC 178 29Nov78 040EC78 25 0 3 . cf 0865aF 0365 F IELO RUN SM DORE PIPE. 4 1 240C T 78 270(17A 29 mot 7A' 040EC7a 25 0 SFC26bbr93P1 DuMMV O I 300C176 050FCf8 25 39 Cf0365wF9301 dummy 0 1 300Cf74 05DfC78 25 39 s cgC465aF0665 LaRGE HaN6to 05NCIN5 TALL 68 1 240C178 30JaN79 12 MAR 79 14Jum79 96 0 cf066stv9845 dummy 0 1 3tJaN79 15JUN79 96 145-AfE95tartl51 SEltFINISH stIGN MECH E0ulP 16 1 240C174 14Novia 10Nov78 040EC7n 13 0 aFl!5tmF9303 puMMy 0 1 15Nov7a 05 DE C 7s 13 27 CF I Sil sF I F FI C040u!I INST AL L a TION 3. I 240CI78 260CT78 ISNOV78 17Nov78 lb 0 Ce l17 8 aF 3172 DUMMY 0 1 270C T 78 20h0W78 16 0 CF2 37JaF25 73 Putt AND itpM FImal ca8LES to 1 240C178 06N0V78 20hov78 040E C 7 8 19 0-CF2573mF93DI 00MMV O I 07NOW78 05LIC78 19 33 atcl=8st0348 ROUF VENis & CEILING 4748 15 1 240C178 13NOW74 34 par 80 InaPP80 365 36 5 i CPS 201aP9301 aP a.C. P0mFR OC/FC7 22 1 240C178 22NDUin 25A0678 265LP78 -el O CF9202aR9201 OuMMV O I 240C178 2tMaR79 103 0 AP930!aP9303 aP-2 4160W A.C. PREOP 39 1 24NOW78 19Ja N 79 2758P78 20Nov78 -el O A&O301aP9315 OuMMV O 1 24NOW78 2F5EP78 -41 0 + CP930lCW9301 DUMMY 0 1 24N0978 19JAN79 39 35 CF030lMC9301 OUMMV O I 24NOW74 02FEP79 48 25 CP930!H093DI 00MMV O 1 24Nov78 15 MAN 79 77 185 CP930lHbS301 dummy 0 1 24NOW78 02 FE B 79 48 72 aP930!IN93el OuMMy 0 1 24N0478 0*Nov78 -10 39 AP93ujaP93U5 aP-1 690hv a.C. PREOP 22 1 22JaN79 20FEP79 2tNOW78 210ECTA -el 0 KP9 305 aP930 7 aP-4 PNEOP 63 1 21 F F b 79 18MAY79 22LIC78 22MaRF9 41 0 AP93076C9308 DUMMY 0 1 21 mat 79 21 MAR 79 -el 0 CP930VaP93tl AP 5 VITAL RUSES PRf0* 41 1 30MaF79 25Mav79 21 MAR 79 16MAY79 -7 O AF93tlev9339 DuMMr 0 1 2pMay79 IFMay79 7 41 Sk9315aP9357 aP-3 4804 a.C. PREOP 61 1 24NOW78 20F E B 79 27 5F P78 210ECFR -e l 0 SP93I7aP9305 Ounmy 0 1 PlFEP79 22 b( C 78 -41 0 AP93tFH69301 DuMav 0 1 21FEb79 02f f h79 .-13 Il CP93t TLL9 3OI DuMMV O I 21FEh79 17aPR79 39 0 CN920SaR9301 OC/FCI ap-! 21 1 240C178 2tNOW7m 2tMakT9 18aPR79 103 0 C3930laR9303 AR.I PRFOP 40 1 22NOW78 19JAN79 !*aPR79 14JU479 103 0 Ek3303kv9845 DUMMY 0 1 22JaN79 15Jumi9 105 152 aill65A51765 DUMMY 0 1 2=0C17e 05 san 79 en o 451965a593DI OUMMV D I 240C17e 03JaN7V to 29 855C72a55573 DUMMY 0 1 240CT7R 29 DI C 78 46 0 055$73a 55 F F 3 PutL L TE RM FINAL CABLE 2 1 240(17s 2500178 290fC78 02JAN79 46 0 a 55 773 a59 30 8 DUMMY 0 1 260CI7a 03JsN79 46 27 A57566a55071 buMMY 0 8 24uC178 2tCitin el 0 e57166a593el Dunaw C 1 240C17e U3JaN79 th 29 85920ta59202 AS-1 OC/f C1 20 1 240C178 20hov74 C4DfCTA 02JaNF9 28 0 )

._. ~ C& Tina 1100 3#102 1 InE L 15 1 1N 6 'e e

  • PaEE 2 OF 40 PSCs(CT mana6EntNT S v5 TE R IInt Now : 240077s -

1754 0F 2840 aC li vl T IE S. Tint ugIT Day hE1Woma 050( C 7 7 ' leapesO Daff Osh0WTA pflWOPm 1 21mnE R hWCLEsp POW (p S T A T I PW ugli I SE L[C IE D _ Olna v 7a l e a P#4 0 / J LISTIME****

  • e...............................................................

aCilvily aC1 1V I Ty - aCTIWliv E aeL 1L5 i L aiC5 1 P FLeal 3DEhTIFICal104 0E 5CR 1P I 1 0N linE CL slant FlhtSH 51 ART flh]SH' 5 101 FR 459202a59308 Dunny 0 1 21Nov7s 03JaN79 2R 9 S$22025n9308 Dunny 0 1 21hev78 15JU479 144 12 a5D308659301 Dunny to 1 05DEC7a' le0EC78 0 3 Ja 4 79 16 Jaw 7, 19 0 85930 8160040 OUnny 0 1 USDEC7e llaPR79 89 69 Pc234th00348 pu!Li UP m00Flh6 4110 7 1 240CI7e Olhov70 06 Juq 79 14 JuN 7 9 157 0 .Eh3341N49145 Dunny 0 1 0240V75 15 JUN 79 157 206 e Ca3773Ca9201 Dunny 0 1 240C17e OIDfC74 27 0 CA0201Ca9303 Ca-3 OC /F C T 75 1 240C178 00F E P 79 O R DE C 7e 19Ma#79 27 24 C a9 30lFn9310 C a-1 C040 WaCUun Pet 0P 20 1 15 man 19

Itappy, 2qpae79 16aPR79 3 33 Ca9301160121 Dunny 0 1 15ma#79-2tna779 47 0

Cb1265CD9301 uunny 0 1 24cC17e 14 F t m 79 7s 46 C bU 365C #6166 Ounny 0 1 200CT78 24Jah79 63 0 Cht?65CU9301 Dunny -0 1 240CT78 14Ffp?9 7p g6 CS245tCD4373 Dunny 0 1 240CT78 33JsN79 6A' O Ce3865C80365 DUMMY 0 1 240CT7a 24Jah79 63 0 Ce3578Cp4373 DUMMY 0 1 240C17s 3tJam79 6n 0 C34372 Cut 373 Dunny 0 1 240Ci74 5tJaN79 68 0-CP4573C09301 Dunny 0 1 240C178 14fEu79 7P 46 CW5172C94373 Dunny 0 1 240C178 3 t Ja h 79 ~ 64 0 6A 0 CS5566C84373 DUnny 0 1 240CT74 31JaN79 Cs5%64C86166 Dunny 0 1 240C176 24JaN79 63 0 V Ct6366CD 3371 Dunny 0 1 240CT78 24JaN79 63 0 e CES36eCue3D1 Dunny 0.l.240C17s 14Ff879 78 46-Cbb46mCB4173 bunny 0 1 240C174 31 Jam 79 64 0 Cb6466Cn6166 punny 0 1 24 PCT 78 24Jah79 63 0 (b7451C82758 Dunny 0 4 240CT78 IFJAN79 58 U CF7451009301 Dunny 0 1 240C178 14ftb79 74 46 CD2totCD9301 ConPL. CODE I

  • 2 11[n5 16 1 240C178 14h0978 2 3 Ja h 79 13FE979 62 30 CD0265Cu*301 Ounny 0 1 240C17e 14Ffk79 7n 46 CD0 36sCD53 66 D unn t 0 1 240C17n 06Ff B 79 72 0

Cl 0 365C09304 Dunny 0 8 240CT78 14FEP79 78 46 CDl465C09301 Dunny 0 1 240C17p 14ffpT9 in 46 Cl2203CD0165 Dunny 0 1 240C178 06FEb79 72 0 CD2571CD33 7 3 Dunny 0 1 240C17e 1]FI679 77 0 CD1573CD*301 Dunny U 1 240C178 14FIH79 78 46 CD917dCO3373 Dunny 0 1 240CITA 13FE B 79 77 0 CL5366CD23FI bunny 0 1 24 0C 178 06ftb79 72 0 ( j CU5366CD*301 Dunny 0 1 240CI78 l#Ff P 79 In 46 CD5%66CD4966 Dunny 0 1 240C17e 16Jah79 57 0 I Cb430lCD9303 CD/CU-l PNLOP 23 1 29DEC78 29Jah79 14FFh79 14 mar 79 32 0 t CI+930th69201 Dunny 0 1 290FC74 19Fi b 79 35 0 CD9303nD9301 bunny 0 1 30Jah79 15 ma N 79 32 70 -EtS127CE5327 (NCa5En[hT5 2770 15 -1 240Clis 13NOW74 24may79 14 JUN 7 9 149 0 CL5327Rv9145 uunny 0 3 14hov78 15 JUN 79 149 198 ...a

4 Lv SPIIMA 1800 3R102 1 IM E L I5 i IN G e o e PAGE 3 0F 40 P&O.ECT M A N AGE MENT SYSTEM TIMF Now : 240CI7R 1754 0F 2800 AC TIVITIE S. TIMC UNil DAY NC ib ORE 05DIC77 18APR80 bnTE Ophov78 NETWo#m : ZIMMER -NUCLEAR Po.FR STATIPN UNIT I SELECTEG OIMAT78 18APR80 ese*1 / J LISTINGeese e.. AClivlif A C i !V 1 iV ACTIVITV E A R L 1E 5 I LA T C5 i P FLOAI I DE hf l F I C A T Iog DE 5CR IP 1 1 0h TIME CL SIART FINISH STARI FINISN 5 101 FR Ct UDICLo002 COMPL. CODE I

  • 2 ITEMS 16 1 2m0CI7b 14NOV78 30 kev 78 210EC78 26 0

Clubul.59308 DUMMY 0 1 15Now78 22 DE C 78 26 34 CLl73SCw9308 00MMY 0 8 240C17# 19 JA N 19 60 57 CL3S5tCav3DI DUMMY O I 240017e 19JAN79 60 57 CLott!CL%573 DUMMY 0 1 240CI7A 19JAN79 60 0 CL5 77 3( w9 30 8 DUMMY O I 240C178 19JAN79 60 57 CL637/CL5573 00MMY 0 1 240Ci78 19 J AN 79 6D 0 CL7466CL3978 OuMMY 0 1 240 CIT 8 19JAN79 60 0 CL79660u9308 OuMMY 0 1 240C178 19JANI9 60 57 CMOCOICMUUO3 S EL 05N. 5.8. PIPE C IN5ip. 21 1 240CI78 FINOW78 24NOV78 22DECT A 22 0 CMOLO3CM0369 DUMMY 0 1 22Nov78 26DEC78 22 24 CMu!$9CM0369 sGN.f LD.E NG.5M.80RE PIPE 45 1 240C17n 27DIC78 20 0C I 78 22DEC78 -2 0 C MG 33*C Mob 65 F AB.L IN51L.5M.00RE PIPE 44 1 28DEC78 28FE879 26D(C78 26FEB79 -2 0 CM056SCMID03 OUMMy 0 1 OlMAR79 27FEB79 -2 0 CullotCMluG3 INSTALL INSTRU. IUR/ PIPING. 40 1 240C174 19DECTA 02JAN79 26FER79 47 49 CMI603CMluG5 COMPL. IN5190. T U B / PIP IN ti ' 1 1 DiMapT9 OlMAR79 27FFR79 27FE879 -2 0 Cul00%LM3003 DUMMY 0 1 02 MAR 79 26FE R 79 -2 0 Cr2 SICM2003 UEL. LAST INSTRUMENTS 1 8 240CI78 240C f 78 20Fl u T9 20FER79 82 It CO2003EM2005 INST ALL L AST INSTRUMENTS 4 5 14NOV78 11NOV74 21 F I B 79 26FEB79 68 0 CM2COSCM100 3 DUMMY - 0 I 20Nov78 27FEB19 68 70 CM3001CM3003 I N51 &'L'(I2 0NOUl i 17 3 240C178 15Nov78 05FEB79 FIFER 79 71 73 CM3L@3CM3005 COMPL(3f CONOUlf 5 1 02 MAR 79 00M A R 79 2nFEu?9 06 MAR 79 -2 0 Cn3cCECM4003 DUMMV O 1 09 MAR 79 07 MAR 79 -2 0 CM4021CM*UU3 CONTINUE CABLES *1ERM 28 1 240C17n DIDLC78 26JAN79 ChMAR79 65 67 . CP4 0@3CM4005 COMPL. CABLES *iERM 5 1 09 MAR 79 15 MAR 79 07 MAR 79 13 MAR 79 -2 0 CM4CCSCM9201 DUMMY 0 1 16 MAR 79 14 map?9 -2 0 ..,.1CCorO5CM4010 SLL DESIGN CHANGL 15 1 240CI78 13NOV7A 31JAN79 20FEB79 68 0 CM blDCM2003 DUMMY 0 1 14NOW78 21FEH79 6R 0 CM*2CICM9301 CM 575 GC/FCT 15 1 16 MAR 79 05APo79 IgMAN79 03APR79 -2 0 CM9 303 CM930 3 CM-1 CONIMI MONITOR PREOP SI 1 06 APN 79 18JUN79 04AFR79 14JUN79

  • 2 0

CM7303Rv9845 UUMMY O 1 19JUN79 I S JUN 79 -2 47 C A0 3DICN9 303 CN-I COMMUNICAT SYS PREOP 62 1 240C178 22JA479 20 MAR 79 14 JUN 79 102 0 Ch'3 303Rve84 5 DuMMT 0 1 23JAN79 15JUN79 102 I5I C008tSC00265 INSTALL SM AL L BORE HANGER 7 3 240C178 OlNOW74 20 FIB 79 2PFER 79 82 0 C0015SC00365 F IELD bun SM PORE PIPC 34 1 240CITA IIDLC78 12JAN79 2hFEP79 0 CP0205DG9302 OuMMY 0 1 02Nov76 OlMAR79 82 89 CuG215Hv9303 DUMMY 0 1 02Now78 OlMAV79 125 68 C00365DG9302 DuMMV 0 1 12DEC7n UlmakT9 55 62 C00 35SMV 9301 DUMMY 0 1 12DEC78 OlMAYF9 9P el C00715C00965 IN51ALL Lh NANGIR$ 16 3 240CI78 14NOV74 07 FIB 79 2AFFB79 73 0 C00905069302 DUMMT O 1 15Now76 DIMAR79 73 80 C0096SHV93U1 DUMMV Q l 15Now7p OlMAV79 I l e. 59 CEl 355 Col 565 COMPLE TE L8 PIPE 3 3 240C176 260017A 26FFu?9 2hr[R79 86 0 CC1535069302 DUMMY 0 1 270C176 UlMAR79 86 93 4

W' CPflMA 1500 3R402 1 1 M E L I 5 1 IN 6 PAGE 4 0F 40 PFoJECT MANAELMENT SYS TE M IIME Now 240C174 1754 or 2480 AC1lylilES. TIME UNIT DAY NETbOPn 05DLC77 I A APRP G GATT D840V7A NETW0km a 21NMER.hDCLEAR P0htR STATIEN UNIT I SELECIED DlMAV7A 18ApaRO

        • I /J LISTING ****

ACIItITY A C 7 I y I T Y ACTivt1T E A N L IE 5 T L A 1 E 5 T P FLOA1 IDE NI!FIC A T ION OE 5CR IP T I oN 11ME CL START FINISH SIAR1 flNISH 5 101 FR Col 565HY9301 DUMMY 0 1 270CT78 OlMAf79 129 72 C04 373069302 DuMMT 0 1 240Ci?8 DiManf9 89 96 C4*4 37 3hv9 301 DUMMY 0 1 240Cl7s OlMA179 132 75 CPOD0!CP9301 COMPL. CODE I

  • 2 ITEMS 27 8 240CIFb 3DNOV F A 12 DI C 78 19JANF9 34 0

Cl0265C09301 DUMMV O ! 240C178 14 F E u T9 78 46 CP0265CP9304 DUMMY 0 1 240CITS 22aAN79 68 27 C PD 365LP5 766 DUMMY 0 1 240C178 22JAN7* 61 0 CPU 965CP1508 DUMMY 0 1 240C178 22JAN79 bl O CFIT65CP9301 DUMMY 0 1 240CT78 22JAN79 61 27 CF 2 365CP3 3 7 8 DuMMT 0 1 240CITN 22JAN79 bl O CS2365CP5766 0UMMY 0 1 240C178 22JAN79 68 0 CP295tCP9301 UUMMY 0 1 240CI78 22JAN79 61 27 CP3578CP4473 DUMMY O I 240CI7a 22JAN79 68 0 CP4373CP9308 OuMMV O I 240CITA 22JAN79 68 27 CF4572CP4173 DuMMt O I 240CT78 22JAN79 61 0 CP5966CP3378 OuMMY 0 1 240CI78 22JAN79 64 0 CP5966CP93u1 puMMY O 1 240C178 22JAN19 61 27 CP656eCP5575 DUMMY 0 1 240CI78 22JANF9 61 0 C P9 30 B C09301 CP-1 CONDEN POLISH PREOP 17 1 010EC78 26DEC7A 22JAN79 13FE879 34 2 CP930le29301 DUMMY O I DIDEC78 02FEB79 43 83 ChuCottuc002 SLL REL HOLD DeG. 21 1 240C178 21NOW78 12bEC78 IlJANF9 34 0 ( C=0002Cws773 DUMMY 0 1 22Nov78 12JAN79 34 36 C w0003C w0004 DELIVER A NUDL 5 8 1 240C178 02NOV78 22bf C 78 04JANF9 42 0 C=0004Cb0006 IN51ALL CW 575. ANODES 10 1 01Nov74 16Nov78 05JAN79 InJAN79 42 0 (- CW0006Cw9 301 DUMMY O I 17NOW7A 19JAN79 42 39 t Cw0 365Cm0465 IN51 ALL SMALL BORE NANGTR I 1 240C17A 240C178 1AdA479 IRJANF9 59 0 Cm0365Cw0565 LUMP FIELD ENG SB PIPE I I 240Cl7a 2400 T 78 04JAN79 04JANF9 49 0 ( Cb0465Cw9308 DuMMT 0 1 250Cif8 1*JAN79 59 56 4 Cm0565Cm8566 DuMMT U l 250C17h 05JAN79 49 Il Cb0565CW9201 DUMMY 0 1 250CI78 05JAN79 49 29 ( C=2103CW2105 METEklNG STRUClueC ACIb LINf5 0 1 240C17p 21NOW78 20 0 Cw280SCw2in7 PROCURE L INSTALL LININE 20 1 240CT78 20NOVF4 2tN0via 19DLC78 20 0 C = 210 7C w 220 5 DuMay 0 1 21Nov7R 20LEC78 20 0 C=2403Cw2203 HTORO WATER EONE S to 1 21Nov7k 05"E C 7 A 20DIC 78 04JAN79 20 0 CW2203Cw9201 DUMMY 0 1 06bfL78 05JAN79 20 0 Cb2 701Cw290 8 F IN AL L8 WALVI DELIVE0V 8 1 240C178 02NOV7F ORJAN79 17JAN79 St O f Ck2401Cw3165 IN5 TALL LB WALwr5 1 1 03Now7a 03NOV7A 18JAN79 18JANF9 58 0 Cw3865C=9301 OuMMY D I C6N0V7e 19JAN79 SR 48 Cm4 57 tCW4 7 71 COMP CONbuli 10 EculP 5 1 09N0wfa 15Nov78 05JAN79 I!JAN79 38 0 Cwe 771Cw5773 DUMMY 0 1 16NotT8 12JAN79 3h 20 cms 573Cm% 773 CONI 1[#M PCLI CABLf5 37 1 240C17A l*DE C 78 ITNOV78 !!JAN79 In 0 Cm5 77 3Cw%97 3 PutL LitkN FINAL CAPLES 5 3 15pt078 2tDEC78 12 JA N 79 IPJAN79 14 0 CuS973Cw93ul buMMY 0 1 22DEC7R 49JAN79 la 15 Cb6 772CW6972 CONT Putt PCLI CARLE 24 3 240E17e 27Nov78 070fC78 IlJANF9 31 0 N

OPflMa !!00 3R402 1 1 M L L I5 i !N G PAGE 5 OF 40 P POJE C T mana6EMENT SV5ftn TInf N0w I 24 0CT 78 1754 or 2a80 AC TIvIIIE S. Tint uMIT Daw hClwena 05DEC77-InapsSO @ aft Dahov78 NElweRa a ZI nPE R huCLEa# Powf R S t a il pN UNIT I SELECTED OtmaV7s 18APW80

        • I /J L1511NGe***

1 ACTIVIIT A C iI y I iY ACTIVIIT E A R L I[ 5 i L A i [ 5 i P FLOAT IDEhl!FICATION D E 5 C R-1 P 1 1 0N TIME CL STARI FjhlLH STARI FINISH 5 10T FR

  • mc972Cwh 7 7 3 DUMMY 0 1 28 MOW 78 12Jah79 31 13 Ct750!Cw7766 Mouwi INST 60p[mT5 12 1 240CT78 08Nov78 14 tT C 78 04JAN79 5 38 0

Caf 766Ces!66 OuMnv 6 0 1.09mov74 05J8N79 39 0 Cs8566Cwe766 COMP th51R PIPE LTUPING 0 3 09howie 05JaN79 3A 0 CbO766Cm4571 dummy 0 1 09NOW78 05J8N79 3R 0 Cb8 766Cd*301 DunMY 0 1 09N0V78 19Jeh79 48 45 CbO201Cu*301 CW DC/FCI to I 060EC78 19PEC78 05Jeh79 18JAN79 20 17 Ch9 301Cw930 3 C =-1 CIRC wi# PREOP 42 1 16Jah79 14 mar 79 19Jah79 19M.4m79 3 0 C DG 3O I T G00 P I DuMMV O I 16Jah79 21 MAT 79 93 71 CDC303tA*308 DUMMY 0 1 15 MAR 79 20 man 79 3 0 C3020lN89307 buMMT 0 1 240CT18 12JAN79 55 104 C2010!Rv9307 Dunny O 1 240CT78 1*JAN79 80 68 Ca0203CV9203 DUMMY O 1 240CI78 30Nov78 26 15 C85203=59208 DUMMY O 1 240CI7A 10h0V78 13 10 CRO301Cu9303 Cu PNEOP-Co#1IN.CHECn5 153 1 240CI74 30mav79 050CT78 10MAYT9 -11 0 Cs130!TP9201 dummy 0 1 240C178 05FE 8 79 73 47 CG9301s VC039 Dunny 0 1 240C178 17Nov78 le O Ca93OJCue305 uunMy 0 1 31MaV79 !!MAY79 33 o (o C a9 305C u*307 N00 WORTH MIN. Cn-2 PREOP 24 1 3tMav79 03JUL79 timaV79 14JUN79 -13 0 Ca9307 eve 845 puMMy 0 1 05JUL79 15Jum79 -13 36 CVC003CT9201 INSTALL 4 ADDED CASLES.ETC. 10 1 240CI7a 06#0v78 15h0W78 2940978 16 5 (I Cval65Cf0265 INSTALL SMALL bout Ha NGE R 5 1 240Cl?8 300CITS 22Nov78 29Nov78 21 0 Cv3265Cvv201 Dunny 0 1 310CT76 30 hew 78 23 10 CT3365Cv9203 DUMMY 0 1 240CT78 30Novia 26 15 (. C70 765CT0965 IN51 DELt'D LB Ha4GERS CV-2 7 1 240C178 O!NOW78 20hov78 29 mow 78 19 0 Cv2565Cv9208 DuMMV O I 02Nov78 33NOW78 19 8 Cvl565Cv2708 OunMy 0 1 240C178 2 7 kOW 78 23 0 [ C12701CV2965 ConP lh51 LR H ANGERS 3 1 240CI74 260C174 27hov78 29Novia 23 0 CV296bCve201 DuMMT 0 1 270Cf7h 33hov78 23 12 C T4 %DIC v* 765 145 T LB watVE5 15 1 240C178 13Nov78 Cahov78 29hov78 It O C V9 76SCV 920 8 Dunny 0 1 14hov74. 3Ohov78 O C10966CY5773 DuMay 0 1 240C178 39howi8 26 0 CY8966CT9201 DuMnv 0 1 240CITS 30h0v78 26 15 Cv0201CV9301 CV CVC CONLEN. OC/FCI 23 1 14h0v7A 15DE CI A 30h0W78 03JA479 11 0 C V930lCV930 3 C V-1 CTC CONDEN. PREOP 20 1 190EE78 16J A N 79 04 jam 79 31JAN79 O C V3 303FC9301 OuMPV O I 17s&N79 UEFfE79 7 EC93080C9303 UC-3 24 /4 A v D.C. PREOP 29 1 240CI78 040E C 78 120C178 7thov78 -A 0 DC9 301009309 DUMPY 0 1 240C174 12 0C 3 78 -8 0 BC9 3Ol0692DI puMay 0 1 240CI7e 27CCITS 3 10 Ct9303a59301 DuMnv 0 1 05DEC78 03Jan79 19 0 .CC9303Cw9301 uuMay 0 1 05 DEL 7m 19JAN79 31 28 EC9303DC9305 DC-1 125v D.C. PNEOP 14 1 05DE C 78 290EC74 22hov78 180EC78 -R 0 EC9303659301 DUMMY 0 1 05DE C 7s IFJAN19 29 10 EC9303HG9201 OUMMV O I 05bEC7M DlJah79 19 43 )

~. - -. -. - - ~. -.. ~. 9 5 SPIIna 1800 3#302

  • lo e i !M E L I 5.T.I N b-

<a o e Pa6E 6 0F 40 D3OJELI newaGE MEmi Sv5 Tim ilnF meu : 240CT74 175e Of 28e0 aCIIWITIES. TIME un t i De v nClwena 05DIC77 leaPha0 belt camew78 hE lween ZinnE P huCLEa# P0wta Sialien unli-I SELECTED Olnavia leaPoe0 .ooe*I # J LI5fl>Geoes e e .........................e .........e ... e.......

  1. Cittliv aC i Iy 1 1 y aCTIgliv E aaL 3E 5 I L-A T E5i P FLeal I DE hilF iCa ll ow DE5CR IP i IeN f]pE CL Sia#T F l kI 5H Slaki IINISH 5 TOT FR bC9305th*301 Dunny 0

-1 02Jah79 16 paw 79 53 47 CCO3056C9301 uunne O I 02Jah7* 25maa79 Sn 99 DC95eSH09301 Ounny 0 1 02Jah79 15 mar 39 52 90 DL9305MG9304 Ounny 0 1 02Jah79 02FID79 23 47 ~' DL930Swv9301 Dunny .0 1 02Jak19 binav 79 - 85 28 C0950SLL9301 Dunny 0 1 02 Jam 79 17 ape 79 75 36-CC919ShS930 7 Ounny O I 02Jah79 12Jah79 e 57 ht9395me9303 Dunny 0 1 02 Jam 79 190EC78 .a O bl9305TE93 tc Opent 0 1 02JaN79 19FEu?9 34 15 DCO3C90C9313 DC-2 250s D.C. PRESP 29 1 200C17e 090E C 78 12 0C I 78 21Nev78 -P O bC93tIDC9303 Dunny 0 8 0%DEC78 2240W78 0 C(9 38 t h59301 Ounny 0 1 050EC7s 03nav79 305 13e DC9318#19301 Ounny 0 1 05DEC7s 19Jan?9 31 36 D6003406e372 DELIvEu DEVICES 5 1 240CT74 300CT78 130 CIT 4 190CT70 -7 0 D60673D60873 Rn P-ConP Putt & T[an FImaL CacLES 5 1 310C170 06tev78 200CITS 260CT78 -7 0 CLEpotb60673 DLLivle DEVICES 5 1 290CIPA 300C178 130C178 190CT78 -7 0 CLOP?3059201 Dunny O 1 07NOV7m 27 DC I 78 -7 0 3 b57t73069201 Dunny 0 1 240C174 . 2 7 DC 178 3 10 b6296SDG3165 #M H-lh51. Flhal Mah6ERS O 1 240C17s 21 pC T 78 3 0 b63565063765 en a.1453. FImat HamGte5 30 1 240Cf75 .06mov7a 130C17s 260 Clin -7 0-h l 063 765DG9201 Dunny 0 1 07 mew 7s - 2 7 0C T 78 ' 7 0 C63e 75069201 punn, O 1 2=0CT7e 27a[I7e s to i 964365D64465 Ih51L SM Ro#E HGe5 Rn 19 0 1 240C17m 270C178 3 0' I bb5365D6*201 bunny 0 1 240CT78 270C17e 3 to D65 765DG5965 Rn a-ConP ANSTL 58 PIPE CLa55 C 5 1 240C17a 300CT7e 200CT78 260CT78 -2 0 DOS *65D692dl Dunny 0 1 310C178 270C174 2 CS4465DG92DI Dunny 0 1 240CITS 270Cl?A 3 10 B66565D69201 Openy 0 1 240CI78 270C174 3 to i C64372DGe573 Rn C-ConP Putt & IEen F INAL Ca6LES 5 1 310CT78 0640 vin 20pCf74 260CT78 7 0 060 751D6p t S I WEwDOR aCCEPl. A & t UNITS -10 1 240CT79 06MOV74 130CT75 2600T7A -7 0 D60951069201 Lunny 0 1 0740978 27 PCT 78 7 0 l C69201DG9301 D6 OC#FCI 20 1 07hov76 050fC70 2 7 0C T 78 2eN0978 -7 0 b623080693C2 GiaR T DE-3 DIESEL EE N. PRE SP 66 'I 060EC74 09ma#19 27hov78 2RFE 4 7 9 -7 0 bb930iDG93u3 ConPL us-1 DIE 5EL 6En.Pkt0e le 1 12=ah79 29 man 19 OlnaW79 20mae79 -7 0 D64303 aP9 309 Sunny 0 l'30nsuT9 ginaw?9 7 0 bpOl650#0365 F &H.t th5TL.5m.F0#F PIPE O 1 240C17e UlJuM79 154 0 bn0365Dn0596 CD451.T[5T Dn to 1 2e0CT78 06hov74 Ol Joh 79 t e Juw ? 9 154 0 i Cn0596kv4845 DunMY 0 1 07hov78 15JUN79 854 203 C00 765069201 bunny 0 1 240C17p 270C17e 3 10 DC2365b69201 Dunny D 1 240Cifu 270C178 I 20 [ b52075002675 RM C-ConP 8451 IN5tp & Ih519 PIPE O 1 240CI79 26cC17e 5 2 0 4 D03 865DG*201 Dunny 0 1 240C178 27uCI74 3 to booe750ee675 en 4-Cune thsl thsik & Ih5tp PIPE D I 240CI78 270C178 5 3 0 I, 905365069203 Dunny 0 1 240Clia 270[17e 3 to b l

.... ~ - - - _, .a - - - -.-~ ~ ~ Otilma !!00 3 ele 2 e o e i IM E L I5 iIN 6 e e o P a6E. 7 OF 40' PSOJE C T pama6Entmi sv5f EM Tipt 40s : 240C17e 1754 or 28e6 aC11v! TIE 5e Tipt 0411 Day affbeen 05DfC77 leap #F0 CATL Genevie mE lm eet : ZInnte meCLEas Ponte siaTIon um!T I SEtrCTED Olmav7a leapen0 eeest / J LI5ftm6eose e .e e o e e e e e o e o e e o e e o e e e.. e o e o e e e e.. e e o e o e e e o e e e o e o e e o e o e e e o e o e o e e e aC11TIIT aC 1 3 9 3 7 Y aCTIVITV E A eL 1C 5 i LaiE 5i P FL0ai "I ibE0ilFICallem BE 5CeIP 1 3 0m TIMI CL Siami FI=ISH Siset 5-101. Fe .......................................................................................fImISH -D07373069208 punny 0 1 240C17e 270C17e 3 10 C0c608008603 mEgypeo Limes 5 I 240CT7a s 300(178 200C T 7e 260C17e -2 0 Cen&03p69201 Dunny 0 1 31bC17e 210(178 -2 's C0860300v2O3 Dunav 0 1 3tcC17a 2taPee0 375 375 ") C2@lSCDe0344 Dece5,5PEClativ,ETC 44NX 26 1 2400179 29mov78 09Pav79 14Jum79 13e O Caela5De03&S meer psalm 5 & PluntImG $6 3 24JaN7V 14F E R 79 23Mav79 14JuM79 e5 0 1 Cou33Cov9145 Dunny 0 1 30mov78

15Jum1, 13e 187

'l 0w33654W9145 pungv 0 1 15 fee 79 15Jum79 e5 134 081003De1003 CST. Fuft eECElv3m6 SLD6 63 1 240CT7e 23 Jam 79 23 FEM 79 22Mav79 e5 0 DalbO3peOles Dunny -0 1 24 Jam 79 21mavi9 e5 0 3 ~l i 003165Dvo*65 51481 In5TL m n6Ee5 to 1 240CT78 190EC78 06DEtie OlFEe79 30 0 a Sc2665Dyl501 Ougny 0 1 200E C 78 02Ffe79 30 0 033 30lcul508 Finat 46m bELIvrev 0 1 240C17e 02fth79 '70 to () e .0085210v1765 ConPL.m6N.Im57Le 9 1 200EC78 0 5 Jam 79 ' 07FE e 79 14FEP79 30 0 004 7350v9208 Ounev i 0 1 04Ja=79 15Ffs79 30-0 0381780v3371 ConPL. Con 0vli.10 Ecule. 5 1 240CI7e 300C T 78 Olf te 79 -07 fem 79 69 0 l) 603371Dv4173 Oueny-0 I 310CI78-D e F E B 79 69 16 0339750stl F3 Cal.1EpMe Comi.a=0 PWe.CeL e 19 1 240 Clin 17 movie 12 Jam 19 07 fee 79 55 2 Ov6 8 730v4373 PhtL & TERM.Finst CaeLLS 5 1 22mov78 .29mov7e certe79 14 rte 79 53 0 () Ov9 3738v9208 Dunny 0 1 30mOv7e - 15F f M 79 53 23 Qu6 774Dve9 72 C= f.Put L Phe.& Comi. Cat. 21 1 240CT7e 25 movie 10Ja m 79 07 fee 79 53 0 000972bv4173 Dunav a 1 22m0 Vie 04Ffh79 53 0 t') B0020lM09303 Dv-l DC 7F C I 20 1 04Ja=79 33Ja=79 15Ffu79 lenapF9 30 68 Chell5940315 DE.altEIns 15En 66 1 240C17e 26Ja=79 14 pas 79 14Jum79 9a O C=0!?20e0322 C0=TalenEmi Pf ar t se 223 3 33 1 240CT78 coDEC7A 30 48 E 79 14 Jum 7 9 133 0 t) Ch0 314ev9845 Dunny 0 1 29Ja=79 15Jum 79 9a 147 j CeB322%#9845 SunnT O 1 IIDE C 78 3 5 Ju= 79 138 180 Cb373:0w0934 Duttwo6m 3430 to 1 240CT 7e ~ 06m0v7e UlJum79 14Jum79 154 0 n.) DOCS 3stv9145 Dunaf 0 1 07=0414 15Jum79 154 203 EkS t370Wl337 PE=E leaflows 3770 57 3 240CT78 15Ja m 79 11pfC78 OIMAR79 33 0 Oml337evw329 uunaw 0 1 16Ja=79 02na#79 33 el {} [EOl7tt00378 IN5 tall MISC ELFCinIC 40 1 240C178 19PEC7e 19aPuT9 14Jum79 124 0 Ef@37pov9145 upg=v 0 1 200EL7e 15Ju=79 124 173 EfCl2?tF0326 F0enw0mu Ebu!P FO 2610 to 1 240CI7e 0640V7e 17pav79 3tMav79 144 0 () i EFQ37tEFIl26 Ounny D l 07=0 Vie claum79 I44 0 ' EFCS2sEFD726 af 51LEL roulP rp 2620 5 1 240Ci?A 3000178 24mav79 35maV79 349 0 E f 0 72ct F il26 Ounev 0 1 310C17A OlJum79 ~199 5 () EFd;2* eft!26 EmetEenTS E0ulp FO -2630 5 1 240C178 300CT74 24mav79 33Mav79 149 5 E f il2tLF 3 326 C onCRE TE.E culP FD 2640 10 3 07mov7m 20m0v78 blJum79 14Jum79 144 0 EFl 32tCy*I45 punny 0 1 21mov78 15Jum79 144 193 (I th9491EM9203 E n sv51t n. OC7F C T 10 1 240CI7s 06m0v7e 200E C 7e .04 Jam 79 to O EM92331G0159 Duary D 1 07=0v18 0$ Jam 79 40 30 EM730!EM9303 EH-1 Tunto fMC PFEOF 64 i OPMap?9 06Jbm 79 16pae79 34Jum79 6 0 s) EM73013v9eth D uM M Y 0 1 07Jum79 15JUm 79 6 55 i GD 4 ~

~_, _ __ _ _ _. .m_. _ _. _. _ _ _. ,m.___ SPInna 1100 3#102 I IM E L 15 1 8 h G e e * . PaEL. t OF 40 POSE C T na ma6E nt hi Sv5 fen linE how : 240C17e 1754 DF 2800 aCilvillE S. ilnE UNIT 047 NElw0Ru 05DEC77 ' - 16 ar e0 0 ' Salt Ophov78 hE lw eem

  • ZInnE N muCLEsa PowEn Stat!ch unti !

SE LE C TE 0 'Olpay14 le a Pe4 0 1-

  1. J LISTIN6e***

. e............................................................ '.. j activliv aC7 Iv1 7Y acT!vliv E AWL IE 5 i L aiE 5I P FLoal IDEhTAFItaT10# 0E 5CR IP 1 1 0N TIME CL 51ani F Ihl 5H SiaNI

FINISH, 5 105 FN

' E IO!79E IC3 79 th5 TALL ELECe IN5 eat 76 1 240017s 09FLP79 2AFfb79 14JuM79 SA 0 IIO374ev9145 punny 0 1 12FE879 15 JuM 79 48 137 E 50365E 50565 F LD.Ruh La5T 2/3 5.R.P. 1 I 240CT78 2400T78 10 Jam 79 10JaN79 53 0 E *8565E 56366 Dunny 0 1 250C17m llaaN79 53 9 E 5Ct65E592cl Dunny 0 1 250C17s 15Ff s 79 - 7e 42 E 5 8 701E 51965 ConPL.H6p. im'5f t. 22 1 240C178 22mov78-16Jah79 14FLR79 57 0. [51565E54203 Dunny 0 1 24Nov76 - 15FIh19 57 21 IlJaN79 54 10 E 52LO 3E 56 366 Dunay-0 1 240CT78 E52365E52565 Connt.LG.heet PirlmG 10 1 240CI74 06mov7A 2 7 DF C 78 IOJAN79 44 0 E52565E56366 Dunar 0 1 07hov78-IlJaN79 44 0 E S$578F 5e373 uunav 0 I C60EC7R ' 05DE C 78 UIFEb79 07FE979 44 0 E 53 3 71E 5357 8 C OMPL.C Dm0eli 10 Eeu!P. 5 1 29h0Vfa 04Ffh79 .44 4 E SC I F 3E 54 3 73 C ONT.it en.CalpL.L Phe. CPL. 38 I 240C178 15DEC74 14DfC7e 07FE 579 36 0 l E 53373E54573 Putt & IEnn.FlhaL CamLES 5 I le0EC7s 22DE C 74 DeFEs79 14FE879 36' O E 54573E59201 Dunny 0 1 26DE C 78 15 FE 879 36 0: [55 372E 55572 Cogi. Putt Pwa.L CNiet.CBL. 34 1 240C178 IIDE C 78 20pFC7e 07FER79 40 0 E S5572E 5*3 73 Dunny 0 1 12DfC74 OAFEB79 40 4 E52575f53373 Dunny 0 1 240CT78 DI FE b 79 L9 25 E 5636tE 56566 COnPL.IW51RW.TuelmG 15 1 07hov7s 2ah0V7A IlJaN79 3tJaN7e we O E50566E53371 Dunny 0 1 29hov78 Ol FIB 79. 44-0 E 5656eE 59201 Dunny 0 1 29hov78 15FEB79 54 'la O I 240C178 IlJaN79 - .54 0 ,i ' E 57 375E568 75 uunny 20 1 260E C 7m 23 Jam 79 15FFe79 14 MAR 79 36-0 8 - E 5920lI5*2D3 E S OC #F CI E 59203H09301 uunny 0 .1 24JAN79 15 man 79 36 74 j) F CUD 0!F C0365 5EL 155pt DOC 3527 19 1 240C174 06#0v78 130EC78 270EC78 35 0 F C800iF C4 3 71 RE SOL vE hLOCmwaLL afiaCMnT5 10 1 240C17e 06h0v78 04JaN79 17JaN79 49 45 F LE003F CII65 DELlvER en FC Ha#EE85 8 1 240CI7m 02hov78 07 DE C 78 100EC7p 33 0 6 f t0 365F C0505 COnPL Fag 6 INST FC 58 1 1 07hov7R 07hovis 31JAN79 31JaN79 5A 0 FCO369FC0165 Dunny 0 1 240C17n 2nDrCis 45 0-F LC465F C9301 Dunny 0 1 240CT78 OlFre79 69 65 3 j, F C0565FC9301 dummy 0 1 04Nov78 GIF E 8 79 5R 54 ( j FLRt0lFC0701 DE516h ChamsE av mal 5ER INSTRu. O I 240C178 2 7 DE C 78 44 0 F Cl!65FCl 365 ConPL IC HahEEk5 30 1 03Nov7e 15DECTA 19btC78 3tJaN79 31 0 .[ ?. FCl365FC9305 Dunny 0 1 14 DEL 78 OIFIb79 31 27 4 FC230lFC2201 DE ll vE E PEnalk INSTPunENis 0 1 2e0C178 2 7 DE C 78 44 0 F (3158F C3351 DE LIVE e SPENT FUEL RaCm Shin 5 L POLIS 7 1 240017M OINOv7A 06 5E P 75 145EP78 34 0 4 ') F C 3 35 8 F C 3551 IN51 SPENT Furt paCm 17 I U2hov78 27h0V78 155tP78 000C178 -3= 0 FL3558FC9301 LEau IE S T SPENT FufL POOL 5 1 28hov7n 04DE C 74 25JaN79 33JaN79 40 36 Fil75 3F m9 308 Dunny 0 1 2=uC 17h - '!00C178 -10 20 F E4 3 71FC4371 CONI Co#0uti INST 55 1 24uCI7h !)JaN19 300CITS 17JaN79 4 0 F CO 3 71F C 4571 ConPL C040ull to EQUIP 5-1 12Jah79 IsJaN79 IMJaN79 24JaN79 4 0 F C4578F C6373 DOAny 0 1 19JaN79 25Jah79 e U FC5 8 74FC5372 PutL PC L 1 Castes -5 1 240CT7n 300C178 06%0v78-luMovin 9 0 F C5 372F C5572 PULL NEna!N PC L I FABLf5 50 3 350C178 !!JAN79 13NOW78 24JaN79 9 0

j d9 t

i

d OPTIM3 1100 3R402 e o e i I M E L I5 i IN b e o e ' P A F,L 9 OF

  1. 0 POOJE C T MANAGEMENT SYSILM IIMO NOW 3 240CT78 1754 CF 2A80 ACTIvlTIES. TIME UNii DAY NElboen 050EC77 In APR8 0 Call -0840WF8 hfiwCPn 2IMMER NUCLEAR POWf R STA110N UNIT 1 SE LE C TE D D AMAV74 leAPRun
      • ol
  1. J LI5ilNG***e ACllvliv A C i I V I T Y ACTIVITY

~L.A R L IDEhllFICATION OE 5C R IP i I ON TIME CL SIAki ~ 1E5 i L A I E 5 i P FLOAI FINISH STARI FINISH 5 TOI FR F C5572FC63 73 OuMMY O 1 12Jah79 2%JAN79 9 5 FLSIF3rC6373 TEuM REMAIN PC t I CAnLES 60 1 240CI78 18JAh79 30cC178 24aAN79 O F L6373F C657) Putt & TE RM FINAL CABLES 5 .I 19JakT9 25J A '3 79 25Jah79 33JAN79 4 0-FLO57)FC9308 DUMMY 0 1 26JAN79 UlFI H 79 4 0

  1. 1 FL7375FC7566 web INST Ih5ip PIPE & TUBE 5 1 240CT78 300CT74 19DfC78 26DEC74

~ 5 39 0 F C 7 5bC F C 7 766 COMPL IN51 IN519 PIPE & 10BE 15 1 310CI7A ~ 20NOWTA 2 7DE C 78 17JAN79 39 0 F C 7 75CF C4 3 7 8 DUMMY 0 1 21h0W78 IAJah79 39 35

  • )

F C 7 7teF C93b t puMMY 0 1 21NOW78 DIFEH79 gg 45 FL93DjfC9301 DUMMY 0 1 240C178 DIFtb79 69 65 F CO30lFC9303 F C-1 FutL POOL COOL PREOP 21 1 26JAN79 23F E R 79 OlffH79 DIMAR79 4 0 !) F CO 30)RW'329 DuMMT 0 1 26FEB79 02 MAR 79 4 52 F E9303Nv9341 DUMMY O 1 26F E H 79 24MAV79 63 Ill F(015tFE0351 MI5C FURh L EQUIP 12 1 240CT7s 08NOV78 b9MAY79 24MAYF9 138 0 ) F 10358 v 59301 DUMMY 0 1 09hov7m 25MAY79 13a a F kO20!F H9301 DUMMY 20 1 02Jah79 29JAN79 05APR79 02MAV79 67 0 F H1331F H9303 F BEL HANOL.FH-1 PeEOP-5 TART 15 1 30JAN79 19 FEM 79 U3MAYT9 23MAV79. 67 0 f) F H9 303F H9305 F UEL HANUL FH-1 PREOP COMPL !$ 1 20FE879 12 MAR 79 24MAV79 14JUNF9 67 U Fm9303NV9341 DUMMY 0 1 20FEH79 24MAV79 67 Ils FH7305RV9145 DUMMY 0 1 13 MAR 79 85JUN79 67 116 .e3 F POOO R F P9201 R C-PI PE CC OMPL. ELECT. 5 I 240C178 300CT7m 12FluT9 16FEB79 76 0 4 F PZOO2F PS030 RFLF ASE HOLD ON ELOCmWALLS to 3 240CITm 06N0v74 120C178 250CTTA _n 0 FFOUBUFP0012 RELOCATE JOCkt Y PUMP 5 2 1 240C178 2500178 .35Ff879 16FEp79 79 0 il F PO!!2FP9201 DUMMY 0 1 260C178 19FEB79 79 3 F P2*S5 F P 1501 uuMMV O ! 240C178 19FfpT9 81 0 F Pl 715F Pw 30 3 DUMMY 0 1 240CT7P 19 MAR 79 101 109 f) FP23h5FP3758 DUMMY 0 1.2400178 19FfB79 el D FF2735FP2965 IN5I VARD PIPING 2 1 2400i78 250C 7 78 15Ffp79 16FLR79 79 0 F P29SsF P9201 OuMHV O 1 240C178 19 FIR 79 79 3 () F P4 37 t F P45 71 COMPLETE CONDUIT TO E0ulP O I U4DEC78 19MAH79 73 0 F F457 tF P53 73 DUMMY 0 1 04DEC78 19MAH79 73 Al F P$030FP52 72 INSTAEL bEST PLOCNWALL-T 15 1 07N0W75 28NOV78 260C178 15NOV78 -8 0 F F $173FP5373 CONT ILPM PCLI CABLE 5 20 1 2400178 20NOV78 19FEb79 16 MAR 79 81 89 FF$472FPol65 DUMMY 0 1 29NOW78 19 MAR 79 76 0 FF$272FP5972 0F516N ELECT CARLE W HALL 30 1 29NOW7h IlJAN79 16NeW78 290EC78 -n 0 C) FP$272FP6901 DUMMY 0 I 29N0%78 14 MAW 79 73 0 F P$ 373FP55 73 PULL LIERM FIhAL CAHLES 0 I 29MAk79 IgMAR79 -H 0 F F $972F P6172 DI L. CAPLL WE5i eALL -1 21 1 12JAN79 09F E B 79 02Jah79 3DJAN79 -5 0 () FP$573FP93On GUMMY 0 1 29 MAW 79 19 MAR 79 -6 0 F P5972F P6172 Pull PLLI CAPLE O I 240C379 31JANI9 68 76 F F 6172F P63 72 CON T PULL PCLI CAPLE 33 I 12F E b 79 2nMAR79 31JAN79 16 MAR 79 -n 0 FP6172FP8602 uuMMY 0 1 12FEP79 36eAY79 67 0 F PS372F P53 7 3 DUMMY 0 1 29 MAR 79 19 MAR 79 -8 0 F P&73tFP6908 DELIVf k INSIWuMFNIS A ,8 240C178 02NOv7A 0? MAN 79 13 MAR 79 90 17 FP643tFP7166 MouNI INSIRUMENT5 I I 29NOWFM 29Novia !* MAR 79 14 MAR 79 73 0 9

m m DPi tPa - Il00 3R102 I I M E L I 5 i IN G e o e PaGE l0 CF 40 > k3 JE C T Ma N AGL ME N T Sv5fLM Tint N0w 1 240Ci?R 1754 0F 2680 aCilvillC5. TIME uMIT Day NEtwo#m 05PF C 7 7 leaPaso bel t 09hov78 NIiWOpn 7 ZIMPER NUCLEsR P0kt R SiaTIPN UN17 1 SEttciEO OlMav7e Inspeso seeel / J LI5flNGees, e e. .e e... e e................................ e............ e....... Ettivity aC i I V 1 I Y aCTIWily i aN L I C 5 i L A i E 1 i P FLeal 10ENilFICAT10N 0E 5CN IP i I ON IIMF CL START FINI$H StaRI FINISH 5 101 FR PP71bbFP7366 SEGIN IN57R PIPC LTUSING 1 1 3DNOW74 3040V74 15 Maw 79 35 mar 79 73 0 F P7 36tF P7566 COMP JNSTR PIPL LTUBING I I DIDFC78 ORDEC78 16 mar 79 36 Mao 79 73 0 F F 7546F P437 3 '00MMY ' O I 040EC7s l' mar 79 73 D F Pit & F F P9301. DuMM Y 0 1 04DFC78 19 pan 79 73 81 ~ I PACDIFP8602 GRINNELL STARI T/G' FP 5 1 240C178 300C T 78 09mav79 15mav79 13e 71 FP Fbtf Pp603 bRINN(LL COMPL. T/G FP' 5 1 I?FEb79 16Ftmi9 16 Ma y 79 22Mav79 67 0 IP8&b3160081 DUMMY O I 19t[b79 25Mav79 67 47 IPSIU4FPP605 DELIVER ha N6E N S 25 1 240CI78 24Novie 07FtB79 13 mar 79 73 0 FP2005FPem06 Ca8LE SPREAD N00M FP 21 1 29NOW7e 29DEC74 14 man 79 ItaPR79 73 0 iPAbb6VC9303 DUMMY O 1 29DEC78 12aPN79 73 99 FP9solFP9308 FP-l OC/FCI 20 l J10CT78 2aN0v78 19ftp79 16 Man?9 76 et FP930lFP9303 I P-1 F IRE PROTECT PPEOP 63 1 29Mak?9 26JUN79 19 mar 79 14JbM79 -R 0 f&#3DIVC9303 DUMMY 0 3 29mau?9 12apk79 10 36 FP9303Rw9a45 OuMMY 0 1 27Juh79 15auh79 .P 41 F bOLDIF W2365 SLL REDESIGN 038 HANGERS 10 1 240CIF8 06Novia 225fP78 0500778 -22 0 f =2 365Fv25F5 IN51 F w-3 HGRS 2 1 07Nov7s ceNevin 060C17e 090CI7e -22 0 FW2565Fh*301 dummy 0 1 09Nov7s 100C178 -22 A Fesl73rwS378 ComPL Cohouti INST 5 1 07hov7s 13NOV7s 265tP7e 020Clis -30 0 Fb537tfW5773 DUMMY 0 1 14Nov78 030C178 30 0 F t5 513F w 5 7 7 3 TERM RLMalN PLC CABLES to 1 240Ci78 06Nov78 1*StP78 020CT7n 25 5 F mS 773F e597 5 PULL & ILRN FINAL Cab 5 5 1 14NOW78 20Nov78 0300T78 090CTis -30 0 F65973Fm9301 OUMMY 0 1 21NOV7N 200C178 -30 0 FW660lfW6603 DLLlwER 5/5 FIT TING 5 5 1 240C17e 3000170 055FP78 Il 5E P 7 4 -35 0 Fw&LOJFw8775 OuMMY 0 1 310CT78 125tP7s -35 0 f >7 372FW5573 DUMMY 0 1 240CI7A 195fP78 -25 0 F m 7 372F W 75 72 POLL REMalN PLC CABLES 10 1 240C17A 06h0V78 195tP78 0700T78 -25 0 Fe7574F=57 7 3 dummy a 1 07Novia 010C17e -25 5 Fb2775FWB966 COMPL INST INSTRu PIPE E TURE 10 1 240CI78 06NOV78 125EP78 255(P78 5 -JD 0 F t9 96bF w517 3 DUMMY 0 1 07N0v78 26Sf>78 -30 0 Fb98UlFW9301 DuMMV O I 240C17s 200CT7a -30 20 fe98tbFw9182 F.w. Tunb.0IL Sv5. 0 1 240C17e 100CIFe -ID 0 4 ib9812Fw9301 DUMMY D 1 240CI7s InuCI78 -30 20 fo917uRu9205 DUMMY 0 1 240Ci?R 14Novia 15 0 Fb9875FW9180 puMMY 0 1 240Cifa 10uti7e -10 0 s Ft92DlFa9301 OC/FCI Fm-1 10 1 240C178 06Mov78 26StP7e n90Ci?8 -20 to l F e9 30l t u'301 DUMMY-0 1 2tN0w7e 19 jam 79 40 37 F b9 301F w9 303 F u-l PREOP - LOGIC 80 1 21Nov76 15Ma079 100C178 plFER79 30 0 4 Fw9 30lFw9320 DuMM Y 0 1 2tN0v7a 29 par 79 89 0 j' F b9 30lHD9301 DOMM Y ' O I 21NOW7p !$ mar 79 79 317 Fe9303Fw9305 F d-l PRFOP IPaNT II 52 1 16MakT9 28Mavi9 02FfB79 16aPo79 -30 0 i O I 30Mav79 3 7 arR 79 -30 0 FW9 30$F w9310 puMMV f e9 310F W9 312 F u-l PREOP IPaNI 23 42 1 30MaV79 2 7 JU L 79 17aPN79 14JUN79 -30 0 F =9312RW 98 45 UUMMY 0 8 30JUL79 15 JUN 79 -30 19 F 39 320FW9322 8 W-2 PklCP 55 1 21Nov7e D8F E H 79 29 mar 79 14JuM79 89 0 b l l -~

'CrilMA 3500 3R102 1 1 M E L I5 1 I N s PAGE II or. 40 P& SsE L T M A N AGE ME N T SYSTEM VIME Now 240C17m 1754 0F ' 2880 ACilvlTIE S. il*E uMI T De v

  1. ETWORN 050E C 7 7 ISAPRep Dait,04N0v79
  2. EIWOWR 8 ' ll MME R MuCLEAR POWf R STATIPN UNIT I SELECIE0 OIMAv74 ISAPR$0-e se *I

/ J LI5fl#Go*** e... "............................................................... AttivITY A C1 Ivi7 v ACTIVITV E A R L 1 [ $ 1 L.A i E5 i P FLOAI . l et tilF I C A T ION DE 5CR IP i 1 0N flME CL START FINISH slARI FINISH $ TOT FR Fut3?2kv9845 DUMMY O I 09F E E 79 15JuM79 to 134 $C93bibC9303 GC-l.24 3 GEN Apr PREOP 59 1 21May79. 13AuG79 23MAu79 14JuM79 41 0 'EL9303Rvel45 DuMMV O-1 14AuG79 15 sum 79 -el n 051701658965 COMPL.HER.IkSIL'N. O 1 240r178 28 MAR 79 103 0 052451G53158 CGLE TEST EQUIPMENT 5 1 240C178 300E174 14 MAR 79 20 MAP 79 9A O C53151659201 ubMMY 0 1 310C17s 28 MAR 79 9R 1s 053978654374 COMPL.CONou!T 10 EONIP. 5 1 07FE879 13F E 8 79 07 MAR 79 13 MAR 79 20 0 GS2371654973 OuMMV O I 14FE879. 14mayT9 20 0' ~ 054 77 36549 7 3 C ON T.1L RM.CN TRL.C PWR.Cet. 25 1 240C17s 2eNov78 07FtB79 33 MAR 79 73 53 i S$1993E55173 Putt & IE RM.F NL.C A8LES 5 1 14FE879 20F E b 79 14 MAN 79 20 MAR 79 20 0 85511 G59201 UUMMV. O I 21FEB79 21 MAR 79 20 0 2 S $5 7 926559 72 'C ON T. Pull Phe.& CNTRL.CSL. 31 1 240CI78 060E C 78 - 30JAN79 IJMAR79 67 0 655972G54973 OumMr 0 1 0 70E C 7e IgMAN79 67 47 65630lG56575 SEI PANELS to 1 240CT78 r6Mov78 21Nov7e 05DEC78 20 0 SSS5fSG57575 OuMMY 0 1 07Nov78 06DEC78-20 0 656901657808 DELiv[R INSTRUMENis 1 I 240C176 240C174 050EC70 050EC78 29 0 057198657301 OuMMY O I 250C170 06bf C 78 29 0 Gh7 30lb57b75 Moumi INS TRUMENTS O 1 250C17e 06bE C 78 2* 9 6 5 7 5 75 G 57 766 IN5fL.0F INSIRU. PIPE & TupING 0 1 07N0v79 06bEC78 20 0 05 7 756G57966 COMPL.INSTL*N.INSTRU. PET 63 1 07N0v74 06FEh79 060fC78 06 MAR 79 2 tl O C5 79c 6 65 39 71 OUMMV O I 07FEb79 07MA479 20 0 85920lG59203 65-OC/FCI 15 1 21FEb79 13 MAR 79 28 MAR 79 10APR79 20 0 859203160040 OUMMY 0 1 14 MAR 79 lIAPR79 20 0 659 ?O!!G9310 65-1 GLAND STEAM PREOP 23 1 190EC74 22JAN79 17JAN79 ItFLRyg 19 0 WLG15tHCO351 IN51 RLMAIN Ho!515 15 1 240CT7e GeF E p 79 DIMAu?9 14Jum79 39 0 HLO353kve845 DUMMY 0 1 09F E 8 79 15 sum 79 39 13e AC9221HC9301 HC Rb CRANE OC/FCT 47 3 24DC174 290LC7e 27N0v78 OlFER79 23 0 HC9 30!HC9303 HC-1 Rb CRANL PRLOP 41 t 0?JAN79 2 7F E 9 79 02FEp?9 30 MAR 79 23 ga HC9323kv9905 DUMMY 0 1 28FEB79 02APR79 23 75 Hb3tolH00uG2 DELivtef 0F A00E0 VALVES 65-1 240CI78 25JAN79 2300178 24JAN79 -1 0 CD0002H01765 DUMMY 0 1 26JAN79 25JAN79 -1 0 d;0004H0 3971 DUMMY 0 1 02F E B 79 OlFEb79 -1 37 HOOl65H00265 INSTALL SM ALL BONE HANLER 8 5 240CI78 02Nov74 05F E B19 14FEH79 73 0 H00 36SHD0365 F LO.Ruh LAST 2/3 5.R.P. 3 3 240C178 2600178 04Nov78 10Nov78 Il O + HDH235H09201 DUMMY 0 1 03Nov78 15 fee 79 78 509 i _H0031bH06766 DUMMY 0 1 270C17s 13Nov7s 11 49 ~HbH3)bH09201 00MMY 0 1 2700178 15F(p19 76 114 ( Hp09&SH0lS01 OuMMY 0 1 240L174 IIJAN79 54 5 HD130lHDISol F NL.hGk.0EL IVERY 5 1 240C17e 300CT79 04JAN79 IUJAN79 49 0 HUISUlHDITOR COMPL. HANGFR INSTALLATION 21 5 3I0C178 29N0v78 17JAN79 14FEBI' $3 0 t HDI S0 lH017 h 5 C OMPL.L.H. PIPL & HANGERS to 1 310C17h 13NOW78 llJAN79 24JAN79 49 50 Hu170lH09201 DUMMY 0 1 3DNov7F 15 F E H 79 53 91 N0lF1SH00004 COMPL. VALVF INS T ALL AT ION 5 1 26JAN79 OlFEP79 25JAN79 3tJAN79 -l 0 HD23b5H03351 uuMMT C 1 240017p 15 F E P 79 70 5 i

P AGE. 12 0F to CPilMA 1100 3p102

    • e i ! M E L 15 T Ih 6 e *
  • PRO JELT M AN AGE MENT SYSTEM TIMF wow 240C774 1759 0F 2800 ACTIVITIES. 11ME UNIT Dat IS app 00 hEiwoRE 05DEC77 IssPaso SELICTED OIMaT79 OAIL 00hov78 NElwopu a 21MMEP NUCLEAR P0wtp 57AllFN UNIT I oesel / J LISTIN6*ese I'

AC I! v liv 'A C i I W I i Y aCT1v11Y E A R L IE5 1 L a1E5 i P Floai e e ' IDE NT IF IC A TION OE 5CR IPT I ON 1]ME CL START F]NISH SIARI FINISH $ TOT FR 0 1 240C17e OlFES79 6* 107 0 1 240C17s 13h0Vis le 52 ( - HD2 365HD3971 DUMMY H33 35 t H0 3551 F NL.aLIGh.& 6 ROUT OF EQUIP. O I 310C178 15 F E 8 79 7e 0 HU2 36bHU6766 OuMMY H0340lH03351 NEC.LINSTALL 5 HAFT COUPLING 5 1 2eoC178 300C17e 09FE 8 79, leFEsit 14 0 0 1 310C178 15F t 8 79 - 14 112 5 1 27Mak?9 024PR79 OlffB79 07FE879 -38. O Hbjb5tH09201 DUM4v - Hoj*74H04171 C OMPL. CON 0ut i 10 EOUIP. D 3 03aPR79 DettB79 38 0 44 1 200C178 260EC70 060EC78 OTFL979 ~ 30 68 N0gl73HD4973 00MMY HD377 3H049 7 3 C ONT. IE RM.CN TRL.& PWR.C8L. 8 1 804PR79 09 FR19 SSFEgit inFL879 -le 0 HDG973H09403 DUMMY E .F . CAB E r f ( h a

4 EPf lM A 1100. 3R102 i I M E L I 5 I IN G PAGE 12 0F 40 , Ph0JE C T M AN AGE MENT 5V5ftM TIMF Now 240CT78 1754 Or 2800 ACTIVITIES. IIME uMIT Dav NETWORM. 0 50t C 77 18Arago Daft 08how78 NElwoPm 21 M ME R l NUCLEAR PohIR ST A fl om UNI T I SELICIED Pl#4Y74 IsAPR40

  • .**I

/ J LISTINGe***

  1. 3

'ACIIVITY A Ci !W I i V ACTIVITV E A R L I E5 I-LA i E5 i P FLOAT I DE hil F I C A T I ON DE 5Ck iP i 1 0 N TIME CL STARY FINISH Si6WI FINISH $ 10I FR

  • )

HU2 365HD3971 DUMMY 0 1 240CI74 UlFIh79 69 107 Hp236bHD6766 DUMMY 0 1 240Cf79 13h0V78 I t' 52 'T HD 3 35 tH0 3551 F HL. ALIGN.& 6ROUI 0F EQUIP. 0 1 310C 178 19Ff879 74 0 j ' Hb300lHU3351 RFC.LIN51ALL 5 HAFT COUPLING 5 1 240Ci78 300CT78 04Ffb79 I4 fee 79 74 0 .Hb3551H09208 DUMMY 0 1 3lOC178 15FfB79 74 132 'l HD397 8H04171 COMPL. CONDUIT 10 EQUIP. 5 1 2 7M A R 79. 02APR79 OlFEu?9 07FE879 -3P-0 HbalilMU4973 DUMMY 0 1 03 APP 79. 04F(b79 -38 0 H04 773H04 9 73 C HNT. IE RM.CNTRL.L PmR.C9L. 44 I 240CTF8 260EC78 060F C 78 07F EP 7 9 30 6R 'l H04473H05173 PULL & TE RM.F NL.C ABLE S 5 1 03APR79 09APR79 04FE879 14FEB70 -34. O HD5173H09201 DUMMY 0 1 10APR79 15 F [ W 79 3h~ 0 HD5 772HD$v12 CONT.PbLL PWR.6 CNIRL. CPL. 49 1 240C178 03JAN79 29NOV78 07 FEM 79 25 0-8 i HD 5912H0 4 9 7 3. 0 0MM Y 0 1 04JAN79 09 fib 79. 25 63 Hbb375HD6575 SET PNL5.L POUNT INSTRU. 47 3 240C178 290EC7a 31AUG78 03NOV78 5 -34 0 Hb6575H06766 INSTALL INSTN. PIPf' AND IUsING 5 1 02JAN79 08JAN79 06h0W74 10NOV7A ~38 0

  • )

HD5 76t H06966 COMPL.IN51kU. PIPE & TUbthG 55 1 09JAN79 26 MAR 79 13kOV78 31JANF9 -38 0 Mb6566HD3971 DUMMY 0 1 27 MAR 79 OlFE879 -3m 0 HDb466N09201 DUMMY ~ 0 1 27 MAR 79 15FEk79 -2M 30 '.') , HD700lHD7003 OfLIVER RL MAIN INSTR UME N T S O I 240Cf78 13Not78 34 0 Hb7003HU6766 buMMY U ! 240Ci?A 13Nov78 le 52 HbS20lH09203 HD OC/FCI 20 1 10APH79 0FMAv79 15Ffh79 14 MAR 79 -3P O ) ' Hb9203HD9308 DUMMY 0 1 08MAY79 15MAH79 -38 0 Hbw 30lH09303 H0/E S/DV-1 WENT/OR/SIM PR 65 'l 09MAY79 088UG79 15Mak79 I4JuM79 3s 0 ~ 1093DJPV9A45 DUMMY 0 1 09Aub79 15 sum 79 -39 la ) . H60169HG0369 8GN.FLO.ENb.5M. BORE PIPE 5 1 240Ci?4 300C178 13DfC78 190EC78 3% 0 HbO265HGU465 DEL PIPE L valgt 52 1 240CT78 04JAN79 205FP78 Ol0EC7 A ~24 0 d HbO 369HGU565 F AB.L IN5fL.5M. BORE PIPF 8 1 310Ci7e 04NOV78 200tC78 02JAN79 35 59 t' HbHC65HG0565-INST LAPGE POWE PIPE E WALWE5 20 1 D9JAN79 05FEP79 04Df C 78 D2JAN79 -24 0 Mb056hHG920I DUMMY 0 1 06FEh79 03JAN79 -24 0 HC0451HGDbb5 OUMMY 0 1 240C179 03JAN79 48 72 (j 4 Hb920lHG9303 OC/FCI Hb-1 22 3 06FEbi9 07 MAN 79. 03 JAM 79 OlFEB79 24 0 Hb4 30!HG9303 F L AM CONTROL HG-1 PPE OP 94 1 08 MAR 79 19 JUL 79 02FfP79 14JUN79 -24 0 hlb 9 303DW9845 DUMMY 0 1 20JUL79 15JUN79 -24 25 % HF DLOlHP9 301 L OMPL. CUDE I. 2 ITEM 5 8 1 240C17n 02NOV7A '13 5t P 78 225EPF8 -29 19 HP3478HP4573 DUMMY 0 1 240C179 te5EP78 -26 0 HP5372HP4573 DHMMY 0 1 240CI78 18 5f P 78 - -26 0 HP910lFC9101 UUMMY 0 1 240C174 OlFIP79 69 0 HP910lRV9306 puMMY 0 1 240C176 19JANf9 60 22 I HP910jHP9201 DUMMY 0 l 240C174 2 t APh RO 380 380 hp HF990FHP9201 UUMMY 0 1 240017M 28AFR60 380 340 HP9 30lHPu3Hy ST Ag 3 Hp_I FUNCI. If %I la i bibf C 78 I4DECTR 255tP78 ObOC17n 48 0 l HP9 M/HPe tt'l f 0MPs HD 5 Fishr t. IF t t et t 1 %ses r 7. r> sa h te reg er 17 e 7 t ent t y p _ms n

1 NN se N e N ee 0 0 99e

    • M>

S2m ene e $J m7Q

== P e 3 ** N t &OP f**> 3E2 e as as "3 "3 "3 mmm OOQ OQO l l EEE EEE 333 OOO ae n Q CDe M M set l P&Q

==a R R tA eee OOC Mem $99 IL & & L33 )

I GPilMA 1400 3Rl02 I I M E L I 5 i I N G e.o e PAGE 33 0F 40 P WSJE C T M A N AGE ME NI SYSTLM IIMF NOW 3 240CT7A 1754 0F 2ne0 ACTIVITIES. TIML UNIT DAY NElkopa 050EC77 18 Ape 80 DATE 08NOV78 hf IWODN ' ll MME R hHCLEAR P0hER STATION UNIT I SE LECIED DIMAY78 184PR80

        • I

/ J LisilNGoteo e e.' ACTIVITY A C i i V I T Y ACTIVITV E A 4 L I C 5 i L A I E 5 i P-FLO A1 IDE hi!F IC A T ION OE 5C R IP I 1 0N IIME CL STARI FINISH SIAWI flNISH $ TOT FR HP9303XVU045 OUMMY 0 1 03JAN79 16MA#79 52 O HVoll/HV0312 $ERVICL bult 0 LNG GRT 1235 2 1 240C178 250CT78 13JUN79 14JUN79 162 0 HWUl51HV0351 SUPPORI 10 HVAC -0UCT.ETC 104 1 240CT7d 2 7M A R 79 1800178 21 MAR 79 4 0 [ HVD3liRV9845 00MMY 0 1 260CT78 15 JUN 79 167 211 HWG353W-9301 Ol8 M M Y O I 24 MAN 79 22 MAR 79 -4 0 HWOS65HV0765 $UPPORI 10 HVAC-INSUL 30 1 240CI78 050E C 7P G4tEB79 FIMAR79 74 0 HVd765V-9301 OUMMY 0 1 060EC78 22 MAR 79 74 7s HVdl69HYD369 BGN.F LO.E NG.5M. PORE PIPE 12 1 240CT78 08NOV78 16JAN79 31JAN79 $7 0 HVd36VHY0565 fad.L INSTL.5M. BORE PIPE 53 I 09NOV78 25JAN79 plFrb79 16APR79 57 0 HYd565HV0798 CONSI. TEST HT 10 1 26JAN79 08F E R 79 17 APR 79 304PR79 57 0 HV079dHY9305 OUMMY 0 1 09fEb79 OlMav79 57 0 HYd7961GOUR4 DUMMY 0 1 09FfM79 15JUN79 89 69 HYdA51HYO958 INSI BULE HV TANMS 5 1 240CT7s 3000178 10 APW 79 16APR79 11 7 0 HYd95]HV0565 DUMMY 0 3 310C178 17APR79 IIT 60 H1200lHY2003 RELOCATE VALut STATION P0up PAD 0 1 240C378 16JAN79 57 0 [* HV200jHT0169 DUMMY 0 1 240Ci78 16JAN79 57 0 HY930lHf9303 HT/CD HVOR/CO2 CM-0UT PRE 32 1 09FEB79 26 MAP 79 OlMav79 I4JUN79 57 0 HY9303RV9645 OuMMY 0 1 27 MAR 79 15 DON 79 57 106 Il ladl651A0265 INSIALL SMALL BORE HANGER 10 1 240C178 06NUV78 10APR79 23APR79 lif 0 1 0165 8 40365 COMP INSI SM PORE PIPE 10 1 240CT78 06N0V78 10APR79 23APR79 11 7 0 It02651A9308 OUMMY 0 1 07NOV78 24APR79 117 97 [I I A0 365 8 49301 DUMMY 0 1 0 7NOV 78 24APR79 lif 97 It040llAll65 COMM tb HANGED INST 12 1 240C178 08NOW78 064tR19 23APR79 !!5 o Iall65I49308 UuMMY 0 I U9NOV78 24APk79 IIS 95 [, I A2 7661 A297 3 INSTALL INSTRU. L IUSING 64 1 240C17h 24JAN79 21NOW78 ?!FEP79 20 0 1829731A3373 ICRM PCLI CABLES 20 1 25JAN79 2 3Ft H 79 ??FIp?9 23 MAR 79 20 0 IAll?3IA9201 00MMY 0 1 22 fee 79 22MapT9 20 0 183972144172 PULL PCEI CABLE 15 1 240CI74 13NOV78 OlMAR79 2 8 M AR 7 9 A9 0 1441728A9201 DUMMY 0 1 14NOW78 22 MAR 79 69 69 1894011493C8 15 INiiRN AIW OC /F C T 23 1 22 FEM 79 26 MAR 79 22 MAR 79 23 APP 79 20 0 {- ( 189308849303 IA/5A INSTNULSER AIR PE0 37 1 27 MAN 79 16MAV79 24 APR79 14JUN79 20 0 IA93039V9145 DUMMY 0 1 17MAY79 15JHN79 20 69 1b0465101865 UUMMY l 240C178 20NOV78 19 0 'INu l6vTNDIE9 6Ls.rLD!iN6.5M. PORE PIPE Yl((5) 1 14NOW78 20NOV78 265fP78 020CT7A -15 0 lh03691NG969 IN51ALL PUMP 5 1 2]NOW76 28 MOW 78 030C178 090C778 -35 0 C,1 -(j' ! 5 21NOV7H 28 WOW 78 030C17e 090 Clin -35 0

    • l NO 36% I N05 65 F A8.L INSIL.5M.RORE PIPE IN04691Nt003 fJuMMY u ! 29N0VFR 200ri?8

-35 0 IN0565tN6003 DUMMY 0 1 29NOV7M 100C178 -35 0 Ih07511N0951 IN51 AIR COMPRESSOR 5 5 1 240CI7a 300C174 030(178 090C174 -15 0 lh09531N6003 OUMMY 0 l 310CI7h locCl?8 -l% 20 IN200lIN2003 SLL !$50t DWb5. FLEt. CohNLCiloN5 15 1 240C174 13NOV14 055fP78 255EPFA -35 0 th20031N0lov DUMMY O I 14h0V78 265tP78 -35 0 20 1 240Cl?8 20h0V74 020C178 270CITA -th 39 th300llN4003 CONTINHE C AFLE S+ TTRM --I h* C0 !! N4 DO S C OMPL. C APLI 5 + 1E RM 4 (3

  • 1 190tC7H PIDEC78 300rT74 OlNOV7a

-35 0

4*ai e 'CrilMA 1100 3Rl02 1 I M C L I 5 i IN G e o e. PAGE le OF 40 P50JE LT M AN A6E MENT SYSTEM TIMF NOW t 240CT78 1754 OF 2880 ACTIVITIES. TIME UNIT Dev' NETWOR8 OSPLC77 'ISAPRep 0$lt 08MOV78' NETWOEM ZIMMEP NUCLE 4a P0bER STATION UNIT I-SELE CTED OIMAv78 - - tempo 80 eseal / J LISTIN6**** 1. ACTIVIIV . A Ci i V I iY ACTIVITT. E A R L IE 5 i LA i E 5 I-P FLUAI lbCh11FICAT10N DE 5CD IP i I oN TIME CL START FINI5H SIARI FINISH 5 10T FR T' ~ Ih400blN4007 IN SVS. OC/fCi 15(5;l 220EC7= 290EC78 02NOV78 08Nov78 -35 0 IN3bO73N9304 DUMMV O 1 02JAN79 0940V 78 .-35 14 -IN500llN5003 INSTALL CONOUIT 5 1 240C178 300C 178 17pCI78 230C178 -5 30 IN5bO33 N5UO5 C OMPLE TE CON 0Uli-4 1 130E L 7s 18DEC78 24 0C 178 270C178 -35' O IN5005IN4003 DUMMY O I 190EC78 300CITS -35 0 --tht00lIN6003 INSTALL INSIPU. IUS/ PIPING IO 1 240C178 240C178 09CC178 090CTF8 -11 24 INAC031N6005,00MPL INSTRU., TUP / PIPING hb5EJQ ! 29NOV78 120EC78 10 0C I 7S 230C178 -35 0 - Q N6LO 51 N500LkUMM l.C 7 W " 'd TC jut $, C# ' 3g, p3q O 1 130EC78 240C178 -35 0 I NT( O l I N 700 3 C OMPL. L.B. PIPE 5 1 240Ci?8 300C178 265tP78 020C178 -20 0 ) IN7003INO369 DUMMY 0 1 310CI78 030C178 -20 15 IN800lIN8003 COMPL. L.9. HANGERS 5 I 240CI78. 300C178 265EP78 020Cf78 -20 0 I N2E03 t NO369 00MPV 0-1 310C178 L30CI78 20 15 N IN3h0lIN9503 DE LIVEN IN SV5. VALVE 5 to 1 240CT7e~ 06WoV78 125EP78 25 5E P7 8 -30 0 INa503148505 COMPL. L.S. VALVE 5 5 3 07NOV78 13NbV78 265EP78 020CTF8 -30 0 Ih850blNO369 DUMMY 0 1 14NOW7M 030C178 -30 5 9 !#360l!NP6U3 CONTINUE. INSTPU. INSTALL 5 1 240Ci7m 300C178 26 5E P 78 020C178 -20 0 IN8503INP605 COMPL.INSTRU. INST ALL 5 1 310C17e-06NOV78 0100178 090CT78 -20 0 INSE05I46003 DUMMY 0 I 07NOV78 10 0C 178 -20 15 IN870lIN8703 DEL. LASI IN;iRUMENTS 5 1 240Ci7e 300CI78 265EP78 ~020CT78 -2G 0 IN2703]N8603 OHMMY 0 'I 310C T 78 0300178 -20 0 IN9 30lINv303 IN-I 0.w. PNEUMATIC 4_ IN1303Ne93n7 DUMMY-PREOP 43 1 22JAN79, ?! MAR 79 ' 09N0V 78 IlJAN79 -49 0 0 1 22 MAR 79 12JAN79 -to o IV3b561wt556 DUMMY 0 I 240CT78 065EP78 -34 10 IV375b!V3956 PEEA55EMbLL' CONTROL ROUS 10 1 240C178 06NOV7e 224Ub78 055EP78 -44 0 -tw34561V4556 DUMMY 0 1 07NOW76 G65fP78 44 0 It4150lV4356 P pE A 5 5 '8 F ul. L SUPPORT CASTING 5 1 240C178 300Ci78 29AUE78 055E P7 8 -39 0 Iwg35elV4556 DUMMY-O 1 310CTF8 065EP78 -39 5 lb455blV4756 COMPLETE CR0 INTERNALS A55'Y 5 1 07N0v78 13NOV78 065fP78 125Ep78 -44 0 IW41561V4956 INSI THERM AL SLEEVES 5 1 14NOV78 20NOV78 - 135fP78 195EP78 -44 0 IV475blV9020 DUMMY O I 14NOV78 145FP78 -43 0 It445blv5156 INSIALL DR1 WE 5 13 1 2tNOV7M 08DEC78 205tP78 060CT75 -94 0 i IW5156hP9302 DUMMY O I IIDEC78 090CI78 -44 4 IW5156LP9302 DUMMY U I Il0EC78 090C178 -44 4 lbbl56WH93L2 DUNMY 0 1 IIDEC78 090 CIT 8 -44 4 s IW5156eI9302 DuMMV O I IIDEC7H 090(178 -44 4 Iws35bHV9325 DUMMY 0 1 240C178 2tAPW80 380 38 0 ) twh351IV6551 IN51 REFhELG PLATF HRIDGE 3 1 240C178 260CI78 02AikT9 04APR79 Ill 0 It6553FH9208 DUMMY 0 1 2 70C 178 05aPR79 lll 44 I tS 751I v 6951 INST NEW F L'EL IN5PECIN STAND 5 1 240C178 300C178 23FEP79 PIMAR79 85 0 Ith451tV7151 INST FDEL PptP MACHINF !? I 3]OC178 lbMOV78 02 MAR 79 19 MAR 79 65 0 IV71511V7351 INST SE RV PLAIFOWM LSUPPORIS 12 1 16N0b78 040EC78 20 MAR 79 04APN79 85 0 IV7351FH92DI OUMMY D 1 05DEC76 05APW79 b5 la It9020lW9022 INSTALL 10P 6tfl0L '4 1 14NOWTH 17Nov7m 14 5f P 78 195EP78 -43 0 IV9024tve956 DUMMY 0 1 20Nov7c 2'155 P 78 -43 I 1 e

'CPilMA. 1100 3R102-

  • e i I M E L i 5 I IN 6
  • e
  • PAGL IS OF en

~ F h D sE C T M AN AGE MENT SYSTEM TIME Now 240CT74 1754 0F 2s80 AcilVIllES. ilpE UNII DAY NElbORK 05DE C 7 7 - - 18APR80 L' A I E 08h0V78 NLlw0pm 2IMMER NHCLEAR P0ptR STAi!ON UNIT l-SE LI C IE D 01M A V 74 IMAPR80

        • 1

/ J LI5ilNGe*** IldNTIFICATION DE5 CR IP I ~ l 0 N IIME CL STARI ' IE 5 I L A i L5 i P Ft041 'ACilvifV A. C i IvI iV ACTIVITV E AN L FINISH STANT FINISH 5 10I.FR IV90221W9024 DUMMY 0 1 20NOW7s 020C T 78 3% 0 IV9024IW9026 INSTALL BLADL 6UIOL5 5 1 20NOW78 27McV78 020C178 060C178 -35 0 IV902mIV5156 DUMMY 0 1 28NOW 78 .090CT78- -35 'O-LLhl65LCH365 INSTALL L B HANGERS 83 1 240CI78 09NOV78 29 MAR 79 164PR79 109 0 -L(0365LC9308 OuMMY 0 I 10NOW74 17APR79 109 158 . LL200 LLC 2003 CLO5L C ST. ' OPE N LL. 503 10 1.240CI78' 06N0V78 12MARRO 25 MAR 80 352 0 LC2003LC2005 INSTALL L.8. PIPE 5 I U7NOV78 13NOV78 26MARAD DIAPR80 .352' O LE2005LC3003 DuMMV O I 14NOW78 02APERO 352 0 LCStolLC30ul INSTALL 5.u. PIPE 5 1 240Ci?8 300CT78 26 MAR 80 OIAPRMO 362 30 LC3003LC300% COMPLF it 5.R. PIPE 5 1 14NOW78 20NOV78 02APR80 08APR80 352 0 LC3005LC5003 OuMMY 0 1 2tNOV7s 09APR80 352 0 LC4LO!LC4003 INSTALL 5.B. PIPE 5 1 240CI78 300CT78 26MARA0 OR APR8 0 362. 0 tj LL4003LC 3003 DUMMY 0 I 310CI78 02APW80 362 10 LL500 LLC 5003 INSTALL INSTRUMENis 10 I 240CT18 06NOW74 26MAkPO OPAPR80 362 10. LC$003LC5005 COMPLETE IN51RuMENI 5-1 21Nov78 28 mow 78 09APR80 15APR80 352 0 ,e, LOS005LC6003 DUMMY O 1 29NOV78 16APERO 352 0 LL600 LLC 6003 CONDuli INST ALL A T ION 5 1 240CI78 300Ci7s beAPR80 15APRn0 372 20 LC6003tC6005 COMPLE TE CONDUlf 3 .I 29NOV78 ORDECin 16APN80 BRAPR80 352 352 ,). ' L L100 LLC 7003 F ULL & IERMIN. CARLES 12 1 240C17h 08NuV78 09 MAR 79 26 MAR 79 95 0 6 LE 7D03LC9201 COMPLE. Putt & TERM CABLES 5 1 09NOU78 ISNOVis 27MAk79 02APR79 95 0 L C920 8t C9308 LC 5V5. OC/FCI 10 1 16NOV78 30hoV78 03 APR 79 16 APP 79 95 144 (, LC9 30 LLC 9303 MSIV LEAN CONTL LC-3 PREOP 42 1 26JUN79 23AUG79 17 APR 7.9 14JUN79 49 0 L L9 30 3RV9845 DUMMY 0 1 24AU679 !$suh79 -99 0 LD0l69L00369 8 6N.F LO.E NG.5M.PN.P IPE 25 1 240CT7a 28NOW78 170C178 20NOV7H -5 17 (. L D0369LD0565 F AB L IN5fL.5M.PR. PIPE 60 1 2 20E C 7a 19 pap 79 23NOV78 15FE879 -22 0 L 00565L D 3001 OUMMY 0 1 20Makf9 16FEB79 -22 0 'tb2LOILO2003 THERMAL DESIGN R[ VIE W 42 1 240C178 210E C 74 225FP74 20NOW78 -22 0 ( LD2003 LOO 369 UUMMY 0 1 220EC78 21NOV78 -22 0 LD300lLD3003 JNSTALL 5.b. H A NGE R S 5 1 20 MAW 79 26 MAR 79 16FEb79 ??FEP79 -22 0 i LblLO3LD4003 DUMMY. O I 2 7M A P 79 23Ffe79 22 0 L ( LD000lLD4003 INSTALL INSTRUMENT 5 10 1 240C17s 06NOV7A 09FE H 79 22FER79 75 97 - L 04003LD4005 C OMPL. INSTPUMLNi$ 5 1 27 MAW 79 02APR79-2 3FE H79 DIMAP79 -22 0 Lb4005LD6003 DUMMY U 1 03APW79. 02 PAN 79 -22 0 9 Lt:500lL D500 3 OE LIVE R LASI INSTRUMENIS 10 1 240C178 06NOV7A 09Ffe79 22FE 4 7 9 75 0 LD5003LD4003 OUMMY 0 1 07NOV76 235EH79 75 97 LD600lLU6003 ]NS T ALL EONDUI T 29 3 240C17e 040EC78 22JAN79 OlMAR79 bl 83 LD)LO3LD6005 COMPLETE'CONDU11 5 1 034Pk T9 09 app 19 02 PAR 79 OmMAR79 -22 0 1 L D6LO5L O 700 3. DUMMY 0 1 10APk79 09 MAR 79 22, O LD700lLD7003 PUL L L IIRM CABLES 54 3 240CI7M 10JAN79 21 DE C 78 GHMADFV 41 63 LDILU3LU7 DOS COMPL. PULL L IERM CARLES 5 1 10APR79 16Appf9 09 MAR 79 15 MAR 79 -22 0 L DID05 L D920 5 DUMMY 0 I 17APh79 16 M A E 79 -22 0 lb920lLO9301 OC/FCI LD-1 22 1 ! ? APH 79-86M4v79 16M8k?9 16APR79 -22 0 L b130 l L D9 30 3 L E A N ULCIION LU-l PPEOP 42 3.37MAY79 17Jul79 I F Af H 79 14Juwi9 -22 0 L D9 30 3 R V 96 4 5 DUMMY 0 I IsJut?9 15JUN79 -22 27 M

.~ ~ EPilMA 3500 3R102' e e o i !M E L 15 i IN G e e o PAGE 16 0F ' .40 FW3JELI MAN AGE ME NI SYST[M TIME NOW : 24 0 CT 78 1754 0F 2880 Acilv! TIES. TIML uMIT DAv Nrthopa 05DEC77 18 APE 80 D Al t 08Nov7A NEIWOPN : ZIPMER NUCLEAR POWFA S T A 1] PN UNIT I .5ELECIED DiMaf74 18 app 40 ese *I. / J LisilNGe*** ACIlvlIV A C i I V I i V ACTIv1TV E A W L 1E 5 i L A I E 5i P.FLOAI 'IDEbilFICATION DE 5Ck IP T 1 0 N-TIME CL SIANT FINISH SIAWI FINISH 5 101 FR

E9301LE9303 LE-l L AP (GUIP PREOPL 44 1 2ANOV7A 30JANF9 114PR79 14JUN79 96 0

LL9303Rw9645 DUMMY 0 1 31JAN79 15JUN79 96 145 L10177LIO377 INSIALL LIGHilNG 80 1 240C178 15FLM79 22FEb79 14JUN79 84 0 LID 377RV9845 DUMMY 0 1 16FE079 15JbM 79 84 133

LL930lLL9303 SIANDHY & EMERGEN. LIG. PREOP Lt-1 42 1 21FEB79 19APR79 17APW79 14JU479 39 0

. LL9 303RW9 8 45 uuMMY 0 1 20APR79 .35JUN79 39 88 L PO Dol LP9301 COMPL. CODE 1 + 2 ITEMS 8 8 240CI78 02NOV78 135f P F8 245EPFS -29 19 LP9203LP9210 00MMY 0 1 240CIF8 2tAPR80 380 380 LP930lLP9302 S T ARI LP-1 FUNCT. if5T 10 I DIDEC7a 14DIC7A 255EP78 060 CIT 8 .en 0 LP9302Le9303 CoMPL. Le-I FuNCT. IESI 11 1 15DEC78 02JAN79 09cC f 78 230Cifa -en 0 LP9303RV9303 DUMMY 0 1 03JAN79 OlFEbf9 21 24 L P9303Rv9307 DUMMY 0 1 03JAN79 19JAN79 12 20 Lt 9 3035PO!80 DUMMV O I 03JAN 79 240C]78 44 0 LP9303RTC045 DUMMY 0 1 03JAN79. 16 MAR 79 52 0 th9 30lLR9303 ' L R-3 LIOulu R AD PREOP 92 1 06JUN79 03AUG79 17APR79-14JUN79 -35 0 LN9303Rv9845 DUMMY O 1 06AUG79 15JUN79 -35 le n&UI4 3M A034 3 HOLLOW CONC BLOCK 4320 380 1 240CT78 18APR80 0 0 MA0343220001 UUMMY 0 1 21APHPO O O Ma0543 MAD 743 SOLIO CONCRETE SLOCn 4330 160 1 240CT78 08JUN79 300C178 14JuM79 4 0 MA0143Pv9145 DUMMY. O I IlJUN79 15JUN79 4 53

  1. ADE4 3 Mall 43 GL A2LD 8LOCR 4340 3 1 240Cl?8 260C178 16APRs0 18APR80 377 0

) Mall 43220DUI DUMMY 0 1 2 70 C 178 2tAPRPO 377 377 CCO2thMC0465 IN51ALL SMALL BONE HANGER 6 1 240Ci78 310CT7A 21NOW78 29NOV78 2C 0 MCO36sMC0565 Feb & IN5I LAST 2/3 MC Sh 10 1 240CT78 06NOV7A 15N0v78 29NOVFa 16 0 ) RCat65CY9201 dummy 0 1 OlNOW78 3DNov78 20 9 'MCH565CV9201 buMMY 0 1 UFNOW7A 30Nov78 16 5 MLJ96bMCl!65 INSI MC HGks IbHLul 15 1 240CT78 13NOV78 04Nov78 29N0v7A 81 0 MLil65CT*2bl DUMMY 0 1 14Nowin 30NOW78 II O ML2totMC2765 INST MC LB VALWE5 2 1 240C178 250Ci78 24Nov78 29NOV78 24 0 ML2 765Cv9201 DUMMY 0 1 260CI7h 30N0w78 24 13 1 ML3371MC4173 buMMV O 1 240C178 27DEC78 .44 0 ML4 37 3CV930 3 DUMMY 0 1 240CT78 04JAN79 49 36 nL5566CVo201 DUMMY 0 1 240C17e 30Novis 26 15 MC556eMC3871 puMMY 0 1 240Cl7h-19DfC78 39 0 Mool35MD0335 METAL DECu!Nb 3510 6 1 240Cf7A 310C 178 07JUN79 14JUN79 I5n 4 MD03354W9145 0 1 UINOW76 35 SUN 79 154 207 Hl0165MIO365 MISC PPG WMOHACVGNibbOI 25 1 240C178 28N0V7A 26APR79 38MAY79 129 0 MIO 365mG05o5 DUMMY 0 1 29Nov78 UlJUN79 129 2 MP920lMP9301 MP OC/FCI 30 1 UIN0tT8 13DE C 7R ObMAW79 16APR79 86 0 MP9 30lMP9303 MP-1 3g5MV PREOP 23 1 14DEC7M ISJANF9 1 F APN 79 15MAYF9 86 0 MP9303MP9305 MP-2 64NV PRLOP 28 ! 16JAN79 13FLM79 16MAY79 I4JUN79 86 0 HP9 305pv9n9 5 DUM: O I 14Ffbi9 15JUN79 86 135 . hP9 309MP9 3 5 0 MP3 OC/Fli 15 1 240CI78 13NOWFR 25APR79 15MAYJ9 12N 96 hP9 310MP9312 MP3 PPE -OP 21 1 02 APb 79 304PP79 16 Mar 79 14JuN79 32 0 b

CPTIMA 1100 3R102 e e e i I M L L I5 I IN G e o e PAGE 17 0F 40 P E3sE C T M A N A GE MEN T 5V51EM IIMI NOW 240C17A 1754 08 2800 ACit tlIIE S. TIME UNIT DAV NE IW ORn 050FC77 ISAPRnD DATE OBNDv78 NElwoPM Z I MME R NUCLEAR poker Sia ll eN UNIT I SftfCTED On"AV7A 18APR80 e eel /J LI5ilNGe*** ACilWIiv 4 C i I V I T y ACTIvliv t A R L I E 5 i L A IE5 i P FLOAT IDENTIFICal10N OE 5CR IP i I O N IIME CL START FINISH. S T ART FINI5H 5 108 FR hP9312RVes45 DUMMY O 1 OIMAY79 15 sum 79 32 al h53 769M50869 DUMMY 0 1 240CT78-30JUL79 194 0 h50 769M51565 OUMMY O I 240C178 28APhMO 300 380 h52165M52965 F48 L INST REMAIN LC SMALL SORL PIPELHANGERS 44 1 240C178 26DEC78 295fP78-30NOV78 -17 0 h 52 96 5NH93O R DUMMY. 0 1 2 70EC 78 010f078 -17 25 h531Dle53665 DIL M5 HANGER 5 e 1 240CT7n 02NOV78 24Aub78 055EP76 -42 0 h5330lM54365 OfL $NuebER5 132 1 240CT7e 30APR79 L7 5( P 76 14 MAR 79 -33 0 h53365M53565 INST M5-1 HGR5 0 1 240C17n !$M8R79 99 0 h53565M54365 OUMMY 0 1 240C178 15 M A R '8 9 99 132 h5356bM59201 UUMMY 0 I 240CI78 19APR79 324 157 h53tb5M53765 CONTINUC INSTALL HANGERS tl I 03NOV78 03JAN79 065EP78 OlNov74 -42 0 h53765453965 INST MS-3 HGR5 20 1.04JAN79 31JAN79 02NOW 78 3DNOV78 -42 0 h53765M54365 DUMMY 0 1 04JA479 15 MAR 79 50 m3 H53965NU4301 DUMMY 0 1 OlFEB79 Ol0fC78 -42 0 h54365M54565 INSTALL SNuP8ERS 25 1 OlMAV79 05JUN79 15 MAR 19 18 APP 79 -33 0 h54565M59201 OuMMY 0 1 06JUN79 19APR79 -33 0 . h55 76bM59201 UUMMY 0 1 240C178 19APR79 124 157 h5bl65M56365 WH INSI IUR. SV-PASS VALVE D 1 240C178 01DfC78 27 0 h56365M55565 DUMMY 0 1 240CT78 19APR79 124 0 955 36 5NP 9301 DUMMY 0 1 240CI78 O B UF C 78 27 69 M56404M56406 MOUNT INSTN O 1 240CT78 20 0C I 78 -2 0 455406M58772 OUMMY D 1 2 4 0 C 17 h - 270CT7a 3 0 N56t0hM59066 BEG INST INSTR PIPE & IUbE le 1 240C178 10NOWTA 200C 178 08NOV7P -? O 457773M57973 BLG II RM PC & I CA8LES 0 1 240CT78 24NOV78 22 19 h57973M54373 PULL L TERM FINAL. CABLES 5 1 20NOV78 27NOV78 24h0V78 30NOV7M 3 0 M53173Nb9308 OUMMY 0 1 2nNOV74 OIDf C 78 3 45 M58772H58972 COMPL PULL PC L I CABLES 19 1 240CI78 17NOVIA 270CI78 22NOV7A 3 0 h58472M5797 3 DUMMr 0 1 20NOV78 24NOW78 3 0 h59'J66M5906 7 COMPL INSI ?NSTR PIPE & IUbE 15 l 13NOV78 04DLC7A U4NOV78 30NOV78 -2 0 h5006 7NB9 301 UUMMY. 0 1 050F0 78 010fC78 -2 40 N59103EH9208 DUMMY-0 1 240C178 OI Df C 78 27 0 R5Dl03M59201 DUMMY 0 1 240C178 14APR79 324 157 25930lM59303 M5-1 MAIN STEAM PREOP 30 1 20JUN79 0180G79 03 MAT 79 14JUN79 -33 0

4 7, OpilMA 1100 3#102

    • e

.i IM E L I5 T 'I N G e o e PAGE ~ 17 0F 40 PH3 JECT MANAGE MENT SY5 f t M TIME N0w 240CT78 1754 0F 2880 ' ACilVI T IE S. TIME UNIT DAV ';iW0pm 05ptC77 '18APR50 l OATL 08NOW78 NETWORu 2IMMER NUCLEAR POWER S T A T I ON UNIT I SELECTED OIMAY74 18APR80 e e* *1 / J LI5flN6*o** e e.............................................................. ACTIVIIV 'A C i IV I i V Acilvliv E A W L 1[ 5 i L A 1 E5i P FLOAT I DE hil F IC A T 104 0E 5 C R.1 P i I ON TIME CL. STANI FINISH SIAHi FINISH 10f FR ......................................................................................................................'5 MP9)l2RW9845 DUMMY 0 1 OlMAV79 ^ 15JUN79 32 81 M50fb9M50869 OUMMY O I 240C178 30 JUL 79 194 0 M50 f69M51565 DUMMY O I 240CI78 21APR80 380 380

  1. 52 f65M52965 F AR & IN51 REM AIN LC SMALL BORE PIPECHAN6ERS 44 1 240C178 260EC78 295E P 78 3DNOV78

-17 0 M52965N89301 OuMMY O' ! 27DEC78 O R DE C 78 -17 25 M53foIM53665 DEL M5 HANGERS 8 1 240C178 02Nov78 24AUG78' 05 5E P 7 8 -42 0 M5330lM54365 Ott SNUB 8tRS 132 1 240C178 30 app 79 0 7 5E P 78 14 MAR 79 -33 0 M53365MS3565 Ikii Mi-1 H0R5 0 1 240C178 1%M AR 79 99 0 M&3565M54365 DUMMY 0 1 240C178 15 MAN 79 99 132 MS3965M59208 OUMMV O 1 240Ci?B 19APR79 124 357 M53665M53765 C ONilNUE INSTALL HANGERS 41 ~l 03NOW 78 03JAN79 065fP78 OlNOV78 -42 0 M53f65M53965 INST M5-3 HERS 20 1 04JAN79 31JAN79' 02Novis 30NOV78 -42 0 '#53f65M54365 DUMMY 0 1 04JAN79 15 MAR 79 50 83 M53565NB9301 DUMMY 0 1 UlFE879 O!DEC78 -42 0 M 54 365M54 565 IN5 FALL SNUB 8ERS 25 1 DINAY79 05JUN79 15 MAR 79 18APR79 -33 0 .M54S65M59201 DUMMY 0 1 06JUN79 19APR79 33 0

  1. 55765459201 DUMMY 0 1 240C178 19 APR 79 124 157 C55865M56365'WH INST IUk. SV-PA55 VALVE O 1 240 CIT 8 O! DE C 78 27 0

MS&365M55565 OUMMY 0 l'240CI78 19APN79 124 0 H56 365N89301 DUMMY 0 1 240CIF8 O R DE C TS 27 69 05b(04M56406 MOUNI INSTR 0 1 240C178 200 CIT 8 -2 0 N56E0hM58772 DUMMV O 1 240 CIT 8 270E178 3 e M56406M59066 BE6 INST INSTR PIPE & TUBE 14 1 240C 178 10NOV78 200C I 7S 08NOV78 -2 0

  1. 57173M57973 BEG TERM PC & I CABLES 0 1 240C178 24NOV 78 22 19 N579T3M58173 PULL L TLRM FINAL C ABLES 5 1 20N0v78 27NOV78 24NOv78 30N0v78 3

0 N54473N89301 DUMMY 0 1 2FNOW78 Ol0EC78 3 45 M53FF2M58972 COMPL PULL PC & I C ABL ES 19 1 240CT78 17NOVF8 270CI78 22NOV7P 3 0 e M58972M57973 OUMMV O 1 20NOW78 24Nov78 3 U M59b6bM59067 COMPL INST IN5fp PIPE & Tubt 15 1 13Now78 04DE C 78 09hov78 3DNOV78 -2 0 i h59067N89301 DUMMY O 1 05DEC78 Ol0EC78 -2 =0 p N5910lRH9201 DUMMY. O I 240C178 LIDIC78 27 0 M59103M59201 DUMMY 0 1 240CI78 19APR79 124 157 N5920lM59301 M5-1 OC /F CI 10 1 06JUN79 19JUN79 19APR79 02MAVT9 -33 0 i M5930lM59303 MS-1 MAIN STEAM PREOP 30 1 20JUN79 OlAUG79 03MAY79 14JUN79 -33 0 h 59 30 3p v 914 5 DUMM Y 0 ~ 1 02AUG 79 15JUN79 -33 16 hicl65NB0365 IN51 L8 PIPE 3 1 2 40C l ? 8 260C178 UFbEC78 Il0ECF8 31 0 kbO365Nb9203 DUMMY 0 1 270C178 120f C 78 31 66 .hbOT69Nh0969 BLG FIELD ENG SP PIPE O I 240Ci?8 0 0 hktl69NSI366 COMPL INSTR PIPE & IUSE 27 1 240C178 30NOV 78 02NOW78 !!OEC78 7 0 hel 366Nuv203 OUMMY 0 1 010EC78 12DfC78 7 42 4 kbl 565Nul665 C OMPL E I[ HGR.1451ALL 25 1 240C176 28N0v78 06NOV78 Il0EC78 9 0 kbl665Nb9203 DUMMY 0 1 29NOV7h 12DEC78 9 44 ht 3 30lNH 3566 MOUNI NH-2 INSTR 30 1 240CT78 05DECTB 160CITS 27NOV78 -6 0 'hb356bM83666 COMPL. NH ELECT. 10 1 06DE C 7e 190LC78 24howie IIDLC78 -6 0 ) 1 \\

9 L 82 TERA 1800 3RIO2

  • e i IM C L I5 i IN b o e e PAGE 21 0F 40 PP3JEL T M AN AGE MEN T Sv5 FEM TIME NON 240CT78 1754 0F 2980 AcilVITIE S.

TIME UNIT DAv NETWORn 050E C 7 7 18APR80 @ alt 08Nov78 NETWopa-: 2IMMER NUCLEAR POWER S T A TI ON UNIT I SELECIED OlMAYT8 18APR8U eteel / J LISTINGe*** KCilvliv A C 7 Iy 1iy AClivliv E A R L I E 5 i L Ai E 5 I P FLOAl~ IbE hi!F IC A IION OE 5CR IP I 1 0N IIME CL STARI FINISH STARI FINISH 5 101 FR PT314tPIO346 PAINTING,$PECIAL CiG 463X 360 1 240CT78 184PR80 0 0 PID 34tl20C01 DUMMY 0 1 21APRAD 'O O Pb2337PW2337 WHIP RESTRAINTS 3910 75 1 240C178 08 F E H 79 14 Nov 78 OIMAR79 15 0 P52 33 FRv 9329 OUMMY O I 09F E B 79 02 MAR 79 15 63 Cb920lRB9301 OC/FCT RBM 19 1 240C178 17Nov78 19APR79 15MAvi9 124 0 Ab930!Ru9303 RBM PREOP 21 1 20N0v78 190E C 78 16 MAT 79 14 JUN 7 9 124 0 .Ch9303Rv9845 00MMY 0 1 200EC78 15JUN79 124 173 RbucolkO9301 COMPL. 80 ! CODE 1

  • 2 ITEMS 12 1 240C178 08N0978 26 5E P78 Il0CT78

-20 0 EbOO32800004 COMPL. RD-2 PUNCHLIST 12 1 240C178 04NOV78 18 DE C 78 04JAN79 38 0 Eb0003R09 307 C OMRL. RD 3 CODE 1 + 2 11 EMS 12 1 240C178 08Nov78 27Nov78 120EC78 23 43 RbOD04Rv9305 00MMY 0 1 09hov78 05JAN79 38 0 Ab3573R03696 0UMMY 0 1 240CT78 15Nov78 16 0 Rb1051RD9203 DUMMY 0 1.240CT74 15Nov78 16 0 Sb7165R09208 DUMMY-0 I 240Cf78 15Nov78 16 0 Eb3635Rv9307 OUMMY 0 1 240CI78 19JAN79 60 68 abD103R09201 OuMMY 0 1 240 CIT 8 15Nov78 16 0 i Els9803Rv9201 DUMMY 0 1 240C178 l28APR80 380 38 0 Rb9193sx9063 DbMMY 0 1 240C178 130E C 78 35 0 Rb9865RD9201 DUMMV O I 240C178 15Nov78 16 0 CDD165rm9063 DUMMY 0 1 240C178 130EC78 35 0 Sb?23RRD9210 DC/FCT RD-1 7 1-240Ci?8 O!Nov78 15Nov78 24Novia 16 0 i CD1205R09307 OC/FCT RD-3 20 1 240C178 20Nov 78 14Nov78 120EC78 15 35 al'9210RR9203 puMMV 0 1 02Nov78 27Nov74 16 14 'Rb130!RD9303 RN. MAN.CONIL.RO-l PREOP 43 1 09NOv78 !!JAN79 120CI78 120EC78 -20 0 Ch930lRv9307 DUMMY 0 1 09N0v78 19JAN79 48 56 ChD303R09307 DUMMY 0 1 12JAN79 13 D( C 78 -20 0 tb9303Rv9329 0 1 12JAN79 02 MAR 79 35 83 Ch7337RD9309 ROU SEO. CONTROL ko-3 PREO 129 'l 12JAN79 13JUL 79 13 bE C 78 14JUN79 -20 0 Sb1309Rv9845 OuMMY 0 1 16JUL79 15JuN79 -20 29 Kbi9)SR09203 OUMMY 0 1 240Ci?8 15 No v 78 16 0 El0lS5RE0265 INSTALL 5 MALL BORE HANGER 30 1 240CT78 050E C 78 040f C78 16JAN79 28 0 C(0255mE9301 OuMMY 0 1 06DEC78 17JAN79 28 50 K105&SWE9301 DUMMV O I 240C178 17JAN79 58 80 Rt 1915RE 2165 COMPLE TE H ANGER INSTALLIN 25 1 2400178 28N0vi8 !!Of C 78 16JAN79-33 0 ( Cl2155WE9301 DUMMY 0 1 29N0v78 ITJAN79 33 55 El290!RE 3165 F IN AL valUE DELIVERY RE049 4 1 240CI78 270C178 04JAN79 09JAN79 49 0

  1. E 3 3%bRE 3365 IN5 FALL VALVE 5 5 1 300Ci?8 03Nov78 10JAN79 16JAN79 49 0

s. Sl 3 355WE 930 8 DUMar 0 1 06N0v78 I?JAN79 49 71 Cl3v51RE2565 DUMMV O I 240Cf78 17JAN79 58 0 Cl4351WE9201 DUMMY 0 1 240C178 15Novia 16 38 REe771RE5573 UUMMY 0 1 240 CIT 8 03JAN79 48 0 . Al5573RE5 773 PULL Li[RM FINAL CABLES 5 1 240C178 300CT78 U3JAN79 09JAN79 48 0 Ef 5 773RE58 7 3 E.D.I.D TEST CASLES 5 1 310CITH 06N0v78 10JAN79 16JAN79 48 0 El5 77 3mE9301 OUMMY 0 1 310C178 17JANF9 53 75 %s i

C?f lM A 1100 3R102 i I M E L I5 i 1 N G

  • e'o PAGE 22 DF 40 PRSJE C T M AN AGE ME N T 5V5 f EM 11MF Now : 240CTV8 1754 of 2880 ACIIvlTIES. TIME uM11 OAV NETWORN 050tC77-18APR80 OAIE. OnNov 78,

NETWORE's'JIMMER NUCLE AR Powf R STATION UNIT I SELECTED 01MAY78 18APR80 'o***I./ J LI5I]NGe*** . e................................................................. AC11WIIT A C 1 1V I I Y ACTIVIiv EA R L.1 E - 5 l' L A i E 5 i P FLUAI IDE NT IF IC A T ION - 0E 5CR IP i 10 N 11ME CL START FINISH SIARI F INI SH 5 101 FR t' EE 5 873m E 9 301 UUMMV O I 07m0W78 17JAN79 44 70 OE0572k[5573 puMMY 0 3 240CT78 03JAN79 to 0 l - EE7566RE7766 COMP INSTRU PIPE &IuPING I I 240CT78 240CT78 02JAN79 02JAN79-47-0 I, - Et$166RE4571 DUMMY. 0 1 250 CIT 8 03JAN79 47' O RFf001hF8366 DEL. LASI IN51RUMENI. 10 1 240CT78 06NOW78 300CT78 10Nov78 4 0-Wi d 365RF 04 65 INSTALL SMALL SONE MAN 6ER to 1 240C178 06MOV 78 10Novis 040EC78 19 0 RF G365RF0565 COMP FA8&lN5T SMALL SORE 10 1 240Ci78 06hov78 00C178 luk0V78 4 0 Efd465wF9301 DUMMY 0 1 0 7Nov 7 8 -OsufC74 19 33

  1. FG565NF. 46 UUMMY 0 1 07hov78 13NJu?8 4

0 CFC565mF9303 UUMMY 0 1 07N0W78 05 DE C e 2 19 33 Rf 2 30 7RF250 7 COMPL H AN GER INSTALLATION 16 1 240C178 14NOV78 10Nov78 04DEC78 13 0 RF2507WF9301 DUMMY 0 1 15N0478 05 bE C 78 13 27 { SF 3 7654F2965 DUMMY 0 1 240CT78 13NOvi8 le O RF4551RF 2965 00MMY 0 1 240C178 13NOW78 14 0 EfC551RF4758 DUMMY 0 1 240C178 05DE C 78 29 0 L-RF S 351RF 5551 COMP CONOUIT TO EOUIPMENT 0 1 2tNOW78 28h0W78 4 0

  1. F 5558pF63 73 DUMMY 0 1 2thov78 2nNov78 4

0 Rf6173RF6373 CON TERM CONTROL & POWER 20 1 240CT78 2040v78 300C178 27mov78 4 0 [* DF6373RF6573 PULL & TERM FINAL CABLES 5 1 21Nov78 28NOW78 28N0W18 040EC78 4 0 Af 6573mF9301 DUMMV O 1 29hov78 050fC78 4 18 Et7172RF7372 CONT PULL PC&I CABLE 20 1 240C178 20NOW78 300Cl?8 27NOV78 4 0 Rf 7372RF6373 DUMMV O ! 21N0v78 28 Movie 4 0 Rf 8 366RF 8566 COMPL IN57 INSTRUM1 TuuNG 10 1 07NOW78 20NOV78 13NOW78 27NOW78 4 0 SF8566pF5351 OUMMY 0 1 2tNov78 24Nov78 4 0 - EH000lRH9301 COMPL. CODE.1

  • 2 ITEMS 16 1 240C178 14NOV78 31AUG78 225EP78

-37 Il RHil65RH1765'0UMMY 0 1 240C178 29 MAR 79 109 0 RHl=0lRH7566 00MMY 0 1 240C178 2tNOW78 20 0 } RHl965Nv9845 DUMMY 0 1 240C178 1%JUN;9 164 213 RH2 765RH4 7 71 DUMMY 0-1 240CI78. 21hov78 29 0 RH4471RH6172 DUMMY 0 1 240Ci?8 21NOv78 20 0 { EH5 772RH53 7 3 DUMMv ' O I 240C178 lbh0W78 17 0 RH5*74RH6t?2 DUMMY 0 1 240CT78 2tNov78 20-0 kH3373RH9208 00MMY 0 1 240CT78 OIDfC78 27 0 [ WH7 766NH4 7 71 DUMMY 0 1 240Cl?8 21NOW78 20 0 CH1103RH9201 OUMMY 0 l'240Ci78 DIDEC78 27 0 RH7201FC9308 DUMMY 0 1 240C178 UlFfM79 69 65 (, RH720lN89301 DUMMY 0 1 240C178 OlufC78 27 69 RH930lRH9302 S T A91 RH-1 FUNCT.TFSI 10 1 UlDEL75 14 DE C 78 255EP78 060C178 -48 0

RH9 302RH930 3 COMPL. ' RH-1 FUNCT.iEST 11 1 150EC78 OlJAN79 0900178 230CT78

-94 0 i' RH9 303R V 9 301 00MM Y 0 1 03JAN79 UlFth79 21 24 RH9303pv9307 00May 0 1 U3JAN79 19JAN79 12 20 @H43035P0180 DUMMY 0 1 03JAN79 240C178 -4P O RH1303XV0045 00MMY 0 1 03JAN79 16 MAN 79 52 0 pl0003RI0005 COMPL. RI-l PUNCHLl5I 13 1 2400178 09NOV74 .065fP78 225EP78 -34 0 b

t: - CPilMA 1800 IR102 1 IM E-L I5 1 1N G .. P A G E 23 OF 40 PWisf L T M AN AGE MENT 'sV5 f EP TIHf NOW 240Ci7m 1754 0F 2880 ACTIVIIIES. I!ME UNIT DAV NE ih0RN. 05DE C77 18APR80 DAIL 08h0V78 h?Im0R% ZIMMER NUCLEAR PowfR StailfM UNIT I SELTLIED OIMAv7n ImAPRe0 ee**I / J LISTING **** e................................................................. ACIIVITV. A C i I V I i V ACliflIV E A R L IE.5 i LA i E 5 i P FLOAT 3DEhllFICATION DE 5CR IP T I ON IIMF CL STARI FINISH. STARI FINISH 5 101 FR

  1. 10005RI9301 DUMMY, 0 1 10NOV78-255EP78

-Je 39

  1. 1930!RI93G2 S T ARI R1-1 FUNCT. TEST 10 1-DIDEC78 140EC7A 255EP78 C60CT78

-ti 0 Ol#302RI9 30 3 COMPL. RI-I FUNCT. IEST. Il i 15DE C 78 02JAN79 690C178 230CT T A -48 0 219303RV9301 DUMMY 0 3 03JAN79 ' OlFf b 79 21 24 DI9 303RV9307 DUMMV O 1 03JAN79 19JAN79 12 20 . DI9 3035P0180 DUMMV O 1 03JAN79 240CI78 -46 0 Ol9303EV0045 DUMMY 0 1 03JAN79. 16 MAR 79 52 0 - #19330R19301 RCIC OIL FLUSH 0.5.CK 25 1 240CT74 28NOV7A 18AUG78 225EP78 ~46 2 ' 5P920!RP9301 RP OC/FCT 10 1 240CT78 06NOV78' 05JAN79 IRJAN79 50 58 PP9 30lHP9303 RP5 RP-1 PREOP 42 1 31JAN79 29 MAR 79 17APR79 14JUN79 5= 0 HP930lHV9307 DUMMY 0 1 31JAN79 19JAN79 -A 0 RP9303RV9845 DUMMY 0 1 30MAH79 15JUN79 54 103 i PR0b0lRR0002 COMPL. WR 5.8. PIPE 16 1 OlNOW78 22NOW78 26DE C 78 17JAN79 37 .0 RN0002RR9303 DUMMY O I 24NOV78 14JAN79 37 35 Chol 65RR0465 OEL HVDRAULIC CONT.5P VALVES 150 1 240 CIT 8 24MAY79 300C178 3tMAY79 4 0 GN0265RR9305 DUMMY 0 1 310CT78 27NOV78 la 5 RNOC65NR1265 INSTALL HYO CONTROL VALVES 10 1 25MAV79 08JUN79 Ol JUN 79. 14JUN79 9 0 EkOb69RRil65 DUMMY 0 1.240Ci?A 15 JUN 79 164 0

  1. 30t65RR0265 IN51 ALL SM ALL BORE HANGER 5 1 240CI78 300C178 17NOV78 24NOV78 le O

RRut65RR9203 DUMMY 0 1 240CI78 27N0V78 23 28 BR1265RV9845 DUMMY 0 1 IlJUN79 15JUN79 4 53 RR$577N#5672 PULL REMAIN P0mER & CEI-15 1 240CI78 13NOV 78 24Nov78 180EC74 24 0 ER5577RR6373 DUMMY 0 1 240CT78, ,28NOW78 29 0 ER5472RR6573 DUMMV O I 14NOV78 190FC78 29 0 Rh5771RR5971 COMPL CONOUIT 10 E0UIP 5 1 240CT78 300CT78 12DEC78 18DEC78 34 0 BR$471RR65 73 DUMMV O 1 3IOCI78 190fC78 34 10 Rh6 373RR6573 IERM REMAIN CONil & PowfR 15 1 240CI78 13NOV78 2MNOV78 18 DE C 7 8 24 U Rh6573RR67 7 3 PULL & TLRM F]NAL CA8LES 5 1 34NOW78 20NOV78 IvDE C TS 26DEC74 24 0 RR6773RR9301 DUMMY 0 1 21NOV7s 2 7 DF C 78 24 22

  1. R7265RR7465 DEL. SNUS8EP HANGERS 14 1 240CI78 10NOV78 D7N0V78 2740V78 to 0

i EP7365ke7565 I N5 f L RR-2 & 3 HANGFR$- 10 1 240CTTA 06NOV78 10NOV78 24NOV74 13 0 Rk7465RR7665 INSTALL SNUP8ER HANGER 5 20 1 13NOW 78 IIDEC78 24NOV78 26DECTA 10 0 KN7565RR9300 DUMMY 0 'NOV78 27NOW78 13 0 RR7565RN9301 DUMMV O 3 07Nov78 27btC78 34 32 pk756bRR9305 DUMMY 0 1 07NOV78 2 7NOW 78 13 0

  1. 2766$RR93UI DUMMY 0 1 120EC78 27DEC78 IO 8

Sk8472RRA672 JN51ALL RR MOTORS 6 1 240CI7m 3 8 0C T 78 24NOV78 ORDEC78 22 0 RR8671RR0001 DUMMY 0 1 OlNov78 26Df C 78 37 0 ER2672NWA772 PULL RR MOTOR CABLES +iERM 10 1 OlNOV78 14NOV7A 04 DE C 78 15DEC74 22 0 RR376uRR5771 UUMMY D 1 240C878 12bEC78 34 0-RWA 766HN9300 DUMMY 0 1 240Cl7n 27N0V78 23 10 C38766RR93UI DUMMY 0 1 240CI78 2 7DE C 78 44 42 kR3 766RR9305 DUMMY 0 1 240C 17 R 27NOV78 23 10 Rh4 772RR9303 COM8INED FCV TE5flNG 21 1 1%NOW78 14 DE C 74 18 DE C 78 17JAN79 22 20 ) 's --.s.-c.e n

w----.mw-- m m.- A. ..A em l g. 4, .-4 m-am+- 4-3i---4 PAGE 24 0F, 40 SP11MA 1100 3R302 1 3M E L I5 i !N6

  • +*

PROJE C T MANAGE MLNT SYSTEM TIME Now 240CT78 -1754 Or 2880 AcilvlTIE S. Tlat UN11 QAV NElWORn 05DEC77 144PR80 '9 ATE 08Nov78 NETWORm : 21 M ME R NUCLEAR POWER 5 T 41104 UNIT I SELECIED O!MAV78 18APRs0

        • l,/.J L1511NG****

. e..... -ACilvity. A C 1 I V I T Y ACTIVliv E A N L 1 E 5 i L A TE 5 1 P FLOAI IDEkilFICAllow 0E5CR IP i I ON TIME CL START FINISH STApi' FINISH 5 101 FR SR720lGR9203 OC/FCI PR-1 21 1 240Ci78 21New7S 260CT78 24NOWF8 2 U I WR9203RR9301 L OGIC 151. RR-1 21 'l 22Nov78 21DE C 78 27NOV78 260EC78 .2 0 Ch923ORR9310 OC/FCI RR 17 1 240CT78 15NOW74 05APR79 27APRF9 114 0 ,GW1300RR9302 5YS. HVDRAULIC. TESTING 21 1 07NOV78 06DEC78 2FNOW78 26 DE C 7 8 ' 13 0 C 930!RR9303 COMBINE FCV IESTING 15 1 22DEC78 15JAN79 2 7 DE C 78 17J4479 2 0 CNC302NR9304 dummy 0 1 0 7DE C 78 27 DE C 78 13 11

  1. N1303RR9331 RR UNCOUPLED TE5flNG 10 1 16JAN79 29JAN79 14JAN79 31JAN79 2

0

  1. CC305RR9307 F VC CCI PREOP.

21 1 0740V78 060EC78 2?Novi8 2bOEC78 13 0 CNO307RR9303 dummy 0 1 07DEC78 27DfC78 13 Il Rb@310RR9312 RR FLON LINE 81AS,NR-5 33 1 16NOW78 04JAN79 30APR19 14JuMF9 114 0 KH9312RV984 5 OUMMY 0 1-05JAN79 15JUN79 lit 163 RW9 320RR9322 ' RECI R. SYSTEM IHOil TEST 21 1 12JuM79 Il Jut T9 04APR79 02MAYT9 -48 0 CW9 322RV9133 OUMMY 0 1 12JUL79 b3Mav79 -48 0 ' 3E9333RR9333 RR LOW SPEED TESTIN6 23 1 30JAN79 2FFER79 OlFEb79 OIMAR79 2 0 RR9333Rv9329 DUMMY 0 1 2 4F E B 79 02 MAR 79 2 50 350129R50329 C ADwtLD5 2920 21 1 240C178 21NOV78 16MAV79 14JUN79 14 3 0 850329Rv914 5 DUMMY O 1 22NOV76 15JuM79 143 192 R1000lRT9 301 COMPL. CODE 1 + 2 ITEMS 65 1 240CI78 25JAN79 14NOV78 18JAN79 5 -5 0 '010465RT9301 OuMMY 0 1 240CT78 19JAN79 60 65 010565RT7566 DuMMV O 1 240C178 2R DE C 78 45 0 310565R19301 DUMMY 0 1 240CI78 19JAN79 60 65 RI!!6bRil701 00MMY 0 1 240Ci74 15JAN79 56 0 til90lNT7566 DUMMY 0 1,240C178 28DEC78 45 0 RI!96 sri 9308 OUMMV O-1 240CT78 19JAN79 60 65

  1. 1256bal3971 DUMMY 0 1 240C178 0$JAN79 50 0

019171Ri6373 OUMMV O 1 240C178 12JAN79 55 0 Ste972RI6173 DUMMY 0 1 240C178 09JAN79 52 0 RI5174RI6373 DUMMY 0 1 240CT78 12JAN79 55 0

  1. 16',7 3R i9 30 8 DUMMY 0 1 240C178 19JAN79 60 65 81720lRIT566 DUMMY U 1 240C178 28 DE C78 45 0

R 17 766R I 19 71 DUMMY 0 1 240CT78 05JAN79 50 0 917766RT9301 puMMY 0 1 240C178 19JAN79 60 65 plRu05RV9306 DUMMY 0 1 240CITS 19JAN79 60 22 R1910lRR9201 DUMMY 0 1 240CT78 260C178 2 0 51910lRR9210 DUMMY 0 1 240CI?8 054PR79 !!4 0

  1. 19203R19205 DUMMY 0 1 240C17a 21APRA0 380 380 ST130lRi9303 Ri-1 PREOP 30 1 26JAN79 08MA079-19JAN79 OlMAR79

-5 0 RI930lRW9307 DUMMY 0 1 26JAN79 19JAN79 -5 3 81930JRW9329 DUMMY 0 1 09 MAR 79 02 MAR 79 -5 43

  1. wl20lRwl501 dummy 0 1 240CT78 30sut79 194 0
  2. WSUG3RW9102 buMMY 0 1 240C178 2 7 JUL 78

-62 0 RW80ldNV9010 DUMMY 0 3 240CI78 3tAUG78 -37 0 GW9005CP0865 DUMMY 0 1 240C17h 22JAN79 61 0 St9005CP0765 OuMMY 0 1 240C17s 22JAN79 61 0 ) i

~ CPIIMS 1100 3R102 i i M E L 15 i IN 6 e* PAGE 25 0F 40 PO3JE L T MAN AGE ME NT SYSTEM ilMF NOW 240CT7R 1754 0F. 2n80 AcilWITIE S. Time UNIT DAY NE ib ORm 050EC77 IsAPR80 DATE ' 0040V18 ' NEiwoRK : Z I MME R NUCLE AR P0wfR S T A TI ON UNIT I ' SELECTED DIMAY78 18APR80

        • 1

/J LISTINCo*** CCilvliv A L T IV I i V ACTIVITV E A R L IE 5 1-L A i E5i P.FLUAT I DE Nil F I C A T ION .OE 5CR IP i 1 0N ilME CL START FINISH SiaWT FINI5N 5 TOI. FR RW9bOSCP1501 DUMMV. D. I 240C178 22JAN79 61 0 RU9005RV9010 DUMMY 0-1 240CT78 31A0678 -37 0 RV90TORV9014 DUMMY O I 240 CIT 8 - 23 AUG78 -43 0 i WW9103CBI565 DUMMr. 0 .I 240CT78 14FEB79 74 0 'QV9103PC9310 OUMMY 0 1 240CI78 21AU678 -45 0 St98233YD057 DUMMY 0 1 240C178 '09FE879 75 0 RW9825VG9301 OUMMY 0 1 240C178. 03JAN79 4e 74 RV9825VPv301 DUMMY 0 1 240CT78 2 3FE 8 79 85 133 WV9833RV9135 CRAIN VESSEL 3 1 12JUL79 16JUL79 03MAV79 '07MAV79 -96 0 RV9135RV9137 INSTALL.INCORE5 5 1.17JUL79 23JUL79 08MAY79 14MAv79 -4s O RV9135xv0069 buMMY 0 1 47JUL79 ISMAY79 -43 0 RW983 fRV9339 F ILL RN. VESSEL 2 1 24JUL79 25JUL79-15 Me V 79 16MAY79 -48 0 R W914 3RW 9 3 4 5 MEE T ' PRE P.F.L. 10 1 094U679 22AUG79 'OlJUN79 14JUN79 -4A I DW9 8%5RV984 7 FUEL LO AD. 1 I 244UG79 2440G79 15 JUN 79 15JUN 7 9 -49 0 DV9197220001 DUMMY 0 1 27AUG79 28 APR80 166 166 QW930lRV9303 COMPL. ECC5 PREOPS 21 1 06F E b 79 06 MAR 19 OlFE879 GIMAR79 -3 0 WV9303RV9329 DUMMY 0 1 07 MAR 79 02 MAR 79 -3 45 RV9 305RV9306 C.R.D. PRE OP F.C. STATION 10J l 09N0V78 22NOV78 05JAN79 18JAN79 34 0 GV930tRV9307 DUMMV O 1 24NOW78 19JAN79' 3M 46 .RW9307RV9309 C R0 PREOP-VENT &$TROM DRS RD-2 30 1 SlJAk79 13 MAR 79 19 J A N 79 OlMAR79 -8 0 RV9309Rv9329 DUMMY 0 1 14 MAR 79 02 MAR 79 -8 40 CV932LRV9329 DRYWELL HVAC BALANCE 21 1 21 MAR 79 184PR79 OlFEb79 OlMAR79 -34 14 3V932 7aV9329 DUMMY 0 1 14NOV78 02 MAR 79 75 12 3 RW9327XV0065 DUMMY 0 1 34NOV78 14 MAR 79 83 0 SV9329RV9331 1.L.R.L CONTMT. 5.1.1.15T 10 1 09MAY79 22MAYT9 02 MAR 79 15 MAR 79 -99 0 RV9329MV0009 DUMMY 0 1 09MAY79 15 MAR 79 -39 0 OW9333RV9401'DUMMV 0 1 23MAY79 16MakT9 -48 0 RV9339Rv9341 INTE G. ECC5 PREOP. 5 1 26JUL79 OlAUG79 17MAY79 23MAv79 -48 0 RW9341RW9843 LOAD SOURCES 5-1.024UG79 USAUG79 24MAY79 3IMAY79 .ma 0 WW940!RW9403 INi[b-mT2. TEST + DRAIN RVP 5 1 23MAY79 30MAY79 16 MAR 79 22 MAR 79 -4 n U RV9403RV9405 INSTALL VIbp4T. INSTRU. 6 1 3tMAV79 07JUN79 23 MAR 79 30 MAR 79 -48 0 059405RV94U7. F ILL R.P.V. AND INSTALL HEAD 2 1 08JUN79 IlJUN79 02APR79 03APR79 -4A 0 RW7405EY0013 DUMMY 0 1 08JUN79 03AFR79 -47 0 RV9407RR9320 DUMMV O I 12JUN79 04APR79 -48 0 RV9845RV9145 00MMY 0 1 244Ub79 15 JUN 79 -49 0 5805551A9201 DUMMY a 1 240C178 22 MAR 79 jun 84 SC33785C4773 DL9MY D I 240C178 22Nov78 21 0 SC39735C4773 DUMMY 0 1 240C178 22NOV78 21 0 504 7735C4973 PULL LIERM FINAL CABLES 5 1 240CI7e 300CT78 22Nov78 29NOV78 21 0 SC99735C9201 UUMMY 0 1 310CT7e 30NOV78 28 0 SC61665C9201 DudMY 0 I 240C17e 30NOV78 26 5 5091125C9201 DUMMY 0 1 240C17e 30NOV78 26 5 $C92315C9301 OC/FCT SC-1 42 1 310 Ci f e 290E C 78 30NOVis 30JAN79 25 0 SL9 3015C9303 5HLC SC-l.PPEOP 21 1 02JAN79 30JAN79 3tJAN79 2AFEBI9 21 0 kw 4


l

~- ~_. .~ f 02112A 1100 3R302 1 1 M E L 1 5 'T I N G PAGE 26 OF 40 P&OJEC T M Ah AGE MENT SV5 TEM ilME NOW 240C178 1754 0F 2880 AcilvlilES. TIME UNIT DAY hElbORM 05DEC77 IR APR80 $4TE 08MOWTA hElucen : 21MMER NUCLEAR POWER STATION UNii 3 SE LEC TED OIMAY78 '. 18APRp0

        • 1

/ J L15 TING **** e, e....... '. ' A C T'I.V.I i V ACilW11V E A R L 1E5 i LA I.E 5 i P FLOAT , 'ACIjWIIV' l OE Ni l F IC Al lON Oi 5CR IP i I oN TIME CL START Flhl5H SIART FINISH 5 foi FR S C9 30 3509 304 WE55LL INJE CT. -T EST. lJCI 1 1 3tJAh794 31JAN79 O! MAR 79 OIMAR79 28 0 SC9304RW9329 OUMMY 0 1 OlFEp79 02 MAR 79 21 69 5801945E0314 LAND 5CAPING,8ACMFILL leux 56 3 240C178 12JAN79 .OlFEBAO l A APR80 324 0 SE 0 314 22000 8 DUMMY 0 1 15Jah79 214PReu 324 324 SF OI2 35F0323 F ORM40Ru,w ALLS 2310 77 1 240Ci?8 12FE*79 16JAN79 02M AY F9.

  • 57 0

55 0 32 35F 132 3 0 1 13F E b 79 U3MAY79 57 0 Sf07235F0923 RE51 EEL, WALLS 2320 25 1 240Ci?8 28N0W78 15 MAR 79 184PR79 99 0 SF0%235Fll23 EMBEDMENis,w ALLS 2330 to i 29NOW78 12DEC7a-19 AF R 79 '02MAY79 99 0 ' 5F C 92 35 F 132 3 0 1 29NOW78 03MAV79< log 52 .0 1 130EC78 03MAV79 99 42 SFil235Fl323 30 I 13F Es 79 26 MAR 79 03MAV79 34JUN79 57 0 Si n 3235F 1523 CONCREIE W ALL5 2340 SFl523RW9145 0 1 27 MAR 79 15JUN79 57 106 SF 172 35F 192 3 F ORMw0RN,E L.5L A85 2510 30 1 240C178 05DE C 78 05 EAR 80 15APR80 347 0 $ Fit 235F2923 0 1 060EC78 16APk80 34 7 50 l $F21235F2323 RESTEEL,5 LAP 5 2520 80 1 240Ci?A 15FEB79 240EC79 15APR80 297 0 SF23235F2923 0 1 16FEB19 16 APR A0 297 0 SF2b235F2723 EM8EDMENIS 5LA85 2530 50 1 240Ci?8 04JAN79 06FEh80 15APR80 32 7 0 SF27235F2923 0 1 05JAN79 16 APR 80 327 30 SF29235F3123 CONCRETE,5LA85 2540 3 1 2 6F E 8 79 20FE 8 79 16 APR80 18APR80 297 U- - 5F3323220001 OUMMY 0 1 21F E B 79 21APRRO 297 297 SF 33275F 3527 TOPPING SLAPS-FORMWN 2710 13 1 240C178 09NOW78 02APR79 18APR79 Ill 0 SF35275F4527 0 1 IONOW78 19APR79 Ill 26 SF 3 72 75F 392 7 TOPPING SL A5 5-RE 51E E L2 720 10 1 240CI78 06NOW 78 05APR79 1AAPR79 114 0 SF 39275F452 7 0 1 0 7NOW 78 19APR79 lit 29 SF98275F4327 10PP!h6 SLAPS-EMBEDS 2730 39 3 240 CIT 8 180EC78 23FE8 79 ~ 18APR79 85 0 SFe3275F4527-0 1 190EL78 19APR79 85 0 SF45275F4727 IOPPINb SLAB 5,CONCRT 2740 40 1 190EC7a 14F E P 79 19APR79 14JUN79 85 0 5F4 72 7RW914 5 0 1 15F E B 79 15JUN79 85 134 560122560322 STRUCTURAL GROUTING 22NX 18 1 240Cl?8 16NOW78 21MAY79 14JUN79 146 0 $h0322RW9845 DuMMV O 1 17h0W78 15JUN79 146 195 5b0 322220001 OuMMY .0 1 17NOW78 28APR80 362 362 l' SH05555H7766 DUMMY 0 1 240Ci78 27FEB79 87 0 5b05555H9201 ObMMY 0 1 240Ci78 03APR79 112 12 SH2 3015H2565 COMPL.HGR e lN5 f L 'N. 12 1 240Ci7s 08NOW78 16 MAR 79 02APR79 100 0 SH25S55H9201 DUMMY 0 1 09NOW7h 0 3 APR 79 100 0 SH38tb5H4971 DUMMV O 1 240C178 20 MAR 79 102 0 SH31655H7766 DUMMY 0 1 240CI78 2 7F E B 79 87 0 5HD7715H4971 DUMMY 0 1 240C17A 20 MAR 79 102 0 SH49715H5873 COMPL.CONouli TO EQUIP. 5 1-240C178 300C178 20MA R 79 26 MAR 79 102 0 5H58715H5973 OuMMY 0 1 310C178 27Mak?9 102 0 5H79165H4971 UUMMY 0 1 240CITb 20 MAR 79 102 0 5H79365H9201 DUMMY 0 1 240CITA 0 3 APR 79 112 12 5H92005H9208 OUMMY 0 1 240C178 USAPW79 112 12 5H91015H920 3 PROV IDE SH FOR WINTER HI O 1 09h0V78 03AFR79 100 0 b

4 l 4 - CPilMA 1300' 3Rl02 I I M E L 15 iIN b PAGE 27 0F .40 PhDJE C T MAN AGE MENT SV5 FEM TIME NOW t 240C178 1754 0F 2840 ACTIVITIES. TIME UNIT DAY i ~ NEibuRE CSOE C 7 7 IMAPR80 = tait'.08MOV78 NE 1 W ORn a ZIMMER. NUCLEAR POWER STATION UNIT I SELEC TED DIMAY 78 ISAPRhD ee**1 / J LI5I!NGo*** e e. AC11VITV 'A C 1 Iy IT Y ACTIVliv E A R L 1E 5 i L A 1 E5 I P. FLOAT I DE NilF IC A I!ON DE 5 CR IP 1 1 0 N IIME.CL START-FINISH SIART FINISH $ 10T FR 4 5HD2335H9205 C ONilNUE SH TE ST I46 to 1 09N0V78 22NOV 78 05APN79 16APR79 '800 0 SH92055H9301 CONilNUE SH IE ST ING 10 1 24NOV78 070EC78 OlJUN79 14JuM79 132 0-5H1205VW9208 DUMMY O I 24NOV78. 17 APR 79 100 33 SH7 30lRV98 45 DUMMY 0 .I On0EC78 15 sum 79-132 183 $H73035H9305 SH-01 STAT HT CONT PREOP 20 1 240Ci7A 20NOV 7 A 14FEb79-13 MAR 79 78 0 1H730S5H9307 5H-01 STAT HT COMP PREOP 5 1 2tNOV78 29NOV78 14 MAR 79 FIMAR79 78 0 $H1307Vu9310 DUMMV O I 30NOV 78 30MAY79 126 Se $H9 30 7 W-9 301 DUMMV D' I 30NOV78 22 MAR 79 Ja 82 $193C3519303 51-1 SEI5MIC INSTNU PREOP 23 1.240C178 24NOV78 14MAY79 14JUN79 141 0 &lt303RV9845 UUMMV O I 2 7NOW 78 15JUN79 141 190 1x01365a0336 VENT 51ACm 3610 3 1 240C178 260C178 14 MAR 79 36 MAR 79 98 0 120336069301 0 1 270CI7A 19p4R79 94 67 1 SE0lel5LU348 SURFACE LAVOUT 40 1 240C178 190EC78 19APR79 14JUN79 124 0 SLO 381RV9145 UUMMY U 1 200EC78 15 sum 79 124 173 $ POLO!5P0005 5+L RELEASE 10 CUT SRW PIPING 3 1 240C178 260C17A 16AUG78 IPAUG7R ~48 0 SPOCOS$P0010 n.E.I.^ ST ART REMOVAL OF SPV PIPING 17 3 2 70C 178 20NOV78 21AUG78 135EP78 -48 0 $P00lDSP0025 DUMMY 0 1 21NOV78 145fP78 .-48 0 - 5 PDC 205P0025 E ST. RE OUIREMENTS FOR CLEANING 5.P. 15 1 240CT78 13NOV78 23AUG78 13 5E P 7 8 -45 5 $P002 SSP 0030 REMOVE SCAFF. & CLEAN-5UPPRE5510N POOL 5 1 21NOW78 28MOV18 19 5E P 78 205LP74 -44 0 $P003U5P0045 DUMMY 0-1 2*NOV 78 28$[P78 -44 0 $P00405P0045 E ST. REOUIREMENT5/ PREPARE FOR FILL 25 1 240 CIT 8 28MOV78 16Aub78 20$EP7A -48 0 SF00455POU50 F ILL POOL 2-1 29NOV78 30NOV78 215E P 78 225EP78 -48 0 $P0050HP9301 DUMMY O 1 OIDEC78 255EP78 -48 0 y - $P005DLP9 301 UU1MY 0 1 OIDEC78 25 SE P 78 -48 0 $P0050NH9301 OU4MV O 1 O!DEC78 25 5E P 78 -th 0 $PC050R19301 00MMY 0 1 010EC78 25 SE P 78 -48 0 $ POD 60$P0065 C OMPL. HANGE R INSIL. +' STEEL WORR 25 1 290C178 28MOV7A 1640678 205EP78 -4R 0 $P00655P0045 DUMM) 0 1 29N0V78 215fP78 -4p 0 . 1POUTU5P0075 5+L ISSUE 00ENCHER SUPPORT DESIGN 15 1 240C178 13NOW78 2RAUG78 Is5EP78 -40 0 - $P007b5POU80 PROCURL /F AB OUENCHEP SUPPORTS 30 1 14NOV7A 270EC78 195EP18 3000178 -40 0 t i ' $P00aOSP0200 puMMY 0 1 24bEC78 3l0C178 -40 8 $P0090$P0095 5+L 155UE GUIDE DESI6N 25 l'240CT78 28NOV7A 28Aub78 255EP78 -45 0 1PUL955 Pol 00 PROCupt/ FAB bulDES 25 1 29NOV78 04JAN79 2h 5E P 78 300Cif8 -45 0 i $P38005P0200 DUMMY 0 1 05JAN79 350CI18 -45 3 SF01055Pul10 DEIERMINE PAINI REO +MT E PAINT 20 1 240C178 20NOV78 29NOV78 27DEC74 25 0 ) ' $ Poll 55P0120 DELIVEN FIRST "T" OUE NCHE R$ 15 1 240CI7m 13NOV78 100C178 300CT78 -10 0 $ Pol 105P0190 00MMY 0 1 21NOVTP 280fC78 25 38 i SP0120$P0200 DUMMY 0 1 14NOV78 3100l78 -In 3R $P01255 Pol 30 DELIVER L AST "I" OUENCHERS 35 1 240Ci78 120LC78. 125EP78 300CT78 -30 0 $P01305P0200 UUMMY 0 1 13DEC78 310C178 -30 is $P01355P0140 5+L RELEASE 151 SRV PIPING 5 1 240CI78 300C 17 A 164Ub78 22AUG78 -44 0 SP01405P0145 DELIVEN LA51 32" SRV PIPING 4R I 3tOCI7b 09JAN79 23AUG78 300CT78 -94 0 $P0340$P0150 DUMMY 0 1 330C178 240 CIT 8 -5 0 $P01455P0200 DUMMY 0 1 10JAN79 330CI78 -en 0 f

(PilMA 1500 3R102 1 1 M E L I 5'T l'N 6 PAGE 28 Of 40-P h0 JE C T M AN A GE ME NI SYSTEM. TIME NOW 3 240CT78 1754 0F 2880 ACIIVITIES. TIME. UNIT DAY l, NEIWORn 050E C 7 7 18APRnD ,A CAit 00N0V78 NETWOpn s ZIMMER NUCLEAR POWER STAileN UNIT I SE LEC TED OlM AY78 'IaAPN60

        • 1

/ J Ll511NGe*** l,. g ,,( ACTIVITV & C i I V I T Y ACTIVITV E A R L 1E 5 i L A.I E 5 i P FLOAI IDE NII F I C A T ION OE$CR IP i1 0N 11ME CL STAki FINISN SIARI FINISH $ 101 FR 5 Pol 50$ POI 55 DELIVER 15 1 SRV PIPING 5 I 310CI A 06h0V 8 240C878 300CT78 0 SPol555P0200 OUMMY 0 1 07hov78 310CT78 ' -5 43 l) SP0 3605P0865 PROC /F A8 00WNCOMER BLING FLANGES 21 1 240C T 78 21NOV74 18JAN79 15FEB79 59 32 A, SPul655PO!70 INSIALL 00bMCOMER BLING FLANGE 5 10 I IOJAN79 23JAN79 16FfB79 'ORMAR79 27 0 SP0170RV9329 DUMMY 0 1 24JAN79 02M AN 79. 27 75 SPoI805 POI 85 DRAIN SUPPhES$10N Pool 5 1.03JAN79 09 JA N 79 2 4 0C I 78 300C T 7 4 -48 0 'f-SPol855P0165 00MMV O ! 10JAN79 16FEB19 27 0 SP01855PO!90 C ON T. $UPPRE5510N POOL WORM 5 4 10JAN79 16JAN79 200EC78 270EC78 -33 0 SP01855P0200 DUMMY 0 1 10JAN79 .3100178 -94 0 l,1 SP01905 POI 95 COMPL. SUPPRESSION POOL WORN 40 1 17JAN79 13 MAR 79 290EC78 22FER79 -13 0 5&OI955P0220 DUMMY 0 1 14 MAP 79. 2 3 F E b 79 -13 0 j, SP02005P0205'5El MAI'L IN S UP PR E S S ION POOL 5 1 10JAN79' 36JAN79 310CI78 06Mdvi8 -4m 0 5F02355P0190 OUMMY-0 1 17JAN79 280EC 78 - -13 0 7,, 5F02055P0210 DUMMY 0 1 17JAN79 07NOV78 -44 0 5P021U5P0215 CLOSE SUPP. POOL ACCESS HATCH 25 8 ITJAN79 20FE879 07N0V78 120EC78 -4P O

d '

5002155P0220 FINISH MONG TU8E & RAIL 15 1 21FE879 13 MAR 79 02FEG79 22FEB79 -13 0 SP0215VP0009 OUMMV O 1 21F E H 79 130fC78 -en U },, ,5 P0 2205P02 2 5. F NL CLEANING & FILL SUPPRESSION POOL 5 1,14 MAR 792 20MA,R79, 23FEB79 OIMAR79 -13 0

) *

$P0225RV9329 OUMMY 0 1 21 MAR 79 02 MAN 79 -13 35 550138550338 RB STRUCT SIEEL 3110 30 1 240CITA 050EC78 03MAY79 14JuM79 134 0 5%0132550332 MISC SIEEL 3210 116 1 240C178 06APRI9 03JAN79 14JUN79 48 0 'It S$0333550333 GALLERF Si((L 3310 33 1 240Ci?8 ORDEC78 30APR79 14JUN79 131 0 550338RV9845 0 1 06DE C 78 15JUN79 134 183 l, 550332RV9845, O ! 09APR79 15JUN79 48 97 ',( '550333RV9845 0 1 Il0EC78 15 JUN 79 131 150 101165101365 COMP IN51 LB HANGERS 10 1 240C178 06NOV78 20NOV78 040EC78 19 0 ~ il1365WF9301 DUMMY 0 1 07h0V78 05DEC78 19 33 j,( 102575102771 UUMMY 0 1 240C17s 20NOV78 19' 10 102771102871 COMP CONDUli TO [0UIP 5 1 0 7NOV 78 13NOV78 20N0v78 27NOV7R 9 C 1,, ID2F71T03573 UUMMY 0 1 34NOW78 2RNOV78 9 0 l,( . iD3 373ID357 3 CONT TERM PCEI CABLE 3 i OlN0V78 03NOW78 22NOV78 27NOV78 15 6 f, 1U3 573 T037 7 3 PULL LIERM FINAL CAPLFS. 5 1 14NOV7A 20NOWTA 24NOV78 04DEC7R 9 0 ],, 103773wF9301 OUMMY O I 21NOW74 05D1L78 9 23 i,f Ib4172iO4372 PULL PCCI CABLE 6 1 240CI78 3100178 14NOV78 21NOWFA 35 0 i, 104372103373 DUMMY 0 1 OlNOV7e 22NOV7s 15 0 T U5 366 T 05566 COMP INSTR PIPE LIUBING 10 1.240CI78 06NOV78 0640V78 17NOV78 9 0 ,J 105566102778 UUMMV O I 07NOV7s 20NOV78 9 0 IU5566WF9301 DUMMV 0 1 07N0V78 05DfC78 19 33 i IE0165TE0265 INSTALL 5 MALL BORE HANGER 10 1 240CI78 06NOV78 03JAN79 16JAN79 4A 0 g

f IE 016S TE 0 365 COMP.F AB & IN51 50 PIPE 10 1.240C17s 06NOV78 26DE C 78 09JAN79 43 0

4, It0265wE9301 DUMMV O I 07Nov78 17JAN79 48 70

g 15 0 36ST E 6566 00MMY 0 1 07NOV78 10JAN79 43 0

4-I E 1365m E 930 8 OuMMY 0 1 240CT7R. 17JAN79 5A 80 TEl965fE2758 puMMY 0 1 240Cifs 15NOV78 16 0

~. (>IIKA 1500 3R102 i ! M E L I5 I IN 6 e o e PAGE 29 of 40, P k3JE C T M A N A fiE ME N T SV5 FEM IIMF NOW t 240CT78 1754 or 2880 AC IIVITIE S. flaE UNIT DAV NETWORh 050fC77 InAPR40 SATE.08h0V78 NElWcem a ZIMMER NUCLEAR P0bfR ST All ow UNI T I SELECTED OlMAV78 18APRnD esee! /J LISTINGeseo e...............................................................- KCIIVITY A C i IV I T Y AcilvlIV E A R L 1E $ i L A I E 5 i P. FLOAI OE5CR IP i I ON TIME CL SIAPT FINISH STARI FINISH 5 TOI FR ..'E ti! F I C A l l 0N ill965fE3575 DUMMY, 0 1 240C178 !!JAN79 54 13 Ill9551E6566 puMMY 0 1 240C178 10 SAN 79 53 10 It.255titl765 puMMY 0-1 240Ci78 15NOV78 16 0 1125541E2758 DUMMY 0 1 240C178 15Nov78 16 0 1(2955mE9208 DUMMW. 0 1 240 CIT 8 15Novi8 16 38 IL 3 371 T E 3571 CONTINUE CONDUIT 13 1 240C178 09NOV78 210fC78 10JAN79 el 0 It3578IE3778 COMP. CONDUIT 10 EOUIP. O I 10NOV7s llJAN79 43 0 113 7711E4573 OUMMY 0 1 10NOV78 IlJAN79 41 0 It4 37JIE4573 CONI.IERM PLC CABLE 5 1 240CI78 300Ci?8 04JAN79 10JAN79 49 A It4573TE4773 PULLL 1[RM FNL CABLES 4-l'10NOV78 15NOV78 IlJAN79 16JAN79 41 0 114 775mE93HI dummy 0 1 16NOV78 17JAN79 41 63 Tl5172iE4173 DUMMY 0 1 240Cl?8 FI DE C 78 41 0 ft5372i[4373 DUMMY 0 1 240C178 04JAN79 49 0 I155721[4573 DUMMY 0 1 240CT78 IlJAN79 54 13 It6516TE 6766 COMP INSTR PIPE / TUBING 1 1 0 7NO V 78 07NOV78 10JAN79 40JAN79 43 0 itb73biE 3571 DUMMV O I DRNOV78 IlJAN79 43 2 IF ol&51F0365 COMPL F A8&lNST ALL 58 PIPE 4 1 240CI78 270C178 14NOV78 17N0V78 15 0 Il0265mF9201 DUMMY 0 1 240CI?8 2]APR80 380 3n0 IF 0 3h51F 6766 DuMMV O 1 300Ci78 20NOV78 is o if0365wF9301 DUMMY 0 1 300C178 050fC78 25 39 1$0165ffil65 DUMMY 0-I 240C178 20NOV78 19 0 illlSbiF1365 COMPL HGR INSTL. 10 1 240Ci?8 06NOV7A 20NOV78 040EC78 19 0 ifl3L5WF9301 DUMMY 0 1 07NOV78 050EC78. 19 33 IllT651F1965 COMPL LARGE 80RE PIPE D 1 14Nov78 20Nov78 4 0 IFit15TF2758 DUMMY 0 1 14NOV78 30NOV78 11 0 IF19thlF3771 OUMMY 0 1 14Nov78 20NOV78 4 0 il19651F6766 DUMMY 0 1 14NOVTP 20NOV78 4 0 IF 2 35 tIF2551 SE T L ALIGN EOUIPMENI 15 1 240C178 13NOV7A 300C178 17NOV78 4 0 IF 2 551 TF 1765 DUMMY 0 1 14NOV78 20NOW78 4 0 IF2551TF2751 DUMMY 0 1 14Nov78 30NOV78 It O IF2751Tf2951 FNL ALIGNMI LGNOUI EQUIP 3 3 14NOV78 16NOW78 30Nov78 04DEC78 O Il2951mF9301 DUMMY O' 1 17Nov78 05 DF C 78 il 25 Il35711F3771 DUMMY 0 1 240CITA 20Nov78 19 15 IF 3 7711F 3971 COMPL CONOUIT 10 E CHIP 5 1 14NOW7P 20NOV78 20Nov78 2FNOV78 4 0 TF 3974 TF47 73 OUMMY 0 1 2tNOW78 2sNOV78 4 0 IF 4 5731F4 7 7 3 C ONilN.TE RM PLC-C ABLES 20 1 240CI7R 20NOV78 30 0C I 78 27NOV78 4 0 IF4 773f r4973 PULL L TERM FNL CABLES 5 1 23NOVTH 28NOV7A 28NOV78 04DEC78 4 0 II497JmF9301 DUMMY 0 1 29NOv7M USDEC78 4 l8 IF5572TF5 7 72 CONI. PULL POWEN & C&] CAB 20 1 240C178 20NOV78 3000178 27NOVF8 4 0 IF5 7721F477 3 DUMMY 0 1 21N O W 78 24Nov78 4 0 ll6966TF 37 71 DUMMY 0 1 240CT78 2nNov78 19 15 Ii6916mF9301 DUMMY 0 1 240C178 USDfC78 29 43 ) 14,0009160011 COMPL.ASSEM.TUHNING bFAR 10 1 240CI78 ObNOW74 22Nov78 06DEC7A 21 0 lbu0llIG0062 OUMMY 0 1 07NOV78 0 7Df C 78 21 10 =

6 $PIInA 1800 3R802 1 1 M E L I 5 i I N G e e o PAGE 30 0F 40 Pk3sELT MANAGEMENI SYSTEM 11ME NOW 3 240C178 1754 or 2880 ACilvillE5. TIME UNIT Day NETWOHk 050EC77 18 APR8 0 L DAIE 08NOV 78 - NEIWORM 3 2]MMER NUCLEAR POWER STATION UNIT l SE LECi[0 OIM Avis leAPR80 / J LI5ilNGe*** e................................................................. ACIIVliv A C i i V I T Y ACilVITY E A R L IE 5 1 L A i E 5 I P FLOAI u IDE NT IF IC All0N DE 5CR 1P i 1 0N ilME CL START FINI$H STANT FINISH 5 101 FR s t h!OISIG0017 UNIT ENCLOS. LP CYLINOER 10 1 240Ci?8 06NOV78 09MAYT9 22MAY79 138 0 160D17160081 DUMMY 0 1 07NOV78 23MAvi9 138 118 I600 3 7 TG0039 I NS TL.HP GLANDS 10 1 240C178 06NOV78 2aMAE79 10APR79 108 0 (- 1000391G0040 DUMMY 0 1 01NOW76 IIAPR79 104 88 1600401G0b48 BLOku0bN G5 15 1 14 MAN 79 038PR79 !!APkT9 OIMAYI9 20 0 160041T60042 NEstoRE G5 15 1 04APR79 24APR79 02MAY79. 22MAY79 20 0 ( 162042160081 OUMMY 0 1 25APR79 23MAV79 29 0 160050160052 COMPL. GLAND STM.C RETURN PIPING 15 1 240Cf78 13NOV78 28 MAR 79 104PR79 103 0 todc52160040 OUMHV O 1 14NOV78 II APR79 103 83 ( 1b0059150061 CALib. SUPERVli.INSTRUM. 10 1 310C17H 13NOV78 15NOV78 29NOV78 11 0 lbdD68160062 INSTALL HP COUPLING 5 1 14NOW78 20NOV78 30NOV78 06 DE C 7 n 11 0 160062160063 ASSEN.LCLOSE PEDESTALS 3 1 21NOV78 24NOW76. 0 7 DE C 78 !!DEC78 O ibf063160064 DUMMY 0 1 27NOV78 17DEC7A It O g 1600631G0lvt DUMMY 0 1 27NOV78 130E C 78 12 8 1600647G0065 START IURNING bE AR 1 1 27NOV78 27NOV78 12 DE C 78 120EC78 il 0 [ 160065TG0191 UUMMY 0 1 28Nov78 13 DE C 78 ~ 55 0 II O -160073159208 OUMMY 0 1 240C178 12JAN79 160077160079 IUNR. GENERATOR OPERATION I 1 05JAN79 05JAN79 19JAN79 19JAN79 10 0 { I60076160081 DuMMV O 1 08JAN79 23MAV79 97 77 160079169301 DUMMY 0 1 09JAN79 22JAN79 10 0 1600811G00e3 VACUUM ON UNIT 16 1 25APH79 16MAV79 23MAV79 14JUN79 20 0 [ ib2083TG0084 DUMMY 0 1 17 MATT 9 15JUN79 20 0 161084160085 IURRINE PEADY 10 ROLL 0 1 17MAY79 15aON79 20 0 16008bpW9145 UUMMY I 17MAY79 15JUN79 20 69 [ Tb00891G0091 COMPL. STM. CHEST CONTROLS 1 240C178 3000178 09N0V78 I4Nov74 It O ib3L91TG0059 OUMMY I 310C178 15NOV78 Il 0 160113160337 DUMMV U 1 240C178 17NOV78 18 0 [ IG0ll71G0119 lh51L.BY-PA55 INTERNALS 27 3 240C178 30NOV78 17NOV78 270CC78 le 0 1601191G0157 DUMMY 0 1 010[C78 2RDE C 78 18 8 169121TG0123 VACUUM PUMP RUN-IN 2 1 15 MAR 79 16 MAR 79 28MAY79 22MAY79 47 0 {. 100123160088 OUMMY 0 1 19 MAR 79 23MAvi9 47 27 16012h160127 N.E.I. IN51ALL SUPPORT 20 1 240C178 20NOW78 07NOV78 050EC78 to 0 ILOl277G0129 SEI bY-PA55 ACCUMAL410R5 5 1 21NOV78 28Novin b6DEC78 120EC78 to O { 163129160131 INSILebV-PA55 PIPE TO ACCUM. 10 1 29NOV7A 12DEC78 130FC78 27DEC78 10 0 100131160457 uuMMY 0 1 13DEC78 29 0E C 7a 10 0 1601531G0155 COMPL. EhC PIPING 24 1 240CITA 27NOV78 22NOV78 270EC74 5 24 0 T65355160157 DUMMV U 1 2nNOV76 2nurC78 21 11 160157IG0359 PWEPARE F OR FLUSH ' 5 1 13DEC7b 190E C 78 24 DE L 78 04JAN79 10 0 1h0159360161 COMP. EHL CONIL.5YS L FLUSH 10 1 20DE C 78 04JAN79 05JAN79 18JAN79 la O IG0161EH9301 DUMmV 0 1 05JAN79 16 maw?9 50 44 1001611G0077 UUMMY 0 1 05JAN79 19JAN79 10 0 1001653G0867 S&L HELOC. EHC ACCUMULATORS 14 3 240CI78 10NOV78 20NOV78 OMDE C 7 a 19 0 160167tG0169 IN51L LHC ACCUM. PIPING 12 1 13NOW 7M 29NOV78 llDEL78 270EC7A le 0 1b0169160457 DUMMY 0 1 30NOVTM 2ADIC78 19 9 )

= - - DPTIMA 1100' 3#102 T I M E L I5 i iN G PAGE 31 0F 40 > R3JE C T M AN AGE ME N T SYST[M TIME NOW 240CT74 1754 0F 2480 ACTIVIllES.- TIME UNIT DAY NrikORK 050EC77.. IAAPR80 DATE USNOV78 NETWORM t ZI M ME R NUCLEAN POWER STATION UNil 1 SELEC TED DIMAY78 18APR40 / J LI5i!NGe*** A....'..'.......'..................................................- AtilWIIV' JDENilFICATION. A C 1 IV I T V ACT!WITY E A R L 1E 5 T L A T E5 i P FLOAT OE 5CR IP T I O N TIME CL 51ARY FINISH 51 ART FINISH 5 TOI FR lG017 big 0177 AIR TEST HVORO. COOLERS to a 240C178 06NOV 7s 16NOV78 30NOVyn I? O $b3177160179 UNI T ENCLOS. GENER A TOR 8 1-07NCW78 16NOV78 Ol0EC78 120EC78 17 0 160174160181 UUMMY 0 1 17Nov78 13 DE C 78 17 0 1b0188160183 COMPL. GENERATOR ASSEMBLY 5 1 17NOV78 24NOV 78 IIDFC78 190LC74 17 0 $60183TGol85 DUMMY 0l 1 27NOV76 20D(C78 17 6 16019b1G0187 Alu TEST GENENATOR 20 1 050E C 78 03 JAW 79 20 DE C 78 18JAN79 11 0 1603871G0077 00MMY 0 1 04JAN79 19JAN'9 11 I 1601871G00n4 OuMMY 0 1 04JAN79 15JUN79 II5 95 1601%I TG019 3 A DJUS T SEAL OIL CONIROLS 5 1 2nNOW78 040EC78 110EC78 190EC78 11 0 160193TG0185 DUMMY 0 1 050EC78 20DE C 78 11 0 1b0203 TG9203 T /b OC/FCT. ELECTRICAL 15 1 240CT78-13NOV78 20NOV78 Il0EC78 19 0 Ib92031G0064 00MMY 0 1 14NOV78 120EC78 19 8 1693316C9301 IG-2(3 TURb AUA PREOP 44 1 08JAN79 08 MAR 79 22JAN79 22 MAR 79 30 Si ib9310CA9301 16-1 IURB GL AND PREOP 21 1 23JAN79 20FER79 19FEB79 19 MAR 79 19 16 1100011I0003 START 11 SV5 TEM INSTALLATION 30 1 240C178 05DE C 78 21bEC78 02FEB79 41 8 130003110005 COMPL 11 SYSTEM INSTALLATION 30 1 IMOEC78 30JAN79 05FEb79 16 MAR 79 33 0 110u05110012 00MMY 0 1 31JAN79 19 MAN 79 33 0 Il001U T 10012 G.E. DE LI VE R STARTREC COMPUTER 21 1 240CI78 21NOV78 16 fed 79 16 MAR 79 80 47 110012110014 INSIALL & CALIBRATE COMPUTER 63 1 31JAN79 27APR79 l# MAR 79 14JUN79 33 0 fl0014RV9145 OUMMV O 1 30APR79 15JUN79 33 82 T10020T10022 h.E.FNL.51A31 REC SVS.0E51GN 15 1 240CTF8 13NOV78 !! DE C 74 02JAN79 33 0 110022110024 G.E. APPROVE & S&L 155.0WG MODIF. 23 1 14NOV78 150EC78' 03JAN79 02FE879 33 0 110C24110003 DUMMY 0 1 IADEC78 05FE B 79 33 0 10*201109203 TO OC T /F C T 15 1 240C178 13NOV78 10NOV78 010!C78 13 0 109203160064 DUMMY 0 1 14NOV78' 12DE C 78 19 4 101203109301 DUMMY 0 1 14NovTa 040FC78 13 7 109308b59301 00MMV O 1 24NOV78 17JAN79 36 17 101301109303 10-1 TURb.0IL PRE 0P $1 ART 21 1 24NOVTH 220LC7A 04 0E C 78 03JAN79 6 0 109303159301 IO-I IURb.DIL PREOP COMPL 21 1 26DEC78 24JAN79 04JAN79 OlFE879 0 0 TP920llP9301 OC/FCf TP-1 19 1 02JAN79 26JAN79 05FEb79 OlM AR 7 9 24 0 IP930llP9303 IIP IP-1 PREOP 47 1 29JAN79 03APR79 02 MAR 79 07MAY79 24 0 TP9303RV9135 00MMV O I 04 APP 79 DRMAY79 24 72 159201159203 15 GC 1/FC T. ELE CTRIC AL 1% 1 240Ci?S 13NOV78 12JAN79 01F E R 7 9 55 0 159203I59308 DUMMY 0 1 14Nov78 02FE H 79 55 49 IS930l[H9301 T5-1 IURB.5DPERVISOP PREOP 30 1 25JAN79 07 MAR 79 02FEU19 15 MAR 79 6 0 V AILO!V A9301 COMPL. PUNCHLIST 5 1 240Ci78 30nCTFA 22MAV79 28MAV79 147 0 VA?331VA9303: VA-01 AUa BLDG PREOP. 12 1 310CT78 15NOV7A 30MAY79 14JUN79 147 0 VA9303RV9145 OUMMY 0 1 16NOV7m 85JUN79 147 196 Vt000!VC9201 VC 5V5. PRELIM. OPERAT10N 60 1 2400178 18JAN79 3600178 10JAN79 5 -6 20 C WC0007VC0013 00MMV-0- 1 240CI78 02JAN79 47 0 C VC00094C0059 DUMMY 0 1 240C174 OIMAk79 A9 0 C Vf0Dl5VC9201 DUMMY 0 1 240CIFA IlJAN79 54 80 WCDul%VC0021 REFRlb. CHADGING VC SYS 10 1 240C178 06NOV7A DINAR 79 14MA479 89 115 VE C021VCOU2 3 C SI. IL511Nb - VC SYSTEM 20 1 20APN 79 17M A Y 79 15MAH79 IIAPR79 -26 0

.._m -~.. - - _ _ CPfina 1100 3R102 i IM E L I 5 I IN G PAGE 32 0F 40 P bS JE C T M AN A6E MENT SYSTEM TIME NOW 240CT78-1754 0F 2u80 ACTIvilIES._ TIME UNIT'OAv NribORM '050tC77 18APR80 98TE, 08NOV78 -NElwCRE ZIMMER NUCLE 4W POWEN STATION UNIT'l SE LE C TE D DIMAV78 18&PR60

        • 1 / J LISTINGo***

e................................................................. ACilVITY A C i I V I i V ACilVily [ A R L 1E 5 i L 4.1 E 5 i P. F LOAI lbEhllFICATION 0E 5CR 1P T ! ON TIME CL STARI FINISH SIARI FINISH' 5 TOI FM VE2023vC9303 00MMY 0 I 18MAY79 I ? APR 79 -26 0 W LS369VC0565 F A6.L ' IN5 f t.5M.80RE PIPE 18 1 240C178-16N0V74 07M AY 79 31MAY79 136 0 ft0565VC0798 CONSI.IE51 VC to 1 17NOW78 010EC74 OBJUN79 14 JU4 7 9 336. O VC0798WV9845 DUMMY 0 1 040E C 78 15JUN79 136 185 9050389C5003 P.R. COMPL. HVAC CONTROLS 80 1 240Ci?8 15FE P 79 In5EP78 10JAN79 5 -26 0 VC5003VC9201 DUMMY 0 1 16FEB79 IlJAN79 -26 0 VE970lVC9203 CUMPL NEMAND C57 VC 545 45. I 16FEb79 19APR79 BlJAN79 14 MAR 79 -26. O VC9203WC0021 00MMt 0 1 20APR79 15 MAR 79 -26 0 ft9303VC9305 WC-01 PRE OP MAIN CONT RM 45 1 IRMAV79 23JUL 79 12APW79 14JUN79 -26 0 WC93D5RV9845 DUMMY 0 1 24JUL79 15JUN79 -26 23 WUl00!v09301 COMPL. PUNCHLIST 5 1 240C178 300CT78 02NOV78 08NOV7A 7 0 ' VD9 30lvo9303 W D-On 0/G PREOP START 11 1 310C178 14NOV78 09NOV78 24Nov78 7 0 VD9303069301 DUMMY 0 1 15NOV78 27NOV78 7 14 VD9 303 V09305 VD-01 D/G PREOP COMPL 2 1 15NOW7e 16NOV78 15 MA Y 79 16MAYI9 126 0 Vie 9305 R v93 39 DUMMY 0 1 17N0V7A 17 MAT 79 . 126 374 Wb0031V60002 5/C FINISH CST VG 25 1 240Cl?8 28NOV78 2 75EP78 310CT78 5 -19 0 WG0up?v69305 00MMY 0 1 29NOV7s UlN0V78 -19 0 vb2165VG0365 INSTALL L 8 HANGER 5 20 1 240C178 20Nov78 04 pf C F8 02JAN79 2R 0 WG0365VG9301 DUMMV O l-21NOV78. 03JAN79 2n 58 Vb5t>0lVG 5003 P.R. COMPL. HVAC CONIROLS 25 1 240C178 28NOV78 27NOW78 02JAN79 23 0 vb5003VG9301 DUMMY 0 1 29N0V78 03JAN79 23 53 . Wh*30lVG9303 VG-01 586T C SEC CTM PREO. 29 1 14 FIB 79 26 MAR 79 OlJAN79 12FER79 0 Wb9303RV9129 DUMMY 0 1 27M AR 79-21APR40' 273 273 VG9303V09301 DUMMY 0 1 27 MAR 79 13FEh79 -30 0 V69305VG9301.ESIA8 INIT CONDITECOMPL. C5T. IESTING 42' I 2 9N O W 78 29JAN79 UINOV78 O2J4479 -19 11 j WH100lVH9312 C OMPL.. PUNCHLISI 9 1 240CITA 03NOV74 I I DE C 78 210EC78 33 34 WHilDIWH9301 COMPL. PUNCHLI5T 9 1 240CI?8 03NOW 78 22NOV78 050EC78 21 0 i VH920lWH9301 VH F AN5 NEEDED ONLY 2 1 240C178 250CT78 04 DE C 78 05DE C 7 8 2n 7 WH950lFP9301 DUMMY 0 1 06NOV78 19 MAN 79 92 100 Wh9 30lVH9 303 VH-02 CW STRUEFP VEN PREO 30 1 06NOW78 18DEC78 060EC78 IRJAN79 23 0 VH9303Cm9301 OUMMY 0 -I 19DEC78 19 DAN 79 ?! In WH9303VH9305 WH-02 CLORIN RM. PREOP 6. I 190EC78 27DEC78 07JUN79-14JUN79 119 0 i WH9 305RV9 8 45 DUMMY 0 1 28DEC78 15JUN79 119 lb8 WP9310VH9311 VH-01 FANS NEED UNLV -PMP 124 1 OlMAV74 240C178 100(178 230CT7a 5 -1 0 WH93llVH9312 ESTAB. PNEREO L COMPL. IESTING -VH 42 1 250CT78 220EC7e '2400178 210ECTA -1 0 - WH9 312V H9 314 VH-08 m5 $1RULPMP5 PNEOP 14 1 26DE C 78 15JAN79 290fC78 InJAN79 3 0 W e9 312 m S9301 0 0MM Y 0 1 2600C78 220f C 7e -l 7 WH9314CW9308 DUMMY 0 1 16JAN79 19JAN79 3 0 WH9314WH9336 VH-01 MU PUMPS 8 1 16JAN79 25JAN79 C5JUN79. 14JUN79 99 0 WH9 31bRV9 8 45 DUMMV O 1 26JAN79-15JUN79 99 148 WJOL0bVJ0007 INSTALL H0005'FLEN CONN & FILTER 5 15 1 240017A 13Nov79 24APR79 14MAY79 127 0 VJ0007VJ0009 PERFORM FILTEP IEST -vJ Sv5 7 8 14NOW 78 22NUV 78 15MAV79 23MAYF9 127 0 VJ0009VJ9311 DUMMY 0 1 24NOW78 24MAV79 127 0 l f-VJ5003vJ93 t o DUMMV O I 240C178 25APR79 128 0 i \\

o 'SPIIMA 1100 3R302 i I M E L I5i i N G PAGE 33 0F 40. Pk3 SECT M A N A GE ME N T SYSTEM ilME NOW 3 240CTF8 1754 0F 2480 ACTIVITIES. TIMC'uMIT DAV NEiboRK 050EC77 IAAPRAD DATE. 00NOW78 'Nfiu08N : 2IMMER ; NUCLEAR POWER STAiltN UNII I SILECi[0 OIMAv 78 IpAPR80

        • I

/J LI511NG**** ACTIVIiv A C i IV I 1 V-ACTIVITV. E A R L IE 5 i L A I E 5 i P FLOAT JDEhilFICATION OE 5 C R.I P i I ON IIME CL STARI FINISH SIARI FINISH 5 101 FR WJ9310VJ9311 ESTAB INI T C040li. PROW. SUPP FOR SPEC MACH 5 HOP 15T 21 1 240CITH 21 N0v 78 25APR79 2 3 MA V 7 9 124 1 , WJ73IIVJ9313 ACCfPT TEST WJ-DI MACH 5 HOP 15 1 24N0V78. 140EC78 24MAV79 14JuM79 127 0 WJ1313RW9145 DbMMY O-1 350EC78 15 JUN 79 127 176 14-vt0003VLO201 CUN51. TEST WL SYSTEM 7 1.240C178 OlNOV78 16 M AR 79 26MARF9 100 0-TL0iulWL9201 DUMMY 0 1 02NOV78, 27 MAW 79 100 0 1 vt079mWL9303'OudMY 0 1 240C178 27 MAR 79 107 !! VLlh01WL9301 COMPL. PUNCHLI51 11 1 2 40C 178 - 07NOW78 12 MAR 79 26 MAR 79 96 0 ' O*WL 5h0 3VL9201 0 0MM V O 1 240C178 27 MAR 79 107 7

    • WLC20lWL9301 WL REFRI UNIT
w. FAN PREOP O 1 02NOW78 27 MAR 79 100 4

WL9 30lVL9303 VL-01 L ABOR HVAC PRE 0P 13 1 04NOW78 -27N0V78 27 MAR 79 12APR79 96 0 V L 9 30 3L E 9301 DUMMV O 1 2nNov78 13 APR F9 96 0 VL9303WX 9301 UUMMY 0 1 2RNOW78 21 APR80 356 356 VP0bOIWP00Ws WP'5v5 MAJOR CST COMPLETE 35 1 240CT78 120E C 78 5 0 0 WP0t034P0004 FLUSH &IE57 LOOP A 15 1 130EC78-04JAN79 200EC78 IlJANF9 5 0 VIObO3VP0009 puMMY 0 1 130E C 78 0 48 680D03VP9201 DUMMY 0 1 13DEC78 26 DE C 78 R 0 W60D04WP0005 PREOP WP LOOP A 15 1 05JAN79 25JAN79 12JAN79 OlFE879 5 0 VFOLOSVPUGOS DUMMY 0 1 26JAN79 02FEh79 5 53 WPub05VP9301 DHMMY 0 1 26JAN79 23FEb79 20 6A WP000FVP0008 FLU $H L TE51 LOOP S 15 1 21 MAR 79 10APR79 12JAN79 OlFE979 -48 0 WF000mWP9303 PRE OP VP LOOP B 15 1 IIAPR79 OlMAv79 02FEB79 22FERF9 -4R' O VP0009WP00ll SET 6"COMPL LAST ORVWELL COOLER 20 1 21F E B 7 9 20 MAR 79 13bEC78 IlJAN79 -en 0 WPH0llRW9326 DUMMY 0 1 28 MAR 79 01FEH79 -34 0 VP00llvP0007 OUMMY D.I 21 MAR 79 !? SAN 79 -en 0 WP0169WP0369 B 6N.F LO.E N6 5M. BORE PIPE 15 1 2400178 33Nov78 06NOV78 27NOVF8 9 0 WP0169VP0565 5ET & ALIGP PUMP 5. CHILLFR5 15 1 240C178 13NOW7a 21NOW78 120E C 7 h 20 il WP0 369WP0565 F As.L INSTL.5M.80RE PIPE 11 ! 14NOW78 29NOV78-24NOW78 120EC78 9 0 VI OS65VP0003 DUMMY 0 1 30NOVF8 130fC78 9 9 VP510!VP5003 P.R. COMPL. HVAC CONTROLS 21 1 240CT78 2]NOW78 03JAN79 3tJANi9 48 0 O*WP5003Rv9326 DUMMY 0 1 22NOV78-Ul F E b i9 4H 82 WP%00)WP9303 DUMMV O 1 22NOW7R 23Ff M79 64 112 WP920lvP9301 WP CHILL 10 CONTL.D.W.TMP 42 1 130EC78 12 FEM 79 26DEC78 22FEB79 8 56 VP930!WP9303 VP-DI PRIN CIM PREOP 5 1 02MAv79 OAMAV79 23FEH79 OIMAR79 -4R 0 WP1303RW9329 DUMMY 0 1 09MAV79 02 MAR 79 -me 0 vu000lV09301 5/C COMPL.5V5. INSTAL.v0 25 1 240CI78 28NOV78 09JAN79 12FEBF9 52 82 '#00565W0079A CON 5T.TE S T VQ 10 1 09NOW78 22NOV78 O!JUN79 I4JUN79 142 0 900198RW9845 UUMMY 0 1 24NOW 78 15JUN79 142 191 v00565Wull65 INSTALL L 8 HANGER $ 12 1 240C176 08NOV78 15MAY79 3tMAY79 142 0 vull65V00565 DUMMY 0 1 09Novin olJUN79 142 0 vu5bO!V4 500 3 P.R. COMPL. HVAC CONTRUL5 25 1 240CI78 25NOV 78 09JANF9 12FERF9 52 0 WE5003vo9308 DUMMY 0 1 29NOW76 ISFIM79 52 82 va9 80lV09 30 3 W4-01 PC PukbE PREOP 13 1 27 MAR 79 12APRF9 13F f h 79 OlMn079 -30 0 V S9 303 R W 9 329 DUMHV O I 13 APR 79 02MakT9 -30 le wh000lVR9301 5/C C OMPL. 5 V 5. IN51AL.vP 45 1 240C178 270E C F4 075fP78 0FNOVim 5 -33 16 ) um

$PilMA 'l100 3RIU2 e e e i I M E L ! 5 i I N G e e e, PAGE

34. 0F 40 PE@eE L T M AN AGL MENT SY5 TEM TIMF NOW s 240CT78 1754 0F 2480 ACilVITIYS. TIME UNIT DAV NCibORn 05DEC77 laAPRBO DATE 09N0V78 NE T WORM : 2IMMER NUCLE AR PO W E R. 5 T A T I ON UNil l SE LE C TED DIMA YT8 18aPRe0
        • 1

/ J LISTINGeeso .,,............................................................. ~. Stilvity A C i I V I i V ACTIVITY E A R L IE5 i L A 1 E5 I P FLUAT IDENTIFICATION OE 5CR 1P 1 1 0N TIME CL START FINISH STARI FINISH. 5 101 FR VR500 LWR 5003 P.R. COMPL. HVAC CONTROL 5 40 1 240CT78 190EC78 158Ub78 100C178 5.-49 -0 Ukh003VN9201 DUMMY a 1 20DEC78 180C178 49 0 VkO20lVR9203 C5T IF5 TING VR SYS 21 1 200EC78 19JAN79 !!OC178 OMNOW7A -49 0 wh9103va9308 OUMMY 0 1 2?JAN79 09hov78 -49 0 V R9 30l lN9301 DUMMY 0 1 22JAN79 09N0V7A -49 0 V69301VR9303 VR-05 RF VENT PREOP STARI 17 1 22JAN79 13F E B 79. 07 CEC 78 02JAN79 -30 0 Uh9303vG9301 DUMMY 0 1 14FEB79 03JAN79 30-0 wkW)D3VR9305 VR-01 RN VENT PRE 0P COMPL 17 1 14 F E 8 79 08 MAR 79 19JAN79 I?FER79 -1A 0 V W 9 30bV 093O R DUMMY 0 1 09 MAR 79 13FEB79

  • . l p, 12 O 650565V59303 DUMMY TEST 14 5 09NOW78 29NOV 78 2%MAV79 14JUN79 138 0

0 1 240C178 25MAV79 ISO 12 v59 30lV59303 V 5 ACCEPT ANCE V59 303RV984 5 DUMMY 0 1 30NOv78 1%JUN79 134 187 V1000lViv208 5/C COMPL. WT SYS DUCim0RN 45 1 240CT7A 27DEC78 24NOV78 29JAN79 22 0 VIUb65VIO798 CON 51.1E51 VI 10 I 240CT78 06NOV78 O l JUN 79 14 JUN 7 9 154 0 viOf9hWV9845 DUMMY 0 1 07NOv78 15JUN79 154 203 V12$0lVi5003 50, 1 240CT78 04JAN79 180EC78 27FEA79 38 0 VIS003VI9301 DUMMY 0 1 05JAN79 2AFEe79 38 16 vi920lVT9206 OUMMY 0 1 2RDE C 78 30JA479 22 0 VI9206VT9208 [Si PRE RE 0ul51 T[ 5 FOR SYS 21 1 2RDEC78 26JAN79 30JAN79 27FEB79 22 0 Vi9gD8vi9301 DUMMY 0 1 29JAN79 2 A F E 8 79 22 0 vio30lvi9303 VT-01 T/b VENTIL PREOP 34 1 29JAN79 15 MAR 79 2AFEb79 16APR79 22 0 0 1 16 MAR 79 17APR79. 22 52 -VI9303Fu9310 DUMMY 10 1 240CT78 06NOV 78 20 MAN 79 02APR79 5 102 35 s Vm0D0!vw0003 5/C F INISH CST. WW SYSTEM vt0003VW9201 COMPL VW $YS,0AMPERS 10 1 2ADEC78 IlJAN79 01APR79 36 app 79 67 0 Vs0009Vu0011 NEC ADPED PAMPERS 45 1 240C178 27DECTA 30JAN79 02APR79 67 0 V.00l!VW0003 DuMMV O I 20DEC78 03 APR 79 67 0 9 500lVW5003 P.R. COMPL. HVAC CONIROL5 5 1 240C178 300CTF8 24APH79 30 APP 79 127 0 Vs5003Wuv 301 OUMMY 0 1 350C178 OIMAV79 127 60 Vm920lvW9301 EST. SY5. PRE RE Q UI 511E S 10 1 12JAN79 25JA N79 17APN79 30APR79 67 0 ve930lVw9303 Vm-01 R/o BLDG VENT PREOP 20 1 26JAN79 22FEB79 OIPAV79 28M4V79 67 0 U h9 303vW9310 OUMMY 0 1 2 3F EB 79 39MAY79 67 0 Vo*310Vue312 vo-02 CONTL RM PkEOP 12 1 2 3F E B 79 12 MAR 79 30MAY79 14JUN79 67 0 ve9 312Rv9845 DUMMY 0-1 13 MAR 79 1%JUN79 67 116 VauColVI9201 IN5f ALL L AST F]RE DAMPER WHEN 4EC'O O I 240C178 14F f 8 79 7R 0 VaQC05VN0007 INSTALL FLEX CONN. C FILIERS 35 1 240C178 12DECTA 14FEb79 034PR79 7R 0 v20007VX0015 DUMMY 0 1 130EC7A C4APR79 74 0 VDUUl3VIOUl5'00MMY 0 1 240CI?P 04AFNF9 III 35 Va00:5Vm00l? C51. TESTING. VI SV5 TEM LREFRI6. CHARGING 10 1 130EC78 27DEC78 04 APR 79 17APR79 79 0 Un00lFVm9302 UUMMY 0 1 2ADEC78 14 4p9 79 7a 0 J"VuSp03Vu920I DUMMY 0 1 240Ci7e 14f Ee 79 7m 0 fewa920lWE0005 DUMMY 0 1 240Ci7M 14: 5079 79 0 W a 9 302V X 9 30 3 VE-01 SWbR HI REMOVAL PREOP 21 1 2ADEC7H 26JAN79 1RAPR79 lbMAY79 74 0 .Va9303RV9339 DUMMY 0 1 29JAN79 17MA Y 79 FA 126 VY000lVY9301 5/C COMPL.5V5. INSTAL.VV 4% i 240C17N 27DEC78 190t178 7tDECF A -3 0 ) A

~__ _. -. ~.._. ~ (PilMA 1100 3R102 I IM E L I5 i iN 6 PAGE 35 EW 40 PbOJECT M AN AGE MENT SYSILM ilME NOW t 240CT7A 1754 or 2880 ACTIVlilES. TIME UNIT DAY WElbORE 05DE C7 7 18 APW8 0 16APPn3 CATE 08NOV7P .NEIWOPM: : IIMMER. NUCLEAR POWER STATION UNIT I SELECIED OlMAV74 seee! / J L1511Nbe*** ee............................-................................... ACIIVITY A C i I V I T V ACTIVIIT E A R L 1E 5 i L A.~ T E5 i P FLOAT I DE NT IF I E A ll0N DE 5CR 1P i I oN TIME CL START-FINISH 51 ART . FINISH 5. ID I - FP-WVbC0lvV5003 P.R. COMPLo HVAC CONTROL 5 45 I 240C174 27DE C78 190CI78 230EC78 -3 0 Vv5003vv9301 DUMMY 0 1 28DEC74 22CIC78 -3 0 919308tV9350 VV-01 CSCS COOL PREOP 19 8 2ADEC78 24JAN79 22DEC78 19JAN79 3 0 8 1 25JAN79 05FEP79' 22JANI9 31JAN79 -1 0 V t9 310V V9312 V V-On LPC5 PREOP SECT 7.3 VV9310VV9320'0UMMV O 1 25JAN79 22JAN79 -3 0 D V9 31PVV9330 OuMMY 0 1 25JAN79 24JAN79 -1 0 UV931uvv9340 DuMMV - 0 1 25JAN79 24JAN79 -l 0 V E9 312RV9 301 DUMMY 0 1 06FE879 OlfEd79 -3 0 VV9320VY9322 VV-01 RHR PREOP SECT 7.2-87.3 A 1 25JAN79 05F E B19 22JANI9 31JAN79 -3 0 VV9322RW9301 DUMMV O 1 06F E B 79 OlfEB19 -3 0 V19330VV9332 VV-OS PPC5 PREOP SECT 7.5 6 1 25JEN79 OlFEP79 24JAN79 3tJAN79 -1 0 WVD332Rv9301 DUMMY 0 I U2F E h 79 Olf t h 79 -I 2 vv934uvv9342 VV-01 RCIC PREOP SECT 7.4 6 1 25Jak79 OlFEB79 24JAN79 '31JAN79- -1 0 VV9342Rv9301 DUMMY 0 1 02FEH79 OlFip79 -1 2 V-030lv-9303 V HEPALCHAR FIL isi PREOP. 60 1 2mMAR79 20JUN79 22 MAR 79 14JUN79 -4 0 V-9303RV9845 DUMMY. 0 1 21JUN79 15 JUN !9 .e 45 ut3965WE9301 DuMMV O I 240C174 17JAN79 Sn 80 et1951ut2151 CGLE TEST.EOUIP 2 1 240C17e 250CT78 15JAN79 16JAN79 56 0 af235tWE9301 DUMMY 0 1 260CT78 17JAN79 Sh 74 Et 2 57 3 WE 2 7 71 COMPL CON 0uli 10 Eculp. 5 1 250*178 310C178 03JANT9 09JAN79 47 0 CE 2 77 5 mE 35 73 DUMMY 0 1 DINOV78 IGJAN79 47 34 UE 337 3WE 3573 CONT. TERM P & C CABLES 20 1 240C17e 20NOV78 !!DEC78 09JAN79 33 0 af 3 37 3WE 9201 DuMMT. 0 1 240CT78 15NOV78 16 38 WE3573WE3773 Putt C IERM. FNL CABLES 5 1 21NOV78 28N0V78 10JAN79 16JAN79 31 0 .tE3773ut9301 DUMMY. 0 1 29NOV78 17JAN79 33 55 W19 372b[4572 CONI. PULL P & C CABLES 20 1 240C178 20NOV78 Il 0E C 78 09JAN79 33 0 =E 4572WE 3573 DUMMY 0 1 21NOV78 10JAN79 33 0 ( EE 556b WE 5 766 COMPL. INSTRU PIPE / TUBING I I 240 CIT 8 240CT78 02JAN79 02JAN79 5 47 0 WI5766mE2574 DUMMY 0 1 250CT7A 03JAN79 47 0 WL5 766kE9301 DUMMY 0 1 250CT78 ITJAN79 57-79 02JAN79 47 0 W E 6 30 ! w E 5566 DUMMY 0 1 240C174 WL920!WE9301 WE EOUIP. ORA.PROCE OC/FCT 42 I inDEC7e 15 FEM 79 15NOV78 16JAN79 -22 0 WE 9 30lWE9303 WE-IL2 EQUIP DR. PROC PNE0 59 1 16f E H79 09MAY79 17JAN79 09APR79 -22 1A Wiv303dVv305 DUMMY 0 1 06JUN79 10 APN 79 -40 0

  1. f0865WF0265 INSTALL SMALL 80RE HANGER 3 1 240CI78 2600178 30NOV 78 04DEC78 26 0
  2. f ol6buF0365 FLD NUN LAST 2/3 58 PIPE 43 1 240C178 22DEC7R D4 0C i ?8 04DEC78

-14 0 Ef 026bWF 9303 DUMMY 0 1 2 70C i 7s 05DEC18 2h 40 E7 0 36bbF 9 30 8 DuMMV O I 26DEC76-05DE C 78 -14 0 uf0765WF0965 START INST ALL. HANGERS 22 1 240C I FM 22NOV78 D2h0V78 04DEC7H 7 0 kf0965WF9301 DUMMY 0 1 24NOV78 US D( C 74 - 7 21 utl565mF2351 ft00W DRAIN SUMP PUMP 5 15 1 240C178 13NOV78 300CI78 17NOV7A 4 0 NF 377 3WF4173 C ONI. TERM. PLC CABLES 95 1 240CI78 13NOV78 2 3 0f i 78 10NOV78 -l 0 af 9 772mF4972 PE G. PULL PLC C ABLE S 17 4 240CT78 15NOV78 225fP78 160CT7R -22 0 Ef 53#2mF4 t T3 DUMMY 0 l 240C17M 11NOW 78 14 0 )

.~. ~_ .. ~ J&hflxA 1800 3RIO2 e.* i l' M E L I5 i i N b e o

  • P AF.E 36 0F 40 P%@JE L T M A N AGE ME N T SV51LM.

71MI NOW 240CT78 lib 4.0F 2880 ACilWITIES. IIME UNil UAV NETWOpa- 050tC77 16 APP 80 DAit. 08N0478 NETWips 3.21MMER NUCLEAR POWER 5 fat!ON uMIT I SELiciED DIMAV 78 IBAPR80

  • o ol / J LI5flNGe***

e............................................................... AClivlTV 4 C i I vI T Y ACilvily E Ak L I C 5 I L A T E5 I P' FLOAT IbE NilFIC A T ION l0E5CR 1P i 1 0N ilME CL STAPT-FINISH 51 ART flNISH $ TOT FR Ef617SWF6366 COMPL. IN51U. PIPE /IUBING 15 -1 240C178 13Nov78 160C178 03Nov78 -6 0 ~ bl 6 366WF 9 30 4 DUMMY O I 14N0v78 05DI C 78 - 14-28 . cf 9 30l=F 9 303 = F-8,20 3 F L OOR&E O.DR PRE 0 en 1 260EC78 27APR79 050f C 78 09APR79 -le 0 ef9303hT9301 OUMMY 0 1 30APR79 10APW79 54 26 -UbOl19WG0369 B GN.F LO.L NG.5M.80RE PIPE 12 1 240CI78 08NOW78 24 APR 79 - 09MAV79-327 0 mbO 319mG0565 F AB.E IN5ft.5M.80RE PIPE 15 ' l 09Nov 78 30Nov78 .30MAY79 3tMAV79-127 0 .Eb051$=60798 CONSI.1EST b6 10 1 Ol0EC78 140E C 78 OlJUw79 34JUN79 127 0 -WIO7164V9845 DuMaY 0 1 150EC78 15JUN79 127 176 sh0 3) SWR 0565 COMPL F AbLINST ALL SH PIPE 26 8 240C178 .29NOV78 06FEB79 13 MAR 79 72 0 WR0465WN9301 DUMMY 0 1 240CI7e IAAPR79 123 12 6 th05tSWR7766 DUMMY 0 1 30NOW78 14MAk79 72 59 O I 30N0W78 19 APR 79 97 100 wkO5&SmR9301 DUMMY 62-1 240C178-22JAN79 190CI78 17JAN79 -3 0 kbD965WRil65 START INSTALL HGR5 r

  1. 211&bwRl101 UUMMY 0 1 23JAN79 IAJAN79

-3 0 W9170lWN]965 COMPL H 64 IN51ALLATION /. ~ 6# 'l 23JAN7* 20APR79 14JAN79 17APR79 -3 0 WNI463WR9304 OUMMY 0 1 23APR79 18APR79 -3 0 et2933 mR3 8 01 F IN AL VALV[ DELIVERY 8 .) 240Cl?8 02NOV78 30 MAR 79 10APR79 110 0 40310 LWR 3365 IN5 f 4LL W AL WE 5 5 s 03NOV7s 09Novi8 IIAPR19 17APR79 ll0 0 eD33hSuR9301 OUMMY i> 0 1 10Nov78 I A APR 79 310 113 ch4 37 8 WR45 71 C ONI.CONDUI T IN51L., 5 1 240C17# 300CT78 30JAN79 05FEH79 67' O DC4578uR5572 OUMMr. 0 I 310C178 06TEB79 67 0 004771WR4971 COMP'CONDuli TO EOUIP S 1 16 MAR 79 22 MAR 79 04 APN 79 10APR79 13 0 CP4971WR6573 puMMY 0-1 23 MAR 79 II APR 79 13 0 U#5572mR6172 PULL REN AIN POWERECEI CAB 46 1 3 4 0C 178 05J A N 79 06FEB79 IDAPR79 67 0 Wh5973bR65.3 IERM RLMAIN. PLC CABLE 34 1 240C178 150EC78 16FEb79 10APR79 80' 67 WWh!72=R6573 OuMMV. O I 08JAN79 IIAPN79 6V 54 WW620lWN6301 DELIVER LAST IN51RUMENI5 21 1 240C17A ,2tNov78 13FEB79 33 MAR 79 77 0 m26338WR7766 DUMMY 'O 1 22NOW7H 14 MAR 79 77 64 q l WW6573WR6773 PULLLIERM fir 4AL. CABLE 5 1 23 MAR 79 29 PAR 79 11 APR 79 17 APR7 9 - 13 0 sF6773=W9301 OuMMY 0 1 30M AR 79 18APw79 13 16 uk7575WR7766 BIG.IN51L INSTRU PIPEITUbE 85 1 240CT7e 22F E h 79 10N0v78 13 MAD 70 5 13 0 WP776 SWR 7966 COMPL INSTRU PIPE /iUBING-35 1 2 3F EB 79 15 MAR 79 14 MAR 79-03APR79 13 0 v27914wR4773 DUMMY 0 1 16 MAR 79 04APR79 13 0 t . WW7 936W R9301 DUMMY 0 1 16 MAR 79 18APW79 23 26 sk920l=R9301 mR RSCCW OC/FCI 27 4 240C178 3DNOW78 12 MAR 79 17APR79 96 99 4 EE930 LWR 9303 WR-l RbCCW PRLOP 41 1 23APR79 19 JUN 79 19 APR 79 14JUN79 -3 0 O, 1 20JUN79 -15JUN79 -3 46 Ek930JRV9845'0UMMY .10 1 2400T78 06Nov78 080EC78 210EC78 32 0 W50 3)5W 50465 INS T ALL' SM ALL SORE HANGER w%D 315W50565 COMPT fab & INST d5 58 - 10.. I 240C178 06NOW78 260CI7a 08NOV7e 2 0 v5046SwS9301 DUMMY 0 1 07Nov78 22 DE C 7a 32 40 i W505&SW58766 00MMY O I 07Nowf8 09Nov78 2 10 v505S5 59201 DUMMY 0 1 07NOW78 10NOV74 3 0 US$ 1bbW58 365 COMf L lNST OF W5 HGPS 15 1 240C178 13NOV78 DILEC78 23DEC7m 27 0

  1. 51315d59301 DUMMY 0 1 14Nov78 22DEC78 27 35 i

o m

S ?- 82 + - - " -[d r E PI 'I M 4 ~ l100 3R102 e o e I 'I M E L I5 I IN 6 e o e' PAGE 37 or 0 PD@JELI MANAGEMLNi SYSTEM" IIME Now : 240CT78 1754 0F 2e80 AC1]vl1][5. ?!ME UNIT DAT-a -NETWON4- 05DEC77 18SPR80 LDAIL 08N0v78 NETWORK : 2IMMER. NUCLEAR POWIR si A T I ON UNIT 1 ' 5E LE C IED OIM AY 74 IMAPRA0 s oe el. / J LI511NG**** EClivliY A C 1 Iy I i V ACTIvliv [

4. R L IL 5 I '

LA T E 5 i P FLOAT I DE hf lF IC A T ION OE 5CD IP i 1 0 N IIME CL START FINISH -SIANI FINI5H' 5 TOI FP 2525%5W555'l OUMMY 0 1 240Ci?8 ORDEC78 27 35 e53555mS376, F ;.4 AL W5 VALVE DEL. P l'240CI78 02Nov7A 05DE C78 ' 14DEC78 '29 0 W53715W53965 IN51 W5 v4LvE5 5 1 03N0v78 09Nov78 35DIC78 210EC T A 29 -0 W53955W59301 DUMMY 0 I 10N0v79 22 DE C 78 29 37 uS4558mS45GI UUMMy 0 ~ 1.240CT76 Ulhov74 6 0

  1. 54451W592DI DUMMY 0 1 240C178 IHNov78 11 10
  2. 55578W55671 COMPL CONDUIT

$ 1 13DEC78 190EC78 O R DE C78 07DEC78 -4 'O W55671W57573 DuMMr 0 1 200EC7a 09 Df C 78 .a 0 e5570lW55801 DELIvfP L AST IN51RUMEN15 20 1 240C17A 20N0v78 120CI78. 08N0v7A -A 0 W55F lWSR766 DUMMY 0 1 2thov7n 09Mov78 .n-0 055973W5 75 7 3 ' C ONI TEPM PC & I CA8LES 6 1 240CI18 310C178 33Nov74 0 70E C 7 8 26-34 W5597)W59201 OUMMY 0 1 240CI78 10Nov7h 13 10 -D57573W57773 PULL L TE RM FINAL CA8LLS 10 1 20DEC78 04 JA M 79 08 DE C 78 21DE C 7 8 - -8 0 'v5777)ws9301 OUMMY 0 1 05JAN79 22 DE C 78 -8 0 W58 733W54966 COMPL INST INSTR PIPE & 1U6 15 1 21Nov78 12DEC74 09 Nov ia 3DNov7b -n 0 e5495cwS5571 DUMMY 0 1 130EC78 OI LE C 78 .-9 0 .W5895tW59301 DUMMY 0 .1 13DEC78 220tC78 7 15 wS9221W59308 e5 5ERvlCE Wie OC/FCI 29 1.07N0v78 18DEC7A 10NOV 78 280EC7m 3 II WSO 335 mS9303 wS-I L2 SERV ICE WIR. PREOP 63 1 05JAN79 03APR79 22 DE L 78 22M AR 7 9 -p 9 ' e54333GC9 301 DUMMY 0 1 04APH79 23Mr A79 -9 33 kIUD31WI9301 C OMPL. CODE 1 e 2 ITEMS - 40 1 240C17a 190EC78 30Nov78 26JAN79 26 6 ' - #13265mi9201 OUMMY 0 I 240C178 21 Nov 78 - 20 0 WIU365W19201 DUMMY 0. I 240C17b ZINov78 20 -0 til515mi2571 DUMMY 0 1 240C178 21Nov78 20 0 mil 555WT5166 OUMMY 0 ~ l 240C178 2thov78 20 0 6I2158w19201 DUMMY 0 1 240C178 2tNOv78 20 0 UT22;uWil365 DUMMY 0 1.240C17n 21hov78 20 0 wi2771W13373 CUMMY 0 1 240C178 21Nov78 20 0 DI3573Wi9201 DUMMY 0 1 240C178 2thov78 20 0-uT5354w12571 DunMY. 0 1 240C178 21Nov7a 20 0 W I5 3btWI9201 DUMMY 0 1 240CT7P 21hov78 20 0 W1920lWI9301 WI feCCW OC/FCI 46 1 240CI78 28DEC74 21Nov78 26JAN79 20 0 j W19301CD9301 DUMMY 0 1 290EC78 14Fth79 32 0 ul9 331W i9303 Wi-1-T8CCW PREOP 36 3 290EC78 19F E R 79 29JAN79 19 MAR 79 20 0 e19 303C A93DI DUMMY 0 1 20F E B 79 20MAH79 20 17 WIO303hC9301 DUMMY 0 8 20FEP79 23 MAR 79 23 64 UE0155WWD365 INSTALL SM ALL~ 80RE PIPE 6 1 240CT78 310C178 02Nov78 09NOV7A 7 0 i WE0 355W59201 DUMMY 0 1 Olhow?M 10Nov7M 7 4 WsH765mWU?65 INSTALL L A RT.E 80RE PIPE 3 1 240CI7h 260LITR 07NOv78 09N0v78 10 0 i deU465ws9208 DUMMY 0 1 2700178 10Nov78 10 7 CWl365WWl565 COMPL. TARD PIPING 19 1 240C178 17hov78 14MAY79 14JUM79 145 0 Wol565Rv9645 DUMHV 0 1 20N0v78 15JUN79 145 194 WNU00lwN0003 SLL 155DE bu 05N. CHANGF 21 1 2400I78 21AOvi8. 295F P 78 260Ci78 -In 0 WR0003mKU005.COMPE. LASI wX CONSTRUCT. 21 1 22NOV78 23DEC78 270ET78 27Nov7A -19 0 4 + n- -s

'EPTIMA 1100 3R102 1 1M E L I5T IN G e o e PAGE 34 0F 40 962 JECT MANAGEMENT SYSTEM TIME NOW 240CT78 1754 0F 2840 ACTIVITIES. TIME uMIT DAY NEft0RM 05DEC77 InAPes0 CATE DeNOV7s .NETWORn 2IMMER NUCLE AN POWFR STATICN UNIT.1 SE LEC TED OIMavin 18APRs0 eeool / J.LisilNG**** AClivlTV .A C 7 1 V I T V ACTIVITV E A R L 1E 5 i L A I E5 I . P FLOAT IDE NT IF IC A T ION 0E 5CR 1P i 1 0N TIME CL START FINISH STANT FINISH 5 1UT FR Waup05Ws9201 DUMMY 0 1 220EC7a 29N0V7s -18 0 m>026bwx9208 DUMMY 0 1 240C178-28MOV7s 24 42 UD0b65WX9201.0UMMY O I 240C178 2ANOV7e 24 42'

  1. 20s.OlWIO701 DELIVER L A 5T INSTRUME NTS 0 1 240CI78 260C175 2

0 030 70!WM 7166 OUMMY 0 1 240C17a 260E178 2 0-r Walj65Wal565 COMPLETE HANGER INSTALLTN 35 1 243CI78 120EC7A 090C178.' 27N0Vis -Il 0-W31565WI9201 DUMMY 0 1 13DEC75 2nNOV 7s. 7 U M2 365W X4151 DUMMY 0 1 240C178 13NOVis le 22 ex3951mx4151 CONTINUE CONOUIT 22 1 240C178 22NOV78 120 CIT 4 10NOV7A -8 U Wael54WX4351 LOMPLLIE CUN0Ull IN51LTN 5 1 24NOV78 30NOV74 13NOV78 17NOV78 -R 0 Wh435 8 kx517 3 00MMY. 0 1 DIDEC7h 20NOV7e -n i UX4973Ws5173 CONIN TERM CONTPOLLPOWEP 5 1 240CT78 300CT78 13NOV78 17NOV7A 14 23 WX5173WX5373 PULL LTERM FINAL CABLES 5 1 04DEC78 Cs0E C 78 20NOV78 27NOV79 -9' O 0 1 Il0EC78 2nNOV7e 9 9 w h 5 37 3W s 9201 OUMMY 23 3 240Ci?8 010EC74 180C178. 17NOV78 -9 0 W35972WX6172 CONilN PULL P.CLI CABLE U n b l 72 W X 517 3. D UM M Y 0 1 040EC 78 20Novi8' -9 0 W h&966WX 7166 CONTIN INSI INSTRU P+T 0 1 240C178 260C178 2 0 .em7166WX7366 COMP INSI INSTRU PIPETUB 12 1 240C178 08NUV78 260C178 10NOV78 2 0 sk736bWX4151 DUMMY 0 1 09NOV78 13NOV78 2 10 WX7 366Wu92DI DUMMY 0 1 09N0V78 2RNOV78 12 30 Wa9199Wm9200 P ARil AL COMPLE TION FOR RT PRE OP 35 1 240C17P 120EC78 090C178 27NOV7A -11 0 Wx*200WN9201 DUMMY. 0 1 130EL78 2sNOV7m -Il 7 WX920lms9301 da SLUDGE NANDL. OC/FCT 63 1 220EC78 22 MAR 7* 24NOV78 26FE879 -la 0 '03930!Wu9303 WM-2 SLUDGE HANDL. PREOP 34 1 23 MAR 79 09MAY79 27FEU79 13APR79 -18 0 0 4 10 MAT 79 17APR79 37 14 ba*303LR9301 DUMMY,. 43 1 10MAY79 -IlJUL79 16APW79. 14JUN79 -18 0 B19303WX9305 WN-1 SOLIO RA0 WAST PREOP ba9305NV9845 DUMMY 0 1 12JUL79 15JUN79 -IP 31 WV0158wV0351 5+L DESIGN *0ELV O5MOSIS E0P 40 1 240C178 190EC78 06h0V78 03JAN79 9 0 DVol65WYO365 BE G.F LD RUN 50 PIPE O 1 200EC78 04JAN79 9 0 tv0355mvo865 DUMMY 0 1 200EC75 04JAN79 9 0 kv035tWY1101 DUMMY 0 1 200EC78 11 MAN 79 57 0 hv0351mVl901 UUMay 0 1 200EC78 20 MAN 79 62 0 21035 thy 2978 UUMMY 0 1 200EC78 IlJAN79 14 0 , h v0 365m v04 65 INSTALL SM ALL BORE HANGER 12 1 200EC7M 08JAN79 21MAH79 09APR79 65 0

  1. T0365WYU565 C OMP.FL D RUN SJ PIPE 43 1 200EC 7n 20F E R 79 04JAN79 05 MAR 79 9

0 bv0465WV9301 DUMMY 0 1 09JAN79 10APR79 65 105 hvo565uY6366 DUMMY 0 1 21FEb79 06 PAN 79 9 0 bT0565WY9301 DUMMY 0 1 2tf EB79 10APN79 34 74 DVil0lufl365 COMP. HGR INSTALLATION 20 1 200EC78 laJAN79 13 MAN 79 09APR79 57 0 kV!365WY9308 DUMMY 0 1 19JAN79 10APN79 57 97 j wil%DluY2151 SET L ALIGN EOUIP. 10 1 200F078 04JAN79 20 MAN 79 02APR79 62 0 kV2151WY2351 DUM"Y 0 1 05JAN79 03APN79 62 0 W V2 351 W V2551 F NL AllGN't GROUI ME EO. 5 1 05JAN79 IlJAN79 03APN79 09APR79 62 0 .DT2551uY9301 OUMMT U I 12JAN79 10APd79 62 102 )

.~.- ~ - 1 ~ p;

CPilMA 3500 3R102 1 1 M E L I5 i1N 6 PAGE 39 CW 40.

l' PNSJEC T M AN AGEMENT SYf7EM IIMI NOW : 240C778 1754 0F 2a80 ACTIVITIES. ~i1=E UNIT DAY DAIE.. NETWURE 05DE C7 7 184PR80 08Nov78 NETWOFm : 2IMMER NUCLEAR P0bER SIATICN UNIT I SLLECTED OlMAY78 18APR80 y / J LI5ilNGe*** f[_ ACIIVITY A C7 1V 1iV ACTIVliv E A R L IE 5 i L A TE 5 i P FLOAI 10E NT IF IC A 110N DE 5 C R.1 P 1 1 0N IIME CL START FINISH STARI FINISH 5 101 FR UV297thv3171,1NITIAL CONDuli IN5fL." 0 1 20DEC78 IlJAN79 14-0 oV3171WY3371 uuMMY O I 200EC 76 2FMakT9

67. 58 WV3373WV4972 DUMMY 0 1 200EC78 IlJAN79-le 0

(. mV337amV3571 COMP. CONDUIT TO EQUIP. 5 1 14 MAR 79' 20 MAR 79 27 MAR 79 02APR79 9 0 WVjb71WV4373 DUMMY 0 1 21 MAR 79 03APR79 9 D WY3973WV4173 BEG.iERM. PEC CABLES 0 1 240C178 07 MAR 79 93 21 { uY4 8 73WV4 3 73 CONI.iE RM PLC CABLES 19 1 04DEC78 290E C 78 07 MAR 79 02APR79 65 56 WV4373WV4573 PULL C TERM FNL CABLES 5 1 2tMAR79 2 7M AR 79 03APR79 09APR79 9 0 WV4573 v9301 puMMY 0 1 2nMAp?9 10APR79 9 49 WYS072WY3973 0 1 240C178 07M AN 79 93 0 WV5b72WY5172 CONTINUE PLC 28 1 240C176 OIDEC78 18JAN79 26EEM79 59 0 WYS172WV4173 0 1 04DECIh 07 MAN 79 65 0 WY5872WY5372 00MPL. PULL POmER + C+] 25 1 04DEC78 09JAN79 27FEB79 02APR79 59 0 M V5 372WV437 3 DUMMY 0 1 10JAN79 OTAPR79 59 50 W V 4 366 m V 656 6 COMP INSTR. PIPE /iUBING 15 1 21FEB79 13 MAR 79 U6 MAR 79 26 MAR 79 9 0 [ WVh566WV3371 DUMMY 0 1 14 MAR 79 27 mag 79 9 0 mV6566mV9301 ouMMY 0 1 14 MAR 79 10APR79 19 59 WV1203Rv9645 O 1 240C178 15 JUN 79 164 233 wV930luY9303 WY LAUNDRV DR$1NS PREOP 47 1 06JUN79 10AuG79 10 APN 79 14 JUN 7 9 -40 0 UY9303RW9145 DUMMY 0 1 13AUG79 15JUN79 ~40 9 b2040lW206DI DELIVER L AST INSTRU. O 1 240Ci78 26 5E P 78 20 0 ( W20t0!k26966 DUMMY CONCENT C 7NTROL P ANEL 5 17 1 2400178-15NOV78 2940678 205EP78 -40 0

  1. 2070lW20801 REL. RADWA5fE 0 1 240Ci?8 26 5E P 78

-20 0 W20P0lWZIO75 INSTALL RADwASTE CONCENT CONTROL P ANE LS 10 1 16NOV78 30NOV78 215EP78 040C178 -40 0 [ W25075W24973 DUMMV O 1 OlutC78 050C178 40 0 U2l075W29302 DUMMY 0 1 DIDEC78 12 MAW 79 69 109 Wil965W29201 DUMMY 0 1 240C17h 02Nnv78 7 47 {~ h23851W23351 DUMMY 0 1 240CI7s 2600178 2 42 k23351WZ3551 CG*E TEST LOUIPMENT 5 1 220EC78 290EC78 260C178 Olhov78 -%D 0 [ .ws3551W29201 DUMMY 0 1 0?JAN79 02Nov78 -40 0 W23971W24173 COMPL. CONDUIT TO EQUIP. 5 1 260C178 Olhov78 285EP78 040CIF8 -20 0 W24171W24973 DUMMY 0 1 02Nov7P 050C178 -20 20 W 25 771W24 9 7 3 C ON T. TE RM.CN TRL. + PWR. CPL. 10 1 240CT78 06Nov78 215 epi 8 040CT78 -23 17 g ~ U28 973W2517 3 PULL + TE RM.F NL. CABLE S 35 I OIDEL78 21DEC78 050C178 250CTF8 -40 0 W25tF3WZ3351 DuMMV. 0 1 22DEC76 260C178 -40 0 W25772W25972 COHl. PULL P,C+I CABLES 10 1 240CT78 06Nov78 215E P 78 040C178- -23 0 W25972WZ4973 DUMMY 0 1 07Nov78 050C178 -21 17 W26966W27166 COMPL.INSTL'N. INSTRU. PIPE 2 1 240 CIT 8 2500178 2b5f P 78 275LPF8 -20 0 W27166WZ3971 DUMMV O I 260C17M 295E P 78 -20 0 wiTl66W29201 DUMMY 0 1 260C178 U2h0VTh 5 45 W2920lWZ9301 WZ CHEM. WA5ft CC/FCT 63 1 02JAN79 29 PAP 79 02Nov78 DIFE 8 7 9 -40 0 W2930lW29302 51Aki WZ-1 FREOP 26 1 30 MAR 79 04MAYT9 D2FfB19 09MapF9 -40 0 . W29 302W29303 C OMPL 'W2-1 PRE OP 21 1 07MAY79 05 JU N 79 12MAWiv 09APRF9 -40 0 ut9303LR9301 DUMMY U l 06Juk79 17APR79 -35 0 i I) {

4 EPflMA 1300 3R302 I IM E L I5 i iN 6 e o e P A F.E 40 0F 40 Pk@JE C T M AN AGE NL Ni SYSTEM TIME NOW s 240C178 1754 or 2880 ACTIVITIES. TIME UNIT Dav hETWORn OSDEC77 thaPReo OSTE 08NOV78 NETWORh a llMMLR NUCLEAR POWE R STATION UNIT I SELECIED OEMAV7R 18 APP 80

        • 1

/ J LISTINGeo*e ACTIVITY A C i I V I7 Y ACTIVITY E A R L IE 5 i L 4 i E5i P FLOAI IDLCilFICATION' OE 5 C R,1 P i I ON 11ME CL STANT FINISH SIARI . FINISH 5.T O I.FR m23303mE9303 DUMMY 0 1 06JUN79 10APR79 -40 0 W2?303WY9301 DUMMY 0 1 06JUN79 10APN79 -40 0 xx4063xx9065 COMPL. RL i's FLU 5H-CRO'S 0 1 240C178 I SDE C 78 3% 0 Im10654D9307 DUMMY 0 1 240C178 13DE C 78 35 55 M Y000lxV0003 CONDE N5ER AVAILABLE O 1 240C178 05aAN19 Sa O AVU0034W9305 UUMMV O 1 240C178 05JAN79 50 12 xvu005xv0007 INSTALL NLADE Gul0E5 1 1 240CIF6 240C178 04 SAN 79 04JAN79 49 0 N YaluGFRV9 305 DuMHV O I 250C178 05JAN79 49 il 0 1 250Ci78 19JAN79 59 67 XY0bO7RV9307 DUMMY XV00093V00ll IN SERVICE INSPECTION 1 1 09MAY79 09MAV79 1% MAR 79 15 MAR 79 -39 0 RV00llRV9'31 DUMMY 0 1 10MAV79 16 MAW 79 39 e xv0013xVuol5 6.L. VL 55EL IN TE RN. INSPECT I 1 08JUN79 08JUN79 03APR79 03APR79 -47 0 XYou!5RR9320 DUMMY 0 1 IlJUN79 04APR79 -47 I X V0017NR9301 ROT A T. PE D. OPE R. UNDER RPU 10 1 240C17e 06NOV78 07h0V78 20NOV78 10 17 XTUOl9sV002) IIP TUB UND RPV-INST

  • CN.

10 1 240CI?8 06NOV78 07NOV78 20NOV78 BC 0 Iv0021NR9301 DUMMY 0 1 07NOV78 21Nov78 10 17 X10023XV0029 ONE MILLION 6AL.0EMIN.uTR 0 1 240C17M 19 Ja N 19 60 0 X V0029RV9307 DUMMY 0 1 240C17M 19JAN79 60 68 . X10039XYUO41 RP!S 21 1 240Ci?8 21NOW78 17NOV78 I n0E C 7 8 le 0 X Y004 t x V004 3 PROR[ CHECNC9T 21 1 22NOV78 210EC78 190EC78 lbJAN79 18 0 Mv0043RV9307 OuMMY 0 1 220EC78 19JAN79 18 26 MTUD45XY004 7 REMOVE BL ADE GulDE 5 5 1 03JAN79 09JAN79 16 map 79 22 MAR 79 52 0 xv0047NV9403 DUMMY 0 1 10JAN79-23 MAR 79 52 100 .XTUU572V0059 INSIALL MIEROR INSULATION 15 1 240C178 13NOVFR 09Fibi9 OIMAR79 75 0 < X 10059k V 932 7 UUMMV U 1 I4NOV7H 02Mah79 75 0 XVUO63RV9338 DUMMY 0 1 240C178 16 MAR 79 100 14 8 NYUD65XV0067 15] INSPECTION 2 1 14NOW78 15NOW78 14 MAR 79 15MARF9 63 0 MVOD67RV9331 OuMMY 0 1 16NOV78 16 MAR 79 83 133 MY0069RV9137 DUMMY 0 1 17JUL79 15MAV79 43 5 NV0073tV0075 SYS. HY0Po & Alu FLU 5H 5 1 240CI78 300C178 10APH79 16 APP 79 137 0 MV0075LC9301 DUMMY 0 1 310 C 178 17APR79 117 166 NYUU77XV0079 FUEL PUOL FULL 0 1 240C178 24MAV79 149 0 MV0079RV9341 DuMHV O I 240CT78 24MAV79 149 197 XYubMIXV0083 FLC H00hED INio SRM.+ CAL 0 1 240CT78 24MAV79 149 0 x100831V9341 DUMMY 0 1 240C178 24MAv79 149 197 NVulu3sVOUO5 DUMMY 0 1 240C17P 04 JAN 79 49 0 N YU 10lk V004 5 DUMMY 0 1 240C178 16 M A R 79 100 48 220001220003 0 1 21APR80 0 0 SkEP.L CP11Ma !!00 3P102 fonNOVin-23:12:378 1285e GENINF HEADINGf J /I LI5flNGl 7216* 2 PAGt512tl449 ) ?? tie 3. ErClunt FINI5HEDIALL5 1288* 4. 50RT A C T IblCH A R7/1,CH ARh /l f H A RV /1,C H Al'8 0/ l, CH AR i l /l,CH AR12/ I l 7219e 5. UulPUI ACITAHLElilMLLl511Nbl

llV

  • Ai A, Q'70 A50 nGn UFO - MGMT T

l E RSSd7 " _ p;myp EURTON ~~ ) SHIELcS F172GERALp 3ggtyygg 3 O,l j fBCST USILTON f 91515th Street, N.W. EIEG 9 H m FI ELp-FILE r Suite 400 RETURN-TO: q N ) Washington. D.C. 20005 g4N,D sia,w 6 L, 202-638-4260 i p Q--= g --- - a y_ @m?.yv n

x. mgym.3...

f'- . + y.:q p.,..q y ~_ . ~. ,3 ~ Monday, November 28,1983 M _. #. . m.. m, _e:, , ~. Volume 11, Number 226 ~ w,. } Cincinnati Gas diEfectric Rddys creat rzains, ~ m To Dump Kaiser As Construct 6h CDOEMeet To ~ Lay Plans For At Zimmer NuclearPowerPlant -" Abandonment Cincinnati Gas and Electric Co. ty serification program," he said, The gas ' pipeline companies will shortly tell the Nuclear "because of their knowledge of the building the Great Plains coal Regulatory Commission that it will systems and components." gasification project met last week fire H.J. Kaiser Corp. as construc-The decision to replace Kaiser with Energy Department officials to 'h' P tor at the paralyzed Zimmer nudear with Bechtel does not mollify all of $*",(*j"I",E] don b e r e project. CG&E spokesman Bruce CG&E's en, tics. Lawyer Thomas project. The consortium formany Encrgy Daily Devme of the Government Accoun' notified Energy Secretar3 Der aid Stoec),hn told The,ll propose to tability Project, the Washington-Ilodel a week ago last Frida3 that that the utilit3 wi replace Kaiser with Bechtel Power based group that has bedeviled they were prepared to at;andon the Corp., which is the oserall project CG&E for years over Zimmer, says senture. That notice was trquired manager. the NRC's directive and the utility's by the terms of their Encrg3 The decision to jettison Kaiser, response leave him " puzzled." Department loan guarantn, which binds the fise companies to prmide which has been in on the project Devine finds it " difficult to DOE with 14 days' notice of 81.e r ( from the start, comes after understand how NRC could dis. pressure from the Nu: lear Reg-qualify Kaiser and not CG&E," ""II"8.'* **"'Id " *h " $" ""* * $*o' dei. ld c aIed b 'ng ulatory Commission's Region 3 of-since the rules have been that CG&E the fice. NRC halted work on the pro-makes the quality assurance deci* panies' expectation that the 53n-f ject a year ago because of quality sions and Kaiser carries them out. In thetic Fuels Corporation w!!! con-assurance problems. Last week, the some cases, Devine charged, Kaiser sider Great Plains' request for price regulators told CG&E that its action had carried out the utility's direc-guarantees at its December 1 based plan, which proposed to keep Kaiser tives under protest, because it felt meeting; if the SFC turns them on, was unacceptable. the utility was not pushing for the dc.wn, the3 wi!! be free to abandon An NRC statement after the fullest level of quality assurance. s, the project on December 2. At last Tuesday s mutmg. a founmat meeting with CG&E senior vice Devine said he is also troubled by. usUng president Joseph Williams noted the pressure that will fall on Ber.htel, 'Nt t o ho s d operty that "Mr. Wilhams was informed to beat the cost estimates the com- - rights, transfer of project manage-that, based upon information ob-pany laid out for CG&E. When ment and other issues with Jan tained to date from the NRC's Of-NRC stopped work at the plant, Mares, DOE's assistant secretary fice of Investigations' ongoing in-CG&E hired Bechtel to take a lookf . for fossil enerzyy is n ~ wMe vestigation at Zimmer, the NRC at how much the plant would cost to w staff is not able to approve Cincin-complete. Then the utility hired the U . O(( C'O M p G M BS, TF nati Gas & Electric Company's pro " giant San Francisco ~ builder;to C W' p@yO88 '~

  • '~

OU" - posed course of action for the ZimQ' manage the project. "That's the realg fff7pgf gfg-[f m:r project with the described role b flaw -in the1 coursetofjaction,y5 w i, ~ -...While the results of the NRC in-{ i. Dev,me.said. He would prefer an-dn s no nn eg for the H.J. Kaiser Corporation - n "outside,' independent organization. p, l' . Vestigation, which ts not expected to that is not tainted to do the quality. wednesday, just because Congress be completed for several more mon-venfication work.,-" p. ",- faned to extend an antitrust exemp-ths; may prove more favorable to CG&E management is under ter-tion that oil companies nly on to Kaiser, the NRC staff cannot ap-rific pressure to finish Zimmer. Ac-' join la laternational planning la prove the Course of Action with the cording to NRC regional director case of an ou disruption. "We information which has been James Keppler, the utility had made clearly would have preferred to developed to date." I no discernible progress on the plant have an eatension.*? he told j It is up - to NRC to approve for several years before NRC halted np riers, but ;"it's fairly clear we t. - CG&E's suggestion that Kaiser beiwork on it. Under Ohio law, CG&E!, -$lidak'bb N removed, and the utility hopes thef,ould not put an abandoned project P.' distloct froni havlag all of thein' sit c 7 regulatorrs will move q uickly.. into the rate base. So the pressure ss# ~,,ound the same table to share la-on, first, to finish it as a nuclear Jformatlee Land then to ivordianne plant or, alternatively, to convertit@c 'A Stoccklin explained that if NRC ap- . their responses. Dat sort of data. q proses the change, Kaiser will re-. to some other kind of plant. Otherd[^2 . (Continued on r se dl l -J mam at the site for some time. r

  1. '* ~ *

~ l . (Continuedon papf4/ ' ~ "They will be there during the quali C,.. g7,% g'ppigjg y e e aww j

4 .iim...*ay,No m,,A,a w 3;;;_ ( '\\ Pipa/ina dent standb> power to impose man-ne 0,e m g4 g. a - s Antitrust Shaield... daton anocaiion coni,ois_,om,mng President Reagan doesn't w ant and once Corp. has ghen dy{ 5 1 (Continued from page onel r con ei ing, .$i$tkr h gathering procedure is " cumbersome" e full Senatc approved Metzen-managing the Trans-Panska N1 but legal, Ilodel said. baum's language on November 17, its Hodel's equammity comes in the wake. next-to-last day of work. But on the next pipeline, whi:h moves Alasia oD of Congress' last. minute impasse over day the House refused to aller its own across the isthmus. OPIC inidated legislation that would have estended the position. Metzenbaurn was just as stub the award in 1974, but has only antitrust esemption (technically, a born; he, wouldn't acquiesce la the given out three, and none since

  • ' limited antitrust defense" rather than House's measure and blocked the-1976. Previous: winners are Kaaer outright DOE lawyer ' ' unanimous consent needed to inte up Aluminum and Chemical Corp. for '

immunity, a noted) past December 31, when it is. the legislation. The result: no action, its smeher in Ghana, Foremost-stated to espire.The Ilouse earfier pass-Congress does not return to work until McKesson for a dairy project in f ed a bill to continue the esemption until Anuar3 23, meaning the longest lapse in Iran and Standard Oil of Indiana mid.1985 for U.S. oil companies par-the IEA antitrust esemption since it was for an India fertilizer project. ticipating in Internationa! Energ3 Agen-first enacted in 1975. The esemption ap. cy oil-sharing planning. But the Senate parend3 has lapsed twice before-for 19 in place. DOE still has authority to gise balked. The Senate Energy Committee ~ da3s and 3 days, both during the sum. IEA company-specific data about oil appended language sponsored by mer of 1982-with no untoward effects. supply, and to require the companies to lloward Metienhaum (D-Ohio) to end DOE officials are now conducting proside that information to DOE ac-the estension nest June 1 unless a new some contingency planning in case a s oll cording to Craig Bamberger in DOE's law is passed by then gising the Presi-disruption occurs nhile no esemption is general counsel's office. m Coal-Water Joins Foster Wheeler, Swedes Dump Kaiser... Foster Wheeler Corp. and AB Carbogel of Sweden have formed a joint Icontinued from page onel venture to commercialize the Carbogel coal-water mixture as a boiler fuel. wise, the owners will have to write it The new company, Carbogel Inc., willlicense the Swedish technology in the U S. Carbogel brings coal-water technology to the joint senture, while Foster off their books. The owners-CG&E (40 percent), Columbus and Wheeler brings its considerable experience as a boiler dengner. Southern Ohio Electric (28.5 per ~ Cargobel's CWF (coal-water fuel) process produces a stable mixture of 75 cent) and Dayton Power and Light percent coal and 25 percent water with a viscosity similar to residual oil, ac-(31.5 percent)-have sunk about cording to the company. Using the Carbogel process, the slurry can be made f $1.7 billion into the project so far. from conventional coal which is cleaned to produce a low-sulfur, low-ash Bechtel estimates it could take that boiler fuel that avoids derating. )' much again to finish the plant. Carbogel coal-water fuel currently is being produced at a piant in Nova J Because of the horrendous pro. Scotia that is owned and operated by the Cape Breton Deielopment Corp. spect of being forced to write off The fuelis being fired at the Chatham Station of the New Brunswick Electric such large amounts, Davton Power Power Commission under a contract with Canada's Department of Energy, j & Light has floated the notion of Mines and Resources. Foster Wheeler's Canadian subsidiary converted one A converting the 810-megawatt of the Chatham Station boilers to fire the fuel. General Electric boiling water reac. k" tor into a gas-fired plant, as an in-terim step followed esentually by NARUC TO MONITOR COAL RATES conversion to coal. The. National Association of chairman of the new NARUC AD " group. NARUC fears that deregu-preh,m,ayton Power spokesman saysmary estimates show that the ; " Regulatory Utility Co conversion to gas-involvmg the m-:; has cstablished a subcommittee toifoHof how the Interstate stallation of five packaged gas-fired ~ " mern Ommission implements the^' oversight 1 subcommittee will be. boilers-would : cost about $350

  • 1980 Sta ggers Rail Act. District of ' preparing 'a position ~~ori' coal nil

.ColumPa Public Sersice CommisI rates for adoption by NARUC's ex-milhon and take about 28 months.. 'I " "**ber,Wespy Long is the} 'ecutive committee next March. partners w ul m i e er discuss options 7and that he expectsW(#; 7 *,w ' Big The Savm.~ T M 'gs ? Tr N' " - they will reachTagreement in .Jtio January on what course to follow.. An analysis done for"the nuclear $dusth'slationwide" advertising cam-paign concludes that nuclear ciectricity has.,aved consumers between $25 ' - Not everyone believes that Dayton Power's proposal should be billion and $40 billion over the past nine years. The savings could be as high taken senously, however. Given the as $70 billion, says Science Concepts Inc., a Virginia consulting firm, which did the analysis for the U.S. Committee on Energy Awareness. If the nuclear enormous financial liabilities at. stake, "these utilities are play,mg power gener'ated during the last decade had been replaced with power entirely very, very complex games with one from coal, the analysis finds, the extra cost would have been $13 billion. lf another," one close observer of the the substitute generation came entirely from oil, the penalty would have been process told The Energy _ Dai/J $75 billion. And if the fuel mix were 75 percent coal and 25 percent oil, the recently. " Don't mistake a man '

avings from nuclear power would have been $28.5 billion.
k cuver for a real position. I think it R; ' $"fss'r'f!idor'iatill"'s'2"dn'R : COAL LEASING GROUP TO MEET i P9 of financial arrangement, tojockefN TheInterior artment's Federal-State Coal Advisory Board will meet in

+ CG&E into relieving Dayton Power... Denver on Decem 7 to look at how Interior has managed its ccal leasing i *: of its financial obligation, or part of.. program. Theboard consists of the governors or.their representatises from ' j.. the states where there'is substantial federal coal.'.A 4 1 it." -

  • ; g y e.

,...:,;z. M f a x ^ } j; .U h k!!hNN.;.% f , i a ' ;1 }* n w m u w :. m m m m m a m; y y

f .D8 L Tua NBW YORK T!btBS, FRIDAY, OCTOBER 14, K33 l

Market Place awM

-v_ .x p.t.71-.r. -Ut111tles wit.u --.9~ much h m -ur -.ecmt - -d cm-ini-implies heavier financing rapatrumenta for each of Weeu N.Y.S E,hsgh,lowandcloesindoHarsaShare r the Zimmarpartners." 1N,uclear Woes ~ 22 4 20 The lead partner is Cincinnati Gas ami Electric, A d 2 f.NL A M unit. It is also the managing utility for the project. with a 40 percent interest in the 7tmmer nuclear y V.'~ y - UNDER ordinary citrinnatanema, a eneman 'the Dayton Power and Light Company holds a 31.5 stock yleiding 14.5 percent, ' at less Swerxmovna - 16 than sts times earnings and at a B aven4ac percent stake in 71mmar, while Columbus ami 14 eanthavn Ohio, a anhandiary of the American Elec. -; peresnt dama==t to last year's stated book value

  • might be considered an appealing investment The

, tric Power Company, has the remaining 38.5 per-8- , cincinnati Gas and Electric Company fits this do. ^1est 1983 a centlaterest.. i " Dayton Power and Light is in the same bowl

scription, but it is hardly operating these days sowe :uaneseessocaenerrs.uc.

<. spider ciren==tanc== "with.rineinnatt Gas and Electric and it will be stirred with the same spoon," Mrs. Kelley said' .'

  • In fact, uttittles have performed lately as n,,,,,,m,,,%,,,,,

yesterday. Accordingly, Merrill Lynch has also re- % ces of the better in the stock market Cin.

  • duced its research opinion on Power to s

' donatiGas and 's camman stock fell to a e 53. week low of 14% on Washianday. In addition, - For the present, utility analysts at Merrill "O.K. to sell" from " neutral," rating tho' Nthree of the %"s profgrred losess also e Lynch, Pierce, Fanner & Smith Inc. and Smith. rmamna stockas" speculative." 7 traded at $3 week lows which meant that the util. Barney, Harris Upham 8: Company said that the In yesterday's trading onthe Big Board, Dayton ity alone --tad for four of the 15 now laws for. Cincinnati-based utility's current annual dividand 1. Power closed at 15%, up %. Its shares have ranged ,, that seeslan on the New York Stock #=ehanga "13e ' of $2.18 a share is secure. Both brokerage houses thisyearbetween19% and14%. - -company provides electric and gas service in - also espect that the amnpany in 1983 will show Smith Barney recently resnoved Dayton Power l ? southwestern Oldo and in small areas of Irantwty earnings at least actual to, or perhaps slightly in elf-from its m=andad list and now regards the . andIndiana. coesof,lastyear's W5 ashare. I stock as a " hold." American Electric Power, a 9 t.! i. Yesterday,thesharesrose%,1015. But, significantly enough, Doris A. Kelley of I majorutilityhnading campanywhose subsidiaries " ' The stock Malaharf at 18% in Sep*amhar, not far - Merrill Lynch rneantly lowered her investment are mainly in the Middle West, also receives s' /,below this year's highest price of 19%. But, so far opinionof theram-stockto"O.K.tosell"from " hold" rating. Merrill Lynch carries a " neutral" , sin October, the shares have era =npared' heavy ! a previous " neutral" rating, in r==panaa to the sur-lavestment opinian on American Electric Power. M elling pressure. The selloff stems front the com-prise aneamea-ta from the company. Mrs. Kal-Analysts have noted certain similarities be. I ~ e y's diaela==e enriy tids mnnth that it would - ley also reduced the stock's suitability status from - { tween ineinaati Gas and Electric and theImg Is. e . hand IJahting Company, whose Shoreham nuclear l i ve to spend an additional $1.5 billion to meet " good tguality"to" speculative." r plant has experienced huge cost overruns. ' Federal safety standards at its 78mmar nuclear She said that there now exists "enough uncer-

plantin Moscow,Otdo, tainty and difdculty in projecting earnings accu-Moreover, the reactors at both utilities are similar i

Moreover, the enmpany said, the work would rately to make the stock unattractive in our opin-In type and sise. Recently, Img Island Lighting add two or three years of construction time to a lon." said it expected its Shoraham unit to begin com-

plant that had been regarded as 97 percent com-Jeffrey J. Hoffman of Smith Barney, who is mercial operation at the start of 1985. However, a I

plate. The utility based its estimate on a report by ' somewhat more optimistic over the company's spokesman for the company said yesterday that a } s its consultants on the project, the Bechtel Power prospects, rated the stock as a " hold." He said that start-up date was uncertain because of continutna Corporation, "while we had==pactad some increase in the sett-technicalprnhimma. i

LDUMAOL run new ronx rmas ranur ocwasa n ms tyg o r e. RetailSalesIncreased; ' clarendon t ci main By 1.6% in September Assets RulingI[ A Federal judge yesterday leeued ramen===d From First Business Page Baldrige saW that the Christmas see - two orders to keep Clarendon Ltd. i sonwould be strong forretailers. operational.1he enmpany, whicir.. "***""'"""d ax-Exempt Yields prised most analysts, who had been With consumer anfidence high, trades metals and other basic goods,' unemployment h and pm. is the New York affiliate of the trad.> j and income M. retaH. W WM M Marc % e R twege weeldy yielde for 10.5% August's Ine. ere can look ibrward to an excellent the country after the Government rigeneraf as==~isondeans September's sales were 10.7 's revenue bones,sipercors holMaymhe predicted. charged that he and an associate had, l cent ahead of the same month ast The Government's figures compare evaded atleast $48 millionin taxes. year,a perkd when the recessionwas the latest month's sales with the The first order, by Judge Richard 4 Revenue CL14% preparing tohit bottom-month before. Earlier tids month the Owen of United States District Court 3 i Bodde .I 10.0 Only materialslost ground nation's major retail chains reported here, provided that Marine MMland, in September, 1.4 percent., a solid rise in September sales com. ' Bank should promes checks for 10B; I 'Tse h=Hding materials decline is, pared to the similar1982 period. employees of Clarendon who are 109 of course, reflecting what happened The domestic retailer, get $~J1,000in salarytoday. c.,

e. ors tothehousingmarhetwhen mortgage Sears, R

& Company, previ : The Internal Revenue Servics/ rates went up this summer," Mrs. cusly said its sales were up 27.5 per. under court order, has setsed 322 mil-81 ShaberseM. centover September 1982. lion of Clarendon's assets at varictur' Fantture stores reported a Hve. banks that say the amount is collat.'s tenths of 1 percent increase in sales. met for loens. The judge ruled that ife i Gonwel Durable goods sales overall, includ-not enough money is available for thea ,' building amaterials trade, climbed 2.9 l G.M. ModelDelay "'""'*"""****"""'"TA ing furniture, ams ud h slanping Bonde g.o seisedInoney. pacent. Nondurable goods sales DETROIT Oct.13 (Reuters) - the Chase ttan weeup t percent. Ihe Genwal Motors Corpration seM M w q an a m m s~r.~ ^ store sales were up a shortage of parts from that companies that owed Clarendour-severwenths of 1 percent; ibod stores, would delaythe start-upof rnancy as of yesterday could pay their i I ,l ' I I I l 8.5 eight-tenths of I percent, and clothing and sales of 1984 model A-body cars bills without risk of the funds beingl wen Apre uov #e u Ave sem oci stores 3Jpercent. for one to three months. The compa-seised by the I.R.S. s r toss Sales dropped 2.2 percent before ny's new front. wheel <trive station a sewer me aandsiner . seasonal aojustment, an indication wagon model was due to 30 on sale nene.v san roa.mse that the September drop in actual Sept. 22, but the shortage will cause a . ilD* >i sales was less than in several previ.- delay until the first week of Novem- "dj flereugle Pridery j>j Re believes the Fed has eased mar. cus Septembers, ber. Low dealer inventoried are ex-In Bessiness Day onlly but adds that "the slight eas. Commerce Secretary Malcolm pected untillateJanuary. yg, % yg % g is much less than the market ex-scted and now with the strength in o economy there are no prospects + 4'any further easing anytime soon." dded c da had This announcement is nedher on oSer to sen nor a solicitation of on caer 10 buy these securttles. sere is increasing concern that oseds e @y the %. redit demands may be picking up i 22 private sector all over again.,n, October % 1983 Mrther he said that "the retail sales

-0FFICE 0F PUBLIC AFFAIRS NEWS

SUMMARY

SEPTEMBER 20, 1982 ]pd(L hk H CINCINNATI--Region III Director James Keppler testified last Thursday night at a hearing on the safety of the Zimmer nuclear power plant. He told the Cincinnati City Council's Environmental Advisory Canmittee that "...the quality of the plant was ' indeterminate,' and...that it might be necessary to conduct some ' destructive testing,' or dismantling part of the plant, to determine whether it meets Federal standards." The New York Times, 9/19. WASHINGTON--The Department of Energy has denied published reports that a " mock infiltration" in 1980 succeeded in taking over the control room of one of the Savannah River production reactors. "'No such infiltration or seizure occurred, nor was a control room overtaken'" according to Herman E. Roser, an Assistant Secretary. The Washington Post, 9/18. All three of Connecticut's nuclear power plants were out of service over the weekend. Connecticut Yankee was shutdown on Friday to repair a "non-nuclear electrical transformer." Millstone 2 scrammed later on Friday "...when a control valve regulating the flow of steam to a turbine closed..." And, Millstone 1 already was out of service for regularly-scheduled maintenance. The New York Times, 9/20. BOSTON--The Environmental Protection Agency begins today a 10-day sure v.c determine if fish in Boston Harbor are contaminated by low-level rads ictive waste. The waste, packed in 55-gallon drums, was deposited from 1946 to 1962 on the authority of the Atanic Energy Commission. The New York Times, 9/18. WASHINGTON--The United States is holding up a " nuclear cooperation agreement" wit r. China because it is suspected that the Chinese are aiding Pakistan and other nations in effor.ts to develop nuclear weapons. The' New York Times, 9/19; The Baltimore Sun, 9/19. 4 l ) -m

m NP,C plans new Zimmer check k By Jerry Condo mation program "Is progressing Keppler went on to say the %c wwwsran surnu more slowly than (CO&E) had. corrective actions could be WASHINGTON - A Nuclear predicted." extensive if serious deficiencies Flegulatory Commission official However, Keppler added, the-.are located in areas such as today told a House subcommit-NRC is "not concerned with the structural steel, weld quality, tee that the NRC intends to rate of progress of this program, past personnel qualifications, bring in a third party to audit but rather that the program be design document and drawing safety conditions at the William completed properly." control, and the quality of other it Zimmer Nuclear Power Sta-essential material. tion at Moscow, Ohio. See ZIMMER, Pcge 5A M E A NWHILE, EARL A. James G. Keppler, the NRC's ~ ~~ ' Borgmann, senior vice president Chicago regional director, told f of CG&E, said in remarks pre-the House Energy and Environ-pared for delivery to the sub-ment Subcommittee inqu' ring Continued from Page 1 A committee that it appeared to into safety problems at Zimmer CO&E that the NRC "is satisfied with progress being made by the that "a third-party check is Since the last hearing (June company and its contractors in essential for public acceptance 10), no progress has been made of Zimmer, in reducing the backlog of alle the implementation of the up-Keppler went on to explain Eations of quality assurance graded quality assurance pro-to Rep. Morris K. Udall, D-Ariz., problems and wrongdoing on gram in confirming the quality of construction." that both the NRC and Cincin. the part of the utility and/or its natt Oas & Electric Co., majority contractors," Keppler said. Borgmann noted that the "IN FACT, THE list of out. NRC, as of Aug.1, had author-owner of the power plant,"have ized the utility to reduce from a stigma attached to them," standing allegations has grown 100 percent to 50 percent the larger. Our progress during this making the independent audit period has been hindered be level of reinspection required of necessary. CURRENTLY, CG&E is con. cause we underestimated the g performed by subcontrac-ducting a quality confirmation amount of staff time required to proFram under scrutiny by the respond to inquiries. We are. presently staffing Zimmer with /jccJ3 Jn/c(//i*hpnce, Jr.c. r n n NRC. eight full-time people, including Keppler said the NRC does not want to bring in the inde* three investigators from the ~ nam a ' c. NRC Of fice of Investigations, rrce: D:1 cer pendent firm until the quality Two additional investigators, Faco rogo rey confirmation program is "Iur who will soon join the NRC, will ther along." augment the investigation." CI N t;Ia W M i, udli) Udall had urged such an In discussing the ongoing POST SEP J4 M2. independent audit at a subcom quality confirmation etfort, mittee hearing on Zimmer in K,pote ntially significant.a, June. He stressed the need, eppler said the NRC sees EVFr!IllG - 190.303 again today. amount of work to be redone in "It seems unrealistic to have three areas: structural steel, confidence that the company weld quality and the ability to (CO&E) that neglected quality trace materials throughout the' assurance for so many years will plant. on its own fully uncover the "WE CAN ONLY speculate deficiencies resulting from its about the magnitude of the own neglect," Udall said. major corrective actions that KEPPLER,THE leadoff wit-will be required if existing ness in the one-day session, told ancertainties are not resolved Udall the CO&E quality confir-through' ongoing quality assur-ance program reviews," Keppler said. .._}}