ML20115A896
Text
- - - -.
......u
,..a 1
The Light MmPuy neestee tis ties & re er e.o.8ex i7oo neestee. rex s 77ooi <7is> 228 92ii a
October 31, 1983 ST-HL-AE-1021 File Number: G25 0
R. A. Hartfield, Chief Management Information Branch Office of Management and Program Analysis U. S. Nuclear Regulatory Commission Washington, D.C.
20555
Dear Mr. Hartfield:
South Texas Project Units 1 & 2 Docket Nos. STN 50-498, STN 50-499 Update to Construction Status Report Houston Lighting & Power Company has reviewed the entries for the South Texas Project in NUREG 0030, " Construction Status Report" dated October 1982.
The reports for December 1982, March 1983, June 1983 and September 1983 have not been received. Attached are annotated ::orrected copies of those pages from the October 1982 report which require changes to update NUREG 0030 through the third quarter of 1983.
If you have any questions, please call Mr. Michael E. Powell at (713) 993-1328.
7 Very truly yours, k.
Yd' J. H. Goldberg Vice President Nuclear Engineering & Construction SSR/cim Attachment kR4lh8840606 KILLEFE84-367 PDR
~. -.
-~-
a-u -. = - - -
" - ~ ~ = = - ~
s, li
-.1 l1 1
October 31, 1983 T
cc:
G. W. Oprea, Jr.-
ST-HL-AE-1021 J. H. Goldberg File Number: G25 l
J. G. Dewease Page'2 J. D. Parsons 1-D. G. Barker C_
M. R. Wisenburg j
R. A. Frazar-
- L "J. W. Williams d
R. J.'.Maroni
^
J. E._ Geiger S. M.~ Dew i
J.1T.-Collins A. Vietti D. P. Tomlinson N. D. Schwarz j_
R._Gordon Gooch _
(Baker & Botts)
(Baker & Botts) f J. R. Newman (Lowenstein, Newman, Reis, & Axelrad)
.STP.RMS-Director, Office of Inspection '& Enforcement Nuclear. Regulatory Commission Washington, D. C. 20555' E. R. Brooks /R. L. Range Charles Bechhoefer, Esquire jCentral Power & Light Company Chairman, Atomic. Safety & Licensing Board P. O.-Box 2121 U. S. Nuclear Regulatory'Comission Corpus Christi, Texas 78403 Washington, D._C.
20555 i
H.'L. Peterson/G. Pokorny Dr. James C. Lamb, III' City of Austin
-313 Woodhaven Road P. O. Box 1088 Chapel Hill, North Carolina 27514 Austin, Texas 78767
.J. B. Poston/A. vonRosenberg Mr. Ernest E. Hill City Public Service Board Lawrence'Livermore Laboratory P. O. Box 1771 University of California San Antonio, Texas 78296 P. O. Box 808, L-46 h
Livermore, California 94550 Brian E. Berwick, Esquire William S. Jordan, III Assistant Attorney General Harmon & Weiss e
for the State of Texas 1725~I Street, N. W.
P. O.': Box 12543 Suite 506 Capitol Station Washington, D. C.
20006
Lanny Sinkin Citizens for Equitable Utilities,.Inc.
Citizens Concerned About Nuclear Power c/o Ms. Peggy Buchorn m
'~114 W. 7th.. Suite 220 Route 1, Box 1684 l
Austin, Texas! 78701 Brazoria, Texas 77422 Robert G. Perlis. Esquire-Hearing Attorney Office of the Executive Legal Director U. S. Nuclear. Regulatory Comission
~
ij Washington,;D. C.
20555
-Revision Date 10-10-83 i
3s 4:y
~
m
.. u,.
4 C0NSTRUCTION STATUS REPORT PAGE N08 2-106 SOUTH TEXAS 1 NUCLEAR POWER PLANTS STATUS AS OF8 I~$
PLANT CNARACTERIS) I C 58 KEY P E R S 0 N N E L8 DOCRET N08 05000494 CORPORATE CONTACT 8 J. N. GOLDBERG VICE PRESIDENT 4"
CP No. O DATE ISSUED 8 CPPR-128/ 12-22-7 NUCLEAR ENGINEERING 8 CONSTRUCTION i:
1 CP EXPIRATION DATE8 99-tviHP (2 i CORPORATE ADDRESS 8 P. O. 30X 1700 j
APPLICANT 8 NOUSTON LIGHTING DWER COMPANY f
NOUSTON. TEXAS 77001 PLANT LOCATION 8 12 MI SSW Of SAY CITY. TEX IE REGION 8 4
CORPORATE PHONE Not (713) 446-3424
- i.
l:
.AE8 BECHTEL MS$58 WESTINGNOUSE' CONSTRUCTOR 8' ERASCO NRC LPM 8
- 3. ^;iii [k. \\l l E I~I I I
REACTOR TYPE 8 PWR IE PROJECT INSPECTOR 8 DER (MWO s
$250 IE RESIDENT INSPECTOR 8
- 0. ;;;;L - D,"T*O ML\\N W i '
INSPECTION S T A T U 58
. FUEL L0AD DATE CHANGES
- l TIME PERIOD' AS REPORTED 5Y U T I L'I T V8
~
Anr. 1982 - Jun. 1982 REPORT NEW REASON FOR CHANGE REPORT BEG DATE END DATE DATE SCHEDULE Rff0RTED BY UTILITY NUM0ER OF INSP.
OF.INSP.
10-3A-74 11-00-81 SCHEDULE REEVALUATION.
j-8205 03-30-82 04-02-82 01-88-80 09-00-83 SCHEDULE REEVALUATION.
i ij 8206 04-12-82 04-23-82 08-05-82 12-00-86 CHANGE IN A/E AND CONSTRUCTOR.
i 5207 04-08-82 04-08-82 i
8288 04-08-82 04-30-82 8209 05-01-82 05-38-82 1
s 1-Inspection reports are available at local PDRs.
t i
t l
- 1
~
L0 CAL PUBLIC D0CUMENT R 0 0 M8 MATAGORDA COUNTY LAW LIBRARY P. O. BOX 487 i
BAY CITY. TEXAS 77414 4 i 4
I
{.I 4.
}
i;wa t
s s,
.. o s.
t.
.I,
i C0NSTRUCTION STATUS REP 0RT PAGE No 2-107 SOUTH TEXAS S NUCLEAR POWER PLANTS STATUS AS OFs C0NSTRUCTION S T A T U St APPLICANT'S CURRENT ESTIMATED FUEL LOADING DATE:
12-08-86 APPLICANTS CONSTRUCTION COMPLETION TIMATE AS APPLICANT'S PREVIOUS ESTIMATED FUEL LOADING DATE:
09-08-85 DEFINED IN CPt (EARLIEST) a,
!?. ~ik t -
I?_ "E l g1 APPLICANT'S ESTIMATED FUEL LOADING DATE AT CP ISSUANCE:
05-81-80 (LATEST)
APPLICANT'S CURRENT ESTIMATED COMrtERCIAL OPERATION DATE 06-08-87 i
CURRENT ESTIMATED PERCENT CONSTRUCTION COMPLETE: 6 4'7.6 % ( P m e Blo & )
93,6 BOP) i C0fW9ENTS REGARDINO CURRENT CONSTRUCTION STATUS 6hiti%M co ti104 8 M KTcRED tb%ht.h i
b'd's %%e442,n15 Noc.k ploS bOM.
C4 ESTIMATED ACTUAL ESTIMATED ACTUAL ESTIMATED START
$1A E COMPL ETI0lf LINELERQg LC9etPLETE MusILIZE AND PREPARE SITE:
89-80-i5 12-00-75 test PLACE STRUCTURAL CONCRETE:
84-00-76
-4th-l h INSTALL REACTOR PRESSURE VESSEL:
99-90-79 09-90-79 teelt
{'
I INSTALL LARGE BORE PROCESS PIPE 8 10-00-78 bW
-464-6 5 '
INSTALL LARGE BORE PIPE MANGERS, RESTRAINTS AND SNUBBERS 8 10-00-78 N -Y_
1tt- $
INSTALL SMALL BORE PIPET 10-00-78
-k-
-904- ~h '
i 10-08-78 WY INSTALL CABLE TRAY 8 464.- M '
l INSTALL EXPOSED METAL CONDUIT 3
- bN..,
-ett-30 '
INSTALL P064ER, CONTROL, ICTRUttENTATION AND SECURITY CABLE 8 MdC WOO M Y
4 02.'
f INSTALL ELECTRICAL 7ERMIti4 MONS 8
- b NN~h 464.o l "
CONDUCT REACTOR COLD NYDR0 STATIC TEST 8 86-80-86 Yh NA CONDUCT NOT FUNCTIONAL TEST 8 89-09-86 kY NA j
CONDUCT PREOP AND ACCEPTANCE TESTS NECESSARY FOR FUEL LOAD 8 12-08-84 12-88-86 NA 1
l i-i i
i 1
4 h.
I l
4 1
1 i
c 2
6
,, T 7,,:" ;,., _..,
,_,1
-... ~ -
l I
{
h;
.g
[;
C0N5TRUCTION 5TATU5 REPORT.
PAGE N0s.2-198 I,
c@ -p^ ^@
' I:
SOUTH TEXA5 2 NUCLEAR POWER PLANT 5 STATUS A5 0F8
^
l' i
PLANT CNARACTERI5TICSt KEY P E R 5 0 N N E L8 DOCKET N08 05009499 CORPORATE CONTACT:
J. H. GOLDOERG. VICE PRESIDENT CP MO. 8-DATE ISSUED:
CPPR-129/'t2-22-75 NUCLEAR ENGINEERING S CC~'5TRUCTION CP EXPIRATION DATE:
- ;; 31-BS CORPORATE ADDRES$8 P. O. BOX 1788 APPL I C.th i t HOU5 TON LIGHTING S POWER COMPANY NOUSTON, TEXA5 77081 PLANT LOCATION:
12 MI 55W 0F BAY CITY, TEX IE REGION:
4 CORPORATE PHONE N0s (713) 486-3828 i
j AEs-BECHTEL M555:
WESTINGHOUSE CONSTRUCTOR 8 EBASCO NRC LPM 8 G. LZiis f\\. '41 E ?II I REACIOR TYPE:
^PWR IE PROJECT INSPECTOR:
DER (f1WE):
1250 IE RESIDENT INSPECTOR:
- e. i;;;;
(), "ftggvg gg gg gj3,4 I N 5 P E C T I O H 5 T A T U 5:
FUEL L0AD DATE CHAN6E5 TIME PERIOD A5 REPORTED BY UTILITYs Anr. 1982 - Jun. 1982 REPORT NEW REASON FOR CHANGE REPORT BEG DATE END DATE
'DATE SCHEDULE RFPORTED BY UTILITY HUN 5Et OF INSP.
OF INSPm i
18-30-78 11-00-82 SCHEDULE REEVALUATION.
1
,8285 03-38-82 04-02-82 01-18-88 09-00-85 SCHEDULE REEVALUATION.
8206 04-12-82 04-23-82 88-05-82 12-08-88 CHANGE IN A/E AND CONSTRUCTOR.
I 8207 04-05-82 04-08-82 3208 04-08-82 04-30-82 l
l 1
8209 05-01-82 85-31-82 k
' l Inspection reports are available at local PDRs.
e 1 l-
! I i!
i t.1 4 i L 0 C A L -P U 5 L I C D0CUMENT R 0 0 M8 l'
MATACORDA COUNTY LAW LIBRARY P. O. BOX 487 I
BAY CITY, TEXA5 77434 af i
il n
!1 4
fi 11 44
,ng, _
t:o E
i C0NSTRUCTION STATUS REPORT PAGE Nes 2-109 STATUS AS OFs 06. ~$.Q..83 l
SOUTH TEXAS 2 NUCLEAR POWER PLANTS l
CONSTRUCTION 5TATUS:
i APPLICANT'S CURRENT ESTIMATED FUEL LOADING DATE:
12-08-88 APPLICANTS CONSTRUCTION COMPLET!O STIMATE AS f
.j APPLICANT'S PREVIOUS ESTIMATED FUEL LOADING DATE 09-08-85 DEFINED IN cps (EARLIEST) W.-3l-APPLICANT'S ESTIMATED FUEL LOADING DATE AT CP ISSUANCE:
88-88-81 (LATEST) gg gg gg APPLICANT'S CURRENT ESTIMATED C0rW1ERCIAL OPERATION DATE 86-04-49 I
I
^
CURRENT ESTIMATED PERCENT-CONSTRUCTION COMPLETE: les D.IDo C0fRtENTS REGARDING CURRENT CONSTRUCTION STATUS Esy;4a1..R".0" %dion edPee"f y'pp g C
";/ ^. r ;;0" " "
9 (Effd$dr1h3 j'>ddW OY M e
ESTIMATED ACTUAL ESTIMATED ACTUAL ESTIMATED START 1L4E COMPLETION COMPLETI3N X COMPLETE MOBILIZE AND PREPARE SITE:
09-08-15 82-00-75 test 4
i PLACE STRUCTURAL CONCRITE:
83-00-77 k Y.
-40468 09-co-M 1
INSTALL REACTOR PRES $URE VESSEL:
89-08-84' MA I
INSTALL L ARGE BORE PROCESS PIPE:
DN OB-Co-Q~d N'$'
.cse G
}
INSTALL LARGE BORE PIPE MANGERS. RESTRAINTS AND SMUBBER$s et-ee-es o7-oo 43 YF.@
-ne og 11 -o0-@?_ Sf *b_h i
INSTALL SMALL SORE PIPE:
14-99-et
-86 4 - O \\
12.-00-82, f: 7h INSTALL CABLE TRAYS e9-04-65
.gga, g)
INSTALL EXPOSED METAL CONDUIT
-*.'-et-es o3-00-19
-e
.cse.lg
~
INSTALL POWER CONTROL, INSTRuttENTATION AND SECURITY CABLE:
12-08-85 MA q $. 0; e %,
to -
INSTALL ELECTRICAL TERMINATIONS:
10-80-8 NA c6-co CONDUCT REACTOR COLD HYDROSTATIC TEST 06-08-88
- 0:
NA CN -M.. -M""
i' CONDUCT HOT FUNCTIONAL TEST:
89-90-88 0;
NA
)j CONDUCT PREOP AND ACCEPTANCE TESTS NECESSARY FOR FUEL LOAD 12-90-86 12-08-84 NA
- i c
j.'
e
,4 i 'I i )
i N
l l
.