Letter Sequence Draft Request |
|---|
|
Results
Other: A820016, Forwards Revised Tech Specs Updating 800805 Submittal Re Single Loop Operation, ML19331C219, ML19331C220, ML20052G189, ML20052G192, ML20071K553, ML20078C302, ML20082Q313, ML20090A754, ML20091K497, ML20132C457, ML20132H028, ML20137S773, NLS8500061, Advises That Util Commits to Incorporate GE SIL-380,Rev 1 Into Tech Spec by End of Current Outage Scheduled for End of June 1985.Tech Spec Changes for Dual & Single Loop Will Be Submitted within 2 Months of End of Outage
|
MONTHYEARML19331C2201980-05-31031 May 1980 Single-Loop Operation Project stage: Other ML19331C2171980-08-0505 August 1980 Application for Amend of License DPR-46,requesting Change to App a Tech Specs 1.1 & 2.1 Re Fuel Cladding Integrity,To Allow for single-loop Operation.Fee Encl Project stage: Request ML19331C2191980-08-0505 August 1980 Proposed Tech Specs 1.1 & 2.1 Re Fuel Cladding Integrity to Allow for single-loop Operation Project stage: Other ML20090A7541980-09-30030 September 1980 Forwards Questions Re GE single-loop Operation Rept, NEDO-24258 Project stage: Other A810016, Forwards Response to NRC Request for Addl Info Re Util 800805 Proposed Tech Spec Change to Allow Operation of Facility W/One Recirculation Loop Inoperable.Summarizes Results for Transients Analyzed1981-04-24024 April 1981 Forwards Response to NRC Request for Addl Info Re Util 800805 Proposed Tech Spec Change to Allow Operation of Facility W/One Recirculation Loop Inoperable.Summarizes Results for Transients Analyzed Project stage: Request ML20091K7911981-06-0808 June 1981 Draft Application for Amend to License DPR-46,revising Tech Spec 3.6.F.3 Re Single Loop Operation Project stage: Draft Request ML20009A3721981-07-0202 July 1981 Submits 810727-0908 Date Range for Proposed Meeting to Discuss Concerns Re Single Loop Operation for BWRs Above 50% Rated Power,In Response to 810512 Application.Proposed Agenda Encl Project stage: Meeting ML20090B2441981-12-10010 December 1981 Forwards Safety Evaluation Re Plant Operation on Single Loop W/Power Limited to 50%.Evalution Completes One Action Under Multi Plant Item E-04 Project stage: Approval ML20052G1891982-05-0606 May 1982 Forwards Response to Four NRC Questions Re 800805 Proposed Tech Specs for Single Loop Operation & Updated Tech Spec Pages Project stage: Other ML20052G1921982-05-0606 May 1982 Updated Proposed Tech Spec Pages,Incorporating All Recent License Amends & NRC Requests Re Single Loop Operation Project stage: Other A820016, Forwards Revised Tech Specs Updating 800805 Submittal Re Single Loop Operation1982-07-28028 July 1982 Forwards Revised Tech Specs Updating 800805 Submittal Re Single Loop Operation Project stage: Other ML20071K5531982-07-28028 July 1982 Revised Tech Specs Re Single Loop Operation Project stage: Other ML20091K4971983-05-31031 May 1983 Technical Evaluation of Electrical,Instrumentation & Control Design Aspects of Proposed License Amend for Single Loop Operation of Cooper Nuclear Station Project stage: Other ML20078C3021983-09-0707 September 1983 Notice of Consideration of Issuance of Amend to License DPR-46 & Opportunity for Prior Hearing Revising Tech Spec to Permit Operation Up to 50% Rated Power W/One Recirculation Loop Out of Svc Project stage: Other ML20082Q3131983-12-0202 December 1983 Proposed Tech Spec Change 9 Re Single Loop Operation Project stage: Other ML20082Q2891983-12-0202 December 1983 Application for Amend to License DPR-46,consisting of Proposed Change 9 to Tech Specs Re Single Loop Operation. Encl Updates 800805 Submittal Which Incorporated All Recent License Amends Through Amend 83 Project stage: Request NLS8500061, Advises That Util Commits to Incorporate GE SIL-380,Rev 1 Into Tech Spec by End of Current Outage Scheduled for End of June 1985.Tech Spec Changes for Dual & Single Loop Will Be Submitted within 2 Months of End of Outage1985-04-0404 April 1985 Advises That Util Commits to Incorporate GE SIL-380,Rev 1 Into Tech Spec by End of Current Outage Scheduled for End of June 1985.Tech Spec Changes for Dual & Single Loop Will Be Submitted within 2 Months of End of Outage Project stage: Other NLS8500260, Application for Amend to License DPR-46,revising Tech Specs to Allow Operation W/One Recirculation Loop Out of Svc Greater than 24 H.Fee Paid1985-09-20020 September 1985 Application for Amend to License DPR-46,revising Tech Specs to Allow Operation W/One Recirculation Loop Out of Svc Greater than 24 H.Fee Paid Project stage: Request ML20132C4571985-09-20020 September 1985 Proposed Tech Specs Allowing Operation W/One Recirculation Loop Out of Svc Greater than 24 H Project stage: Other NLS8500261, Revised Application for Expedited Amend to License DPR-46, Revising 850920 Tech Spec Changes Re Single Loop Operation. Revs Incorporate All Amends to OL Up to & Including Amend 93 Issued on 8306031985-09-23023 September 1985 Revised Application for Expedited Amend to License DPR-46, Revising 850920 Tech Spec Changes Re Single Loop Operation. Revs Incorporate All Amends to OL Up to & Including Amend 93 Issued on 830603 Project stage: Request ML20132H0281985-09-23023 September 1985 Proposed Tech Specs,Revising 850920 Tech Spec Change Request Re Single Loop Operation Project stage: Other ML20137S7731985-09-24024 September 1985 Amend 94 to License DPR-46,permitting Reactor Operation W/One Recirculation Loop Out of Svc,Allowing Detection of thermal-hydraulic Instabilities,Updating Refs & Deleting Blank Pages Project stage: Other ML20137S7991985-09-24024 September 1985 Safety Evaluation Supporting Amend 94 to License DPR-46 Project stage: Approval NLS8500266, Requests Withdrawal of Single Loop Operation Tech Spec Changes Requested in 800805,820506 & 28 & 831202 Submittals. Proposed Changes Superseded by 850923 & 25 Requests1985-09-27027 September 1985 Requests Withdrawal of Single Loop Operation Tech Spec Changes Requested in 800805,820506 & 28 & 831202 Submittals. Proposed Changes Superseded by 850923 & 25 Requests Project stage: Withdrawal ML20138H1791985-10-18018 October 1985 Notice of Withdrawal of Application for Amend to License DPR-46 Project stage: Withdrawal 1982-07-28
[Table View] |
Text
_
! 2W
~
CENECAt OFFICE d~
- fcfb'2CSh0%^i 73 \\ _.._ Nebraska Public Power District _. _ _ _ _ _ _ _ _ _
l l
June 8, 1981 TRSCCPT MtCak Nf32AZA FtTEC Powet CCTMCI I
b R** +402/563-5223NIihr/U a TO g-a "'2
/,' -
,1-l Director, Nuclear Reactor Regulation y" a _ p /
~
- DAT, Attention:
Mr. Thouas A. Ippolito, Chief s
Operating Reactors Branch No. 2 NO. C# PAGES Division of Licensing U.S. Nuclear Regulatory Commission Washington, DC 20555 Subj ect:
Exoedited Change to Appendix A Technical Specifications Single-Loop Operation 4.
Cooper Nuclear Station NRC Docket No. 50-298, DPR-46
[j_
Dear Mr. Ippolito:
dh
Reference:
- 1) Letter from J. M. Pilant to T. A. Ippolito Dated August 5, 1980 " Cooper Nuc1 car Station Single-Loop Operation"
- 2) Letter from J. M. Pilant to T. A. Ippolito Dated April 24, 1981 " Response to Single-Loop Operation Questions" In reference 1 the District submitted an analysis requesting revision to the Technical Specifications to allow continued operation of Cooper Nuclear Station with one recirculation loop out of service.
In reference 1 and reference 2 pro pt approval of the submittal was requested prior to startup from the May 1981 outage.
As discussed with the staff this date, the startup of CNS requires that the plant operate in excess of 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> with one idle recirculation O
loop so that the SC 2 te=perature differential of Specification 3.6.A.5 can be satisfied before bringing the idle loop on line.
Therefore, it is respectfully requested that Specification 3.6.F.3 be revised as follows on an expedited basis.
3.
The reactor shall not be operated for a period in excess of 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> with one recirculation loop out of service.
This time restriction shall be extended to 7 days for a period comc:encing June 8,1981". During this 7 day period:
a) the stead'a state thermal power shall not exceed 50% of rated, b) the MCPR safety limit shall be increased.01; c) the MCPR limiting cc..dition of operation shall be increased.01 for each fuel type; d) the MAPLHCR limit shall be reduced by 0.7 for all fuel types; e) the APRM scram and rod block set-points and the rod block monitor setpoints shall be reduced by 3.5%; f) the suction valve in the idle loop is closed and electrically. isolated.until the idle loop is being prepared for return to service.
8406070203 840319 PDR FDIA BELLB4-105 PDR e
1
' Mr. Thomas A. Ippoll o June 8, 1981 Page 2 fee of $4,000 was enclosed with reference 1, Since a Class III amendment no cdditional fee is included at this time.
The staff's prompt attention to this request is greatly appreciated.
In addition to three signed originals, 37 copies are also submitted for your use.
Sincerely, A
tw W.
asOg
- .. Pilant Director of Licensing t
and Quality Assurance
/9 JMP:JDW:esk D
e i
.___