Forwards Updated Const Status Repts as of 821201.Info for Inclusion in NUREG-0030
ML20127C834
Person / Time
Site: 05000000, San Onofre
Issue date: 12/03/1982
From: Beckman B
SOUTHERN CALIFORNIA EDISON CO.
To: Hartfield R
NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
Shared Package
ML082170543 List: ... further results
References
FOIA-84-367, RTR-NUREG-0030, RTR-NUREG-30 NUDOCS 8504120359
Download: ML20127C834 (3)


Text

.

A O

Southern California Edison Company

[E

.P O. BOX 600 2244 WALNUT GROVE AVENUE ROSE ME A D. C ALIFOR NI A 917 70 December 3, 1982 Mr. R. ' A. Hartfield Chief, Management Information Brandl Office of Management and Progran Analysis U. S. Nuclear Regulatory Comnission Washington, D. C.

'20555

Dear Mr. Hartfield:

SUR7ECT: Update of the " Construction Status Report (NUREG-0030) Nuclear Power Plants"

)

San Onofre Nuclear Generating Station Units 2 and 3 Enclosed is a copy of the " Construction Status Update" with data as of December 1,1982 for the next publication of the Constructicn Status Report

- Nuclear Power Plants.

Any questions regarding the updated information should be directed to me, at (213) 572-2508.

Very truly yours, B. A. Beckmal Ieal Cost / Schedule Engineer Enclosure 8504120359 840606 1

PDR FOIA KILLEFE84-367 PDR m

.v

CONSTRUCTION SPA'IUS. EIORT

-PAGE NO

~ SAN ONOFRE 3 NEX' LEAR IOWER PIANIS SPA'IUi AS OP: '12-01-82 CCNSTRUCTI(N SIWIUS:

APPLICANT'S ACkUAL PLEL IDADI!G DATE:

11-15-82 ' APPLICANT'S (DNSTIUCPICH (XMPIETION ESTIMATE AS.

APPLICANT'S PREVIOUS ESPIMATED FtEL IDADING DATE:

11-01-82 DEFINED IN CP:

(EARLIEST)-

APPLICANT'S ESPIMATED FLEL IDADI!G DATE MP CP ISSUANCE:

'05-00-80 (IATEST) 03-02-83 APPLICANP'S CLRRENT ESTIMA3ED CDMEICIAL TEl& TION DATE: 09-15-83 CURRENP ESTIMATED PERCENT CINSfl0 CPI (N OCMPLETE:

98%

00PMEKfS REGARDING CURRENT (INSPRIETION STA'IUS: '10 UPDATE PIOVIDED FOR 'IHE SECCND QUARPER OP 1982.

ESTIMATED ACTUAL ESPIMA'IED ACIUAL ESTIMATED SPARP SPARP COMPLETION COMPIEFION

% 00MPIEFE MOBILIZE AIO PREPARE SITE:

02-07-74 10-07-74 100%

PLACE STRUCIURAL CONCRETTE:

11-24-74 06-16-75 100%

INSTAIL REACIDR PRESSURE VESSEL:

12-19-77 12-23-77 100%'

INSTAIL IARGE BORE PROCESS PIPE:.

04-01-77 12-01-81

-100%

INSTAIL IARGE BORE PIPE HANGERS, RESTRAINTS Ato 09-01-77 03-01-82 100%

SNtBBERS:

4 INSPAIL ! NAIL BORE PIPE:

01-01-77 03-01-82' 100 %

'INSPAIL CABLE TIRY:

02-01-77 09-30-81 100 %

INSTAIL EXPOSED METAL (XNDUIT:

06-01-77 04-01-82 100%

INSTAIL POWER, CINTIOL, INSfRLMENTATION AtO 02-15-78 05-01 100 %.

SECURITY CABIE:

INSTAIL ELECTRICAL TEIMINATIONS:

02-01-79 06-01-82 100%

00NDUCf REACIOR ODID HYDROSTATIC TESP:

03-05 03-17-82 100%

00NDUCf HOP FUNCPI(NAL TEST:

05-29-82 08-08-82 100%

00NDUCf PRBOP AND ACCEPTANCE TESPS NECESSARY FOR 08-01-81 11-03-82 100%

FUEL IIRD:

CNSTRUCTICN SPA'IUS REPORP PAGE NO:

SAN ONOFRE 3 NUCLEAR POWER PIANIS STATUS AS OF: 12-01-82 PIANP GARACTERISTICS:

KEY PERSW NEL:

DOCKI?f NO:

05000362 CORPORNFE CONTACT:

DR. L. T. PAPAY, VICE PRESIDENT CP NO. & DATE ISSLED:

CPPR-98 / 10-18-73 ADVANCED ENGINEERING CP EXPIRATION DATE:

06-01-81 00REORATE ADDRESS:

2244 WAINUP GIUVE AVENUE APPLICANT:

SOUINEIN CALIFOINIA EDISON IOSEMEAD, CALIFOINIA 91770 PLANP IDCATION:

5 MI S OF SAN CIEMENIE, CA IE REGION:

5 CDRPORATE PHONE NO:

(213) 592-1472 AE:

BECH'IEL NSSS:

00MBUSTICN ENGINEERING CDNSTRUCIOR:

BEOfTEL NRC LPM:

H. 1000 REACIOR TYPE:

IWR IE PI(lTECF INSPECIOR:

DER (MWE): -

1100 IE RESIDENT INSPECIOR:

R. J. PATE INSPECTION STA'IUS:

FUEL IIRD DATE GANGES TIME PERIOD AS REPORTED BY UfILITY:

Apr.1982 - Jun,1982 REPORP NEW REASCN FOR GANGE REIORP BEG DATE END DATE DATE SCHEDULE REPORPED BY UPILITY NUMBER OF INSP.

OF INSP.

11-14-74 11-00-80 ISSUANCE OF A PERMIT BY 'IHE CALIFORNIA 82-05 02-13-82 04-09-82 OQASTAL 00MMISSI N.

82-06 03-31-82 04-05-82 12-12-74 03-09-81 NO REASCN NOTED.

82-07 06-01-80 06-30-81 10-22-75 05-00-81 IABOR DIFFICULTIES.

82-08 04-19-82 04-23-82 02-00-80 11-0 0-81 NO REASCN PROVIDED.

82-09 05-17-82 06-04-82 02-18-81 09-00-82 NO BEASCN PROVIDED.

82-10 04-10-82 05-24-82 09-30-81 11-01-82 NO REASCN PROVIDED.

82-11 05-24-82 05-28-82 12-01-82 11-15-82 AcruAL 82-12 06-28-82 07-02-82 82-13 05-24-82 06-25-82 Inspection Reports are available at local PDRs.

LOCAL PUBLIC DOCLNENP IOOM: