Forwards Util Transmitting Info Re SER Open Items Which Will Not Be Completed by Core Load.Supplemental SER Input Requested by 820625
ML20127A175
Person / Time
Site: 05000000, Saint Lucie
Issue date: 06/02/1982
From: Tedesco R
Office of Nuclear Reactor Regulation
To: Speis T
Office of Nuclear Reactor Regulation
Shared Package
ML082170543 List: ... further results
References
FOIA-84-367 NUDOCS 8206110346
Download: ML20127A175 (1)


Text

.

. /p u%'o

.a n UNITED STATES

/M # #

g/

Y i. ~ 'I,}g NUCLEAR REGULATORY COMMISSION fy' g p** f ) '

' ~

f

.~

B '.

WASHINGTON. D. C. 20555 V

f dh#

\\..v /

.F, g JUN 2 1982 S&W MEMORANDUM FOR: Themis P. Spets, Assistant Director for Reactor Safety, DSI William V. Johnston, Assistant Director for Materials & Qualification Engineering, DE Hugh L. -Thompson, Acting Director Division of Human Factors Safety Wayne Houston, Assistant Director for Radiation Protection, DSI Lester R. Rubenstein, Assistant Director-

' i for Core & Plant Systems James P. Knight, Assistant Director for Components & Structures Engineering, DE George W. McCorkle, Chief Power Reactor Safeguards Licensing Branch, NMSS FROM:'

Robert L. Tedesco, Assistant Director for Licensing Division of Licensing

SUBJECT:

ST. LUCIE 2 ENGINEERING & CONSTRUCTION ITEMS THAT ARE NOT EXPECTED TO.BE COMPLETED BY CORE-LOAD Attached is a Florida Power & Light (FP&L) letter providing information on FP&L open items that will not be completed by_ core load.

For several of the items, FP&L is requesting relief and providing the justification for the relief.

' For some of the other items. FP&L has reiterated their understanding of the agreed to schedule beyond core load. These latter items have been documented I

in the SER.

Cognizant Branches as well as expected completion dated (ECD) are noted in the margins _ of the attached. letter.

Please review the FP&L position and formally provide the St. Lucie 2 Project Manager an input-for the next SSER by June 25, 1982. The input should indicate the-acceptability (or the unacceptability) of the FP&L proposed schedule and the basis for the staff's position.

For-those FP&L reiterated items please fonnally confirm the agreed to schedule.

W% '*

Robert L. Tedesco, Assistant Director for Licensing Division of Licensing i

l i

Attachment:

As stated-j.g

  • ~

g (, g ? W-yp J

km