Forwards Updated Const Status Repts as of 831231 for LaSalle Unit 2,Bryon Units 1 & 2 & Braidwood Units 1 & 2.Info for Inclusion in NUREG-0030
ML20127C674
Person / Time
Site: Byron, Braidwood, LaSalle, 05000000
Issue date: 01/30/1984
From: Peterson E
COMMONWEALTH EDISON CO.
To: Hartfield R
NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
Shared Package
ML082170543 List: ... further results
References
FOIA-84-367, RTR-NUREG-0030, RTR-NUREG-30 NUDOCS 8504120226
Download: ML20127C674 (5)


Text

.

. /'

'N Commonwealth Edison g

e,

/

_f 72 West Adams Street, Chicago, lihnois i

'D

'7 Address Reply to: Post Office Box 767

\\

/ Chicago lilinois 60690 January 30,198h Mr. R. H. Hartfield, Chief Management Information Branch Office of. Management and Program Analysis U.S. Nuclear' Regulatory Commission Washington, D.C.

20555

Dear Mr. Hartfield:

SUBJECT:

CONSTRUCTION STATUS REPORT (NUREG-0030) (YELLOW BOOK)

Attached is the construction status data as of December.31, 1983, for the following Commonwealth Edison Nuclear Power Plants:

LaSalle Unit 2 Byron Unit 1 & 2 Braidwood Unit 1 & 2 If you have any questions or comments concerning this information, please call me on (312) 294-8221.

0-

k. I te n

Director Project Scheduling and Cost Control

-Attachment-CDP / cam cc:

J. S. Able B. Thomas /C. Reed R. H. Holyoak J. J. Maley D. L. Farrar V. I. Schlosser/R. P. Tuetken j

J.'G. Keppler (NRC) (h)

M. J. Wallace 940606 6

PDR

-367

\\

_ -_.-~. -

1 C0N5TRUCTION 5-TATU5 REP 0RT

'PAGE NO 2-seS BRAIDWOOD 1 NUCLEAR POWER PLANT 5 STATUS A5 0F 12-31-83.

PLANT CHARACTERI5 TIC 5:

KEY PER50NNELa DOCKET NO:

e5ese456 CORPORATE CONTACT:

C. REED, VICE PRESIDENT CP Ho. 8 DATE ISSUED: CPR-132 / 12-31-75

'CP EXPIRATION DATE:

Il-st-82 CORPORATE ADDRESS P. O. 80X 767 APPLICANT COMMONWEALTH EDISON CHICAGO. ILLINOIS 6e69e PLANT LOCATION:

24 MI 55W OF JOLIET, ILL IE REGION:

3 CORPORATE PHONE N08 (382) 294-3121 AEr SARGENT a LUNDY M555:

WESTINGHOUSE CONSTRUCTOR:

COMMONWEALTH EDISON HRC LPM K. K!PER REACTOR TYPE 8 PWR IE PROJECT INSPECTOR:

H. Torch DER (MWE): -

st2e IE RESIDENT INSPECTOR:

L. MC GREGOR INSPECTION 5 T A T U S:

FUEL LOAD DATE CHANGES TIME PERIOD-A5 REP 0RTED 5Y U T I L I T Y8 OCT, 1983 - DEC, 1983 REPORT NEW REASON FOR CHANGE REPORT BEG DATE END DATE DATE SCHEDULE REPORTED BY UTILITY

' NUMBER OF INSP.

OF INSP.

.e1-es-se e4-se-82 POST TMI NRC LICENSING SIDWDOWN NOT AVAILABLE es-14-se e4-se-a3 DEL AY DUE 10 FIN ANCI AL CON 51 DER ATIONS.

ls9-15-se at-es-a5 FINANCIAL CONSTRAINTS AND HEALLOCATI01 Inspection Reports are avalIable at local PDRs.

OF ENGINEERING RESOURCES TO OPERATING PLANT TMI RELATED ITEMS.

01/30/84 08-85 SCHEDULE R8 ASSESSMENT.

T

[

L0 CAL PUSL IC D 0 C U M E N T.

R00M WILMINGTCH TOWNSHIP PUsLIC LIBRARY 2el 5. KANKAKEE STREET WILMINGTON. ILLINDIS 6e481 i

8 C

I C0N5TRUCTION ~ 5TATU$

REPORT PAGE Not 2-000 BRAIDWOOD 1 NUCLEAR POWER PLANT 5 STATUS A5 0F 12-31-83 C 0 N 5 T.R U C T I O N 5TATU58 08-00-85 APPLICANT'S CURRENT ESTIMATED FUEL LOADING DATE:

04-00-85 APPLICANTS CONSTRUCTION COMPLETI0H ESTIMATE A5 APPLICANT'S PREVIOUS ESTIMATED FUEL LOADING DATES DEFINED IN CP: (EARLIEST).st-et-80 AP*LICANT'S ESTIMATED FUEL LOADING DATE AT CP ISSUANCE:

05-00-81 (LATEST 3- '04-30-87 APPLICANT'S CUR 5 TENT ESTIMATED COMMERCIAL OPERATION DATE: 04-00-86 CtsRRENT ESTIMATED PERCENT CONSTRUCTION COMPLETE: 70%

I COMMENTS REGARDING CURRENT CONSTRUCTION STATUS

  • ESTIMATED ACTUAL ESTIMATED ACTUAL ESTINATED 5iART START COMPIEiTON gnME Q10J 3_[0f1PLETE i

M051LIZE AND PREPARE SITE:

08-00-75 03-00-76 100%

PLACE STRUCTURAL CONCRETE:

03-00-76 11-82' 100%

INSTALL' REACTOR PRESSURE VESSEL 8 04-00-79 04-00-79 100%

INSTALL LAPGE BORE PROCESS PIPE:

04-00-76 05-84

-95%-

INSTALL LARGE BORE PIPE NANGERS RESTRAINTS AND SHUBBER$t 08-00-77 03-85 50%

08-00-76 11-84 72%

INSTALL SMALL BORE PIPE:

INSTALL CAOLE 12AY8 12-00-76 10-82 100%

l' INSTALL EXPOSED METAL CONDUIT

  • 08-00-78 07-84 81%

INSTALL POWER. CONTROL.: INSTRUMENTATION AND SECURITY CABLE:

11-00-78 03-85 68%

INSTALL ELECTRICAL TERMINATION 58 11-00-78 04-85 55%

CONDUCT REACTOR COLD HYDROSTATIC TEST:

07-83 07-83 100%

CONDUCT NOT FUNCTIONAL TEST:

03-85 03-85 0*

CONDUCT PREOP AND ACCEPTANCE TESTS HECESSARY FOR FUEL LOAD:

06-83 06-85 5%

e i

C0N5TRUCTION 5TATUS REP 0RT PAGE NO: 2-ete BRAIDWOOD 2 NUCLEAR P0WER PLANT 5 STATUS A5 0F 12-31-83 PLANT CHARACTERI5 TIC 5 KEY PER$0NNELa DOCKET hos e5ese457 CORPORATE CONTACT:

C. REED, VICE PRESIDENT CP NO. 8 DATE ISSUED: CPR-133 / 12-31-75

.CP EXPIRATION DATE:

fl-st-83 CORPORATE ADDRESS:

P. G. 80X 767 APPLICANT:

COMMONWEALTH EDISON CHICAGO. ILLINGIS 6e69e PLANT tcCATION:

24 MI 55W OF JOLIET, ILL IE REGION:

3 CORPORATE PHONE NO:

(312) 294-3121 AE

- S ARGENT

COMMONWEALTH EDISON NRC LPM:

K. KIPER REACTOR TYPE:

PWR IE PROJECT INSPECTOR:

R. Lerch DER (MWE):

112e IE RESIDENT INSPECTOR:

L. MC GRCGOR IN5PECTION 5TATU5:

FUEL L0AD D A T E 't H A N G E 5

. TIME PERIOD A5 REPORTED EY UTILITY OCT, 1983 - DEC, 1983 REPORT HEW REASON FOR CHANGE

^

REPORT BEG DATE END DATE DATE SCHEDULE REPORTED BY UTTLTTY NUMBER OF INSP.

OF INSP.

es-e8-Se e4-se-83 POST TMI NRC LICENCING SII)WDOWN NOT AVAILABLE

'es-84-Se e4-se-84 DELAY DUE TO FINANCIAL CONSIDERATIONS.

09-15-8e at-se-86 FINANCIAL CONSTRAINTS AND REALLOCA-Inspection Reports are available at local PDRs.

TION 0F ENGINEERING RESOURCES TO OPERATTNG PLANT TMI RELATED ITEMS, 01/30/84 08-86 SCHEDULE REASSESSMENT.

L0 CAL PUBLIC D0CUMENT R00M WILMINGTON TOWH5 HIP PUBLIC LIBRARY 2e1 5. KANKAKEE STREET WILMINGTCH. ILLINDIS 6e481 f

~..

=

,. - ~..

~...... -.

W o

u e

C0N5TRUCTION 5-T A T U $ ;R E P 0'R T PAGE NO '2-ell BRAIDWOOD 2 N U C L E A.R P0WER P L.A N T 5 STATUS.A5 0F 12-31-83 C0N5TRUCTION 5 T A T U 5:

APPLICANT'S CURRENT ESTIMATED FUEL LDADING DATE:

~ ~

APPLICANTS CONSTRUCTION COMPLETION ESTIMATE'A5

~

APPLICANT'S PREVIOUS E5TIMATED FUEL LOADING DATE:

04-00-86 DEFINED IN CPt (EARLIEST) 11-01-a1 APPLICANT'S ESTIMATED FUEL LOADING DATE AT CP ISSUANCE:

05-80-42 (LATEST) 04-30-88 APPLICANT'S CURRENT ESTIMATED COMMERCIAL OPERATION DATE8 04-00-87

' -5h%

, CURRENT ESTIMATED PERCENT CONSTRUCTION COMPLETE:

COMMENTS REGARDING CURRENT CONSTRUCTION STATUS ESTIMATED ACTUAL ESTIMATED ACTUAL ESTIMATED START 111R1 COMPtETION

$0fPJf U p3 3_[0MPtFIE l

, MOBILIZE AND PREPARE SITE 8 es-ce-75 03-es-76 100%

PLACE STRUCTURAL CONCRETE:

85-se-76 11-82 100%

l INSTALL REACTOR PRE 55URE VE55ELt 11-se 11-se-80 toex j

IM5 TALL LARGE BORE PROCESS PIPE 8 85-00-76 03-85 43%

l INSTALL LARGE BORE PIPE MANGERS. RESTRAINTS AND SNUseERS:

Sa-se-77

'04-86 19%

l INSTALL SMALL 80RE PIPE:

08-00-76 11-85 17%

INSTALL CABLE TRAY 8 12-00-76 08-84 78%

INSTALL EXPOSED METAL CONDUIT 8 01-00-7,-

07-85 28%

+

INSTALL POWER, CONTROL.-INSTRUMENTATION AND SECURITY CAeLE8 12-es-7a 03-86 13%

INSTALL ELECTRICAL-TERMINATIONS:

32-se-74 04-86 9%

j CONDUCT REACTOR COLD HYDROSTATIC TEST 8 09-84 09-84 ex CONDUCT NOT' FUNCTIONAL TEST:

09-85 09-85 ex CONDUCT-PRE 0P AND ACCEPTANCE TESTS MECESSARY FOR FUEL LOAD:

08-84 e4-se-a6 ex 3

+

1 4

.-