.F, g JUN 2 1982 S&W MEMORANDUM FOR: Themis P. Spets, Assistant Director for Reactor Safety, DSI William V. Johnston, Assistant Director for Materials & Qualification Engineering, DE Hugh L. -Thompson, Acting Director Division of Human Factors Safety Wayne Houston, Assistant Director for Radiation Protection, DSI Lester R. Rubenstein, Assistant Director-
' i for Core & Plant Systems James P. Knight, Assistant Director for Components & Structures Engineering, DE George W. McCorkle, Chief Power Reactor Safeguards Licensing Branch, NMSS FROM:'
Robert L. Tedesco, Assistant Director for Licensing Division of Licensing
SUBJECT:
ST. LUCIE 2 ENGINEERING & CONSTRUCTION ITEMS THAT ARE NOT EXPECTED TO.BE COMPLETED BY CORE-LOAD Attached is a Florida Power & Light (FP&L) letter providing information on FP&L open items that will not be completed by_ core load.
For several of the items, FP&L is requesting relief and providing the justification for the relief.
' For some of the other items. FP&L has reiterated their understanding of the agreed to schedule beyond core load. These latter items have been documented I
in the SER.
Cognizant Branches as well as expected completion dated (ECD) are noted in the margins _ of the attached. letter.
Please review the FP&L position and formally provide the St. Lucie 2 Project Manager an input-for the next SSER by June 25, 1982. The input should indicate the-acceptability (or the unacceptability) of the FP&L proposed schedule and the basis for the staff's position.
For-those FP&L reiterated items please fonnally confirm the agreed to schedule.