Forwards Updated Const Status Rept as of 840331
ML20127C776
Person / Time
Site: 05000000, Harris
Issue date: 04/20/1984
From: Zimmerman S
CAROLINA POWER & LIGHT CO.
To: Hartfield R
NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
Shared Package
ML082170543 List: ... further results
References
FOIA-84-367 NLS-84-192, NUDOCS 8504120330
Download: ML20127C776 (3)


Text

. _ _ _ _ _ - _.

CD&L SERIAL: NLS-84-192 Carolina Power & Light Company APR 2 01984 Mr. R. A. Hartfield, Chief Management Information Branch Office of Management and Program Analysis United States Regulatory Commission Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT DOCKET No. 50-400 UNIT NO. 1 CONSTRUCTION STATUS REPORT

Dear Mr. Hartfield:

Carolina Power & Light Company hereby submits the Shearon Harris Nuclear Power Plant construction status report for the first quarter of 1984. This report reflects the construction status as of March 31, 1984.

Should you have any questions regarding this matter, please contact Mr. Pedro Salas at (919) 836-8015.

Yours very truly, S.

. Z mmerman nager Nuclear Licensing Section PS/ccc (9916PSA)

Enclosure:

Construction Status Report cc:

Mr. B. C. Buckley (NRC)

Mr. Wells Eddleman Mr. G. F. Maxwell (NRC-SHNPP)

Dr. Phyllis Lotchin Mr. J. P. O'Reilly (NRC-RII)

Mr. John D. Runkle Mr. Travis Payne (KUDZU)

Dr. Richard D. Wilson Mr. Daniel F. Read (CHANGE /ELP)

Mr. G. O. Bright (ASLB)

Chapel Hill Public Library Dr. J. H. Carpenter (ASLB)

Wake County Public Library Mr. J. L. Kelley (ASLB) 8504120330 840606 PDR FOIA KILLEFE84-367 PDR 411 Fayetteville Street

  • P. O. Box 1551
  • Raleigh. N. C. 27602 i

/

+

CONSTRUCT 1ON STATUS REPORT PAGE NO.

1 H ARRIS 1 NUCLEAR POWER PLANTS STATUS AS OF: 3/31/84 PLANT CHARACTERl5 TICS:

KEY PERSONNEL:

DOCKET NO:

05000400 CORPORATE CONTACT:

N. A. NQ)tFFIE, SEN. V. PRESIDENT CP NO. & DATE ISSUED:

CPR-158 / 01-27-78 CORPORATE ADORESS:

NUCLEAR GENERATION CP EXPIRATION DATE:

06-01-84 411 FAYETTEVILLE STREET APPLICANT:

CAROLINA POWER & LlGIT RALEIGI, NORN CAROLINA 27602 PLANT LOCATION:

NEW H ILL, NC

. IE REGION:

1i CORPORATE IMONE NO:

(919) 836-0663 AE:

EBASCO f6C LPN:

B. C. BUCKLEY NSSS:

WEST INGiOUSE lE PRINCIPAL INSPECTOR:

CONSTRUCTOR:

DANIEL INTERNATIONAL

-CONSTRUCTION:

REACTOR TYPE -

PWR

-TEST AND STARTUP:

DER (NWE):

900 IE RESIDENT INSPECTOR :

G. F. NAXWELL INSPECT 10N S T A T U S:

FUEL LOAD DATE CHANGES AS REPORTED BY UTILlTY:

Tite PERIOD REPORT NEW REASON FOR Oi ANGE REPORT BEG DATE Em DATE DATE S0iEDULE REPORTED BY UTILITY NLMBER OF INSP.

OF INSP.

05-07-75 06-01-83 REVISED CLRRENT ENERGY AW LOAD FORECAST.

09-08-80 06-00-84 LOWER RATE GROW 1H IN CUSTONER DENAND N AN FROJECTED.

12-16-81 12-00-84 LOWER RATE GROWN IN CUSTONER DENAPO N AN PROJECTED.

09-30-82 05-00-85 12-31-82 06-00-85 LOCAL PUBLIC DOCUNENT ROON:

WAKE COUNTY PUBLIC LilRARY 104 FAYETTEVILLE STREET RALElG1, NORM CAROLINA 27601 (9116PS A/ccc)

CONSTRUCTION STATUS REPORT

.PAGE NO.: 2 H ARRIS 1 NUCLEAR POWER PLANTS' STATUS AS OF: 3/31/84 C0NSTRUCT1ON STATUS:

APPLICANT'S CURRENT ESTIMATED FUEL LOADING DATE:

06-00-85 APPLICANT'S CONSTRUCTION COMPLET10N ESTIMATE AS APPLICANT.'S PREVIOUS ESTIMATED FUEL LOADlHG DATE:

12-00-84 DEFINED IN CP: (EARLIEST) 06/01/83 APPLICANT'S ESTIMATED FUEL LOADING DATE AT CP ISSUANCE:

09-00-80 (LATEST) 06/01/84 APPLICANT'S CtRRENT ESTIMATED C000eERQlAL OPERATION DATE: 03-00-86 CURRENT ESTIMATED PERCENT CONSTRUCTION COMPLETE: 84%

C000eENTS REGARDING CURRENT CONSTRUCTION STATUS:

ESTIMATED ACTUAL EST IM ATED ACTUAL ESTIMATED START START COMPLETION COMPLETlON

$ COMPLETE M081LIZE AfD PREPARE SITE:

01-14-74 01-14-74 01-28-78 01-28-78 1005 PLACE STRUCTtRAL CONCRETE:

01-28-78 01-28-78 05-01-84 995

  • lNSTALL REACTOR PRESStRE VESSEL:

12-01-79 04-15-80 04-01-80 08-29-80 1005 INSTALL LARGE BORE PROCESS PIPE:

04-01-79 04-01-79 08-01-84 92%

INSTALL LARGE BORE PIPE HANGERS, RESTRAINTS Ato SNUBBERS:

04-01-79 04-01-79 01-01-85 72%

INSTALL SMALL BORE PIPE:

04-01-79 04-01-79 08-01-84 93%

INSTALL CABLE TRAY 04-01-79 04-01-79 06-01-84 99%

INSTALL EXPOSED METAL CONDUlT:

04-01-79 04-01-79 01-01-85 92%

INSTALL POWER, CONTROL, INSTRUMENTATION Apu SECtRITY CABLE:

03-01-81 02-26-81 01-01-85 64%

INSTALL ELECTRICAL TERMINATIONS: (PQf ER AND CONTROL ONLY) 01-01-82 06-15-81 01-01-85 31%

CONDUCT REACTOR Col.D HYDROSTATIC TEST:

09-04-84 09-25-84 0%

CONDlCT HOT FUNCTIONAL TEST:

01-02-85 01-11-85 05 CONDUCT PREOP APO ACCEPTANCE TEST NECESSARY FOR FUEL LOAD:

06-01-83 03-24-83 06-01-85 0%

  • RPV set including CFON welding and upper and lower Internals alignment.

(9916PS A/ccc)