Forwards Updated Const Status Rept as of 840331.Const 77.5% Completed.On 840403 Announced That Commercial Operation Delayed Until Late 1986
ML20127C814
Person / Time
Site: 05000000, Beaver Valley
Issue date: 04/25/1984
From: Bohlke W
STONE & WEBSTER ENGINEERING CORP.
To:
NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
Shared Package
ML082170543 List: ... further results
References
FOIA-84-367 LR8404250002, NUDOCS 8504120344
Download: ML20127C814 (5)


Text

,

STONE 6 WEBSTER ENGINEERING CORPORATION 245 SUMMER STREET. BOSTON, M ASSACHUSETTS AconESs ALL conntspoNoENCE TO P.O. SOX 2325. ROSTON Mass. 02107 W.U. TELEX 94-0001 w onM C Nst.WCTION O v m as AtioNS

  • L*.'T..

,YG".*.

,.".'J ',,".* o* " !,*
  • Mr. R. A. Hartfield Chief, Management Information Branch April 25,1984 Office of Resource Management J.O.No. 12241 U.S. Nuclear Regulatory Commission LR8404250002 Washington, DC 20555 BEAVER VALLEY POWER STATION - UNIT NO. 2 J.O.NO. 12241-0.F.E.NO. 10080-C.O.NO. 6289 DUQUESNE LIGHT COMPANY YELLOW BOOK NETWORK

)

Enclosed for your information is one copy of the Construction Status Report for BVPS-2 reflecting construction progress of 77.5 percent as of March 31, 1984. A project delay in commercial operation from May 1,1986 to late 1986 was announced on April 3, 1984. Specific milestone date changes will not be available until the next quarterly update.

/,

H.

o Ike Project Manager Enclosures FEW:cs AR 8504120344 840606 PDR FDIA KILLEFE84-367 PDR

Y sieu. ms <a rmaes>,.o ccwoa.

.E Copy'to:

field RJWashabaugh-4(ene)

HAVanWassen-2(2 enc)

DVDenning-3(3 ene)

Mr. R. A. Hartfield April 25,1984 Chief, Management Information Branch Office of Resource Management J.0.No. 12241 U.S. Nuclear Regulatory Commission LP2404250002 Washington, DC 20555 BEAVER VALLEY POWER STATION - UNIT NO. 2

-J.0.NO. 12241-0.F.E.NO. 10080-C.O.NO. 6289 DUQUESNE LIGHT COMPANY YELLOW BOOK NETWORK

' Enclosed.for your information is one copy of the Construction Status Report for BVPS-2 reflecting construction progress of 77.5' percent as of March 31, 1984. A project delay in' commercial operation from May 1, 1986 to late 1986 was announced on April 3, 1984. Specific milestone date changes will not be available until the next quarterly update.

t

{.

fk W.H.Bbhlke Project Manager Enclosures FEW:cs

~@

y

peut s suwta tus,stunus conoon

(... y

. Copy to:

NRC-PA-2(ene)

Attn' RAHartfield

-RJWashabaugh-4(ene)

HAVanWassen-2(2 ene)

DWDenning-3(3 ene)

.Mr. R. A. Hartfield -

April 25,1984 Chief, Management Information Branch Of fice of Resource Management J.O.No. 12241 U.S. Nuclear Regulatory Commission LR8404250002 Washington, DC. 20555 BEAVER VALLEY POWER STATION - UNIT NO. 2 J.0.NO. 12241-0.F.E.NO. 10080-C.O.NO. 6289 DUQUESNE LIGHT COMPANY YELLOW BOOK NETWORK Enclosed for your information is one copy of the Construction Status Report for BVPS-2 reflecting ' construction progress of 77.5 percent as of March 31, 1984. A project delay in commercial operation from May 1, 1986 to late 1986 was announced on April 3, 1984. Specific milestone date changes will not be available until the next quarterly update.

?

{ ffUA W. H. Bohlke Project Manager Enclosures FEW:cs

=@

l s'

i ceNsiRWtiIeN siATWsREPORi Pact Ilse 2-e03 states. As are 3/31/84 bEAVE3VAttEY2 N e C t E A a r e W E a r L A N i s-ERSONNEk PLANT CNARACTERISTItse PRESIIENT CORP, ORATE. CONT, ACT.,,3. J V00LETE.R,,.VI.C.E.Nr c0 0.i T.00.S mi.N uc 0

sec. E - *

.s..e...

110 8 I118 018 PLAZA BLDG.110. 2 N NPIne N N!

b-3Yjg SUITE 210, PA ROUTE 60 APPLICANte steWEsNE Llelli teMPANY rLcNi tocAIae PITTS8UltGN, PA 15205 N e' kCestowEenotestER COWORA1E PHollE Nds (412) 923-1960 tssse uts:IncNetsE INtC LPns L, L go cousseuClose ettesseNE e 88 Easter IE PRINCIPAL INsPECIslte

-CeNSTRUCTIeNe G. Valton' arActeR turEs PWR

-1Esf AMe SIARIUPe CER IHWEle as2 IE REsteENT INsPECioRe

+

i

'I C s P E C 1 I e N s i A T U Se FWEL LeAeeATE cNANeEs TIME PERise As REPeRiEeeY W i I L I i Ye 1

REPORT NEW aEAsell ret CNAWeE REPeRT eEs DATE Effe eATE oATE 31H(gg(1 REPeRIES eY_WIILIIY levneER of INsh 3F__ INsr i e9-27-14 et-se-a1 - FINAllCIIIe PResLEMs.

et-et-76 te-es-et ne aEAseN eIVEN eY TNE WTIt11Y.

e7-s4-76 sz-es-et SITE sett reuNe4 less PaesttMs.

et-Is-7e to-es-et We REAseN eIVEN eV INE UTILITY.

i sa-ts-te it-es-as FleeAseCIAL copsleERAtleses awe aEsotte iI teas renECAsis.

es-es-se ta-se-as nEeUClleN IN LEVEL eF tellstRWCileII i

.I ACIIVIIY set le FINAsocIAL coNsleEnATIeNs.

l, I

04-03-84 TBD Allow additional time for construction I

and testing.

i l

I 1

l i'

tocAL P W e t I C. e e C U M E 11 i R e e Me e.

I'. JONfs MttleRIAL tleRARY

&&S TRAHELIN AVENUE AlleWIPPA. PENHsVLVANIA Istel I

-~~

~'~~~~~

' ~

i

~

toe $TR#CTIOsetTATes aaPOaT raea sese a*f LEAVER Val.lu ?

NWtLkgR l' 9 le a R PLANT $

sensus as are 3/3,t/#4' l

h o n s v a c c T a e n s T A T e se i

I arrtscantes cenaths istseenste rett soapsme entre es-on-e5 arriscasts constaustsee tenertatten asessesse as artescaures rateseos asassoaste teet tenesse estre sa-3s-sa ser:Pm se tre !.!anasst asteeses arrescant's tseenaste rett leaseme east as cr assoasces ea-se-se arrt scant's cuestne Eseenaste casettascat -ertaaTsen esses es-01-e{

82/3s/s4,

j cuessus asessenste reactus cesseeecteen courteste 77.5 l

cursetnis assaaessee coastes teesseetsson statess

  • Note I 6

i tsessenste accent tsessetets asemat Essistate MEL M

NRIgli 3Mp seenstart ame retraat sette J

5/4/74 5/4/74 1/3n/14 1/3s/Is noe Peace seauctuaAt cesscetite II/22/76 11/22/76 9/3/84

'98 3 I

ts/30/st 11/16/a1 n/30/a1 n/30/s1 30s,

sassait stactes reassent vessets sassant sanat sent reecess rerte 6/s2/7s 6/s2/7s 10/22/84 93 t

g ensinet annet sent eser manetas.stssaasnes ano sessestate 7/87/7s 7/t1/7s 10/22/84 74 x I

INssatt selatt BGRE rette 13/l/05 1/4/82 3/25/85 69 g seistatt caste st4Ve 3/28/77 3/28/77 9/10/84 91,

sustatt foreste settat catenesTo 3/33/73 ~

3/g3/73 7/15/85 80 f aussait route.cenenet.smstaunensassen Ace necesesV castte 6/22/es s/22/es 8/19/85 58 g

]

suse Att titcenscAt staessuaisease 3/0/82 5/4/82 9/9/85 28.,

I comenct atAtste tote elvesessasst 18978 t/28/85 3/25/05 6m

]

connect met enacesenat sess 4/8/ss 9/9/85 en cumbett retur Alst AcettlANet itsTS NtcassARY rdt Putt tones 7/2/84 12/1/85 03 i

i On April 3, 1984 a project delay in Commercial Operation from May 1986 to late 1986 was announced, along with re-evaluation of remaining scope. The announced delay does not include any planned recovery, actions. Recovery plans'are being evaluated

[

which could advance the projected fuel load schedule back to the original date of December 31, 1985. Thus the licensing schedule established for BVPS-2 should not he altered. The BVPS-2 project is continuing unabated with all of the presently planned licensing activities and it is understood that the project will continue to have the NRC's full support for the i

Licensing Program as currently schedule for BVPS-2.

No specific milestone dates or detail percent complete changes are available. These will be reported in the next quarterly update.

1

=

-