Washington Public Power Supply System P.O. Box 968 3000GeorgeWashingtonWay Richland. Washington 99352 (509)372-5000 e.
October 25, 1982 Mr. R. A. Hartfield, Chief Management Information Branch Office of Management and Program Analysis U. S. Nuclear Regulatory Commission Washington, D. C.
20555
Dear Mr. Hartfield:
Subject:
CONSTRUCTION STATUS REPORT (NUREG-0030)
Reference:
Letter from R. A. Hartfield to R. L. Ferguson, same subject, dated October 30, 1981 Enclosed for your information are the updated construction status reports.for our Nuclear Projects 2 and 3 as of September 30, 1982.
Very truly yours, G. D. Bouchey, Ma ager Nuclear Safety & Licensing GCS/sm Attachments cc: R Auluck NRC w/a RW Hernan NRC w/a WH Lovelace NRC w/a NS Reynolds D&L w/a LL Wheeler NRC w/a kDk41 08 840606
~
KILLEFE84-367 PDR
A'
'C0N5TRUCT ION S'T A T U S-R E P O'R T.
'PAGE NO: 2-130.
WASHINGTON NUCLEAR 3 NUCLEA R P O W E P.
PLANTS STATUS AS OF Sept. 30 PLAN T CHARA C'T'E R I$T I C St K E' Y P E R S 0 N.N E L DOCKET NO:
OS000508 CORPORATE CONTACT:
R.
L.
FERGUSON, NENAGING DIRECTOR.
CP No. 8 DATE ISSUED:
CPPR-154/ 04-!!-73 CP EXPIRATION DATE:
01-01-83 CORPORATE ADDRESS:
P.
O.
BOX 968 l
APPLICANT:
WASHINGTON PUBLIC PCWEP. SUPPLY SYSTEM
'RICHLAND,' WASHINGTON 993S2 l
' PLANT LOCAT!ON:
26 MI W OF OLYMPIA. WA I
IE REGIONS 5
CORPORATE PHONE NO:
(S09) 372-5000' i
AE:
EBASCO
)
NSSS:
COMBUSTION ENGINEERING CottS TRUCT OR :
ESASCO NRC LPM:
L. WHEELER REACTOR TYPE:
DEP (MWE1:
1242 IE RESIDENT INSPECTOR:.
W.
G.
ALBERT-
&1IN 5PEC T ION 5T A i U 5:
FUEL L0A D.'D A TE CHANGE 5 l
1-TIME PERIOD A S REP 0RT ED BY UT I L I T Y:
J& 1932 - Mar. 19 9 REPORT NEW REASON FOR CHANGE REPORT BEG DATE END DATE P A_LE SC*EDULE P EP O R T E DJUS L T TY
.T tiUMSFR OF INSP.
OF INSP.
05-22-79 06-00-84 SCHEDULE REEVALUATION.
82-01 0t-11-82 0t-15-82 06-00-80 32-00-45 REASON FOR.18 MONTH StIP WAS:
82-02 01-01-82 01-31-82 6 MONTHS - DUE TO LATE PIPING START l
82-03 02-01-82 02-05-82 12 MONTHS - DUE TO REVISED QUANTITY l
82-04 03-01-82 C3-19-82 AND PRODUCTIVITY ESTIMATES.
A
$2-0S 02-08-32 02-28-82 82-06 03-01-82 03-31-52 11-00-81 06/00/86 FOUR MONTNS SCHEDULE RECOVERY 82-07 03-23 03-2S-82 BASED ON REASSESSMENT OF PROJECT CAPABILITY AND CONTRACT INCENTIVES I
Inspection Reports are available at Iocal PDRs.
FOR. PRIME CONTRACTORS.
j 07/15/82 06/00/86 Reporting based on official fuel y
load date. The project target fuel.-
.. [
load date is 12/85. Present I
construction progress, schedule and l
licensing activities support 12/85.
I I
L0 CAL P U 8 L I C
.D 0 C U M E N T R 0 0 M:
W.
H.
ABEL MEMORIAL LIBRARY 125 MAIN STREET. SOUTN MONTESANO, WASHINGTON 98563 9
8 e
),fj
~
C0N57RUCTION 5TA T.UL5 ~ REPORT PAGE'M0: '2-131 *k WASHINGTON NUCLEGR 3 NUCLEAR.P0WER
'.P.L;A N T S.
' 5TATUS A5 0F6ept.130 C 0 N 5 i R U C T I-D N 5 T A T U-5:
- APPLIC ANT'S CURRENT ESTIMATED FUEL LDADING DATE: '/
' APPLICANTS CONSTRUCTION COMPLETION ESTIMATE.ASL 4
U APPLICANT'S PREVIOUS ESTIMATED FUEL LOADING DATE:
/
DEFINED IN CP: (EARLIEST) 01-01-83 APPLICANT'S ESTIMATED FUEL LOADING DATE AT CP ISSUANCE: 7/83 APPLICANT'S CURRENT ESTIMATED COMMERCIAL OPERATION DATE 12/86
~
Oi-01-85 ctATEST).
C1ARENT EST3 HATED PERCENT CONSTRUCTION COMPLETE: 62.2%
- COMMENTS REGARDING CURRENT CONSTRUCTION STATUS: WOFFICIAL PUBLISHED SCHEDULE IS. JUNE 1986.
Dec. ' 8 985 REPRESENTS PROJECT TARGET FUEL LOAD DATE. -ALL ESTIMATED START AND COMPLETION DATE5 are based on the December 1985 Target Fuel Load Date.
r
{.
ESTIMATED ACTUAL ESTIMATED ACTUAL' E$TIMATED F.
START
}JART_
C OMP L ET I ON' CO*tP L E T_1 Qt! i,CfMP LClf NO3ILIZE AND PREPARE SITE:
04-00-77 04-00-77 04-00-78 1007 PLACE STRUCTURAL CONCRETE:
09-00-78 09-00-78 10/00/84 87.2%
INSTALL REACTOR PRESSURE VESSEL:
08-00-81 08-00-81 08-00-81 1004 INSTALL LARGE EORE PROCESS PIPE:
03-00-80.
33-00-80 0?/00/85 80.7%
INSTALL LARGE EORE PIPE HANGERS. RESTRAINTS AND INUBSERS:
03-00-80 03-00-80 08/00/85 66.9%
l INSTALL SMALL. BORE PIPE:
c3-00-41 03-00-81 05/00/85
-44.8%
INSTALL CABLE TRAYS 09-00-20 09-00-80 02/00/84 75.8%
. INSTALL' EXPOSED METAL CONDUIT:
04-00-81 04-00-81 04/00/85 28.6%-
INSTALL POWER CONTROL. INSTRUMENTATION AND SECURITY CABLE:
02-00-82 04/00/85 12.6%
INSTALL ELECTRICAL TERMINATIONS:
03-00-82 03/09/82 08/00/85 1.4%
CONDUCT REACTOR COLD HYDROSTATIC TEST:
10/00/84 04/00/85 e.,.
CONDucr NOT ruMCTIoNAL TEST:
11/00/84-06/00/85
,e CONDUCT PREOP AND ACCEPTANCE TESTS NECESSARY FOR FUEL LOAD:03/00/83 12/00/85 c
i A
r
--"1 C0N$TRUCTION STATU.S R E P.0 R T PAGE HO: 2-128,,
WASHINGTON NUCLEAR 2-
.H U C L E'A R POWER P L A N.T-S STATUS AS OF: Sept.;30, 1982 PLANT C H A R A C T E R I 5 T I C 5:
KEY P E R S 0 N N E L:
DOCKET NO:
05000397
' CORPORATE CONTACT:
R. L. FERGUSON, MANAGING DIRECTOR CP HO. 8 DATE ISSUED: CPPR-93 / 03-19-73 CP EXPIRATION DATE:
02/1/84 CORPORATE ADDRESS:
P. O. BOX 968 APPLICANT:
WASHINGTON PUBLIC POWER SUPPLY SYSTEM RICHLAND. WASHINGTON 99352 PLANT LOCATION:
30 MI NW OF RICHLAND. WASH iE REGION:
5 CORPORATE PHONE NO' (509) 372-5000 AE:
BURNS 8 ROE-NSSS:
DENERAL ELECTRIC IE PRINCIPAL INSPECTOR:
CONSTRUCTOR:
BECHTEL NRC LPM:
R. Auluck REACTOR TYPE:
DER (MWE):
1103 IE RESIDENT-INSPECTOR:
R. FEIL IHSPECTION S T A T U S:
FUEL L0AD DATE CHANGES TIME PERIOD AS REPQRTED BY.U T I L I T Y:
Jan, 1982 - Mar, 1982 REPORT-NEW REASON FOR CHANGE REPORT BEG DATE END DATE DAIE SCHEDilLE REPORTED BY UTILITY NUMBER OF INSP.
OF INSP.
08-15-74 07-00-77 HO REASON NOTED.
I 82-01 01-11-82 01-85-82 01-10-75 12-00-77 INSUFFICIENT MANPOWER BY MAJOR 82-02 01-01-82 01-31-82 CONSTRUCTOR.
82-03 02-01-82 02-04-82 08-00-75 04-00-78 PERSISTING CIRTICAL PROBLEMS.
82-04 02-08-82 02-12-82 02-00-76 01-00-79 CONTINUED SLIPPAGE BY MAJOR CIVIL AND 82-05 02-01-82 02-28-82 NECHANICAL CONTRACTORS.
82-06
.03-01-82 03-05-82 07-31-76 06-15-79 CIVIL CONTRACT DEFAULT AND EXTENDED 82-07 03-01-82 03-31-82 LABOR DISPUTE.
10-12-76 12-00-79 CONTINUED SLIPPAGE BY MAJOR CIVIL AND Inspection Reports are avalIable at local PDRs.
MECHANICAL CONTRACTOR AND CONTINUING PIPE FITTER STRIKE.-.
01-17-77 03-00-80 PIPE FITTER STRIKE.
04-27-79 03-00-81 SCHEDULE REEVALUATION 06-00-80' 08-00-82 HD REASON PROVIDED.
11-20-81 03-30-83 QUALITY PROBLEMS, LABOR DISPUTE.
SCHEDULE RE-EVALUATION.
03-31-82 09-00-83 SCHEDULE RE-EVALUATION.
L0 CAL PUBLIC D0CUMENT R 0 0 M:
I RICNLAND PUBLIC LIBRARY SWIFT AND NORTHGATE STREETS RICHLAND, WASHINGTON 99352 s
i h
j e
J.;
.C 0 N 5 T R U C T I_0 N ~ S T-A T-U $
REPQRT
,PAGE Nos.;2-129-l WASHINGTON. NUCLEAR 2.
HUCLEAR POWER P L' A~ M -T S -
STATUS AS OF. Sept. 30,7 "82
lCDNSTRUCTION' SLT A T U S:
APPLICANT'S CURRENT ESTIMATED FUEL LOADING DATE:
A1-LO-83 APPLICANTS : CONSTRUCTION '-COMPLETION ESTIMATE' AS
' APPLICANT'S PREVIOUS ESTIMATED FUEL LOADING DATE: L
. 5/84 DEFINED IN CP (EARLIEST) 12-08-82
' APPLICANT'S ESTIMATED FUEL LDADING DATE AT-CP ISSUANCE:
84-00-77
.(LATEST)
_02-00-84 ~
APPLICANT'S CURRENT ESTIMATED COMMERCIAL OPERATION DATE ; 02-00-84 CURRENT ESTIMATED PERCENT CONSTRUCTION COMPLETE:
92.1
-COMMENTS-REGARDING CURRENT. CONSTRUCTION STATUS:
r ESTIMATED ACTUAL ESTIMATED
- ACTUAL.
ESTIMATED' START START COMPLETION SQMPLETIqN % COMPLETE MOBILIZE AND PREPARE SITE:
- 08-00-72 05-00-73
.100%
' PLACE STRUCTURAL CONCRETE:
Y 1
05-00-73 03-00-78 100%-
l.
INSTALL REACTOR PRESSURE VESSEL:
03-00 100%
INSTALL LARGE BORE PROCESS PIPE:
07-00-75 03/00/83, 97.1%~
INSTALL LARGE BORE PIPE NANGERS, RESTRAINTS AND SNUBBERS:
07-00-75 05/00/83' 92.5%
INSTALL SMALL BORE PIPE 8 07-00-75 03/00/83
'90.4%.
INSTALL CABLE TRAY:
02-00-75 11/00/79 100%
[.
INSTALL' EXPOSED METAL CONDUIT:
02-00-75 08/U0/83 89.7%4 I
INSTALL POWER, CONTROL, INSTRUMENTATION AND SECURITY CABLE:
02-00-75 08/00/83 93.0%
INSTALL ELECTRICAL-TERMINATIONS:
02-00-75 08/00/83-77.8%-
CONDUCT REACTOR COLD HYDROSTATIC: TEST:
't-08/00/82 100%
CONDUCT HOT FUNCTIONAL TEST:
N/A N/A h/A N/A N/A CONDUCT PREOP AND ACCEPTANCE-TESTS NECESSARY FOR FUEL LOAD:
02/20/82:
09-00-83
.02%-
I
\\
I t
(