The Light ME%f Houston Lighting & Power P.O. Box 1700 Houston, Texas 77001 (713)228-9211 October 27, 1982 ST-HL-AE-900 File Number: G25 R. A. Hartfield, Chief Management Information Branch Office of Management and Program Analysis U. S. Nuclear Regulatory Commission Washington, D.C.
20555
Dear Mr. Hartfield:
South Texas Project Units 1 & 2 Docket Nos. STN 50-498, STN 50-499 Update to Construction Status Report Houston Lighting & Power Company (HL&P) has reviewed the entries for the South Texas Project (STP) in NUREG 0030, " Construction Status Report", dated October 1982. Attached are annotated corrected copies of those pages which require changes. These revisions will update NUREG 0030 through the third quarter of 1982.
In HL&P's August 6, 1982 update to the entries in NUREG 0030, the construction permit expiration dates were corrected to be December 31, 1987 for unit I and December 31, 1989 for unit 2.
These revised dates, which were indicated in the STP construction permit extension (dated April 30,1982),
were not included in the NUREG 0030 issued in October 1982.
If you have any questions, please call Mr. M. E. Powell at (713)877-3281.
Very truly you'r, A
J. H. Goldberg Vice President Nuclear Engineering & Construction MAM/mg Attachment 850412g377840606 kLEFE
-367 PDR
b-Houston Lighting & Power Company October 27, 1982 cc:
G. W. Oprea, Jr.
ST-HL-AE-900 J. H. Goldberg' File Number:G25 J. G. Dewease Page 2 J. D. Parsons D. G. Barker.
M. R. Wisenburg R. A.- Frazar J. W. Williams R. J. Maroni-J.:E. Geiger H. A.~ Walker
.S. M. Dew J. T. Collins (NRC D. E. Sells (NRC W. M. Hill,'Jr.
.(NRC M. D. Schwarz Baker & Botts)
R. Gordon Gooch Baker &Botts)
J. R. Newman Lowenstein, Newman, Reis, & Axelrad)
STP RMS Director,.0ffice of Inspection & Enforcement Nuclear Regulatory Commission Washington, D. C. 20555 G. W. Muench/R. L. Range Charles Bechhoefer, Esquire Central Power & Light Company Chairman, Atomic Safety & Licensing Board P.~ 0. Box 2121 U. S. Nuclear Regulatory Commission Corpus Christi, Texas 78403 Washington, D. C.
20555 H. L. Peterson/G. Pokorny Dr. James C. Lamb, III City of Austin 313 Woodhaven Road P._0. Box 1088 Chapel Hill, North Carolina 27514 Austin, Texas 78767 J.-B.-Poston/A. vonRosenberg Mr. Ernest E. Hill City Public Service Board Lawrence Livermore Laboratory P. O. Box 1771 University of California San Antonio, Texas 78296 P. 0. Box 808,-L-46 Livermore, California 94550 Brian E.-Berwick, Esquire William S. Jordan, III Assistant Attorney General Harmon & Weiss for the State of Texas 1725 I Street, N. W.
P. O. Box 12548 Suite 506 Capitol Station Washington, D. C.
20006 Austin, Texas 78711 Lanny.Sinkin Citizens for Equitable Utilities, Inc.
Citizens Concerned About Nuclear Power c/o Ms. Peggy Buchorn 5106 Casa Oro-Route 1, Box 1684 San Antonio, Texas 78233 Brazoria, Texas 77422 Jay Gutierrez,. Esquire Hearing Attorney Office of the Executive Legal Director U. S. Nuclear Regulatory Commission Washington, D. C.
20555 Revision Date 10-18-82 o-
C0N$TRUCTION
$TATUS REP 0RT PAGE NO3 2-106 SOUTO TEXAS S NUCLEAR P0WER PLANTS STATUS AS OFs 06-30-82 l
P L A,N T CHARACTERISTIC 58 KEY PERS0NNEL DOCKET NO:
65000498 CORPORATE CONTACTS J. H. GOLDBERC. VICE PRESIDENT NUCLEAR ENGINEERING 8 CONSTRUCTICH CP MO. 8 DATE ISSUED CPPR-128/ 12-
-S CP EXPIRATION DATE:
0; I'-!? - /
7' CORPORATE ADDRES$s P. O. BDX 9700 APPLICANT:
HOUSTON LIG 8 POWER COMPANY HOUSTON. TEXAS 77001 PLANT LOCATION:
12 MI S$W OF BAY CITY, TEX IE REGIOMs 4
CORPORATE PHONE Nos (713) 486-3828 AE BECHTEL k
NS$$8 WESTINGHOUSE
~
CONSTRUCTOR:
EBASCO HRC LPM 8 D. SELLS REACTOR TYPE 8 PWR IE PROJECT INSPECTOR DER (MWE):
1250 IE RESIDENT INSPECTOR:
W. HILL IOSPECTIOM STATUSt FUEL L0AD DATE CHANGES TIME PERIOD AS REPORTED BY UTILITYs Anr. 1982 - Jun. 1982 J
REPORT NEW REASON FOR CHANGE REPORT BEG DATE END DATE DATE SCHEDULE REPORTED BY UTILITY NUMBER OF INSP.
OF INSP.
10-30-78 11-00-81 SCHEDULE REEVALUATION.
8205 03-30-82 04-02-82 01-88-80 09-00-83 SCHEDULE REEVALUATION.
8206 04-12-82 04-23-82 08-05-82 12-00-86 CHANGE IN A/E AND CONSTRUCTOR.
8207 04-08-82 04-08-82 8208 04-01-82 04-30-82 8209 05-08-82 05-31-82 e
Inspection reports are avalIable at Iocal PDRs.
})
b t,
)
L0 CAL PUBLIC D0CUMENT R 0 0 M8 MATAGORDA COUNTY LAW LIBRARY P. O. BOX 487 BAY CITY, TEXAS 77434 l
l 7
I C0MSTRUCTIOM STATUS REP 0RT PA!E Mot 2-107 HUCLEAR POWER PLANTS STATUS AS oft 06-30-82 SOUTH TEXAS 1 C0NSTRUCTIOM STATUSt APPLICANT'S CURRENT ESTIMATED FUEL LOADING DATE 12-08-86 APPLICANTS CONSTRUCTIDH COMPLETI E IMATE AS A'PLICANT'S PREVIOUS ESTIMATED FUEL LOADING DATE 09-05-53 DEFIHED IN CPt (EARLIEST)
/4 4
APPLICANT'S ESTIMATED FUEL LOADING DATE AT CP ISSUANCE:
05-01-80 (LATEST)
/ ggf APPLICANT'S CURRENT ESTIMATED COMMERCIAL OPERATION DATE: 06-00-87 CURRENT ESTIMATED PERCENT CONSTRUCTIDH COMPLETE:,$FT* dflah COMMENTS REGARDING CURRENT CONSTRUCTION STATUS: HA = HOT AVAILABLE.
ESTIMATED ACTUAL ESTIMATED ACTUAL ESTIMATED START 11AR1 COMPLETI0H gjMPLETION K_GEMPLETE 09-00-75 12-00-75 100%
MOBILIZE AND PREPARE SITE:
04-00-76 04-00-85 NA PLACE STRUCTURAL CONCRETE 09-00-79 09-00-79 100%
INSTALL REACTOR PRESSURE VESSEL:
10-00-78 06-00-86 HA INSTALL LARGE BORE PROCESS PIPE 10-00-78 06-00-86 HA INSTALL LARGE BORE PIPE HANGERS, RESTRAINTS AND SHUBBERS:
10-00-78 06-00-86 HA INSTALL SMALL BORE PIPET 10-00-78 01-00-85 NA INSTALL CABLE TRAY 8 HA 07-00-78 07-00-85 INSTALL EXPOSED METAL CONDUITt INSTALL POWER, CONTROL, INSTRUMENTATION AMD SECURITY CABLE 8 09-00-85 10-00-86 NA INSTALL ELECTRICAL TERMINATIDMS:
09-08-85 10-00-86 NA
~
CONDUCT REACTOR COLD HYDROSTATIC TESit 06-00-86 08-00-86 NA 09-00-86 12-00-86 NA CONDUCT HOT FUNCTIONAL TEST 8 CONDUCT PREOP AND ACCEPTANCE TESTS HECESSARY FOR FUEL LOAD 12-00-84 12-00-86 HA O
t C0N5TRUCTION 5TATUS REPORT PAGE Hos 2-108 503TH TEXA5 2 NUCLEAR POWER PLANT 5 STATUS AS OF8 86-30-82 PLANT CHARACTERI$ TIC 5:
KEY PERS0NNELa DOCKET N08 05000499 CORPORATE CONTACT:
J. H. GOLDBERG, VICE PRESIDENT CP NO. 8 DATE ISSUED: CPPR-129/ 1 NUCLEAR ENGINEERING 8 CONSTRUCTION CP EXrIRATION DATE:
t a. t s - a z.
CORPORATE ADDRESS P. O. BOX 1700 APPLILAhis HOUSTON L 4 POWER COMPANY HOUSTON, TEXA5 77001 PLANT LOCATION:
12 MI SSW OF 3AY CITY. TEX IE REG 10Mt 4
CORPORATE PHONE NO:
(713) 486-3828 AE BECHTEL H555:
WESTINGNOUSE CONSTRUCTOR:
EBASCO NRC LPM:
D. SELLS REACTOR TTPE:
I DER (MWE)*
1250 IE RESIDENT INSPECTOR:
W. HILL IN5PECTIOH 5TATU5:
FUEL L0AD DATE CHANGES TIME PERIOD A5 REP 0RTED BY UTILITYa Anr. 1982 - Jun. 1982 REPORT NEW REASON FOR CHANGE REPORT BEG DATE END DATE DATE SCHEDULE REPORTED BY UTILITY MUMBEg OF INSP.
OF INSP 10-30-78 11-00-82 SCHEDULE REEVALUATION.
8205 03-30-82 04-02-82 01-18-80 09-08-85 SCHEDULE REEVALUATION.
8206 04-12-82 04-23-82 08-05-82 12-00-88 CHANGE IN A/E AND CONSTRUCTOR.
8207 04-03-82 04-08-82 8208 04-08-82 04-30-82
)
8209 05-01-82 05-31-82 Inspection reports are available at local PDRs.
L0 CAL PUSLIC D0CUMENT R00Mr MATACORDA COUNTY LAW LIBRARY P. O. BOX 487 BAY CITY, TEXAS 77414 e
=
e o
I PAGE N08 2-159
(
C0NSTR0CTION 5TATUS REPORT j
STATUS AS oft 56-30-82 NUCLEAR POWER PLANTS SOUTH TEXAS 2 C0N5TRUCTION STATUSt 12-08-88 APPLICANTS CONSTRUCTION COMPy TIMATE AS APPLICANT'S CURRENT ESTIMATLD FUEL LOADING DATE 99-01-85
. DEFINED IN CP (EARLIEST) /2/
APPLICANT'S PREVIOUS ESTIMATED FUEL LDADING DATE:
(LATEST) 10-01-81 APPLICANT'S ESTIMATED FUEL LOADING DATE AT CP ISSUANCE:
APPLICANT'S CURRENT ESTIMATED CONMERCIAL OPERATION DATE: 06-80-89 CURRENT ESTIMATED PERCENT CONSTRUCTION COMPLETE: gk+3 COMMENTS REGARDING CURRENT CONSTRUCTION STATUS: NfA = NOT AVAILABLE.
l*
ESTIMATED ACTUAL ESTIMATED ACTUAL ESTIMATED t
START 11A E COMPLETION COMPLETION % COMPLETE 89-88-75 12-00-75 1892 j
MOBILIZE AND PREPARE SITEt 03-00-77 83-00-87 NA PL ACE STRUCTURAL CONCRETE:
05-80-84 99-08-84 NA l
INSTALL REACTOR PRESSURE VESSEL:
07-00-83 06-08-88 M4 INSTALL LARGE B0RE PROCESS PIPE 87-00-83 06-08-88 NA INST ALL L ARGE OORE PIPE MANGERS, RESTRAINTS AND SMUBBERS:
10-08-83 06-08-88 NA INSTALL SMALL BORE PIPE:
07-08-83 31-50-87 NA INSTALL CABLE TRAY 97-08-83 51-90 NA INSTALL EXPOSED METAL CONDUITS 12-00-85 08-88-88 NA I
INSTALL POWER CONTROL, INSTRUMENTATION AND SECURITY CABLE:
12-08-85 10-08-88 NA INSTALL ELECTRICAL TERMINATIONS:
06-80-88 08-80-88 NA CONDUCT REACTOR COLD MYDR0 STATIC TESTt 89-58-88 12-88-88 NA CONDUCT HOT FUNCTIONAL 'F.ST 12-00-86 12-00-88 NA CONDUCT PREOP AND ACCEPTANCE TESTS MECESSARY FOR FUEL LOAD: