ML20127C933
Text
l C
1 IAP-83-349 Carolina Power & Light Company JUL 291983 Mr. R. A. Hartfield, Chief Management Information Branch Office of Management and Program Analysis United States Nuclear Regulatory Commission Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PIANT UNIT NOS. 1 AND 2 DOCKET NOS. 50-400 AND 50-401 CONSTRUCTION STATUS REPORT
Dear Mr. Hartfield:
Carolina Power & Light Company hereby submits, as reruested for NUREG-0030 (Construction Status Report), the updated Shearon Harris Nuclear Power Plant construction information for the second quarter of 1983, to reflect the construction status data as of June 30, 1983.
Yours very truly, e
S Zimmerman Manager Licensing & Permits PS/ccc (6776 PUB)
Attachment cc:
Mr. E. A. Licitra (NRC)
Mr. G. F. Maxwell (NRC-SHNPP)
Mr. J. P. O'Reilly (NRC-RII) 412 g40606 l
367 PDR g1LLE 411 Fayetteville Street
- P. O. Box 1551
- Raleigh, N. C. 27602 i
C0NSTQUCTION STATUS REPORT PAGE NO : 1 2
HARRIS 1 NUCLEAR POWER PLANTS STATUS AS OF 06/30/83
~ PLANT CHARACTERISTICS:
KEY PERSONNEL:
DOCXET NO:
05000400.
CORPORATE CONTACT:
M. A. MCDUFFIE, SEN. V. PRESIDENT CP NO. & DATE ISSUED:
CPR-158 / 01-27-78 CORPORATE ADORESS:
ENGINEERING & CONSTRUCTION CP EXPlRATION DATE:
06-01-84 411 FAYETTEVILLE STREET APPLICANT:
CAROLINA POWER & LIGHT RALEIGH, NORTH CAROLINA 27602 PLANT LOCATION:
NEW HILL, NC IE REGION:
Il CORPORATE PHONE NO:
(919) 836-6663 AE EBASCO NRC LFN:
E. A. LICITRA
-NSSS:
. WESTINGHOUSE IE PRINCIPAL lNSPECTOR:
CONSTRUCTOR:
DANIEL INTERNATIONAL
-CONSTRUCTION:
-REACTOR TYPE PWR
-TEST Af0 STARTUP:
DE5t 09WE):
900 IE RESIDENT INSPECTOR :
G. F. MAWELL INSF'ECTION STATUS:
FUEL LOAD DATE CHANGES AS REPORTED 8Y UT1LITY:
TIME PERIOD REPORT NEW REASON FOR CHANGE REPORT BEG DATE END DATE DATE SCHEDULE REPORTED BY UTILITY NLNBER OF 1NSP.
OF lNSP.
05-07-75 06-01-83 REVISED Ct* PENT ENERGY AND LOAD FORECAST.
09-08-80 06-00-84 LOWER RATE GROWTH IN CUSTO4ER DEMAND THAN PROJECTED.
12-16-81 12-00-84 LOWER RATE GROWTH IN CUSTONER DEMAND THAN PROJECTED.
' )
09-30-82 05-00-85 12-31-82 06-00-85 LOCAL PUBLIC DOCUMENT ROOM:
WAKE COUNTY PtBLIC LIBRARY 104 FAYETTEVILLE STREET RALEIGH, NORTH CAROLINA 27601 (6776PlB)
CONSTRUCTION STATUS ~ REPORT PAGE NO,: ~2 HARRIS 1 NUCLEAR P0WER PLANTS STATUS AS OF: 06/30/83 C0NSTRUCTION STATUS:
APPLICANT'S CURRENT ESTIMATED FUEL LOADING DATE:
06-00-85 APPLICANT'S CONSTRUCTION COMPLETION ESTIMATE AS.
APPLICANT'S PREVIOUS ESTIMATED FUEL LOADING DATE:
12-00-84 DEFINED IN CP: (EARLIEST) 06/01/83 APPL! CANT'S ESTIMATED FUEL LOADING DATE AT CP ISSUANCE:
09-00-80 (LATEST) 06/01/84 APPLICANT'S CURRENT ESTIMATED CGetERCIAL OPERATION DATE: 03-01-86 CURRENT ESTIMATED PERCENT CONSTRUCTION COMPLETE: 815 COMENTS REGARDING CURRENT CONSTRUCTION STATUS:
ESTIMATED ACTUAL ESTIMATED
-ACTUAL ESTIMATED
-START START COMPLETION COWLET10N
% COMPLETE a
MOBILIZE AND PREPARE SITE:
01-14-74 01-14-74
.01-28-78 01-28-78 1005 PLACE STRUCTURAL CONCRETE:
01-28-78 01-28-78 02-01-84 965
- INSTALL REACTOR PRESSURE VESSEL:
12-01-79 04-15-80 04-01-80 08-29-80 100%
INSTALL LARGE BORE PROCESS PIPE:
04-01-79 04-01-79 08-01-84 825 lNSTALL LARGE BORE PIPE HANGERS, RESTRAINTS AND SNWBERS:
04-01-79 04-01-79 11-01-83 66%
INSTALL SMALL BORE PIPE:
04-01-79 04-01-79 08-01-84 795 INSTALL CABLE TRAY 04-01-79 04-01-79 04-01-84 92%
% TALL EXPOSED METAL CONDUlT:
04-01-79 04-01-79 04-01-84 725 IN$ta: L POWER, CONTROL, INSTRIMENTATION AND SECURITY CABLE:
03-01-81 02-26-81 06-01-84 465 INSTALL ti.FCTRICAL TEfttlNATIONS: (POWER AND CONTROL ONLY).
01-01-82 06-15-81 12-01-84 20%
CONDUCT REACTOR WD HYDROSTATIC TEST:
05-01-84 06-01-84 Of 4
CONDUCT HOT FUNCTIONAL TEST:
08-01-84 10-01-84 05 CONDUCT PREOP AND ACCEPTANCE TEST NECESSARY FOR FUEL LOAD:
06-01-83 03-24-83 12-01-84 0%
- RPV set; exclude internals and head package.
(6776PW) i 4
4
CONSTRUCTION STATUS REPORT PAGE NO.: 3 HARRIS 2 NUCLEAR POWER PLANTS STATUS AS OF: 06/30Al3 i
PLANT CHARACTERISTICS:
KEY PERSONNEL:
D00(ET NO:
05000401 CORPORATE CONTACT:
M. A. MCDUFFIE, SEN. V. PRESIDENT CP NO. & DATE ISSUED:
CPR-159 / 01-27-78 CORPORATE ADDRESS:
ENGINEERING & CONSTRUCTION CP EXPIRATION DATE:
06-01-86 All FAYETTEVILLE STREET l
APPLICANT:
CAROLINA POWER & LIGHT RALEIGH, NORTH CAROLINA 27602 l
PLANT LOCATION:
NEW HILL, NC l
lE REGION:
11 CORPORATE PHONE NO:
(919) 836-6663 AE:
EBASCO NRC LFNs E. A. LICITRA NSSS:
WESTINGHOUSE lE PRINCIPAL INSPECTOR:
CONSTRUCTOR:
DANIEL INTERNATIONAL
-CONSTRUCTION:
REACTOR TYPE PWR
-TEST AND STARTUP:
DER (MWE):
900 IE RESIDENT INSPECTOR :
G. F. MA* ELL 1NSPECTION S T A T U S:
FUEL LOAD DATE CHANGES AS REPORTED BY UTIL1TY:
TIME PERIOD REPORT NEW REASON FOR CHANGE REPORT BEG DATE END DATE DATE SCHEDULE REPORTED BY UTILITY NtMBER OF INSP.
OF INSP.
05-07-75 06-01-85 REVISED CURRENT ENERGY AND LOAD FORECAST.
l 01-00-80 06-01-86 REVISED CURRENT ENERGY AND LOAD FORECAST.
l 09-08-80 06-01-87 SLOWER RATE GROWTH IN CUSTOMER DEMAND THAN PROJECTED.
12-16-81 06-01-88 EXPANDED CONSERVATION AND LOAD MANAGEMENT PROGRAM.
09-30-82 UNDER REVIEW l
12-31-82 06-00-89 l
l LOCAL PUBLlC DOCUMENT ROOM:
WAKE COUNTY PLBLIC LIBRARY 104 FAYETTEVILLE STREET l
RALEIGH, NORTH CAROLINA 27601 (6776PtB) l l
CONSTRUCTION STATUS REPORT PAGE NO,: 4 HARRIS 2 NUCLEAR POWER PLANTS
' STATUS AS OF: -06/30/83 CONSTRUCTION STATUS:
APPLICANT'S CURRENT ESTINATED FUEL LOADING DATE:
06-00-89 APPLICANT'S CONSTRUCTION COMPLETION ESTINATE AS
_ @PLICANT'S PREVIOUS ESTINATED FUEL LOADING DATE:
06-01-88 DEFINED IN CP: (EARLIEST) 06 A)1/85.
APPLICANT'S EST!NATED FUEL LOADING DATE AT CP ISSUANCE:
06-01-85 (LATEST) 06/01/86 APPLICANT'S CURRENT EST!NATED COe4ERCIAL OPERATION DATE: 03-00-90 CLRRENT ESTINATED PERCENT CONSTRUCTION COMPLETE: 45 COe4ENTS REGARDING CURRENT CONSTRUCTION STATUS:
l ESTINATED ACTUAL ESTINATED ACTUAL ESTINATED START START COWLETION COWLETION f COWLETE NOBILIZE AND PREPARE SITE:
01-14-74 01-14-74 01-28-78 01-28-78 1005 PLACE STRUCTURAL CONCRETE:
02-01-79 02-01-79 04-01-86 31%
INSTALL REACTOR PRESSURE VESSEL:
09-01-85 01-01-86 Of INSTALL LARGE BORE PROCESS PIPE:
06-01-79 06-01-79 02-01-87 135 INSTALL LARGE BORE PIPE HANGERS, RESTRAINTS AND SNtBBERS:
07-01-82 07-01-82 02-01-88 05 INSTALL SMALL BORE PIPE:
06-01-79 06-01-79 02-01-88 45
)'
lNSTALL CABLE TRAY 04-01-85 10-01-87 Of INSTALL EXPOSED NETAL CONDUIT:
04-01-85 10-01-87 35 INSTALL POWER, CONTROL, INSTRIMENTATION AND SECURITY CABLE:
06-01-85 03-01-88 Of INSTALL ELECTRICAL TEIMINATIONS:
08-01-85 04-01-88 0%
CONDUCT REACTOR COLD HYDROSTATIC TEST:
11-01-87 12-01-87 Of CONDUCT HOT FUNCTIONAL TEST:
02-01-88 04-01-88 Of CONDUCT PREOP AND ACCEPTANCE TEST NECESSARY FOR FUEL LOAD:
12-01-86 06-01-88 0%
(6776PtB) j
..