Forwards Updated Const Status Rept as of 840331.Info for Inclusion in NUREG-0030.Unit 1 Const 83.4% Completed.Target Date for Fuel Load Remains at 860103
ML20127C786
Person / Time
Site: 05000000, Clinton
Issue date: 05/02/1984
From: Hall D
ILLINOIS POWER CO.
To: Hartfield R
NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
Shared Package
ML082170543 List: ... further results
References
FOIA-84-367, RTR-NUREG-0030, RTR-NUREG-30 0982-L, 982-L, NUDOCS 8504120334
Download: ML20127C786 (5)


Text

ILLINDIS POWER COMPANY gy 99gg_L CLINTON POMR STATION. P.O. box 678, CLINTON, ILLINots 61727 May 2, 1984 Docket 50-461 Mr. R. A. Hartfield, Chief Management Information Branch

-Office of Management and Program Analysis U. S. Nuclear Regulatory Commission Washington, D. C.

20555

Subject:

Construction Status Report (NUREG-0030)

Reference:

USNRC letter dated 10/30/81, R. A. Hartfield to L. J.

Koch, Illinois Power Company

Dear Mr. Hartfield:

The referenced letter requested Illinois Power Company to provide quarterly updates of the Construction Status Report (NUREG-0030) for Clinton Power Station. Enclosed is an updated copy of the June 30, 1982 report indicating the status as of March 31, 1984. Please note that the last Construction Status Report we received was for the period ending June 30, 1982.

As of March 31, 1984, construction of Unit I is estimated at 83.47.

complete, with the target date for fuel load remaining at January 3, 1986.

S er

yours,

. Hall Vice President Enclosure REW/mm cc:

NRC Resident Office kok4I 840606

~-

FO MLLEFE84-3s7 pyg

\\

C0N5TRUCTION

$TATU5 REPQRT PAGE N08 2-828

~b-CLINTON 1 NUCLEAR POWER PLANT 5 STATUS A5 0F

~

P L,A N T CNARACTERISTICS KEY PERSONNEL:

DOCKET NO:

85008468 CORPORATE CONTACT:

W. C. GERSTNER. EXEC VICE PRESIDENT CP MO. 8 DATE ISSUED 8 CPPR-837/ 02-24-76 CP fXPIRATION DATE:

CORPORATE ADDRESS:

500 SOUTM 27TN STREET APPLICANT:

ILLINOIS POWER DECATUR. ILLIN0IS 62525 PLANT LOCATIOMs 6 MI E OF CLINTON. ILL IE REGION:

3 CORPORATE PNOME N08

-(T171-93TW17 ~ CET".- TS11-(217) 935-8881 Ext. 599 558 ELE Rc CON 51RUCTORt 8ALDWIN A550CIATES HRC LPM:

4h-WMMMG-G. NdArdaon REACTOR TYPE 8 BWR IE PROJECT INSPECTOR:

M. M. WESCOTT DER (PtWE3:

0950 IE RESIDE,NT INSPECTOR:

N. LIVERMORE IH5PECTION 5TATU5 FUEL L0AD DATE CMANGE5 TIME PERIOD A5 REPORTED 5Y UTILITYs Ane. 1982 - Jun. 1982 REPORT NEW REASON FOR CHANGE REPORT BEG DATE END DATE DATE SCHEDULE REPORTED SY UTILITY NUMBER OF INSP.

RF INSP.

8115 06-82-81 02-05-82 06-23-78 84-08-82 TIME LOST DUE TO SEVERE WEATHER 8204 02-86-82 03-38-82 CONDITIONS.

8206 04-28-82 04-30-12 01-21-88 88-00-83 REEVALUATION OF CONSTRUCTION SCHEDULE.

8207 05-87-82 05-20-82 04-29-82 88-83-84 REEVALUATION OF CONSTRUCTION SCHEDULE.

82es e6-Os-82 e6-le-82 05.g4.g3 01 03 86 Reevaluation of Construc. tion Inspection Roports are available at local PDAs.

Schedule.

Status to be pitovided by the NRC

'N L0 CAL PUBLIC DDCUMENT R 0 0 Mr VESPASIAN WARNER PUBLIC LIBRARY 170 HEST J0ltN50H 51REET CLIllION. ILLIN0!$ 61727 i

- ~..--..--

w.

C0N5iRUCTION 5TATU$

R E P 0 R T-PAGE N

-829 CLINTON I NUCLEAR POWER PLANT 5 STATUS A5 0Ft ;; :; ::

C O N,5 T R U C T I O N 5 Y A T U S:

APPLICANI's CURRENT ESTIMATED FUEL LOADING DATE:

01 :: 0'. 07-03-86 APPLICANTS CONSTRUCTION COMPLETION ESTIMATE A5 APPLICAN1'S PREVIOUS ESTIMATED FUEL LOADING DAYE:

:: 10J-05-84 LEFINED IN CPt (EARLIEST) 10-e5-88 APPL ICAlli's ESTIt:ATED FUEL LOADING DATE AT CP ISSUANCE:

1G-08-80 (LATEST)

:: :: 10-01-84 AFPLICANT'S CURRLHT ESTIMA1ED CortitERCI AL OPERATION DATE: m 17-01-86 CU': RENT LSTIMATED PERCENT CONSTRUCTION COMPLETE:

4++

83.4%

CO.rtEhf5 REGARDING CURRE14T CONSTRUCTION STA1US*

ESTIMATED ACTUAL ESTIMATED ACTUAL ESTIMATED 5 TART

$.]f gl_

COMPLETION COMPLE7IAH Y COMPLETE MOBILIZE AND PREPARE SITE:

10-0675 83-16-76 teex FLACE STRUCIURAL CONCRETE:

82-25-76

.nM-et-et 08-05-83 inox INSTALL REACTOR PRESSURE VE5SEL:

10-86-79 18-15-79 teex INSTALL LARGE BORE PROCESS PIPEa 05-81-76

: :: 12-01-84

-esx 99.6%

INSTALL LARGE BORE PIPE MANGCRS. RESTRAINTS AND SHUBBERS:

85-SI-76

:- -- 02-01-85 eet 94.5%

INSIALL SMALL 3CRE PIPE:

06-01-77

:: :: 04-01-85

.s u 94,7%

INSTALL CABLE TRAY:

86-st-7s

:: :: 06-01-84

-e n 95.8%

INSTALL EXPOSED METAL CONDUIT:

56-81-7s

: :: 10-01-85
      • 7 7 81 INSTALL POWER. CONTROL. INSTRUMENTATION AHD SECURITY CABLE:

12-12-79

:: :: 10-01-85

-s+e 58.7%

INSTALL ELECTRICAL TERMlllATION$8 04-St-se

:: :: !!-01-85

-*es 57.8%

CONDUCT REAC10R COLD NYDR0 STATIC TESTt 02-23-s3 0' :: :: 02-08-85 ex CONDUCT NOT FUNCTI0t!AL TEST N/A N/A N/A N/A N/A CONDUCT PRECP AND ACCEPTANCE TESTS HECESSARY FOR FUEL LOAD:

83-06-as

:: :: 12-19-85 5 4%

=

C0N5TRUCTION 5TATUS REF0RT PAGE NO: 2-030 03-31-84 CLINTON 2 NUCLEAR POWER PLAOT5 STATUS A5 0F 98-M PLANT CNARACTERI5 TIC 5:

KEY PER50NNEL DOCKET Nos 85888462 CORPORATE CONTACTS W. C. GER$THER. EXEC VICE PRESIDENT CP NO. 8 DATE ISSUED: CPPR-134/ O2-24-76 CP EXPIRATION DATE8 CORPORATE ADDRESS:

500 SOUTH 27TN STREET DECATUR. ILLINOIS 62525 APPLICANTS ILLINOIS POWER PLANT LOCATION:

6 MI E OF CLINTON. ILL IE REGION:

3 CORPORATE PNOME N08 4 R 4M--M7-4 4 6 4-ENT= -M S (217) 935-8887 Ext. 599 55:

GE EL C

COM5TRUCTOR8 BALDWIN ASSOCIATES NRC LPM:

Nr-WI4:1-IAMs-G. HavLison REACTOR TYPE:

3WR IE PROJECT INSPECTOR:

N. M. WESCOTT DER (PEdE)8 8958 IE RE.51 DENT INSPECTOR:

N. LIVERMORE IN5PECTION 5TATU5 FUEL L0AD DATE CNANGE5 TIME PERIOD A5 REP 0RTED 8Y UTILITV8 Anr. 1982

.lun.

1982 REPORT NEW REASON FOR CHANGE REPORT BEG DATE ENO DATE DATE SCNEBULE REPORTED AY UTILITY 31334 1 8 0F INSP.

OF INSP.

93-24-77 18-09-87 FINANCIAL CONSIDERATIONS AND UNCERTAINTY OVER FEDERAL NUCLEAR GENERATION AND FUEL POLICIES.

18-20-88 N/5 REDUCED LOAD GROWTN RATE.

10-14-83 Cancelled Reduced Load GrowtJI Rate Statua to be ptovided by NRC x

s L0 CAL PURLIC DOCUMENT R00M8 VESPASIAN WARNER PUBLIC LIBRARY 128 WEST JONM50N STREET CLINTON. ILLINOIS 61727 l

1

. - ~.. -

m l

C0N5TRUCTION 5TATUS REP 0RT

' PACE Not' 2-031 CLINTSN 2 NUCLEAR P0WER PLANT 5 STATUS A5 0F

. ~, ~

C 0 N 5 T R U C'T I O N 5TATU5:

APPLICANT'S CURRENT ESTIMATED FUEL LOADIkG DATE:

N/5 APPLICANTS CONSTRUCTION COMPLETION ESTIMATE AS APPLICANT'S PREVIOUS ESTIMATED FUEL LOADING DATE:

10-08-87 DEFINED IN CPt (EARLIEST) 10-08-83 APPLICAMi'5 ESTIMATED FUEL LOADING DATE AT CP ISSUANCE:

1e-00-43 (LATEST) 08-85 APPLICANT'S CURRENT ESTIMATED COMMERCIAL OPERATION DATE8 N/5 CURRENT ESTIMATED PERCENT CONSTRUCTION COMPLETE:

IX bWua si runnerar m y e

C0retENTS REGARDING CURRENT CONSTRUCTION STATUS: UNIT 2 aa e'

^

ESTIMATED ACTUAL ESTIMATED ACTUAL ESTIMATED SI COMPLETION

$0ftL EIIa,tl 3 COEP_LElg START 10 E 06-i5

-OA-86-76 100x MOSILIZE AND PREPARE SITE:

PLACE STRUCTURAL CONCRETE:

INSTALL REACTOR PRE 55URE VESSEL:

INSTALL LARGE SORE PR3CE55 PIPE:

INSTALL L ARGE BORE PIPE MANGERS. RESTRAINTS AND SNUBBER 58 INSTALL SMALL SORE PIPES INSTALL CABLE TRAY INSTALL EXPOSED METAL CONDUIT 8 INSTALL POWER CONTROL, INSTRUMENTATION AND SECURITY CABLE:

INSTALL ELECTRICAL TERMINATIONS CONDUCT REACTOR COLD NYDROSTATIC TEST CONDUCT NOT FUNCTIONAL TEST:

CONDUCT PREOP AND ACCEPTANCE TESTS MECESSARY FOR FUEL LDAD

~ " ~ - ~ - ~ " ' " ' ~ ~ ~ ' ' ' ' " - " ~ ~

~ -

~ '