Forwards Updated Const Status Rept as of 840331
ML20127C772
Person / Time
Site: 05000000, Hope Creek
Issue date: 04/11/1984
From: Landrieu P
Public Service Enterprise Group
To: Hartfield R
NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
Shared Package
ML082170543 List: ... further results
References
FOIA-84-367 NUDOCS 8504120327
Download: ML20127C772 (3)


Text

O PS G Company Pubhc Service ElJctric and Gts i

80 Park Plaza, Newark, NJ 07101/ 201430-7000 MAILING ADDRESS / P.O. Box 570, Newark, NJ 07101 April 11, 1984 Mr. R. A.

Hartfield Chief, Management Information Branch Office of Resource Management United States Nuclear Regulatory Commission washington, D.C.

20555

Dear Mr. Hartfield:

HOPE CREEK GENERATING STATION UNIT NO. 1 DOCKET NO. 50-354 LICENSE NO. CPPR-120 CONSTRUCTION STATUS REPORT AS OF MARCH 31, 1984 Attached is the construction status report for Hope Creek Unit 1 statused as of March 31, 1984.

Very truly yours, LJ W r, n P.

R.

H.

Landrieu Project Manager - Hope Creek Engineering and Construction HPC:srd Attachments CC:

Mr.

L.

E. Tripp - IE, Region 1 M P 82 117/11 8504120327 840606 PDR FOIA KILLEFE84-367 PDR The Energy People 9MB42

CENEm0CTICN SrMUS EPCRP FIXIFAR EOfR PLANIS PAGE FO: 2-065 IEPE QHK 1 SEMtB AS T:

3/31/84 PIANr 01ARAOlmISTIG:

KEf PERSONEL:

[DO(Er to:

05000354 CDRPORME CINI:ACT:

T. J. MPRTIN - VIG PRESIDENr

. T PD. & DPfIE ISTED:

GR-120 11/04/74 G FXPIRMPICN DRIE:

12 3 DGIfEERI!G MO (INS'HUCTIN CDRPTNIE ADDRESS:

80 PAFK PUGA APPLICANT:

C SERVICE EIR2IRIC & GAS CD.

PUWF IIXATIW:

FORBK, NEW JH6EY 07101 IE IEGICN:

I G2eGWIE PfDE to:

(201) 430-8316 AE:

IE0f1TL NRC IPM:

D.WGER 10SS:

GENERAL IHCIRIC IE PRDCIPAL DEPECIDR:

CIN1RACIDR:

IB3frEL REACIDR TYPE:

IMt

-CINSIRUTION:

W. H. IWIENAN (RESIDENT IIEPECIOR)

DER (11E):

1067

'IEST MO SPARIUP:

IE IESIDENT INSPFr'inR:

IN5etLTim SrMUS:

EUEL IDAD DNIE OIANGES AS FEFTPED Bf UTILITI:

TDE PERIOD BEPmr PEN REA931 ECR OiAtCE DA'IE SCHEDULE BEEQtIED BY UrILITI aIX 1983 - SEPIDEER 1983 04-00-75 06-00-02 IE[AY IN WIRINDG STME T MW JEFSEY BEPmr EEG DPf1E EPO DPGE CDASIE AREAS 17CILITY PEEMIT.

tueER

& DEP.

& DEP.

05-00-76 12-00-82 REEVAIIRFICN T IHAY OUSED IE N. J.

83-18 12-05-83 01-08-84 CDASIE AREAS FPCILITI PEBMIT.

84-01 01-10-84 01-13-84 10-00-76 11-00-83 PE-EXAMDRFICN T 'DE EHORP FEQUIRED 'ID 84-02 01-09-84 02-20-84 84-03 01-20-84 01-20-84 CINSIRCr 'DE PLANT.

84-04 02-21-84 04-01-84 02-00-80 11-00-84

?O FEAKN GIVEN.

08-00-80 06-00-86 IDER '!HAN MirICIPMTD EIECIRICITI SAIES GOmi (INFINDED INEIATICN M ansSkNar 'IsEum m an6r.O 08-00-82 01-00-06

'INCErr FUEL IDAD DPfIE.

1 IOCPL REIC 00aMNr KIM:

SALEM EME PWLIC LIBRARY 112 EST If0AIMMY SAUM, NEW JERSEY 08079 l

M P6311/041-std

~

CGelSTRUCTION STATUS REPORT PAGE NO: 2-066 NUCLEAR POWER PLANTS

. HOPE CREEK 1 STATUS AS OF:

3/31/84 CONSTRUCTION STATUS:

APPLICANT 8S CURRENT ESTIMATED FUEL LOADING DATE:

01-00-86 APPLICANT'S PREVIOUS ESTIMATED FUEL LOADING OATE:

APPLICANTS CONSTRUCTION COMPLETION ESTIMATE AS 11-00-84 DEFINED IN CP:

(EARLIEST)

APPLICANT'S ESTIMATED FUEL LOADING DATE AT CP ISSUANCE:

06-00-81 APPLICANT'S CURRENT ESTIMATED COMMERCI AL OPERATION DATE:

'(LATEST)

.12-31-86 12-00-86 CURRENT ESTIMATED PERCENT CONSTRUCTION COMPl.ETE: '855.

(X)MMENTS REGARDING CURRENT CONSTRUCTION STATUS: NONE ESTIMATED ACTJAL ESTIMATED ACTUAL ESTIMATED START

'iART COMPLETION COMPLETION y COMPLETE MOBILIZE AND PREPARE SITE:

02/76 03/76 08/77 08/77 1005 PLACE STRUCTURAL CONCRETE (REACTOR BLDG. TO RPV PEDESTAL):

07/77 08/77 10/79 09/79 1005 INSTALL REACTOR PRESSURE VESSEL:

11/80-11/80 12/80 12/80 1005 lNSTALL LARGE BORE PROCESS PIPE:

04/79 04/79 10/84 965 lNSTALL LARGE BORE PIPE HANGERS, RESTRAI NTS, AND SNUBBERS:

04/79 04/79 06/85 8 35 INSTALL SMALL BORE PIPE:

12/81 07/81 12/84 8 05 INSTALL CABLE TRAY:

t 08/79 08/79 12/84 995 INSTALL EXPOSED METAL CONDUlt:

09/81 05/81 07/85 715 INSTALL POWER, CONTROL, INSTRUMENTATION, AND SECURl1Y CABLE:

02/83 11/82 09/85 495 INSTALL ELECTRICAL TERMINATIONS:

03/83 02/83 11/85 3 35 CONDUCT REACTOR CODE HYDROSTATIC TEST:

04/85 05/85 05 CONDUCT COLD FUNCTIONAL TEST:

12/85 12/85 05 CONOUCT PREOP AND ACCEPTANCE TESTS NECESSARY FOR FtlEL LOAD:

09/8 5 01/86 05 N P83 11/04 2-srd R

m

.