GeorDia Power Company Post Office Box 4545 Atlanta, Georgia 30302 b
Telephone 404 522-6060 Southern Company Sennces, Inc.
Post Offee Box 2625 Birmingham, Alabama 35202 Telephone 205 870-6011 October 13, 1982 Chief, Management Information Branch Office of Management and Program Analysis U. S. Nuclear Regulatory Commission File:
X7BG48 Washington, D.C.
20555 Log:
GN-197
Reference:
50-424/50-425 Gentlemen:
Information is provided herewith for your use in updating the NRC Construction Status Report (yellow book).
Should you have any questions pertaining to this report, please contact my office at (404) 526-7707.
Very truly rs,
/
e
(,, A,
D. O. Fos er Vice President and General Manager CWH/DOF/tlp Attachment xc:
James P. O'Reilly, NRC Region II R. E. Conway D. E. Dutton R. H. Pinson L. T. Gucwa H. H. Gregory, III 8504120401 840606 PDR FOIA KILLEFE84-367 PDR
C 0 il S T R U C T I 0 N STATUS REP 0RT PAGE N0:
2-138' UNIT 1 NUCLEAR P0WER PLANTS STATUS AS OF:
10/03'/82 PLANT C H A R A C T E R-I S.T I C S:
, KEY P E R S 0 N_N E L:
DOCKET NO:
05000424 CORPORATE CONTACT:-
_D.
E. Dutton, Vice President CP NO. & DATE ISSUED:
CPR-108 / 05-28-74 CP EXPIRATION DATE:
04-30-81 Generating Plant Projects CORPORATE ADDRESS:
Georgia Power Company APPLICANT:
GEORGIA POWER COMPANY 333 Piedmont, Atlanta, GA 303C PLANT LOCATION:
BURKE COUNTY / GEORGIA CORPORATE P110NE NO:
(404) 522-6060 II REGION:
II NRC LPM:
S. BURWELL AE:
SOUTHERN SERVICES /BECHTEL IE PRINCIPAL INSPECTOR:
NSSS:
WESTINGHOUSE-
-CONSTRUCTION:
CONSTRUCTOR:
GPC
-TEST AND STARTUP:
REACTOR TYPE:
W. F. Sanders DER (MWE):
1100 INSPECTI0N S T A T U S:
FULL L O'A D DATE CHANGES TIME PERIOD AS REP 0RTED BY U T I L I T Y:
REPORT NEW REAS0ft FOR CilANGE REPORT BEG DATE END DATE DATE SCHEDULE REPORTED BY ~ UTILITY NUMBER OF INSP.
OF INSP.
09-27-74 NOT KNOWN CONSTRUCTION SUSPENDED FOR FINANCIAL REASONS.
05-11-77 05-00-83 NO REASON GIVEN.
01-09-78 05-01-84 OVERESTIMATED PROJECTED NEED FOR POWER.
.07-17-80 11-00-84 NO REASON PROVIDED 11-18-81 09-01-86 SCHEDULE REASSESSMENT
\\
~
i L0 CAL PUBLIC D 0 C U M E il T R 0 0 M:
BURKE COUNTY LIBRARY 4TH STREET WAYNESBOR0, GEORGIA 30830 i
C0NSTRUCTI0N S T_R T'U S REP 0RT' PAGE N0: ~2s139:
UNIT 1 NUCLEAR P0WER PLANTS STATUS AS OT:
10/03/l C0NSTRUCTION S T A T U S:
,' APPLICANT'S CURRENT ESTIMATED FUEL LOADING DATE:
09-01-86 APPLICANTSbONSTRUCTIONCOMPLETION-APPLICANT'S PREVIOUS ESTIMATED FUEL LOADING DATE:
11-00-84 ESTIMATE AS Dr.rINED IN CP:
' APPLICANT'S ESTIMATED FUEL LOADING DATE AT CP ISSUANCE:
10-01-79
-(EARLIUST) 04-01-80 APPLICANT.'S' CURRENT ESTIMATED COMMERCIAL OPERATION DATE:
03-01-87 (LATEST)
CURRENT ESTIMATED PERCENT CONSTRUCTION COMPLETE: 40.4%
DATE CONSTRUCTION STARTED: 08-01-76 CIFRRENT ESTIMATED CONSTRUCTION DURATION IN MONTilSi 126' COMMENTS REGARDING CURRENT CONSTRUCTION STATUS:
ESTIMATED ACTUAL' ESTIMATED ACTUAL ESTIMATED START START COMPLETION COMPLETION
- 1. COMPLETE MOBILIZE AND PREPARE SITE:
08-01-76 09-15 100 %
PLACE STRUCTURAL CONCP,ETE:
08-01-78 02-15-84 72.4%
INSTALL REACTOR PRESSURE VESSEL:
02-01-83 03-15-83 0%
INSTALLED LARGE BORE PROCESS PIPE:
09-01-80 05-01-86 17.8%
INSTALL LARGE BORE PIPE HANGERS, RESTRAINTS AND SHUDDERS:
09-01 80 05-01-86 9.3%
INSTALL SMALL BORE PIPE:
07-01-81 05-01-86 3.5%
INSTALL CABLE TRAY:
08-01-80 04-01-85 43.7%
INSTALL EXPOSED METAL CONDUIT:
11-01-81 01-01-86 6.6%
INSTALL POWER, CONTROL, INSTRUMENTATION AND SECURITY CABLE:' 03-01-83 11-01-85 0 %
INSTALL ELECTRICAL TERMINATIONS:
05-01-83 01-01-86 0 %
CONDUCT REACTOR COLD HYDROSTATIC TEST:
03-01-86 04-01-86 0 %
CONDUCT HOT FUNCTIONAL TEST:
05-15-86 07-15-86 0 %
\\
CONDUCT PRE 0P AND' ACCEPTANCE TESTS NECESSARY FOR FULL LOAD:
07-24-84 08-01-86 0 %
9
C0NSTRUCTI0N STATUS REP 0RT PAGE NO:' 2-140' UNITL2 21UCLEAR P0WER P L A N T'S STATUS AS OF:
10/03/82.
P.L A N T' C H A R'A C T E.R I S T.I C S:
)K ~ E Y ~ _P E R S 0_N N E L:
DOCKET NO:
05000425 CORPORATE CONTACT:
D. E. DUTTON,'VICE PRESIDENT CP_NO. & DATE ISSUED:
CPR-109 /'06-28-74 GENERATING PLANT PROJECTS CP EXPIRATION DATE:
04-30-82 CORPORATE ADDRESS:
GEORGIA-POWER. COMPANY APPLICANT:
GEORGIA POWER COMPANY 333 PIEDMONT, ATLANTA, GA 3030; PLANT LOCATION:
BURKE COUNTY / GEORGIA
, CORPORATE PHONE N0:
(404) 522-6060 II REGION:
II NRC LPM:
S. BURWELL
'AE:
SOUTHERN SERVICES /BECHTEL IE PRINCIPAL' INSPECTOR:
NSSS:
-CONSTRUCTION:
CONSTRUCTOR:
- GPC
-TEST-AND STARTUP:
REACTOR TYPE:
W. F. Sanders DER (MWE):
1100 I N S P E C T I O N.
S T.A T U S:
FULL LOAD D-A T E
- CHANGES TIME PERIOD A S.
REP 0RTED BY U T I L I T Y:
REPORT NEW REASON FOR CHANGE REPORT BEG DATE END DATE DATE SCHEDULE REPORTED SY UTILITY NUMBER OF INSP.
0F INSP.
09-27-74 NOT KNOWN CONSTRUCTION SUSPENDED FOR-FINANCIAL REASONS.
05-11-77 05-00-84 NO_ REASON GIVEN.
11-02-77 05-00-85 OVERESTIMATED PROJECTED NEED FOR POWER.
07-17-80 05-00-87 NO REASON PROVIDED 11-18-81 03-01-88 SCHEDULE REASSESSMENT.
~
~
L0 CAL PUBLIC D0CUMENT R O O M:
BURKE COUNTY LIBRARY-4TH STREET WAYNESBOR0, GEORGIA 30830
C0NSTRUCTION STATUS R E P'O R T PAGE NO:
2-41' UNIT 2 NUCLEAR P0WER P L A N T-S STATUS AS 00:
-10/03/81 C0NSTRUCTI0N S T A T U S:
s APPLICANT'S CURRENT ESTIMATED FUEL LOADING DATE:
03-01-88 APPLICANTS CONSTRUCTION COMPLETION APPLICANT'S PREVIOUS ESTIMATED FUEL LOADING DATE:
05-00-87 ESTIMATE AS DEFINED IN CP:
APPLICANT'S ESTIMATED FUEL LOADING DATE AT CP ISSUANCE:
10-01-80 (EARLIEST) 04-01-81 APPLICANT'S CURRENT ESTIMATED COMMERCIAL OPERATION DATE: 09-01-88 (LATEST)
CURRENT ESTIMATED PERCENT CONSTRUCTION COMPLETE:
13.6%
DATE CONSTRUCTION STARTED:
08-01-76 COMMENTS REGARDING CURRENT CONSTRUCTION STATUS:
CURRENT ESTIMATED CONSTRUCTION DURATION l[N MONTHS:
147 ESTIMATED ACTUAL ESTIMATED
' ACTUAL ESTIMATED START START COMPLETION COMPLETION
% COMPLETE MOBILIZE AND PREPARE SITE:
08-01-76 09-15277 100
%~~
PLACE STRUCTURAL CONCRETE:
08-01-78 08-15-84 48.9%
INSTALL REACTOR PRESSURE VESSEL:
08-01-84 09-15-84 0 %
INSTALLED LARGE BORE PROCESS PIPE:
09-01-80 11-01-87 11,4%
INSTALL LARGE' BORE PIPE HANGERS, RESTRAINTS AND SHUDDERS:
09-01-80 11-01-87
.7%
INSTALL SMALL BORE PIPE:
02-01-83 04-01-88
.6%
INSTALL CABLE TRAY:
08-01-80 10-01-86 8.5%
INSTALL EXPOSED METAL CONDUIT:
03-01-83 07-01-87 0 %
INSTALL POWER, CONTROL, INSTRUMENTATION AND SECURITY CABLE: 09-01-84 05-01-87 0 %
~
INSTALL E' ECTRICAL TERMINATIONS:
11-01-84 07-01-87 0
CONDUCTREACTORCOLDHYDRdSTATICTEST:
09-01-87 10-01-87 0 %
P CONDUCT HOT FUNCTIONAL TEST:
12-15-87 02-15-88 0 %
CONOUCT PRE 0P AND ACCEPTANCE TESTS NECESSARY FOR FULL LOAD: 01-24-86 02-01-88 0 %
= _ _
_