MEMORANDUM FOR:
W. G. Mcdonald, Director Office of Management Infornation i
t and Program Control i
ti FROM:
W. H. Lovelace, Chief
[
Plans Branch Regulatory Infonnation Systems Division i
Office of Management Information and Program Control
SUBJECT:
SITE EVALUATION OF HATCH 2 CONSTRUCTION AND i
PREOPERATIONAL TESTING PROGRESS - JUNE 28-30,1977 S
GC Personnel:
W. H. Lovelace, MIPC
.L. E. Foster, Principal Inspector, Region II F. S. Cantrell, Reactor _ Inspector, Region II (Part-Time) i H. A. Wilber, Reactor Inspector. Region II (Part-Time) t l
'Other Personnel:
(Georgia Power Company)
W. A. Widner, Project Manager i
K. M. Gillispie, Construction Project-Manager 1
- H. H. Gregory, Assistant Construction Project Manager M. A. Phillips, Assistant Construction Project Manager l
}
,D. P. Shannon, Plant Manager C. T. Jones, Senior Plant Engineer i
H. W. Dyer, Operations Supervisor J. O. Dorou h, Planning and Scheduling Supervisor R. Usher, P anning and Scheduling (Mechanical) l l
W. Boinbridge, Planning and Scheduling (Electrical)
=
)
C. R. Miles, Quality Assurance Field Supervisor l
- C. E. Belflower, Quality Assurance Site Supervisor i
j Purpose of Visit:
The purpose.of the visit was to review and evaluate the construction i-progress to determine if the schedule for completion of construction and preoperational testing is connensurate with the current plant i
status and to determine if the estimated fuel load date of April,1978 -
is realistic.-
3 1
2 1
- Derotes those present at exit interview.
8504120370 840606
~
t
,i W. G. Mcdonald AUG 151977 Findings:
h% personnel were presented an overview of the entire project schedule and progress by Georgia Power Company personnel. Georgia Power Company personnel' presented detailed discussions on status and progress of each phase of construction, systems turnover and preoperational testing activities. These discussions covered the status of electrical, mechanical, civil, procurement, engineering,
.I systems turnover and preoperational testing activities in detail.
Work completed and work remaining (with percentage completion of each item was presented. Backup data records, network logic diagrams.
computer charts and computer printout schedules) were used to 7
substantiate the current status and work mmaining.
~
Georgia Power Company personnel were questioned on the status of Union negotiations, potential labor problems, manpower on site,
=
?
material procurement, preoperational testing procedures and startup i
procedures to determine if any of these items would cause a delay L
in the fuel load date.
Ui VAs(qgMgined that no apparent problems exist.
[-
NRC personnel tou' red the construction site to verify that the construction, systems turnover and preoperational testing activities g
f as presented by Georgia Power Company had actually been completed
(
or were in progress.
6 NRC personnel questioned Georgia Power Company personnel as to why 4
the overall reported percentage complete. jumped so sharply between i
February and April of this year.
It was explained that many systems F-were ready for turnover except for maybe one termination and when p-the termination was made the item jumped from 0% complete to 100%
i j_
complete.
r 3
l Detailed information such as detailed logic netwroks, quantities of piping, cable, snubbers, conduit, etc.
schedule and,syst. ems turnover schedule, remaining,preoperational test y
[%
are available for detailed discussi.on.;, b,1, i
4
)
g?
==
Conclusion:==
h" Based on the evaluation of the foregoing data and information, 7
i discussions with Georgia Power Company personnel and actual
[
observation of site activities, it appears that the April,1978 fuel loading date is realistic.
~
a r_
I-
,t 3-W. G. Mcdonald AUG10out g.e 9
hKL personnel met with staff members from Georgia Power Company at the conclusion of the visit and reviewed the findings..-
U)$Ul
_Y~
'j William H. Lovelace, Chief j
Plans Branch Regulatory Information Systems i
e-Division Office of Management Information and Program Control cc: c.L...V. Gossick E. G. Case u
R. S. Boyd A. F. Abell 6
k f
4 I
k I
ob:.. cva!.
,n.,
f i
i 1
i
t f
_ %, ~L e AA 6. //ctk /.J, S J=-
azrc i
\\
l f.,,,
- -..' a). A. /
L.
a,.
.f$
sizrc b>..: J :
._ - _ h w1. r - -
.f,,t z. y P.L' r- +~',
n)Py K-
% Pg -.
I t
A.* O.) l.
lf..
e
_^^ ^
.._ wee & - - _
3 _:
... sci..#.. L A
, m z e c.----.
.L.r. f s ' A. * - '- > L -- s _, A z
r
.r Es. OJ' si, A =- - L
&,Am.E WJL'..d
.. g g, - _L_ 'JJ._., A --@ /,y~ s_
, A,-
__ E (fJ C.' )
2,
.. d L P D :.- ( & & h.... t* p,)
. --.. k). A. J<Jii _- =, A y /?rmp r.m. Gb1.,',L-# - W f y' n y _
.rQ'
- H. f. G y, s ~ R J L 1~
r
./>/
r.A.P/'n;-~,&_d
- C __ r t'
PQ wn ; _
D. A".1L_=, PL + *: - - -
l'
'{efe
?.
1 y
J.a. LL ~, &@ Lp=-_
y
.'.a H,.PA=-,-
J. M.
- i., L,- _--
._-.r. w., es
', b i 3 >4 c~a - -o c).R-.* ~iQ, PD-- _Q J1 1-1.i, (s..L.x: I) e.r. x.L., #- > +, sm.
- -_ f 3 A,,.= : =
.C.S.
--:-, h A
_-S
_- ?
=
s sg r
r n. :r
.,L.
n...
s g
e.
.o
.i
- 5. i., -
- f'
,.. i, *p s
..pmi=6
..: ~_cx C -s..-:.", n..
,'.aq.c ys.;m;in.. rp.~.
y-
l LU l i
1
. Pna -r zl'):
7N,"-[--s 66 Y w d,n.'--
.J
_ & s,. d.3 t L e r.-. 6 m..,
,en i
4(s d4 f & 7 T k l
W l-T Tl e_J p. y.. = -r' A m P, ;
w_= _. -.. a
._--. 4 c4 cApL.J =rr --
) c A.c
. -- f;,w&q^= -
-r*J 4JMy p, arn
_. A..
i e
-A,$
- 4c-l = -
m y_--. 2 J. d :
2Wi
.,m-
_ _~1 > A am9 p
_Q,. m -.1
,~__ -. _ ~ - _ a. j ~. -. _ r-J _sm _ O P-G,.
a
___ //ni..,_
- _
l'"T'. Q J_
j
_. n l
J._
-i-
. z =-
)
p -- y. c
,. 3
.. _...,d)_. 7. = ~ g 9 x,i.. 74..
w_,
_ = } ZW./.d'r_3 - -
M..*.A, 1, t' !..."l, J,
-2..-
_ _ _ _[ -
_.__.,. & y f- __ _ b T_ 3 ',
,A,f_
. n 1*. l t'-
dt._'l
/4.)d ca, I f)
. J J w
y J p. *p w, 1. i-7mL m y
.3 A Q J.-r-G.
=
a_,
1
\\
2 ~.
e
,ar-e / _ -_s
,. -.. m, 4.a 'y m}k7 f _- f _ -L + ~ 1..a.< A - '_ > >._. w&
kyd8-k 4 D$.t.. W a hx.Y l
An
_L _ _,
/
A*-_^-^*
^
^^
f*^^7__-__-__
1 A _ - e
- r. 4 n J"-
C,,
( a e 1 w p. j & m y.:
J, l
=, -
J, p==-
n p__p D, w' l
- - _ = *.
y
. >.. -._ _. J p p..../..n c
yL2-wA
....._ dd~
n w
~ As.
% /,. / A J a&x.,
f f
e e
\\
te
',.e.,. *j /
,s, -
- , t s-4 s.
p
.s
' au.'. :
?N,, t, f
.,I. *,..,
. e:
,,., ;, y 3,_
.%. c..t -
..u. c..y ym 4W_.
"?.
$Yh.
- b
<$$hn'k.Y -
I l
0l
[
^ - _ _
7
, y a _
A..........
.WRC jw - - __ A U.1tD.& - G' _- O k -
t~ '=,. a. - c d z e _ n.. W J z$(s i
n r
_) p -.
-- p l.L'
,.ac.2%'&. -
2lX : _.=
!a ~ L
,_._-A 2 ; <L'.' _ fo<. x k.- -..
7 i
T _ >J
. ff< W 1_. r m 7
i
'.bw.
NAC O-2 A
a.
..I-A 1 J 5
.mfif.,s,.,.
_ X * / p -..
7-
_A n_-
W M._
J. b.-
$. T'~. - _
g
- W _,s. & -
'. j &
e c y.,M -
7 w
1.
j f-7 a _- -
17 W
. _. Af_: - f.. K +
m
~.__... b = ' _- M d.
. -4z6
- - >Zi-m
,2 o)Q i - - 1_r.}ii?'.g _&
. r W_pM $ /*' *.3 c;~ -,- 4A a L
pf-l1.)
_ p-J_]
1
_ /
s.
'of.s
,J. j. s_.,-,'_-,,. s f_ -'-- - -1. _ ) n
_ s_*-t_'_.
\\..-
., n - 1 2 _-_, W,Lg
- 1. 1.
\\.. -... y[j -7. - ?.A.;'- - -
2 4._1. 1, &
? __
_e -r _ _.1_.._ -
_.L e _ 2._'__ i_ _ A,,.. a a. n. r > 1_.
7
) ""
i M "l.JrDl'-
.L ? - r-
_* J.
~
~
W /
.,i
~-, %.g+f a m
- [/J&'
e
._._. S. 0 ~. z:n(s n J.
_/* ~
g{r s
r
. - l74 d A J, >-
r ___
_..._: C,_ '_ /d_
A.
d
<M 1 & M
's~:,a-, W __.1 l
&4
.u1-f'_,Ny-Bil'4 &$ /9 71',
A x*_ M i n A 2. '-_.
T
^
3 1,, ;'.
...j,
\\
...s't l
- s l
' i. '
Q : 'l:... , M.', !.,?.i :, -.y l
.*. x
. 'y :f;,.
,..,.,r.
.'. l.
. 0.:. ).,A:; ~y,--=g.f W n eMd92nq+F?M+44wse.dsisesarch.:2+EE
L' l
.e M ? z-
' ^
l z'
L< _
d&
~ _-... W.. &.._. = -l y
_2 W.s
.....,.7
'- tm &
~~
e s_
. s. --.._ -.-- _...
- a
'=t" s.,..
4.
9 ?y.:t
- s.w 43
.4,
-i;m.
-,w--.
x-l
.4 I
44:
2--
/L M.,--..
..Aw"c_
...h-
+
e-e.
~ - ~............-,
-e-6N
.h*W-Surhe.w
.auP h 4 hme D6 e-w
.m.e
.m a e% w +
O S m-ee4 a.m em.e p.
.-@ ee em.m
- .6 h.-.
. ~.....
e
.h-g -en e
.s.,-
} -*-
+.
.s.-.
3
.s T..
6 a
e o
g
.e h
.e
+.s 9*
4
- e DeSs G
gg M.6e
==
-eag e
h
~
- b
- g*
'.g s
.e.. * -
'e,..
g 4.e*
s * *
- c
.. r s
- z. J...,.,,
.,.,.p....,....n.,+,,,...,,.
n-E-,....
~,. v... e.%'$.e$ &
& ; m.. ~..
b
?bYN k'
W Y
-4
- OUTLINE FOR HRC VISIT. - __.
,_ _ -- n... - - _ _ -
I.
Goldbook
?
- -(J0D) ---
A.
Current-Status- -- -
4~ -- -
~ B.
Update Problems
- --. cr m r.-
II.- Discussion'of Hydro to Fuel Load Duration ---- -
--.. (J0D)--~ ~~ A.'
Unit II' Projection and Unit-I Actual -
B. ' Other Projects Durations-R TIII. Time ' Scaled ~ Logic-Diayam for-Critical-Ketivities-
==-.---- ----
A.
Critical Path'
-C(RDU)
B.
Other Critical. Items J-C.
Discussion of Work Week Assumptions'--
\\
~
-~
~IV.
Startup Schedule
\\
A.
Impert Schedule '
(RDU)
B.
Impert-Barcharts
- -^-
C.
Handout Schedule D.
90 Day.Barchart Schedule--
V.
Status
- (J00) - ---
A r Project $ummary Handout
=
c-(RDU)
B. -Mechanical
- 1. - Mechanical Summary Handout
~
2.
Mechanical Pe'rc'ent Report ' ~~ ~ ~ '~~'~~ ~
-~ ~~~ - ~'
'-~
~ ~
3.
Mechanical Punch List Report (WRB)
C.
Electrical u'-
1.
Summary Handout 2.
System Report (Not Complete Cables).,
~"~
~
~-
~3~.' ~ Cable ' Numb ~er ~ Report ~ (Statusr rall Cables)
~M---~'
~~
~
o
~ (J0D)
D.
System-Punch Out---
1.
System Punch List 2.
Punch List. Teams.
.c (CTJ)
E.
Startup 1.
Sunmary Handout 2.- - Procedure Status -
-=
3.
Additional Comments f
VI. Manpower and-Budget
/
(J0D)'
A.
Manpower Projections '
~~
l.
Construction 2.
Production B.
Budget"
~~~
~
"~"'
~
o 1.
Project Budget Status 2.
Field Budget Status VII. Material
~
/
~(J0D)
A.
ProcurementItems(Project'Pr'gressReport)
~
~~
o (HHG)
B:
Valve Status Report-
- ~ - " - - -
C.
Hanger and. Restraint. Status.1-wm
--e--v y
y
+
.. SUt@!ARY ' ~ ~- ~ ~~ ~ ~ ~
'-' "~ ~' ~ ' " - ~
4
.r.
Total. Project. "e' Complete (Cons-truction) ' r---- '.90%r #' +~= "
' ~ ' -
f r:--- -
Project Engineering.
~97%
Civili% Complete- --
-99%
Mechanical % Complete
-89%
~-
Electrical % Complete
- 80% - -- - -
Startup Program % Complete' n-r.
- 2..;. -
Project Milestones 4
Projected / Actual ' T ~'2 Scheduled ~~ ~
- Start Construction
- Jan 2 p-1972/A- ^ -"-
Jan ~1972 -- 2
~
Set RPV July 27, 1975/A Aug 1975..-- -- -
i RPV Hydro r
Jun 4, 1977/A ' ~
Jun 1977 -~~
~
Fuel Load.
a-Mar-14,- 1978 - --Apr-ll.-1978 Commercial 0peration,ar
+ :<=+=-Dec.27y.1978 r= - - ~ '-- = Apr - 1 = 197 9 ' " +-~ -
~. - - --
The Startup Schedule has 4.0 weeks 'of positive slacl: against our: "-"---~ ~
~
scheduled Fuel ~ toad' of'Apr~il TT,~1978'.'
~ ~ ' ' ~ ~
' ~
,I s
a...-
.k.
..a..-
.,4
..m...b.._-
4
+
6 r
1 ii l
I Ly;-
o
{-
1
.j,
. 11ECllAHICAL - :
t- - :
1='-
CURRENT STATUS Itechsnical % Complete
-89%
4 -
% Spools Installed 94%
% EciuTpment. Installed 85% ><
% Valves-Installed
% Hangers Installed 23% =- -- - - '
90%
% Instruments Installed 248% *
% Restraints Installed
--==.
--30%== : &-
4
- of : Items Remaining-to be Installed =-= :.
- ~
Spools 289 Valves 1365 Equipment 504 Hangers 466 Instruments.
3171 *
~
Restraints 503 o
Total # of items 6298 as -of June-22;n1977.
' 7"-'~'
~ ' ~ ~ ~'
Totar~ # 'of Iteifir5868~as WJuhd~ 2871977 ~ 7-"
~ ~
-~
~~ '
- Progress 430 items in 6 days
- + - - - ~ " -
~
~ ~ ~-* This figure is not felt to be ~ac' curate;
.+
+
9
.4 s
+
~
ELECTRICAL-CURRENT STATUS r.
Elec'trical % Complete.
c 2-80%
- -w m --
% Cable Pulled
'~~~
~
% Catile Terminated
~
e-89%
78%
. Estimated Cable Footage
..4.,500,000 ft..
- Total. Footage Pulled -to Date -- - 4,043,952~ft.-
Footage Remaining to be: Pulled:-r:456,048-f t~tr"
-~
i -
9-O O
3 9
4 e
I l
i l
I'
. I
[
1
.... ~..
s.. STARTUP- - -
=...
-~ e-. L
. ; #-'.~. ' 7 -- $ -
CURRENT STATUS:
,A_._.
.y
~
% Flushes Completed 71%: -
% CATS Completed 61%...
% Preops Completed 19.%~ ---
^
l ---...
. Number of-Activi ties-Remaininrto-be -Completed ---- i - ----------
.. ~
Flushes
- 57 a-CATS 98
~
.Preops
. 88 1
Total. Number of. Activities;,_
u ;._,r--:_
f.b.,.., z '., g- ::.7- ~ - -
c.
Flushes
- -195 CATS -
249
.... _.. ~.... ~
Preops 109 Flush Procedures All but Containment-Recombiner--(2T49)-System-have-bcEn-approved.--T--
Preop Procedures
~..
~.First' Draft 83
. Preliminary Appr. oval 71
- -s 9% a s > '.- x - ~ ' - -
Approved for Execution.-
33 r
1st. Dr.a.f t Ho..t Sub'mi.tted -
' _l..
-i
- Startup Procedures -
=-
_. __.....__ _ ritten.... _ _ _, _..
,128-.... ~ _........... ~'
W
~
~ Approved ~
1,,
The following' Preops are. in progress :---~~~. A~.%A1 L 4.D -
'" ~ ~
e-
.=.c..
-C32'-3510 ' LFeedNater' Con U6T "' * " '
- ^#"2Y
~~T
- R41-3510 - - 24/48 Vol t DC - -
+ - "~ -- 60 %' - - "- "
-~ -
R42-3510 125/250 Vol t DC C - ': C E 7255 - "-Nr 1
~-'. -
-~
H
-95%-1 w% ~-
R43-3520-Diesel Gen.-Fuel Oil
^ ~ ~ - =
R43-.3530.
. Ditsel. Gen. HVAC 95%
_......... R44 -3510~ ' ' 'Vitar AC- ~ ~ ~ ' ' " ~~ ~ ~ ":
~85%:
" R51 -3510~~ "Cominunications~" ~~ ~
~#20%-~~ ~ ~~'~ ~'"~
R71 -3510 -
4160 Volt AC 65%.
W24-3510
- Cool.i ng : Towers _ --- '--- ---- 87.%-
~. - - - -. -
5% <
'The following preops-are complete--Permanent-System-turnover-is needed.
P51-3510 Service Air R71-3520 600 Volt AC
~
' T41 -. 3560.
.T41-3570 CRD Room llVAC
- _ ~
. g;,.
N40.. 3510. 0..
. S.ta t.o. r _Co. ol i.ng....... -...
- P11-3510
-Condensate Storage and Transfer.
R52-3510
- 480/277 Lighting Switchgear
- c. - -
. 1 :
' R71-3530
- 120/208. Volt AC a -
The following pfeops are' completed. and1 approved 7-r:/_. -
R34-3510
. Aukiliary Grounding.
- n HNP-2-10007 RPV: Hydro.
1 e-e s
4 9-4
.m-c i....
I
+ -
=
.4 f
a
.,. n.
a.
. - * ~
. ~..
.. _. : ',,, ur ; _ _. x _
. _-.* -,; 3.2 3-,
- _,,3 3_,
.c 4
.7.m.
y
... p.
a P
o..
r a
-e
- w.
i
..s..!*...
i
.r i
=y
~
f.
i A.
..g a' e
(
- -e.-*
- e ega 6 A es e
S 4
6.
- =
,f%y e 1ir-a6 e
- gg 64*
O
.c r
e r..#
e
T h
.. l f f G., h p c - f - L L e mj ~ h s.,n A.:.}/ 6117w f Aa,,4,.f &da L.&pdnyn WA 18 /I. s s nL%2-cak-.Ap<smuy~
O P.
[ As v -m
- $hu Am>7:ec.
5_ew./ Ahd' N,?&d,sA _.
0 T.
haes 22paloa x<4aw_w
- 1). M D u o. Ek<y'a cn_4 n,n w.y. a v L u M Q -.s g. n n Gn L._/_.ch,-
.S_. _k.inin 7 _ a._ d'ss & &,'j,. 6:n da m n s aI.
Bw Jook
. % y el u?dt 7
.0u$=7El-lh.,-.Lc
' 0d!;lAuw.umEaE, c'aAeL G,anwer
-....-.AL&/&tw1c.._ -.SaA/,cA-sJ&pn.
...-$i EO SZA1t'
~.. U S C. ' J E E G t..o M. R -
......Ea.-. 0%N.TK. elf.-
JLEC_ ~ S W e o &. 1 [.-
i.
...._....-.lb!
] ^s/ELACL.
-_ A/2 C.._/rbQ _, A2ZEC
~
--..--=
NM.M.*ehb6W
- .Wun
- New m.
de w.4
.56e
,e gl.
m O. g.ww e.
4 medaa.4-epte OM4DeewM hm.
Eesehen w
me.. msng%pm a e
mge.,w.m,-.,94w. h.6+-h M6
'm'=.4=e--M*-
- 8F' r. _. _
- =
z.id.-m
-M h.4%
- u. We
--di.mm..-i4.ess659.W.
h. m6 MG4 e.
e.M m e m
aemm@ W W
..NO N W O 4
O g.gumaeeee emoo --
a ym
-w
- 4 4.e- *. e W..+ 6 ei igm
. gmpe ge.
- e m e.
gemewanmeh =..e dm. gN gsah,m,_, %. esp gs.,.4 p.
-M..menn
.em e,e e
-Mh-N.*
. ee.w o we. e, eb -_
.e e,p
-.eum.gi>. gun. m. m ee.u.=
.ime
- meed'=r* * * ** > - * '
a geg 6 W gW_
h4gwh64.ne Weg e e
- w w w 6&=t
- N+-oi>a D----
9-h N'**H e h e g.W W _
.Sm 6 n
OUTLINE JOR HRC._ VISIT.._._.
. _ ;,_ _ ;;_. _ c f_ - - _
t-I.
Goldbook s(J0D)-
A.
Current-Status' -.
-~
B.
Update Problems-c -- -
II.
Discussioneof Hydro to Fuel Load Duration
'~(J0D)~
A.
Unit II Projection and Unit'I Actual-B.
Other Projects Durations 7
~
Tim'e Scaled LogiE-Diagiam for Critical A6tivities- =- -
=" -- ----
- 'III.
A.
Critica1' Path l(RDU)
B.. Other Critical Items C.
Discussion of Work Week. Assumptions --
IV. Startup Schedule A.
Impert' Schedule (RDU)
B.
Impert -Barcharts -
^-
C.
Handout Schedule L'. ' 90 Day Barchart Schedule -.
V.
Status
-(J0D)- --
A r Project'-Summary Handout v
(RDU)
B.
-l.echanical
- 1.. Mechanical Summary Handout
'2._'. Mechanical _P.erc'en_t Report '
~
~ - ' ~
~ -~--
- - ' ~ '
3.
Mechanical Punch List Report (WRB)
C.
Electrical
~--
~
1.
Summary Handout 2.
System Report (Not Complete Cables)
'3
~Chble'Numbbr Report (Staturof 611 Cables)
' ' ~ ~ ~ ".
(J0D)
D.
System-Punch Out -
1.
System Punch List 2.
Punch List Teams (CTJ)
E.
Startup 1.
Sumary Handout 2.
Procedure Status 3.
Additional Comments VI.
A. power and Budget Man (J00)
Manpower Proacctions 1.
Construction 2.
Production B.
Budget'
~
~ ' '
~
1.
Project Budget Status 2.
Field Budget Status VII. Material
~
e
'(J0D)
~'A. ~ Prbcuiement"'Iteins (Project' Progress Report)
' ~
(IlllG)
B; Valve Status Report C.
llanger and Restraint Status. --
..c_c a
.. Total. Project L Complete-(Construction)--
'90% *~~ + " ~ ~ " =
Project Engineering-
- -97%
Civil-% Complete--
99%
Mechanical % Complete 89%
Electrical % Complete
-- 80%
Startup Program % Complete.' = -.. '
Project Milestones
. Projected / Actual ~ ~"~ ~ Scheduled Start Construction Jan 2,-1972/A
~~
Jan-1972
~
Set RPV
-July 27, 1975/A Aug 1975
'RPV Hydro Jun 4,1977/A -
Jun 1977 Fuel Load.
Mar-14,1978 -
---Apr-l l i -1978 -
Commercial. Operation- - - --...-=- -=..Dec 27, 1978
- Apr 1,1979
~
The Startup Schedule has 4.0 weeks of positive slack against car -
'- ~~~
scheduled-Fuel Load of April 1T ~1978.
~~ ' ~~
~
i D
- - e e 4ee e -
.O-.
..e"
...as.
.e.,.e.m,
.we.
o D
w I
r e
i 1
,1
'l 4
'Y'
' HECHANICAL 2--.-
r r :. r: -
CURRENT STATUS Mechanical % Complete
---89 %
% Spools Installed 94%-
85%+
% Valves-Installed
%fduTpmentInstalled
~ '
-73%
% Hangers Installed 90%
- % Instrunents Installed
~48% *
% Restraints Installed
=, -30% n m. - - - --
- of Items Remaining.to be Installed --- ~-
Spools 289 Valves 1365 Equipment-504 Hangers 466 Instruments 3171
- Restraints 503 o
Total # of items 6298 as of June 22-:.1977i.-
Total # of It' ins'5868 as of'Jurio' 28,^-1977 ~"~ ~ ~
~'
~ ~ ~ "
' ^ ' ~~
~
~~
e Progress 430 items in 6 days -
~ < - - -
'* TMs" figure is not felt to be accurate.
e, e
4 4
e 6
e
- q:
ELECTRICAL ~
- CURRENT STATUS
~
. Electrical % Complete
= 80%
% Cable Pulled.
.89%
% Cable Terminated' 78%
Es'timated Cable Footage
_. 4,500,000 ft..
Total. Footage Pulled to Date-4,043,952 ft.
Footage Remaining to-be Pulled-.456,048-ft~.--
r e
1 v
e l
c
.y y.STARTUP - :---- - -
-- + - b -
s.
~
CURRENT STATUS
'e ;-
?
% Flushes Completed 71%: -
- +-
% CATS Completed 61%.
% Preops Completed
-19%-
Humber of-Activitics--Romaining-to be *Ccmpleted ~~~ - -- -- ----
. _. _ -.. - - - ~
Flushes 57 i
CATS 98 Preops 88
. q._ r Total.. Number of Activities.
-.._ _ _,. a.1....." Mc_.--. -
~
Flushes 195 r...
CATS 249 Preops~
109
' ' ' ~ ~
' ~ "
~
"' ~ ~ ~ ^ ^ ~
Flush Procedures All but Containment Recombiner-(2T49) System-have-be5n-approve +.-*-- 7*.=
-~
Preop Procedures First D' aft
' ' ~ ' 83' ~
'"~
r
-Preliminary Appr. oval 71 V-24 "A^
~
Approved for Execution 33
~
r 1st Draf t Hot Submitted 1 -
-i Startup Procedures -
}lr i t te n.. _... _. _ _ _ _ _.,12 8.. _... ~ _
~
Approved ~
l..
The following~ Preops are. in progress : -..~. ~
-..br-.u
.M.S... ;... ' J
^ " '
-~
C32"3510" "~'Feediater'Cr4 trol ~
" M" 5".N.T."~
~
f R41-3510 -
24/48 Volt DC-
- ~ -60%-
l~
R42-3510 125/250 Vol t DC ~ ~
"25% ~
'.C Tu ~
7
~ ~
R43-3520-Diesel Gen. Fuel Oil
-95% Ito% r R43.3530._. D.ie_sel. Gen. HVAC 95%
~ ~ ' ~ - " " '
.. ~~R463510~
TVif.al~AC~ ' ~
' ~ " "'- "' '~~ ~ 8 5 %.- ~ ~~ ~
~ - ~ R51 -3510 ^
Communichtions' ~-~
'-20%
R71-3510 4160 Volt AC 65%.
W24-3510
- Cooling. Towers----- l-
-- - 87 %-------
- - - - ~ ~ ~. -
---The following preops-are completer--Perma.nent-Systenrturnover-is needed.
p51-3510 Service Air R71-3520 600 Volt AC T41-3560 RCIC Room HVAC
~ ~ ~
~
~ ~ ~ ~
' ' ' ~ " '
' ~
T41-3570
'CRD Room IIVAC w.-
e e 9
c.
.. $.1 -..
N40.35100,-
S ta tor Cool i.ng.....,. -. -
i._ -......-.. _.
r P11-3510_
Condensate Storage and Transfer
~?.
RS2-3510
' 480/277 Lighting Suitchgear-e.
- R71-3530
' 120/208. Volt AC The following pfeops 'are completed. and' approved----- ;..r..
R34-3510
' Auxiliary Grounding HNP-2-10007 RPV. Hydro
- 2......
o
.=. :.--
y.._._.....
I:
.............:,..,...=...-:.
t l
n
-. ;?
....=.;. -: :......;
p
(
4 io.
e a
4
.ve e
e e
- 8 0
+
y 4
e
. g s.
e 9
4 2 m
- 00TLIllE FOR flRC VISIT....
- c. r 1
I.
Goldbook
- (J0D)-
A.
Current. Status" - -
~ ~ ~
B.
Update Problems-II.- Discussion'of Hydro co Fuel Load Duration
~ ~-(J0D) ~
~ A. ' Unit II Projection and Unit I Actual -
B.
Other Projects Durations-
" III. Time Scale 4 Logth-Dia'glam for Critical Ac:tivities =
"----- +---
A.
Critical Path (PDU) 8.
Other Critical Items C.
Discussion of Work Week Assumptions --
' I V.' Startup Schedule A.
Impert' Schedule (RDU)
B.
Impert -Barcharts -
C.
Handout Schedule D.
90 Day Barchart Schedule.
- ~. -. -. - -
V.
Status (J00)
At-- Project Summary Handout (RDU)
B.
Mechanical
- 1.
Mechanical Summary Handout
' ~ ~
' - ~ ~ ~ ~ ~ '
' ~ '
~
~
J._. ' 2... Mechanical..P.erc'e_nt. Report 3.
Mechanical Punch List Report (WRB)
C.
Electrical 1.
Summary Handout 2.
SystemReport(NotCompleteCables)
~3l "Chble' Number Report '(Status of ~all Cab 1'es)
~~~-
(J00)
D.
System Punch Out 1.
System Punch List 2.
Punch List Teams (CTJ)
E.
Startup 1.
Sumnary Handout 2.
Procedure Status 3.
Additional Comments A. power and Budget VI.
Man (J00) 11anpower Projections 1.
Construction 2.
Production
~
B.
Budget 1.
Project Budget Status 2.
Field Budget Status ;
(J0D)
V I I._.. A.Materi.al_.
ProcurementItems(Project'ProgressReport)
(HilG)
B.
Valve Status Report-C.
Hanger and Restraint Status- _
r.
i
.t u
. y
SUMMARY
~~ ~
' ~ ~
~ ~ " ~
i cj;
. _ _ _. Total. Project %. Complete- (Constructien)- ta?' 90% * *r""^~-
=
~
- p s
1 Project Engineering "97%
y Civil % Complete--
-99%
Mechanical % Complete 89%
c, g Electrical % Complete r - 80 %
3;
~Startup Program.% Complete'
.s 7 r-....
Ii 1
Project Milestones f
Projected / Actual
- -' Schedule ~d '
,L Start Construction Jan 2,-1972/A Jan 1972 1
Set RPV July 27, 1975/A Aug 1975
]
-RPV Hydro -
~
Jun 4,1977/A -
Jun 1977 Fuel Load.- -.. _.
- Mar-14,+ 1978
--- Apr-ll r1978 Commercial Operation
..+ w= Dec 27, 1978
-- Apr 1,' 1979 f.
I
'i
~.
The Startup Schedule has 4.0 weeks of positive slack against tmr
~
~
scheduled Fuel' Load of ' April '11,"1978.
'y J
4
!i e
i s
l r
O
7
. IlECilANICAL r~
rr- =.
CURRENT STATUS I
Mechsnical % Complete-
-89%
% Spools Installed 94%
% EquTpment Installed 85%
+e
% Valves Installed
% llangers Installed
- 73%-
90%
% Instruments Installed
~48%
- j
% Restraints Installed n r30%: -
- of. Items Remaining to be' Installed Spools 289 Valves 1365 Equipment 504 Han0ers 466 Instruments 3171
- Restraints 503 o
Total # of items 6298 as lof June-22,1977..
~~~ ~ '
~
Total # of ItEins ~5868 as of Mune' 28; 1977 ~
~~
Progress 430 items in 6 days
' ~* This figure is not felt to be ac' curate.
4+
- + -
O e
9
?
ELECTRICAL CURRENT STATUS Elec'trical % Complete e.-80%x.
--u-
' ~~~" '
% Cable Pulled 89%
% Cable Terminated 78%
Estimated Cable Footage
.4,500,000 ft...
2 Total Footage Pulled to Date-4,043,952 ft.
~
Footage Remaining to be Pulled.c.456,048 ft.r-o D
4 4
I
e.,d
... STARTUP--- :-. -- - r - -- u l- - - - -
t.
'e.;-
' 7 --
c CURRENT STATUS
.4
/ _. _.
~
~.'
% Flushes Completed 71%i -
% CATS Completed
. 61L
% Preops Completed
- 19% -
Number of-Activitics -Remaining-to -be -Completed ----- -- --
~ - - - -
t Flu'shes 57 r
CATS 98 4
.Preops 88 Total.. Number of Activi. ties-
.c.....
.?.=.._..:.--
Flushes 195 CATS 249 Preops 109........
Flush' Procedures 4
All but Containment Recombiner--(2T49-) -System-have-bebn-approved.. O --
- -~
Preop Procedures First Draft......... -
~~
83
-Preliminary Approval 71
-^
- >. y>
- ~
c-3-w.
Approved for Execution 33
~
1st D.r.a.f t flo.t Submitted
- 1..
-i
- - ~ ~ - - - -
- Startup Procedures s=
u
=--
~.
Wri tten........... _ _ _
128
~ '-
Approved 1,,
J, The following Preops are. in. progress :
- ~ ~ ~..N~C 6C. ;L----.C
"~~
~
a
.e.,.e.
.. C32'-3510. " Feedwater Control # ~"~ W$~%"'IN.~~ ~~ 7 "
^
' " ~~ ~
R41-3510 24/48 Volt DC--
+ '
~ m- ~ 60%' + e. -- - b
'~ ^
R42-3510 125/250 Volt DC 7 ~ ~' -?
C T255+ N w. r'".
7: ~ ~
" - ~
R43-3520-Diesel Gen.- Fuel Oil
-95%-1 tow ~ ~
- + -
' -~
R43.3530 _. Die._sel. Gen. HVAC 95%
R44 '3510~ " ' 'Vitar'AC' T ~ ~ ~ ~ ~- -"" ' 8 5 %. "~""
~ '
~ ~ ~ ~ ~ " " ' -
~
R51-3510 "'" Communications -
~200 -
R71-3510 4160. Volt AC.
65%.
W24-3510
~ Cool-ing. Towers-
-..- - 87 %-----
=
"The following preops-are complete-P e rma n e n t_--Syst ent-tur n ov e r-is-n eeded.
P51-3510 Service Air R71-3520 600 Volt AC T41-3560 RCIC Room HVAC
~ ~ " " ' ~ '
~ ' ' ~ ~
""~
' ~'~
~
~ '
T41-3570
'CRD Rooin ilVAC
~.
y-
.m f
m e
,e-.
f
~
l N40-35100 Stator Cooling'ra. -...- -.._.an'd Transfer
_~~ ~~~.-_..... _...
Conden' sate sto id
~
~ ' ' ' ~ ' p11:3510 "
~ ~
tR52-3510
- 480/277 Lighting Switchgear-
-- ~ -
.R71-3530 120/208 Volt AC The following pfeops are completed and approved n../.t.0
~
..i +-
R34-3510
- Auxiliary Grounding....
.-1.....
HNP-2-10007 RPV Hydro e
4 o
9
~
4.
- ei..
g.
e.
p p
g e
~..:.z.
. ~ :: _g.:.:-. ;- -
2;___,_,.
a 6
.g..s.
P
. e -.
.. -. y7 g,,...
{.
f e
4*N O
4.
M 4_
9 g
4
+*** *
- n s.
..;;-..~_..
, +- -+
g,, _ g 8
=
m.
=-e..
f.
s
.........,.....,..l*
e u C A
~
a
.s c.
,w 8"
- 8 4
y1 4 ?
4 m.
e a
e p -.
y se-
&