Category:MONTHLY OPERATING ANALYSIS REPORT
MONTHYEARNOC-AE-000676, Monthly Operating Repts for Sept 1999 for South Texas Project,Units 1 & 2.With1999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for South Texas Project,Units 1 & 2.With NOC-AE-000643, Monthly Operating Repts for Aug 1999 for South Texas Project,Units 1 & 2.With1999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for South Texas Project,Units 1 & 2.With ML20210R3631999-07-31031 July 1999 Monthly Operating Repts for July 1999 for South Tx Project, Units 1 & 2.With NOC-AE-000593, Monthly Operating Repts for June 1999 for Stp,Units 1 & 2. with1999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Stp,Units 1 & 2. with NOC-AE-000563, Monthly Operating Repts for May 1999 for Stp,Units 1 & 2. with1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Stp,Units 1 & 2. with NOC-AE-000543, Monthly Operating Repts for Apr 1999 for Stp,Units 1 & 2. with1999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Stp,Units 1 & 2. with NOC-AE-000507, Monthly Operating Repts for Mar 1999 for Stp,Units 1 & 2. with1999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Stp,Units 1 & 2. with NOC-AE-000468, Monthly Operating Repts for Feb 1999 for South Texas Project Electric Generating Station.With1999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for South Texas Project Electric Generating Station.With NOC-AE-000403, Monthly Operating Repts for Dec 1998 for South Texas Project Unit 1 & 2.With1998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for South Texas Project Unit 1 & 2.With NOC-AE-000385, Monthly Operating Repts for Nov 1998 for Stp,Units 1 & 2. with1998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Stp,Units 1 & 2. with NOC-AE-000357, Monthly Operating Repts for Oct 1998 for STP Electric Generating Station,Units 1 & 2.With1998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for STP Electric Generating Station,Units 1 & 2.With NOC-AE-000329, Monthly Operating Repts for Sept 1998 for Stp,Units 1 & 2. with1998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Stp,Units 1 & 2. with NOC-AE-000296, Monthly Operating Repts for Aug 1998 for South Texas Project,Units 1 & 2.With1998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for South Texas Project,Units 1 & 2.With NOC-AE-000256, Monthly Operating Repts for July 1998 for STP Electric Generating Station,Units 1 & 21998-07-31031 July 1998 Monthly Operating Repts for July 1998 for STP Electric Generating Station,Units 1 & 2 NOC-AE-000233, Monthly Operating Repts for June 1998 for Stp,Units 1 & 21998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Stp,Units 1 & 2 NOC-AE-000202, Monthly Operating Repts for May 1998 for South Tx Project Electric Generating Station,Units 1 & 21998-05-31031 May 1998 Monthly Operating Repts for May 1998 for South Tx Project Electric Generating Station,Units 1 & 2 NOC-AE-000172, Monthly Operating Repts for Apr 1998 for South Texas Project Units 1 & 21998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for South Texas Project Units 1 & 2 ML20216G4911998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for South Texas Project,Units 1 & 2 NOC-AE-000108, Monthly Operating Repts for Feb 1998 for South Texas Project Electric Generating Station,Units 1 & 21998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for South Texas Project Electric Generating Station,Units 1 & 2 NOC-AE-000090, Monthly Operating Repts for Jan 1998 for South Tx Project, Units 1 & 21998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for South Tx Project, Units 1 & 2 NOC-AE-000061, Monthly Operating Repts for Dec 1997 for South Texas Project Electric Generating Station1997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for South Texas Project Electric Generating Station NOC-AE-000039, Monthly Operating Repts for Nov 1997 for South Texas Project Units 1 & 21997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for South Texas Project Units 1 & 2 ML20199K0571997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for South Texas Project Unit 1 & 2 ML20198J9221997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for South Texas Project,Units 1 & 2 ML20216H9651997-08-31031 August 1997 Monthly Operating Repts for Aug 1997 for South Texas Project Electric Generating Station,Units 1 & 2 ML20210K5201997-07-31031 July 1997 Monthly Operating Repts for July 1997 for STP ML20141H3041997-06-30030 June 1997 Monthly Operating Repts for June 1997 for South Tx Project, Units 1 & 2 ML20148K5871997-05-31031 May 1997 Monthly Operating Repts for May 1997 for South Texas Project Electric Generating Station Units 1 & 2 ML20141G2841997-04-30030 April 1997 Monthly Operating Repts for Apr 1997 for South Texas Project Electric Generating Station Units 1 & 2 ML20137X5811997-03-31031 March 1997 Monthly Operating Repts for Mar 1997 for South Tx Project Units 1 & 2 ML20137X6011997-02-28028 February 1997 Revised Monthly Operating Rept for Feb 1997 for South Tx Project Unit 2 ML20137B3981997-02-28028 February 1997 Monthly Operating Repts for Feb 1997 for STP ML20134M7421997-01-31031 January 1997 Monthly Operating Repts for Jan 1997 for South Texas Project Electric Generating Station,Units 1 & 2 ML20133P3191996-12-31031 December 1996 Monthly Operating Repts for Dec 1996 for South Texas Project Electric Generating Station,Units 1 & 2 ML20132C1301996-11-30030 November 1996 Monthly Operating Repts for Nov 1996 for South Texas Project Electric Generating Station Units 1 & 2 ML20134M7431996-10-31031 October 1996 Monthly Operating Repts for Oct 1996 for South Texas Project Electric Generating Station,Units 1 & 2 ML20129A5961996-09-30030 September 1996 Monthly Operating Repts for Sept 1996 for South Texas Project Units 1 & 2 ML20129A6361996-08-31031 August 1996 Monthly Operating Repts for Aug 1996 for South Texas Project Electric Generating Station ML20129A6541996-07-31031 July 1996 Revised Monthly Operating Rept for July 1996 for South Texas Project Electric Generating Station Unit 1 ML20116M6721996-07-31031 July 1996 Monthly Operating Repts for Jul 1996 for South Texas Project Electric Generating Station ML20115H0321996-06-30030 June 1996 Monthly Operating Repts for June 1996 for South Tx Project, Units 1 & 2 ML20112H9921996-05-31031 May 1996 Monthly Operating Repts for May 1996 for South Texas Project Electric Generating Station Units 1 & 2 ML20117G0101996-04-30030 April 1996 Monthly Operating Repts for April 1996 for STP ML20100R2861996-02-29029 February 1996 Monthly Operating Repts for South Texas Project Electric Generating Station Units 1 & 2 ST-HL-AE-0053, Monthly Operating Repts for Jan 1996 for STP1996-01-31031 January 1996 Monthly Operating Repts for Jan 1996 for STP ST-HL-AE-5277, Monthly Operating Repts for Dec 1995 for South Texas Project1995-12-31031 December 1995 Monthly Operating Repts for Dec 1995 for South Texas Project ST-HL-AE-5256, Monthly Operating Repts for Nov 1995 for STP Units 1 & 21995-11-30030 November 1995 Monthly Operating Repts for Nov 1995 for STP Units 1 & 2 ST-HL-AE-5239, Monthly Operating Repts for Oct 1995 for South Texas Project Units 1 & 21995-10-31031 October 1995 Monthly Operating Repts for Oct 1995 for South Texas Project Units 1 & 2 ST-HL-AE-5215, Monthly Operating Repts for Sept 1995 for South Tx Project1995-09-30030 September 1995 Monthly Operating Repts for Sept 1995 for South Tx Project ST-HL-AE-5178, Monthly Operating Repts for Aug 1995 for STP Electric Generating Station1995-08-31031 August 1995 Monthly Operating Repts for Aug 1995 for STP Electric Generating Station 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217K9441999-10-15015 October 1999 SER Accepting Util Alternative Proposed Relief Request RR-ENG-2-4 for Second 10-year ISI Interval at Stp,Units 1 & 2 Pursuant to 10CFR50.55a(a)(3)(i) ML20217K9151999-10-15015 October 1999 SER Authorizing Util Relief Request RR-ENG-2-3 for Second 10-year ISI Interval of Stp,Units 1 & 2 Pursuant to 10CFR50.55a(a)(3)(i) NOC-AE-000676, Monthly Operating Repts for Sept 1999 for South Texas Project,Units 1 & 2.With1999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for South Texas Project,Units 1 & 2.With ML20217D0531999-09-30030 September 1999 Rev 1 to STP Electric Generating Station Unit 2 Cycle 7 Colr ML20217D0481999-09-30030 September 1999 Rev 1 to STP Electric Generating Station Unit 1 Cycle 9 Colr ML20211P8411999-09-0909 September 1999 Safety Evaluation Supporting Alternative Proposed by Licensee to Surface Exam to Perform Boroscopic VT-1 Visual Exam of Pump Casing Welds within Pump Pits for Welds Covered by Relief Request RR-ENG-24 ML20211P7811999-09-0909 September 1999 SER Approving Second 10-year Interval Inservice Insp Program Plan Relief Request RR-ENG-2-8 (to Use Code Case N-491-2) for South Texas Project,Units 1 & 2 ML20211Q6731999-09-0909 September 1999 Safety Evaluation Accepting First 10-yr Interval ISI Program Plan Request for Relief from ASME Code Case N-498 NOC-AE-000643, Monthly Operating Repts for Aug 1999 for South Texas Project,Units 1 & 2.With1999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for South Texas Project,Units 1 & 2.With ML20212E5191999-08-31031 August 1999 Rev 3 to SG-99-04-005, STP 1RE08 Outage Condition Monitoring Rept & Final Operational Assessment ML20211F4531999-08-24024 August 1999 Safety Evaluation Supporting Licensee Proposed Alternative to Defer Partial First Period Exams of flange-to-shell Weld to Third Period & Perform Required Ultrasonic Exams,Both Manual & Automated,During Third Period ML20211F5111999-08-23023 August 1999 Safety Evaluation Supporting Licensee Proposed Alternative Contained in Request for Relief RR-ENG-30 ML20210C9411999-07-31031 July 1999 Rev 1 to SG-99-07-002, South Tx,Unit 1 Cycle 9 Voltage- Based Repair Criteria 90-Day Rept, Jul 1999 ML20210R3631999-07-31031 July 1999 Monthly Operating Repts for July 1999 for South Tx Project, Units 1 & 2.With ML20210D9161999-07-23023 July 1999 Safety Evaluation Accepting Inservice Testing Relief Request RR-56 Re Component Cooling Water & Safety Injection Sys Containment Isolation Check Valve Closure Test Frequency ML20210D4821999-07-21021 July 1999 1RE08 ISI Summary Rept for Steam Generator Tubing of South Texas Project Electric Generating Station Unit 1 ML20210D4491999-07-21021 July 1999 Revised Chapters to Operations QA Plan, Including Rev 9 to Chapter 1.0, Organization & Rev 6 to Chapter 16.0, Independent Technical Review NOC-AE-000583, LER 99-S03-00:on 990619,failure to Revitalize Sdg Number 11 Was Noted.Caused by Failure to Communicate Status of Sdg. Subject Sdg Revitalized on 990619 & Licensee Will Develop Security Force Instruction Re Sdgs.With1999-07-15015 July 1999 LER 99-S03-00:on 990619,failure to Revitalize Sdg Number 11 Was Noted.Caused by Failure to Communicate Status of Sdg. Subject Sdg Revitalized on 990619 & Licensee Will Develop Security Force Instruction Re Sdgs.With ML20207H6361999-07-0808 July 1999 Safety Evaluation Approving 2nd 10 Yr Interval ISI Program Plan Request to Use ASME Section XI Code Case N-546 for Licenses NPF-76 & NPF-80,respectively ML20216D7481999-07-0707 July 1999 1RE08 ISI Summary Rept for Welds & Component Supports of STP Electric Generating Station,Unit 1 NOC-AE-000593, Monthly Operating Repts for June 1999 for Stp,Units 1 & 2. with1999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Stp,Units 1 & 2. with NOC-AE-000570, LER 99-S01-00:on 990527,discovered That Unescorted Access Had Been Inappropriately Granted.Caused by Failure to Follow Procedure.Util Verified That Individual Did Not Have Current Unescorted Access at STP or Any Other Util.With1999-06-28028 June 1999 LER 99-S01-00:on 990527,discovered That Unescorted Access Had Been Inappropriately Granted.Caused by Failure to Follow Procedure.Util Verified That Individual Did Not Have Current Unescorted Access at STP or Any Other Util.With ML20196G5821999-06-23023 June 1999 LER 99-S02-00:on 990601,failure to Maintain Positive Control of Vital Area Security Key Was Noted.Caused by Lack of Attention to Detail.Discussed Event with Operator Involved IAW Constructive Discipline Program ML20195J6871999-06-17017 June 1999 Safety Evaluation Supporting Proposed Alternative Contained in RR-ENG-2-5.Proposed Alternative Authorized Per 10CFR50.55a(a)(3)(i) for 2nd ISI Interval ML20196A2391999-06-15015 June 1999 Change QA-042 to Rev 13 of Operations QAP, Reflecting Current Organizational Alignment for South Texas Project & Culminating Organizational Realigment That Has Been Taking Place During Past Several Months NOC-AE-000563, Monthly Operating Repts for May 1999 for Stp,Units 1 & 2. with1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Stp,Units 1 & 2. with ML20206U5411999-05-18018 May 1999 Non-proprietary Errata Pages for Rev 2,Addendum 1 to WCAP-13699, Laser Welded Sleeves for 3/4 Inch Diamete Tube Feedring Type & W Preheater SGs Generic Sleeving Rept ML20206A7721999-04-30030 April 1999 STP Electric Generating Station Unit 1 Cycle 9 Colr NOC-AE-000543, Monthly Operating Repts for Apr 1999 for Stp,Units 1 & 2. with1999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Stp,Units 1 & 2. with ML20205H0321999-03-31031 March 1999 Change QA-040 to Rev 13 of Operations QA Plan NOC-AE-000507, Monthly Operating Repts for Mar 1999 for Stp,Units 1 & 2. with1999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Stp,Units 1 & 2. with ML20205A3781999-03-22022 March 1999 STP Electric Generating Station Simulator Certification Four Yr Rept for Units 1 & 2 ML20204B2711999-03-15015 March 1999 Safety Evaluation Authorizing 990201 Request to Authorize Alternative to Regulations Per 10CFR50.55a(a)(3)(i) That Would Revise Start of Second 120-month IST Interval to No Later than 011201 ML20207M9231999-03-12012 March 1999 Amended Part 21 Rept Re Cooper-Bessemer Ksv EDG Power Piston Failure.Total of 198 or More Pistons Have Been Measured at Seven Different Sites.All Potentially Defective Pistons Have Been Removed from Svc Based on Encl Results NOC-AE-000468, Monthly Operating Repts for Feb 1999 for South Texas Project Electric Generating Station.With1999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for South Texas Project Electric Generating Station.With ML20207D1101999-02-24024 February 1999 Change QA-039 to Rev 13 of Operations QA Plan, for STP ML20203H8361999-02-17017 February 1999 Safety Evaluation Supporting Request for Relief from ASME Code Requirements for Class 3 Piping for Plant ML20202H9621999-02-0303 February 1999 SER Accepting Change to EALs Used in Classification of Emergency Conditions ML20202E8471999-01-31031 January 1999 2RE06 ISI Summary Rept for SG Tubing of STP Electric Generating Station,Unit 2 ML20216G2011999-01-31031 January 1999 City Public Svc of San Antonio Annual Rept 1998-1999 ML20199G5961999-01-31031 January 1999 Cycle 7 Voltage-Based Repair Criteria Rept for Jan 1999 ML20199K7711999-01-21021 January 1999 Safety Evaluation Accepting ISI Program Request for Relief for ASME Cose Repair Requirements for Code Class 3 Piping ML20199G8161999-01-19019 January 1999 SER Accepting Util 970707 Response to NRC 970509 RAI Re GL 92-08, Thermo-Lag 330-1 Fire Barriers. NRC Finds No Significant Safety Hazards Based on Application of Util Ampacity Derating Methodology ML20199H4981999-01-11011 January 1999 2RE06 ISI Summary Rept for Welds & Component Supports of Stp,Unit 2 ML20206Q3751999-01-0404 January 1999 2RE06 ISI Summary Rept for Sys Pressure Tests (Class 1 & 2) ML20206Q3721999-01-0404 January 1999 2RE06 ISI Summary Rept for Repairs & Replacements ML20216G2171998-12-31031 December 1998 Houston Industries 1998 Annual Rept. App a 1998 Financial Statements & Us Securities & Exchange Commission Form 10-K Encl NOC-AE-000403, Monthly Operating Repts for Dec 1998 for South Texas Project Unit 1 & 2.With1998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for South Texas Project Unit 1 & 2.With ML20216G1521998-12-31031 December 1998 Central & South West Corp 1998 Summary Annual Rept & Securities & Exchange Commission Form 10-K ML20198M3431998-12-28028 December 1998 SER Accepting Util Request for Relief from ASME Code Repair Requirements for ASME Code Class 3 Piping for South Texas Project,Unit 2 1999-09-09
[Table view] |
Text
-
~
~
The Light c o mp a nyS uth Texas Project Electric Generating P. O.Station Box 289 Wadsworth, Texas 77483 Houston Lighting & Power January 15, 1996 ST-HL-AE-5277 File No.: G02 10CFR50.71 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555 South Texas Project Units 1 and 2 Docket Nos. STN 50-498, STN 50-499 Monthly Operatine Reports for DecemLr 1995 Pursuant to 10CFR50.71(a) and South Texas Project (STP) Technical Specification 6.9.1.5, attached are the Monthly Operating Reports for December 1995.
If you should have any questions on this matter, please contact Ms. D. M. Bergendahl at (512) 972-7688.
/MM _-
F. H. Mallen Manager, Planning & Controls RLH/lf Attachments: 1) STPEGS Unit 1 Monthly Operating Report - December 1995
- 2) STPEGS Unit 2 Monthly Operating Report - December 1995 9601230073 951231 i PDR ADOCK 05000498 :
R PDR l l
i h:\wpbucic\ misc-95\5256 ljt
}
i
[
1 SOUTH TEXA5 PROJECT ELECTRIC GENERATIBIG STATIOtt UttIT 1 3000fTMLY OPERATISUG REPORT DECERGEER 1995 MOUSTott LIGNTISOG ABID POWER CO.
SERC DOCKET 300. 50-498 LICEBESE 35 0 . BfPF-7 6 Reviewed By: -' A h8 6.MQEdGhND'HL' A Dgte i Approved M dM / ~ //~ 94r
- i. W. MYERS C Q Date m _ _ _ _.
-. ~ . . _ . . . .. . . . . - .. ~. .. . - -. .- _ . .. ~ . - . . - - - . - . . - -- . . - .
. =. .
RAcakthly summarv ,
l i
STPEGS Unit .1 began the reporting period operating at 100% reactor power. !
On December 18, 1995 at 0335 a reactor trip occurred due to a turbine trip -
above 50% reactor power. The cause of the trip was a pilot wire monitoring relay ,
actuation causing Main Generator Lockout. '
r The root cause of the trip was determined, corrective maintenance performed f and the unit returned to service on December 21 at 1843. The unit achieved full power on December 23 and operated for the remainder of the reporting period with ,
no unit shutdowns or significant power reductions. ;
l i
i i
J l
I l
OPERATIasG DATA REPORT DOCKET NO. 50-498 UNIT 1 DATE Jan. B. 1996 COMPLETED BY R.L. H111 TELEPHONE 512/972-7667 OPERATIses STATUS
- 1. REPORTING PERIOD: 12/01/95-12/31/95 GROSS HOURS IN REPORTING PERIOD: 744 '
- 2. CURRENTLY AUTHORIZED POWER LEVEL (MWt): 3800 MAX. DEPEND. CAPACITY (MWe-Net): 1250.6 DESIGN ELECTRICAL RATING (MWe-Net): 1250.6
- 3. POWER LEVEL TO WHICH RESTRICTED (IF ANY) (MWe-Net) : None
- 4. REASONS FOR RESTRICTION (IF ANY): N/A THIS MONTH YR TO DATE CUMULATIVE
- 5. NUMBER OF HOURS REACTOR WAS CRITICAL..... 669.7 7684.3 41637.2
- 6. REACTOR RESERVE SHUTDOWN HOURS........... 0 0 0 ,
- 7. HOURS GENERATOR ON LINE.................. 656.9 7572.0 40339.3
- 8. UNIT RESERVE SHUTDOWN HOURS.............. 0 0 0
- 9. GROSS THERMAL ENERGY GENERATED (MWt).... 2405809 28334354 148156335
- 10. GROSS ELECTRICAL ENERGY GENERATED (MWH).. 825800 9726710 50381670 ;
- 11. NET ELECTRICAL ENERGY GENERATED (MWH).... 789780 9301768 47812720
- 12. REACTOR SERVICE FACTOR................... 90.0% 87.7% 64.6%
- 13. REACTOR AVAILABILITY FACTOR.............. 90.0% 87.7% 64.6%
- 14. UNIT SERVICE FACTOR...................... 88.3% 86.4% 62.6% ..
- 15. UNIT AVAILABILITY FACTOR................. 88.3% 86.4% 62.6%
- 16. UNIT CAPACITY FACTOR (Using MDC)........ 84.9% 84.9% 59.3%
- 17. UNIT CAPACITY FACTOR (Using Design MWe).. 84.9% 84.9% 59.3%
- 18. UNIT FORCED OUTAGE RATE.................. 11'. 7 % 2.4% 26.3% I
- 19. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE AND DURATION OF EACH) :
Scheduled 35 day refueling outage to begin on May 18, 1996. .
- 20. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: N/A
)
J AVERMaB DhZLY U3 TIT POTTER LEVEL DOCKET NO. 50-490 I UNIT 1 l DATE Jan. 8, 1996 COMPLETED BY R.L. 11111 TELEPHONE 512/972-7667 MONTH DECEMBER DhY AVERMBE DAILY POttBR LEVEL DhY AVERMBE DAILY Potter LEVEL (MWe-Net) (MWe-Net)
I 1 1260 17 1262 j 2 1263 18 174 3 1263 *9
. 0 1
4 1254 20 0 ;
5 1256 21 0 1 6 1254 22 163 7 1263 23 1025 8 1258 24 1262 j 9 1263 25 __ 1267 10 1263 26 1266 11 1263 27 1267 12 1257 28 1267 13 1262 __ 29 1266 14 1262 30 1263 15 1263 31 1266 16 1259
UstIT SHUTDO4WES AND POWER REDUCTIONS .
DOCKET NO. 50-498 UNIT 1 .
DATE Jan. 8. 1996 -
COMPLETED BY R.L. Fill TELEPHONE 512/972-7667
- REPORT MONTH DECEMBER 1 2 3 4 5 No. Date Type Duration Reason Method of Licensee System Component Cause & Corrective Action.to (Hours) Shutting Event Ne Code Prevent Recurrence Down Report #
Reactor f 93-09 951218 F 87.1 H 3 1-95-013 EA RLY-85 A reactor trip occurred due to a turbine trip above 50% reactor power. The cause of the trip was a pilot wire monitoring relay actuation causing Main Generator Lockout. The Main Generator Lockout resulted in an automatic turbine trip and automatic reactor trip. '
The cause of.the pilot wire monitoring relay actuation was due to an "A phase" ground on a Main Transformer protection relay. This ground combined with a fault to a 345 KV transmission line caused by lightning resulted in an actuation of the pilot wire monitoring relay.
i The corrective actions to prevent recurrence will be discussed in the LER.
1 2 3 4 5 F: Forced Reason: Method: IEEE 805-1983 IEEE 803A-1983 l
S: Scheduled A-Equipment Failure (Explain) 1-Manual B-Maintenance or Test 2-Manual Scram C-Refueling 3-Automatic Scram D-Regulatory Restriction 4-Cont. of Existing E-Operator Training & License Exam Outage F-Administrative 5-Reduction G-Operational Error (Explain) 9-Other H-Other (Explain)
__m__ _ _ _ . _ . _ _ _ . _ _ _ _ _ _ . _ _ . - . _ . _ _ _ _ _ _ . _ . - _ _ _ . _ _ _ _ _ _ _ _ _ _ _ . -_ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ , - * . _ . -m
- _ , _ . _ _ _ _ _ . _ . _ _ _ _ _ . __ _ _ _ _ _ _ _ _ _-m__ -_ _ ___-
=
Pomvm and safety valves summmary Following the Unit 1 reactor trip on December 18 at 0335, at approximately 0350, the Pressurizer Power Operated Relief Valves cycled open and closed three times. Auxiliary spray flow was used to regain control of pressurizer pressure.
The electrical buses supplying power ' to the Reactor Coolant Pumps were ,
reenergized at approximately 0430 hours0.00498 days <br />0.119 hours <br />7.109788e-4 weeks <br />1.63615e-4 months <br />. At approximately 0511. hours, Reactor Coolant Pump 1A was started followed by starting Reactor Coolant Pump 1D approximately eleven minutes later. The reestablished forced Reactor Coolant-System flow restored normal pressurizer spray. capability. j i
l l
i I
i l
. = . .- .-. . _ _ . - . - _ _ , . . _ , _ . _
e SOUTE TEXAS PROJECT ELECTRIC GENERATIBOG STATIOtt UNIT 2 3000ETMLY OPERATI3IG REPORT s DECEsdERR 1995 MOUSTOtt LIGatTISOG ABID POWER CO.
asRC DOCKET 350. 50-499 LICE 38SE 300. NPF-SO r
Reviewed By: Ol@) k_
" NM~ 'ENbAHL Dale '
' Approved By: 4 h f fd R. d. MASSE Date
l e .
1 Menthly sumum;r STPEGS Unit 2 operated during the reporting period with no unit shutdowns or significant power reductions.
1 l
i 1
1 l
I l
I I
1 l
l 1
l 1
l . .
OPERATING DATA REPORT DOCKET NO. 50-499 UNIT 2 )
DATE Jan. 8. 1995 l COMPLETED BY R.L. Hill TELEPHONE 512/972-7667 OPERATING STATUS
- 1. REPORTING PERIOD: 12/01/95-12/31/95 GROSS HOURS IN REPORTING PERIOD: 744
- 1. CURRENTLY AUTHORIZED POWER LEVEL (MWt): 3800 MAX. DEPEND. CAPACITY (MWe-Net) : 1250.6 DESIGN ELECTRICAL RATING (MWe-Net): 1250.6
- 3. POWER LEVEL TO WHICH RESTRICTED (IF ANY) (MWe-Net) : None
- 4. REASONS FOR RESTRICTION (IF ANY) : N/A THIS MONTH YR TO DATE CUMULATIVE
- 5. NUMBER OF HOURS REACTOR WAS CRITICAL..... 744.O _ 8064.0 38100.7
- 6. REACTOR RESERVE SHUTDOWN HOURS........... 0 0 0
- 7. HOURS GENERATOR ON LINE.................. 744.0 7985.8 36818J B. UNIT RESERVE SHUTDOWN HOURS.............. 0 0 0
- 9. GROSS THERMAL ENERGY GENERATED (MWt).... 2805403 30194180 134974677
- 10. GROSS ELECTFICAL ENERGY GENERATED (MWH).. 966700 10370511 45828381
- 11. NET ELECTRICAL ENERGY GENERATED (MWH).... 926620 9923091 43649346
- 12. REACTOR SERVICE FACTOR................... 100.0% 92.1% 66.5%
- 13. REACTOR AVAILABILETY FACTOR.............. 100.0% 92.1% 66.5%
- 14. UNIT SERVICE FACTOR...................... 100.0% 91.2% 64.3%
- 15. UNIT AVAILABILITY FACTOR................. 100.0% 91.2% 64.3%
- 16. UNIT CAPACITY FACTOR (Using MDC)......... 99.6% 90.6% 60.9%
- 17. UNIT CAPACITY FACTOR (Using Design MWe).. 99.6% 90.6% 60.9%
- 18. UNIT FORCED OUTAGE RATE.................. 0.0% 1.7% 25.9%
- 19. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE AND DURATION OF EACH) :
N/A
- 20. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: N/A
AVERAGE DAILY UNIT POWER LEVEL 3 DOCKET NO. 50-499 UNIT 2 DATE Jan . 8, 1995 COMPLETED BY R.L. Hill TELEPHONE 512/972-7667 MONTH DECEMBER DhY AVERAGE DAILY POWER LEVEL DhY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 1 1263 17 1263 2 1263 18 1238 3 1259 19 1233 4 1262 20 1228 5 1263 21 1216 6 1258 22 1199 7 1258 23 1200 8 1263 24 1200 9 1258 25 1198 10 1264 26 1200 11 1259 27 1209 12 1264 2B 1263 13 1258 29 1263 14 1263 30 1259 15 1263 31 1264 16 1259
e .* l UstIT suuTDosess Asso yourant REDUCTroues ,
DOCKET NO. 50-499 UNIT 2 DATE Jan. R. 1995 .
I COMPLETED BY R.L. Hill ]
TELEPHONE 512/972-7667 i REPORT MONTH DECEMBER
- j 1 2 3 4 5 No. Date Type Duration Reason Method of Licensee System Couponent cause & Corrective Action to (Hours) Shutting Event Code Code Prevent Recurrence Down Report #
Reactor l
THERE WERE NO UNIT SHUTDOWNS OR SIGNIFICANT POWER REDUCTIONS DURING THE REPORTING PERIOD 1 2 3 4 5 F: Forced Reason: Method: IEEE 805-1983 IEEE 803A-1983 S: Scheduled A-Equipment Failure (Explain) 1-Manual B-Maintenance or Test 2-Manual Scram C-Refueling 3-Automatic Scram D-Regulatory Restriction 4-Cont. of Existing E-Operator Training & License Exam Outage F-Administrative 5-Reduction G-Operational Error (Explain) 9-Other H-Other (Explain)
c -
PORVs and Safety Valves . Susan 4DC There were no PORV or Safety Valves challenged during the reporting period.