ML20127C723
Text
.
I Companyof NewHempeNro PUBLIC SERVICE m a stA m i,'. -
ONice:
1671 Worceder Road Fromingham, Mossochusetts 01701 (617). 372 - 8100 May 4, 1984 SEN-652 T.F. B4.4.2 United States Nuclear Regulatory Commission Washington, D. C.
20555 Attention:
Mr. R. A. Hartfield, Chief Management Information Branch Office of Management and Program Analysis
References:
(a) Construction Permits CPPR-135 and CPPR-136, Docket Nos. 50-443 and 50-444
Subject:
Construction Status Report: Seabrook Station Unit 1 and Unit 2
Dear Sir:
We have attached the Construction Status Report for the period ending March 31,1984.
Since the project schedule was under evaluation during the period, no changes are reflected in the construction milestones.
A temporary suspension of construction was announced on April 18, 1984 Our next quarterly report (April 1, 1984 to June 30, 1984) will further address these items.
Very truly yours, YANKEE A'IDMIC ELECTRIC COMPAhT John DeVincentis Engineering Manager Atomic Safety and Licensing Board Service List cc:
i 8504120282 840606 PDR FOIA KILLEFE84-367 PDR
CONSTRUCTION 5TATUS REF0RT PACE NO. 2-120 SEA 8R00E STATION 1 NUCLEAR F0WER FLANTS STATUS AS OF:.. :: 0;
.s-21-sy C0NSTRUCTION $ 7 A T U 5:
AFFLICANT'S CURRENT ESTIMATED FUEL LOADING DATE: 46-44 %
APPLICANIS CONSTRUCTION OMfFLETION ESTIMATE AS DEFINED IN f
AFFLICANT'S PREVIOUS ESTDtATED FUEL LOADING DATE:
N i=34-$Al CF2 (EARLIEST) February,1979 AFFLICANT'S ESTDfATED FUEL LOADING DATE AT CF ISSUANCE:
08-01-81 (LATEST) June, 1983*
AFFLICANT'S QJRRENT ESTIMATED CdMMERCIAL OPERATION DATT:
10 : O '. f CURRENT ESTIMATED PERCENT CONSTRUCTION CDMPETE: M (DMMEN15 RECARDING CIERENT (X)NSTRUCTION STATUS:
ESTIMATED AC111AL ESTIMATED AC1t!AL ESTIMATED START START CDMPLETION -
C)M P2 TION I CDMPLETE MOBILIZE AND FREFARE SITE:
7-76 8-77 100 I FLACE STRUCTURAL CXNICRETE:
9-77 8-83 99 I INSTALL REACTOR FRESSURE VESSEL:
5-81 5-81 100 I INSTALL LARCE BORE FROCESS FIFE:
10-79 7-84 8e Z U INSTALL LARCE BORE FIFE RANGERS, RESttAINIS, AND SNUBBERS:
10-79 8-84 JrZys/
INSTALL SDtALL BORE FIFE:
9-80 8-84
.etr I g INSTALL CABLE TRAY:
9-79' 12-83
'99 I INSTALL EIFOSED METAL CONDUIT:
4-79 7-84 99 I INSTALL 70WER, CDNTROL, INSTRtMENTATION, AND SEQIRITY CABLE:
5-81 7-84 erZ$Y INSTALL ELEC1RICAL TERMINATIONS:
6-81 8-84
& Z6$f CDNDUCT REACTOR CDLD BYD80 STATIC TEST:
4-84 4-84 02 CONDUCT NOT FUNCTIONAL TEST:
6-84 8-84 0Z CONDUCT PREOF AND ACCEPTANCE TESTS NECESSARY FOR FUEL LDAD:
11-82 9-84 5Z C Request for extension of construction permit latest construction completion dates submitted la Applicant Letter dated May 26, 1983 NRC approval pendinE.
9k Scubus hw bvm.uare t
-~
I i
C0N5TRUCTION 5TATU5 SEABROOK 1 t r. s REPORT PAGE N0: 2-100 NUCLEAR
- POWER ~ PLANT 5 STATUS A5 0F 0: !! !!
s e ~
.2<.21. Qq PLANT C H A R A,C T E,R,I,5 T_I C 5:
KEY P E R S O N H E L:
DOCKET MO:
05000443 QJ hgMNT AND CP NO. 8 DATE ISSUED: ;CPPR-135/ 07-07-76 CORPORATE CONTACT:
'J. C.
- e l i" "" CHIEF EXEC. OFFICER CP EXPIRATION DATE:
84~~ 3 0-8 3 *~
~
APPLICANT:
~
PUBL1C SERVICE OF NEW HAMP5 HIRE CORPORATE ADDRESS:
1000 ELM STREET PLANT LOCATIDM:
"It MI 5 OP PORT 5 MOUTH. NH MANCHESTER. NEW HAMPSHIRE 03105 IE REGION:
't CORPORATE PHDHE NO:
(603) 669-4000 AE U ITED ENG. 8 CONSTRUCTORS H555:
W STINCHOUSE CCHSTRUCTOR:
UNITED ENG.'8 CONSTRUCTORS NRC LPM:
REACTOR TYPE:
- i. _- "::L:: Y.Nf($$$
IE PROJECT INSPECTOR:
DER (MWE):
1198 IE RESIDENT INSPECTOR:
A. C. CERNE IN5PECTI0N 5 T A T U 58.
FUEL L0AD DATE CHAMCE5 TIME PERIOD h, % - f. _.
""2_'_.
": 2 MMICif $3I#f A,5 REPQRTED BY U T I L I T Y:
REPORT BEG DATE END DATE REPORT NEW REASON FOR CHANGE DATE SCHEDULE REPORTED BY UTILITY
!!t:MBJR '
0F.TNSP.
OF INSP.
09-06-77 09-01-82 DELAY 5 DUE TO EPA REVERSAL OF PREVIOUS W 5-04-82 0 6 ' * - Si 82-05 or-APPROVAL OF ONCE THROUGH CIRCULATING
- J,-06-82 WATER SYSTEM 8 SUBSEQ. NRC WITHDRAWAL OF
"?-::
c6-28-82 u vin CONST PERMIT. 8 TIME REQ TO REMOBILIZE 11-08-78 01-0t-83 SCHEDULE REEVALUATIDH.
04-04-81 11-30-83 SCHEDULE REEVALUATION.
Inspection Reports are available at local PORs.
- IO*II 3*30"IY SCMOUM R##VAWAUOM 13*lt st-N-33 ss-le t3 13 -11 p.gr.t3 ig-.g3 f3-20 iz P.7 it-et-R3 83 - 21 sz-st-ps 12-22-93 93 -22 iz-4-f3
/-20-fV tv-os
/-zs-py 3 -/2-99 L0C&L PUBLIC D0CUMENT R 0 0 M:
EXETER PUBLIC LIBRARY FRONT STREET EXEtER. NEW HAMPSHIRE 03883
& kHEbulG AGING kfEVALun7ED
C0NSTRUCTION $TATUS AEF0RT PAGE NO. 2-122 SEABROOK STATION 2 NUCLEAR F0WER FLANTS STATUS AS OF: !!
'^"2-3-31-9 9 C0NSTRUCTION 5 T A T U S:
AFFLICANT'S CURREltf ESTIMATED FUEL IAADIIC DATE:
NM AFFLICANTS CONSTRUCTION CDNP1ETION ESTIMATE AS DEFINED IN AFFLICANT'S PREYIOUS ESTIMATED FUEL LOADIIC DATE:
44 44-46 4-36*$'f CF: (EARLIEST) January,1981 APPLICANT'S ESTDIATED FUEL IAADIIC D4TE AT CF ISSUANCE:
10-01-83 (LATEST) Octobe r,1984*
APPLICANT'S GERENT EST1 MATED GNetERCIAL OPERATION DATE:
07 % 07 h CURRElff ESTDIATED PERCBIT CONSTRUCTION (XNIFIETE: avt GNSENTS RECARDIIIC GREENT GNISTEDCTION STATUS:
ESTIMATED ACTUAL ESTIMATED M ACTUAL ESTDtATED START STAltT (DMFtETION (DMFt2 TION I (DMPLETE 4
MotILIZE AND FREFARE SITE:
7-76 8-77 100 I FLACE STRUCTURAL (XWOLETE:
8-81 5-86 aeP 2H INSTALL REACTOE FRESSTRE YESSEL:
10-83 44-INSTALL LARCE BORE FROCESS FIFE p g.g de * /00 9-82 10-86 4I INSTALL IJECE BORE FIFE EAICERS, RESTEAINTS, AND SNUB 3ERS:
9-82 11-86
+23 INSTALL SMALL BORE PIPE:
7-84 10-86 0I IltSTALL CABLE TRAT:
1-84 1-86 0%
INSTALL EKFOSED NETAL CONDUIT:
4-84 9-86 0I INSTALL POWER, CDetTROL, INSTRIDIENIATIDW, AND SEGRITT CABLE:
9-84 9-86 02 INSTALL ELECTRICAL TEletIIILTICIIS:
10-84 10-86 0t OMIDUCT REACTOR CDLD NTDROSTATIC TEST:
11-86 12-86 0I (XNIDUCT NOT FUNCTIONAL TEST 1-87 2-87 0I (XINDUCT FREOF AltD ACCEPTANCE TESTS IEECESSART FOR FUEL LOAD:
3-85 11-86 0t cRegsest for estension of construction petutt latest construction completica dates submitted in Applicant 14tter dated May 26, 1983 NRC approval pendteg.
- Scudws hw #uvatun7sn
~.
CDH5TRUCTIOH 5TATU5 REPORT PAGE NO: 2-102 SECBROCK 2 HUCLEAR POWER PLANT 5 STATUS A5 0F
" i - ? " ' 'y 1.zi-t PLANT CHARACTERI5 TIC 5:
KEY PERS0NNEL k.I. N A4485cM DOCKET NO:
65000444 CORPORATE CONTACT:
U.
O.
'"it". PRESIDENT A NO ( M [
CP MO. 8 DATE ISSUED: CPPR-136/ 07-07-76 Ear #Curswd Opried4 CP EXPIRATION DATE:
10-31-84 CORPORATE ADDRESS:
1000 FLM STREET APPLICANT:
PUBLIC SERVICE OF HEW HAMPSHIRE NANCHESTER. NEW HAMP5 HIRE 03105 PLANT LOCATION:
lb MI 5 0F PORT 5 MOUTH. NH IE REGICM 1
CORPORATE PHONE HO:
(603) 669-4000 AE UNITED ENG. 8 CONSTRUCTORS H555:
' t' 5'.!S Y gNIS CONSTRUCTOR:
UNITED ENG. 8 CONSTRUCTOR 5 HRC LPM:
t.
REACTOR TYPE:
DER (MWE):
.5198 IE RESIDENT INSPECTOR:
A. C. CERNE IH5PECTION 5TATU5:
FUEL L0AD DAT E CHAHGE5 TIME PERIOD A5 REPORTED BY UTILITYa MM. NIN A ' -
22~--
I2 REPORT HEW REASON FOR CHANGE REPORT BEG DATE END DATE DATE REPORTED BY UTILITY NUMBER OF INSP.
OF INSP.
oi ;.
at-84-82 a'*: 00 -
09-01-84 DELAYS DUE TO EPA REVER$AL OF PREVIOUS 09-06-77 APPROVAL OF ONCE THROUGH CIRCULATING va-u6-82 us ;; :: _
WATER SYSTEM 8 SUB5EQ. NRC WITHDRAWAL OF CONST PERMIT. A TIME REQ TO REMOBILIZE 11-08-78 11-01-84 SCHEDULE REEVALUATION.
04-04-81 02-28-86 SCHEDULE REEVALUATION.
Inspection Reports are available at local PDRs.
pg gg,yg gg ggg g 13-N it-i4-33 ii _ ie _g3 G-20-83 4-30-8'? Scagouu gggywn y,og 93-IS I1-s-93 1-to-ty t3-16 ti-29-t3 12-1-93 14-0!
1-12-24 3 8 4 L0 CAL PUBLIC DDCUNENT R 0 0 Ms EXETER PUBLIC LIBRARY FRONT STREET EXETER. NEW HAMPSHIRE 03883 3
-% Senesute Eems REGYALUMED "1
m