Southern California Edison Company
[E
.P O. BOX 600 2244 WALNUT GROVE AVENUE ROSE ME A D. C ALIFOR NI A 917 70 December 3, 1982 Mr. R. ' A. Hartfield Chief, Management Information Brandl Office of Management and Progran Analysis U. S. Nuclear Regulatory Comnission Washington, D. C.
'20555
Dear Mr. Hartfield:
SUR7ECT: Update of the " Construction Status Report (NUREG-0030) Nuclear Power Plants"
)
San Onofre Nuclear Generating Station Units 2 and 3 Enclosed is a copy of the " Construction Status Update" with data as of December 1,1982 for the next publication of the Constructicn Status Report
- Nuclear Power Plants.
Any questions regarding the updated information should be directed to me, at (213) 572-2508.
Very truly yours, B. A. Beckmal Ieal Cost / Schedule Engineer Enclosure 8504120359 840606 1
.v
CONSTRUCTION SPA'IUS. EIORT
-PAGE NO
~ SAN ONOFRE 3 NEX' LEAR IOWER PIANIS SPA'IUi AS OP: '12-01-82 CCNSTRUCTI(N SIWIUS:
APPLICANT'S ACkUAL PLEL IDADI!G DATE:
11-15-82 ' APPLICANT'S (DNSTIUCPICH (XMPIETION ESTIMATE AS.
APPLICANT'S PREVIOUS ESPIMATED FtEL IDADING DATE:
11-01-82 DEFINED IN CP:
(EARLIEST)-
APPLICANT'S ESPIMATED FLEL IDADI!G DATE MP CP ISSUANCE:
'05-00-80 (IATEST) 03-02-83 APPLICANP'S CLRRENT ESTIMA3ED CDMEICIAL TEl& TION DATE: 09-15-83 CURRENP ESTIMATED PERCENT CINSfl0 CPI (N OCMPLETE:
98%
00PMEKfS REGARDING CURRENT (INSPRIETION STA'IUS: '10 UPDATE PIOVIDED FOR 'IHE SECCND QUARPER OP 1982.
ESTIMATED ACTUAL ESPIMA'IED ACIUAL ESTIMATED SPARP SPARP COMPLETION COMPIEFION
% 00MPIEFE MOBILIZE AIO PREPARE SITE:
02-07-74 10-07-74 100%
PLACE STRUCIURAL CONCRETTE:
11-24-74 06-16-75 100%
INSTAIL REACIDR PRESSURE VESSEL:
12-19-77 12-23-77 100%'
INSTAIL IARGE BORE PROCESS PIPE:.
04-01-77 12-01-81
-100%
INSTAIL IARGE BORE PIPE HANGERS, RESTRAINTS Ato 09-01-77 03-01-82 100%
SNtBBERS:
4 INSPAIL ! NAIL BORE PIPE:
01-01-77 03-01-82' 100 %
'INSPAIL CABLE TIRY:
02-01-77 09-30-81 100 %
INSTAIL EXPOSED METAL (XNDUIT:
06-01-77 04-01-82 100%
INSTAIL POWER, CINTIOL, INSfRLMENTATION AtO 02-15-78 05-01 100 %.
SECURITY CABIE:
INSTAIL ELECTRICAL TEIMINATIONS:
02-01-79 06-01-82 100%
00NDUCf REACIOR ODID HYDROSTATIC TESP:
03-05 03-17-82 100%
00NDUCf HOP FUNCPI(NAL TEST:
05-29-82 08-08-82 100%
00NDUCf PRBOP AND ACCEPTANCE TESPS NECESSARY FOR 08-01-81 11-03-82 100%
FUEL IIRD:
CNSTRUCTICN SPA'IUS REPORP PAGE NO:
SAN ONOFRE 3 NUCLEAR POWER PIANIS STATUS AS OF: 12-01-82 PIANP GARACTERISTICS:
KEY PERSW NEL:
DOCKI?f NO:
05000362 CORPORNFE CONTACT:
DR. L. T. PAPAY, VICE PRESIDENT CP NO. & DATE ISSLED:
CPPR-98 / 10-18-73 ADVANCED ENGINEERING CP EXPIRATION DATE:
06-01-81 00REORATE ADDRESS:
2244 WAINUP GIUVE AVENUE APPLICANT:
SOUINEIN CALIFOINIA EDISON IOSEMEAD, CALIFOINIA 91770 PLANP IDCATION:
5 MI S OF SAN CIEMENIE, CA IE REGION:
5 CDRPORATE PHONE NO:
(213) 592-1472 AE:
BECH'IEL NSSS:
00MBUSTICN ENGINEERING CDNSTRUCIOR:
BEOfTEL NRC LPM:
H. 1000 REACIOR TYPE:
DER (MWE): -
1100 IE RESIDENT INSPECIOR:
R. J. PATE INSPECTION STA'IUS:
FUEL IIRD DATE GANGES TIME PERIOD AS REPORTED BY UfILITY:
Apr.1982 - Jun,1982 REPORP NEW REASCN FOR GANGE REIORP BEG DATE END DATE DATE SCHEDULE REPORPED BY UPILITY NUMBER OF INSP.
OF INSP.
11-14-74 11-00-80 ISSUANCE OF A PERMIT BY 'IHE CALIFORNIA 82-05 02-13-82 04-09-82 OQASTAL 00MMISSI N.
82-06 03-31-82 04-05-82 12-12-74 03-09-81 NO REASCN NOTED.
82-07 06-01-80 06-30-81 10-22-75 05-00-81 IABOR DIFFICULTIES.
82-08 04-19-82 04-23-82 02-00-80 11-0 0-81 NO REASCN PROVIDED.
82-09 05-17-82 06-04-82 02-18-81 09-00-82 NO BEASCN PROVIDED.
82-10 04-10-82 05-24-82 09-30-81 11-01-82 NO REASCN PROVIDED.
82-11 05-24-82 05-28-82 12-01-82 11-15-82 AcruAL 82-12 06-28-82 07-02-82 82-13 05-24-82 06-25-82 Inspection Reports are available at local PDRs.
LOCAL PUBLIC DOCLNENP IOOM:
MISSICN VIEJO BRANG LIBRARY 24851 CHRISANTA DRIVE MISSION VIEJO, CALIFOINIA 92676 e