Forwards Updated Const Status Repts as of 840419 for LaSalle Unit 2,Bryon Units 1 & 2 & Braidwood Units 1 & 2.Info for Inclusion in NUREG-0030
ML20127C807
Person / Time
Site: Byron, Braidwood, LaSalle, 05000000
Issue date: 04/19/1984
From: Peterson E
COMMONWEALTH EDISON CO.
To: Hartfield R
NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
Shared Package
ML082170543 List: ... further results
References
FOIA-84-367, RTR-NUREG-0030, RTR-NUREG-30 NUDOCS 8504120340
Download: ML20127C807 (11)


Text

.

t_

= '~

'x. Commonwealth Edison

~/

) -72 W'st Adams Street. Chicago, flimois i

~

7 Address Reply to: Post Office Box 767

\\

f Chicago, (lhnois 60690 April 19, 1984 Mr. R..H.

Hartfield, Chief Management Information Branch

-Office of. Management and Program Analysis U.S. Nuclear Regulatory Commission Washington,.D.C.

20555

Dear Mr. Hartfield:

SUBJECT:

CONSTRUCTION STATUS REPORT (NUREG-0030) (YELLOW BOOK)

. Attached is the construction status data as of March 31, 198h, for the following Commonwealth Edison Nuclear Power Plants:

LaSalle Unit 2 Byron Unit 1 & 2 Braidwood Unit 1 & 2 If you have any questions or comments concerning this information, please call me on (312) 29h-8221.

m 7 __ A__-

M m

E. M. Peterson Director Project Scheduling and Cost Control CDP /EMP/ cmp

. Attachment cc:

J. S. Abel B. Thomas /C. Reed R. H. Holyoak T. J. Maiman D. L. Farrar V. I. Schlosser/R. P. Tuetken J. G. Keppler (NRC) (h)

M. J. Wallace 84o606 367 PDR _

E

C0NSTRUCTION STRTUS REPORT PRGE NO: 2-0S8 LRSALLE 2 NUCLERR PONER PLRNTS STATUS RS OF 03-31-84 I

I l

l PLRNT CHRRRCTERISTICS:

l KEY PERSONNEL l

l l

l l

DOCKET NUMBER 0S000375 l

CORPORATE CONTACT :

C. REEO, VICE PRESIDENT l

l CP NO. & DATE ISSUE 0..

CPR-100 / 09-10-73 l

l l

CP EXPIRATION DATE....

12-31-80 l

CORPORATE A00RESS :

P. O. BOX 767 RPPLICRNT.............

COMMONNERLTH EDISON l CHICAGO. ILLINOIS 60690 l

PLRNT LOCATID'l........

11 MI SE OF OTTAHR.ILl l

IE REGION.............

3 l

CORPORATE PHONE NO:

(3121 294-3121 1

I RE....................

SARGENT & LUNOT l

l l

NSSS..................

GENERAL ELECTRIC l

l l

CONSTRUCTOR...........

COMMONNERLTH EDISON l NRC LPH :

R. 800RNIR l

l REACTOR TTPE..........

BNR l

IE PROJECT INSPECTOR:

H. NESCOTT I

I DER [MNEl 1078 l

IE RESIDENT INSPECTOR:

R. NRLKER l

l l

l 4

I I

I I

INSPECTION STATUS :

l FUEL L0R0 0 ATE CHANGES l

INSPECTION REPORTS RVRILR8LE AT l

.R S REPORTEO 8Y UTILITT LOCAL PORTS).

l l

.1 REPORT NEN RERSON FOR CHANGE l

l DATE SCHEDULE REPORTED BY UTILITT l

l 1

l l

l 09-01-76 -LICENSING DELRTS.

l 10-01-77 -LICENSING DELRYS / PUBLIC HERRINGS.

l l

10-1S-73 01-01-79 -PUBLIC HERRINGS.

l l

10-17-7E 06-01-79 -ECONOMIC RERSONS.

l l

04-20-77 03-00-80 -RERSSESSMENT OF CONSTRUCTION SCHEDULE STRTUS.

l 09-24-79 06-00-81 -0ESIGN RNO CONSTRUCTION DELRTS CRUSED BT l

l COMPLEXITY OF INCLUDING MARK II CONTRINMENT l

l HTOROOTNRMIC LORDS.

l OS-14-80 12-00-81

-TO INCORPORATE THI RELRTED CHANGES INTO l

l DESIGN AND CONSTRUCTION, RNO REFLECT l

l l

CONTINUING NRC LICENSING SLONDONN.

l l

01-14-81 OS-00-82 -CONTAINMENT LORDING MODIFICRTIONS.

l l

09-30-81 12-00-82 -FOCUS ON UNIT 1 RLTERATIONS HHICH REFLECT ON l

l UNIT 2 INSTALLRTION. -

l l

03-31-82 04-30-83 -FOCUS ON UNIT 1 RLTERRTIONS HHICH REFLECT ON l

UNIT 2 INSTALLRTION.

l 03-31-83 03-31-83 -STRUCTURAL STEEL MODIFICATIONS.

06-31-83 10-01-83 -CLERRANCE OF NON-RNTICIPRTED DEFICIENCIES l

l COMBINED HITH DIFFICULTIES IN SCHEDULING l

l PRE-OP TESTS.

09-30-83 11-18-83 -SAME AS THE PREVIOUS RERSON.

12-31-83 12-30-83 -RCTURL FUEL LORO START.

ll L0CRL PU8LIC 0DCUMENT R O O Me l

ILLINOIS VRLLET COMMUNITY COLLEGE RURAL ROUTE NO. 1 l

OGLES 8Y. ILLINOIS 163E8 PROJECT SCHEDULING & COST CONTROL l

RPRIL IS. 1984 l

l l

l

C0N5TRUCTION 5TRTUS REPORT PRGE NO:- 2-059 :

LRSALLE 2 NUCLERR PONER PLRNTS STATUS RS OF: 03-31 a g

1

~

5TATUS :

.g l

CDN5TRUCTION l

I RPPLICANT'S CURRENT ESTIMRTED FUEL LORO ORTE........... 12-30-83 (Al RPPLICANT'S CONSTRUCTION COMPLETION ESTIMRTE I RPPLICANT'S PREVIOUS ESTIMRTED FUEL LORO ORTE.....;.... 11-18-83 RS DEFINED IN CP:.ERRLIESTI l

(

RPPLICANT'S ESTIMRTED FUEL LORO ORTE RT CP ISSURNCE...

08-01-7S (LRTEST 1 12-31-83.

1 RPPLICANT*5 CURRENT ESTIMRTED COMMERCIAL OPERRTION DATE.. 01-30-816 l

1 1

1 I

I

~l l

CURRENT ESTIMATED PERCENT CONSTRUCTION COMPLETE: 100%

I l

1 1

1-I l'

i 1

1 COMMENTS K GARDING CURRENT CONSTRUCTION STATUS :

l l

l ESTIMATED ACTUAL ESTIMATED RCTUAL ESTIMRTED l

START START COMPLETION COMPLETION

% COMPLETE 1

I MOBILIZE AND PREPARE $1TE 10-00-73 07-00-74 100.0 %

I PLACE STRUCTURRL CONCRETE 07-00-74 09-00-76 100.0 %-

I l

INSTALL K RCTOR PRESSURE VESSEL 11-00-76 11-00-76 100.0 %

i l

INSTALL LARGE BORE PROCESS PIPE 11-00-76 03-00-82 100.0 %.

l l

INSTRLL LARGE BORE PIPE HANGERS. RESTRRINTS.

I i

RNO SNUB 8ERS 01-00-77 06-00-83 100.0 %

1 INSTALL SMALL BORE PIPE 11-00-76 06-00-82 100.0 %

1 INSTALL CABLE TRAT 09-00-77 04-00-82 100.0 %

l INSTALL EXPOSED METAL CONOUIT 01-00-77 06-00-83.

100.0 %

INSTALL PONER. CONTROL. INSTRUMENTATION RNO

^

SECURITY CABLE 02-00 06-00-83 100.0 %

INSTRLL ELECTRICRL TERMINRTIONS 02-00 09-00-83 100.0 %

l l

CON 00CT KRCTOR COLO HTOROSTRTIC TEST 10-00-82 10-00-82 100.0 %

1 3

I CONOUCT HOT FUNCTIONRL TEST 03-00-84 03-00-84 100.0 %

l l

CONOUCT PE OP RNO RCCEPTRNCE TESTS NECESSART l

l FOR ruEL LORO 07-00-82 12-00 100.0 %

1 1.

I l

I l

I I

I NOTE :

(R1 = RCTUAL PROJECT SCHEDULING & COST CONTROL RPRIL IS. 1984 i

CDNSTRUCTION STRTUS REPORT PRGE NO: 2-012

~

BTRON 1 NUCLERR PONER PLRNTS STRTUS RS OF 03-31-84 l

l

. KEY PERSONNEL:

l l

PLRNT CHRRRCTERISTICS:

l l

I I

DOCKET NUMBER 05000455 l

CORPORATE CONTACT C. REED. VICE PRESIDENT l

' l CP NO. & ORTE ISSUED..

CPR-130 / 12-31-75 l

l l

CP EXPIRATION ORTE...

I CORPORATE RODRESS :

P. D. BOX 7S7 -

l l

CPPLICRNT............ COMMONNERLTH EDISON l

CHICRGO. ILLINOIS 60690 l

l PLRNT LOCATI ON.......

17 MI SN OF ROCKFORD.ILI l

l IE REGION............ 3 l

CORPORATE PHONE NO:

(3121 294-3121

- l RE................... SRRGENT & LUNDY l

l NSSS................. NESTINGHOUSE

- l CONSTRUCTOR.......... COMMONNERLTH EDISON NRC LPM i S. CHESTNUT l

RERCTOR TTPE......... PNR IE PROJECT INSPECTORS R. LERCH l

i DER IMNE) 1120 l

IE RESIDENT INSPECTOR:

J. HINOS 1,

I l

l' l

l l

l INSPECTION STRTUS :

1 FUEL LORO ORTE CHRNGES l

1 1

I INSPECTION REPORTS AVAILR8LE RT l

RS REPORTEO 8T UTILITT l

LOCAL PORES).

l L

l l

REPORT NEN RERSON FOR CHANGE l

DATE SCHEDULE REPORTED ST UTILITY I

I I

1 l

l 01-05-77 10-00-80 -!NCRERSED DESIGN (87 DEFINITIONI RNO l

l l

MODIFICRTIONS. RNO RE00CED LORO ESTIMATES.

I l

03-01-78 03-00-81 -REVISED LORO DEMRNO FORECAST.

l t

l 01-08-80 04-00-82 -POST TMI NRC LICENSING SLONDONN.

l l

09-1S-80 04-00-83 -REALLOCATION OF RESOURCES TO OPERATING PLANT TMI RELRTED ITEMS.

l 09-30-82 08-00-83 -ADDITIONRL TIME REQUIRED FOR RECONCILIRTION l

.1 l

RNRLYSIS. SYSTEM TURNOVERS AND PREOP SCHEDULE.1 l

l 07-26-83 12-00-83 -RERSSESSMENT OF REMRINING NORK AND TESTING l

l l

PROGRESS.

I i

10-27-83 02-00-84 -SAME RS LRST-TIME.

l 01-30-84 08-00-84 -LICENSE DENIRL ST RSLB.

I I

I I

I I

I I

I 1

I I

i 1

1 I

I L0CRL PUBLIC 00CUMENT R O O Ma l

BTRON PUBLIC LIBRARY THIRD AND NASHINGTON STREET I

BTRON. ILLINOIS 61010 1

PROJECT SCHEDULING & COST CONTROL, RPRIL 15, 1984

CDNSTRUCTION STRTUS REPORT PRGE NO: 2-013 BTRON 1 NUCLERR-PONER PLANTS STATUS AS OF 03-31-84 I

.I CONSTRUCTION STATUS e i

l l

RPPLICANT'S CURRENT ESTIMATED FUEL LORD DATE.........

08-31-84 APPLICANT'S CONSTRUCTION COMPLETION ESTIMRTE I l

RPPLICRNT'S PREVIOUS ESTIMRTED FUEL LOAD DATE.........

02-1S-84 AS DEFINED IN CP: (ERRLIEST) 0S-01-80 l

l RPPLICRNT'S ESTIMRTED FUEL LOAD ORTE AT CP ISSURNCE.... 05-00-80 (LRTEST I 10-01-84 l

l APPLICANT'S CURRENT ESTIMRTED COMMERCIAL OPERATION ORTE. 01-31-8S I

I I

I I

l I

CURRENT ESTIMATED PERCENT CONSTRUCTION COMPLETE:

93 %

l l

l I.

I 1

l' i

l I

COMMENTS REGARDING CURRENT CONSTRUCTION STATUS :

1 1:

I l

I I

ESTIMATED ACTURL ESTIMATED ACTUAL ESTIMRTED START START COMPLETION COMPLETION

% COMPLETE l

i l

l HOBILIZE RNO PREPRRE SITE 04-00-7S 12-00-7S 100.0 %

l PLACE STRUCTURAL CONCRETE 12-00-75 07-00-82 100.0 %

l l

INSTALL REACTOR PRESSURE VESSEL 09-00-78 11-00-78 100.0 %

l INSTALL LARGE BORE PROCESS PIPE 01-00-76 07-00-82 100.0 %

l INSTALL LARGE BORE PIPE HANGERS. RESTRAINTS, AND SNUBBERS (M) 0S-00-77 05-00-84 96.3 %

INSTALL SMALL BORE PIPE 08-00-76 04-00-83 100.0 %

l INSTRLL CRBLE THRT 12-00-76 12-00-82 100.0 %

' INSTALL EXPOSED METAL CONDUIT (M) 02-00-78 05-00-84 91.2 %

INSTALL POWER. CONTROL. INSTRUMENTRTION AND l

SECURITY CRBLE (M) 08-00-78 05-00-84 98.0 %

l INSTRLL ELECTRICAL TERMINRTIONS (MI 08-00-78 06-00-84 84.S %

l CON 00CT REACTOR COLD HTORDSTATIC TEST 07-00-81 07-00-81 100.0 %

i l

CONOUCT HOT FUNCTIONRL TEST 04-00-83 07-00-83 100.0 %

i CONOUCT PREOP RNO RCCEPTRNCE TESTS NECESSART l

FOR FUEL LORD (M) 06-00-80 06-00-84 93.0 %

I i

l' l

I I

l l

i NOTES e (A) = RCTUAL (M) = RLL NORK REQUIRED TO LORO FUEL IS COMPLETE IN THIS CRTEGORT.

INCLUDED ARE CHANGES NOT RffECTING FUEL LOADING.

I PROJECT SCHEDULING & COST CONTROL APRIL IS, 1984 I

C0NSTRUCTI-ON STRTUS REPORT PAGE NO: 2-014 BTRON 2

. NUCLEAR PONER PLRNTS STATUS RS Of: 03-31-84' I

l KEY PERSONNEL I

1 I

l PLRNT C'H R R R C T E R I S T !.C S :

I I

l l

DOCKET NUMBER....... 05000455 CORPORATE CONTACT :

C. REED. VICE PRESIDENT I

l

.CP NO. & ORTE ISSUEO..

CPR-131 / 12-31-75 I

l CP EXPIRATION ORTE...

-1 CHICRGO. ILLINOIS 60690 I

CORPORATE RODRESS :

P. O. BOX 767 l.

RPPLICANT............ COMMONNERLTH EDISON l

PLANT LOCATION.......

17 MI SH Of ROCKFORD.ILI l

IE REGION............. 3 I

CORPORATE PHONE NO:

(3121 294-3121

.I RE...................-

SARGENT & LUNDY l

l i

NSSS................. NESTINGHOUSE l

S.' CHESTNUT l

l l'

CONSTRUCTOR.......... COMMONNERLTH EDISDN l

~

NRC LPM i l

RERCTOR TYPE......... PNR I

IE PROJECT INSPECTOR:

R. LERCH l

l DER (MNE) 1120 l

IE RESIDENT INSPECTOR:

J. HINDS I

I I

I I

I i

. L0RD 0 RTE CHRNGES l'

I-N S P E C T I O N STATUS :

I FUEL l

8Y -UTILITT I

INSPECTION REPORTS AVAILABLE RT I

AS R E P.O R T E.0 l

LOCAL POR(S).

1 I

.I l

~

REPORT NEW RERSON FOR CHANGE ORTE SCHEDULE REPORTED BT UTILITT I

i 1

r

-l i.

I

.I 01-14-7S 05-00-82 -REOUCED LORO ESTIMRTES.

l l

01-08-80 03-00-83 -POST THI NRC LICENSING SLONDONN.

I l

09-15-80 04-00-84 -REALLOCRTION Of ENGINEERING RESOURCES TO' l

i OPERRTING PLANT TMI RELATED ITEMS.

l l

04-27-83 02-00-85 -RERSSESSMENT Of REMAINING HORK.

l 07-26-83 05-00-85 -RERSSESSMENT Of REMAINING HORK AND EMPHRSIS

,0N UNIT 1.

1 01-30-84 10-00_-85 -FOCUS ON UNIT 1 COMPLETION.

I I

I l

l 1

I l-1 i

l i

l l

I I

I I

I I

I I

l l

l l

l l

l L0CRL PUBLIC 00CUMENT R O O Me BTRON PUBLIC LIBRART THIRO AND HRSHINGTON STREET BTRON. ILLINOIS 61010 i

PROJECT SCHEDULING & COST CONTROL RPRIL IS, 1984

CDNSTRUCTION STATUS REPORT PAGE NO: 2-01S STRON 2 NUCLEAR PONER PLANTS STATUS AS OF 03-31-84 1

1 l

CONSTRUCTION STATUS :

l I

.l.

I RPPLICANT'S CURRENT ESTIMATED FUEL LORD DATE.........

10-31-8S APPLICANT'S CONSTRUCTION COMPLETION ESTIMATE I l

RPPLICANT'S PREVIOUS ESTIMATED FUEL LOAD ORTE.......... OS-31-8S AS DEFINED IN CP (ERRLIEST) 11-01-81 l

l.

APPLICANT *S ESTIMATED FUEL LORD DATE AT CP ISSURNCE.... 05-00-81'

[ LATEST 1 04-01-86 l

l APPLICANT'S CURRENT ESTIMATED COMMERCI AL OPERRTION. DATE. 04-30-86 1

l l

I I

i i

i l

l CURRENT ESTIMATED PERCENT CONSTRUCTION COMPLETE: 67%

1 l

i i

i i

I l

l I

l COMMENTS REGARDING CURRENT CONSTRUCTION STATUS :

l I

l I

i I

ESTIMATED ACTUAL ESTIMATED RCTUAL ESTIMATED.

I l

START START COMPLETION COMPLETION

% COMPLETE I

I I

l MOBILIZE AND PREPARE SITE 04-00-75 02-00-76 100.0 %

l l

PLACE STRUCTURAL CONCRETE 02-00-76 07-00-82 100.0 %

l l

INSTALL REACTOR PRESSURE VESSEL 07-00-79 10-00-79 100.0 %.

l INSTALL LARGE BORE PROCESS PIPE 05-00-76 11-00-84 84.9 %

l 1

INSTALL LARGE BORE PIPE HANGERS. RESTRAINTS.

l I

AND SNUB 8ERS OS-00-77 07-00-85 44.0 %

l 1

INSTALL'SMALL BORE PIPE 08-00-76 06-00-8S 43.3 %

l l

INSTALL CABLE TRAT 12-00-76 OS-00-84 99.7 %

l l

INSTALL EXPOSED METAL CONDUIT 02-00-78 01-00-8S 47.2 %

l l

INSTALL POWER. CONTROL. INSTRUMENTATION ANO l

SECURITT CABLE 11-00-7u 06-00-8S 42.1 %

l INSTALL ELECTRICAL TERMINATIONS 11-00-78 06-00-8S 40.6 %

l i

CONOUCT REACTOR COLD HTORDSTATIC TEST 01-00-8S 01-00-BS 0.0 %

CONOUCT HOT FUNCTIONAL TEST 04-00-8S 04-00-8S 0.0 %

l CONOUCT PREOP AND ACCEPTANCE TESTS NECESSART I

l FOR FUEL LORD 08-00-84 10-00-8S 0.0 %

l 1

I 1

I I

I I

I I

I I

l l

i PROJECT SCHEDULING & COST CONTROL i APRIL IS. 1984 l

9

C0NSTRUCTION STRTUS REPOMT PAGE NO: 2-006 BRRION000 1 NUCLERR PONER PLRNTS STATUS RS OF 03-31-84 I

I I

l PLRNT CHRRRCTERISTICS:

I

'KET PERSONNEL 1

l l

l l

DOCKET NUMBER-OS000LS6 l

CORPORATE CONTACT :

C. REED. VICE PRESIDENT l

l CP NO. & DATE ISSUED..

CPR-132 / 12-31-7S 1

l l

CP EXPIRATION DATE...

1 CORPORATE RODRESS :

P. D. BOX 767 l

l RPPLICRNT............ COMMONNERLTH EDISDN I

CHICAGO. ILLINDIS 60690 l

PLANT LOCRTION....... 24 MI SSN Of JOLIET. ILI I

IE REGION............

3 l

CORPORATE PHONE NO:

(3123 294-3121 l

RE................... SRRGENT & LUNOT I

i 1

NSSS................. NESTINGHOUSE l

l l

CONSTRUCTOR.......... COMMONNERLTH EDISDN i

NRC LPH :

K. KIPER I

l REACTOR TTPE......... PNR l

IE PROJECT INSPECTOR:

R. LERCH I

i OER (MNE) 1120 l

IE RESIDENT INSPECTOR:

L. MC GREGOR I

l l

1 i

i

!NSPECTION STRTUS :

1 FUEL L0A0 DRTE CHRNGES 1

INSPECTION REPORTS RVRILABLE AT l

AS REPQRTED BY UTILITT l

LOCRL POR(S).

l l

l l

REPORT NEN REASON FOR CHANGE l

l DATE SCHEDULE REPORTED BT UTILITT I

I I

I I

l 01-08-80 04-00-82 -POST TMI NRC LICENSING SLONDONN.

1 05-14-80 04-00-83 -DELRT DUE TO FINANCIAL CONCIDERATIONS.

I I

09-1S-80 04-00-8S -flNANCIAL CONSTRAINTS AND REALLOCATION OF I

l l

ENGINEERING RESOURCES TO OPERATING PLRNT l

1 l

THI RELATED ITEMS.

l l

l 01-30-84 08-00-8S -SCHEDULE RERSSESSMENT.

1 I

I I

I I

i i

l l

I I

I I

I I

I l

l l

I I

I i

l I

l i

I i

1 1

I I

I I

I I

IL0CRL PUBLIC D0CUMENT R 0 0 M: l i

NILMINGTON TONNSHIP PUBLIC LIBRART 201 S. KRNKRKEE STREET I

WILMINGTON. ILLINDIS 60481 i

PROJECT SCHEDULING & COST CONTROL RPRIL IS. 1984

CDNSTRUCTION STRTUS REPORT PAGE NO: 2-009 8RRIDNOOD I NUCLERR PONER PLRNTS STRTUS RS Of: 03-31-84 l

l l

CONSTRUCTION STRTUS :

I 1

I l

RPPLICANT*S CURRENT ESTIMRTED FUEL LORD ORTE.........

08-31-85

.RPPLICANT*S CONSTRUCTION COMPLETION ESTIMRTE l l

RPPLICANT*S PREVIOUS ESTIMATED FUEL LORD ORTE.........

04-30-BS RS DEFINED IN CP: (ERRLIEST) 11-01-80 l

l RPPLICANT*S ESTIHRTED FUEL LORD ORTE AT CP ISSURNCE.... 0S-00-81 ILRTEST I 04-30 l l

RPPLICANT*S CURRENT ESTIMRTED COMMERCIAL OPERATION ORTE. 04-30-86 l

l I-1 1

1 1

.I I

l CURRENT ESTIMRTED PERCENT CONSTRUCTION COMPLETE: 70%

I 1

I I

I I

I l

l COMMENTS REGARDING CURRENT CONSTRUCTION STATUS :

1 1

i l

i I

I I

ESTIMRTED ACTUAL ESTIMATED RCTURL ESTIMATED I

l START START COMPLETION COMPLETION

% COMPLETE l

i I

I I

I MOBILIZE RNO PREPARE SITE 08-00-7S 03-00-76 100.0 %

1 1

PLACE STRUCTURAL CONCRETE 03-00-76 11-00-82 100.0 %

l l

INSTRLL REACTOR PRESSURE VESSEL 04-00-79 04-00-79 100.0 %

l I

INSTALL LARGE BORE PROCESS PIPE 04-00-76 0S-00-84 98.3 %

I l

INSTRLL LARGE BORE PIPE HANGERS, RESTRRINTS.

l I

RNO SNU88ERS 08-00-77 06-00-8S S7.0 %

l l

INSTALL SMALL 80RE PIPE 08-00-76 11-00-8L 80.2 %

l l

INSTALL CABLE TRAT (m1..........................

12-00-76 10-00-82 100.0 %

l INSTRLL EXPOSED METRL CONDUIT 08-00-78 12-00-84 85.1 %

l INSTRLL PONER. CONTROL, INSTRUMENTATION RNO l

l SECURITY CABLE 11-00-78 07-00-8S 6S.4 %

l l

INSTRLL ELECTRICAL TERMINRTIONS 11-00-78 08-00-8S 57.S %

l l

CONOUCT REACTOR COLD HTDROSTATIC TEST 07-00-83 07-00-83 100.0 %

i l

CONOUCT HOT FUNCTIONRL TEST 03-00-8S 03-00-8S 0.0 %

l l

CONDUCT PREOP RND RCCEPTRNCE TESTS NECESSART l

l FOR FUEL LORD 06-00-83 07-00-8S 7.9 %

l l

1 i

l i

I I

l I

I I

i NOTE tal = EXCLUDES CABLE PRN COVERS.

PROJECT SCHEDULING & COST CONTROL RPRIL IS. 1984 I

CDNSTRUCTI0N STRTUS REPORT PAGE NO '2-010 BRRIDN000 2 NUCLERR PONER PLRNTS STRTUS RS OT: 03-31-8L i

l l

l PLRNT CHRRRCTERISTICS:

I KEY PERSONNEL:

1 I

I I

I DOCKET NUMBER....... OS000tS7 l

CORPORATE CONTRCT :

C. REED. VICE PRESIDENT l

l CP NO. & DATE' ISSUED..

CPR-133 / 12-31-7S I

i l

CP EXPIRATION DATE...

I CORPORATE ROORESS :

P. D. BOX 767 l

l

'RPPLICRNT............ COMMONNERLTH EDISON I

CHICRGO. ILLINOIS 60690 l

I

. PLANT LOCATION....... 2% MI SSN OF JOLIET. Ill i

I IE REGION............ 3 i

CORPORATE PHONE NO:

(3121 294-3121 l

l RE................... SRRGENT.& LUNOT l

l l

NSSS................. NESTINGHOUSE l

1 1

CONSTRUCTOR.......... COMMONNERLTH EDISDN l

NRC LPM i K. KIPER l

l REACTOR TTPE......... PHR l

IE PROJECT INSPECTOR:

R. LERCH l

l DER (MNE1 1120 l

IE RESIDENT INSPECTOR:

L. MC GREGOR I

l 1

1 I

l i

l INSPECTION STRTUS :

1 FUEL L0AD DATE CHRNGES I

l I

INSPECTION REPORTS RVRILR8LE AT l

RS REPQRTED 8Y UTILITT l

LOCRL POR(SI.

I l

l REPORT NEN RERSON FOR CHANGE I

l DATE SCHEDULE REPORTED ST UTILITT l

l l

l l

l l

l 01-08-6U 04-00-83 -POST THI NRC LICENSING SLONDOHN.

l I

OS-14-80 04-00-84 -0ELAT 00E TO FINRNCIRL CONCIDERATIONS.

l I

09-1S-80 04-00-86 -flNANCIRL CONSTRRINTS AND REALLOCATION Of I

l ENGINEERING RESOURCES TO OPERATING PLANT l

l l

THI RELATED ITEMS.

I l

1 01-30-84 08-00-86 -SCHEDULE RERSSESSMENT.

I I

l l

l l

1 1

I I

l l

1 1

I I

I I

I I

I I

I I

I I

I I

I I

I I

l I

I i

l I

I l

I i

1 1

I I

I I

l L0CRL PUBLIC 00CUMENT R 0 0 M: l I

I l

NILMINGTON TOWNSHIP PUBLIC LIBRARY l

i 201 S. KANKRKEE STREET WILMINGTON. ILLINOIS 60481 PROJECT SCHEDULING & COST CONTROL RPRIL IS. 1984

C0NSTRUCTION STRTUS REPORT PRGE NO: 2-011 BRRION000 2 NUCLERR PONER PLRNTS STATUS RS OF 03-31-84 I

I l

CONSTRUCTION STRTUS :

I I

I i

RPPLICANT'S CURRENT ESTIMRTED FUEL LORO DATE.........

08-31-86 RPPLICANT'S CONSTRUCTION COMPLETION ESTIMRTE l l

RPPLICANT'S PREVIOUS ESTIMRTED FUEL LORD DATE.......... 04-30-86 RS OEFINED IN CP (ERRLIEST) 11-01-81 l

l RPPLICANT'S ESTIMRTED FUEL LORD ORTE RT CP ISSURNCE...

0S-00-82 (LRTEST l-04-30-88 l

l RPPLICRNT*S CURRENT ESTIMRTED COMMERCIRL OPERATION ORTE. 04-30-87 l

l l

1 I

I I

l CURRENT ESTIMRTED PERCENT CONSTRUCTION COMPLETE: 54%

l i

l i

I I

I I

l COMMENTS REGRROING CURRENT CONSTRUCTION STRTUS :

1 i

i l

I l

ESTIMRTED RCTURL ESTIMRTED RCTURL ESTIMRTED l

l STRRT START COMPLETION COMPLETION

% COMPLETE l

1 1

I l

l MOBILIZE RNO PREPARE SITE 08-00-7S 03-00-76 100.0 %

l PLRCE STRUCTURAL CONCRETE 03-00-76 11-00-82 100.0 %

l INSTRLL RERCTOR PRESSURE VESSEL 11-00-80 11-00-80 100.0 %

INSTRLL LRRGE BORE PROCESS PIPE 05-00-76 OS-00-BS 46.1 %

i INSTRLL LARGE BORE PIPE HANGERS. RESTRAINTS.

l l

RNO SNUB 8ERS 08-00-77~

06-00-86 19.5 %

l l

INSTRLL SMRLL BORE PIPE 08-00-76 11-00-8S 21.8 %

l l

INSTRLL CR8LE THAT (m) 12-00-76 12-00-84 81.0 %

l INSTRLL EXPOSED METAL CONOUIT 01-00-79 07-00-85 32.1 %

l INSTRLL PONER. CONTROL. INSTRUMENTRTION AND I

SECURITY CR8LE 12-00-78 07-00-86 13.8 %

l INSTRLL ELECTRICAL TERMINATIONS 12-00-78 08-00-86 13.4 %

l CONOUCT RERCTOR COLO HTOROSTATIC TEST 01-00-85 01-00-85 0.0 %

l l

CONDUCT HOT FUNCTIONRL TEST 01-00-86 01-00-86 0.0 %

i i

CONOUCT PREOP RNO RCCEPTRNCE TESTS NECESSART l

r0R FUEL LORD 08-00-84 07-00-86 0.0 %

l I

I I

I I

l 1

I l

i PROJECT SCHEDULING & COST CONTROL l RPRIL IS. 1984 1

1

!