ML20090B617

From kanterella
Jump to navigation Jump to search

Forwards Safety Evaluation Input Re Multi-Plant Item E-04 on Single Loop Operation W/Power Limited to 50%.Proposed Amend Does Not Involve Significant Hazards Consideration
ML20090B617
Person / Time
Site: 05000000, Monticello
Issue date: 09/10/1982
From: Speis T
Office of Nuclear Reactor Regulation
To: Lainas G
Office of Nuclear Reactor Regulation
Shared Package
ML17139C189 List:
References
FOIA-84-105 TAC-48646, NUDOCS 8209240430
Download: ML20090B617 (1)


Text

"

i

t j?[pnecy UNITED STATES o,

NUCt. EAR REGULATORY COMMISSION g p j g WASHINGTON. D. C. 20555

% %,1n c f *x g7cv/

SEP 10 192 Docket Nos.: 50-253 MEMORANDUM FOR:

Gus C. Lainas, Assistant-Director for Operating Reactors, Division of Licensing FROM:

Themis P. Speis, Assistant Director for Reactor Safety Division of Systems Integration

SUBJECT:

SAFETY EVALUATION OF MONTICELLO NUCLEAR GENERATING PLANT SINGLE LOOP OPERATION Plant tume:

Monticello !!uclear Ger.erating Plant Docket Numbers:

50-263 NSSS Supplier:

General Electric Responsible Branch:

- ORB-2 Project Manager:

H. Nicolaras Review Str.tus:

Complete Enclosed is the Safety Evaluation Report to permit Monticello Nuclear Generating Plant to operate on a single loop with power limited to 50%.

This completes cce action under multiplant item E-04 (TAC #48646)

Themis P. Sp.21s, Assistant Director for Reactor Safety Division of Systems Integration

Enclosure:

As stated cc:

R. Mattson R. Capra L. Phillips T. Marsh G. Schwenk G. Mazetis Richard Clark N. Lauben D.

B.- Vassallo H. Nicolaras C0!. TACT:

G. Thcmas

{

X29445

.