Letter Sequence Request |
|---|
|
Results
Other: A820016, Forwards Revised Tech Specs Updating 800805 Submittal Re Single Loop Operation, ML19331C219, ML19331C220, ML20052G189, ML20052G192, ML20071K553, ML20078C302, ML20082Q313, ML20090A754, ML20091K497, ML20132C457, ML20132H028, ML20137S773, NLS8500061, Advises That Util Commits to Incorporate GE SIL-380,Rev 1 Into Tech Spec by End of Current Outage Scheduled for End of June 1985.Tech Spec Changes for Dual & Single Loop Will Be Submitted within 2 Months of End of Outage
|
MONTHYEARML19331C2201980-05-31031 May 1980 Single-Loop Operation Project stage: Other ML19331C2171980-08-0505 August 1980 Application for Amend of License DPR-46,requesting Change to App a Tech Specs 1.1 & 2.1 Re Fuel Cladding Integrity,To Allow for single-loop Operation.Fee Encl Project stage: Request ML19331C2191980-08-0505 August 1980 Proposed Tech Specs 1.1 & 2.1 Re Fuel Cladding Integrity to Allow for single-loop Operation Project stage: Other ML20090A7541980-09-30030 September 1980 Forwards Questions Re GE single-loop Operation Rept, NEDO-24258 Project stage: Other A810016, Forwards Response to NRC Request for Addl Info Re Util 800805 Proposed Tech Spec Change to Allow Operation of Facility W/One Recirculation Loop Inoperable.Summarizes Results for Transients Analyzed1981-04-24024 April 1981 Forwards Response to NRC Request for Addl Info Re Util 800805 Proposed Tech Spec Change to Allow Operation of Facility W/One Recirculation Loop Inoperable.Summarizes Results for Transients Analyzed Project stage: Request ML20091K7911981-06-0808 June 1981 Draft Application for Amend to License DPR-46,revising Tech Spec 3.6.F.3 Re Single Loop Operation Project stage: Draft Request ML20009A3721981-07-0202 July 1981 Submits 810727-0908 Date Range for Proposed Meeting to Discuss Concerns Re Single Loop Operation for BWRs Above 50% Rated Power,In Response to 810512 Application.Proposed Agenda Encl Project stage: Meeting ML20090B2441981-12-10010 December 1981 Forwards Safety Evaluation Re Plant Operation on Single Loop W/Power Limited to 50%.Evalution Completes One Action Under Multi Plant Item E-04 Project stage: Approval ML20052G1891982-05-0606 May 1982 Forwards Response to Four NRC Questions Re 800805 Proposed Tech Specs for Single Loop Operation & Updated Tech Spec Pages Project stage: Other ML20052G1921982-05-0606 May 1982 Updated Proposed Tech Spec Pages,Incorporating All Recent License Amends & NRC Requests Re Single Loop Operation Project stage: Other A820016, Forwards Revised Tech Specs Updating 800805 Submittal Re Single Loop Operation1982-07-28028 July 1982 Forwards Revised Tech Specs Updating 800805 Submittal Re Single Loop Operation Project stage: Other ML20071K5531982-07-28028 July 1982 Revised Tech Specs Re Single Loop Operation Project stage: Other ML20091K4971983-05-31031 May 1983 Technical Evaluation of Electrical,Instrumentation & Control Design Aspects of Proposed License Amend for Single Loop Operation of Cooper Nuclear Station Project stage: Other ML20078C3021983-09-0707 September 1983 Notice of Consideration of Issuance of Amend to License DPR-46 & Opportunity for Prior Hearing Revising Tech Spec to Permit Operation Up to 50% Rated Power W/One Recirculation Loop Out of Svc Project stage: Other ML20082Q3131983-12-0202 December 1983 Proposed Tech Spec Change 9 Re Single Loop Operation Project stage: Other ML20082Q2891983-12-0202 December 1983 Application for Amend to License DPR-46,consisting of Proposed Change 9 to Tech Specs Re Single Loop Operation. Encl Updates 800805 Submittal Which Incorporated All Recent License Amends Through Amend 83 Project stage: Request NLS8500061, Advises That Util Commits to Incorporate GE SIL-380,Rev 1 Into Tech Spec by End of Current Outage Scheduled for End of June 1985.Tech Spec Changes for Dual & Single Loop Will Be Submitted within 2 Months of End of Outage1985-04-0404 April 1985 Advises That Util Commits to Incorporate GE SIL-380,Rev 1 Into Tech Spec by End of Current Outage Scheduled for End of June 1985.Tech Spec Changes for Dual & Single Loop Will Be Submitted within 2 Months of End of Outage Project stage: Other NLS8500260, Application for Amend to License DPR-46,revising Tech Specs to Allow Operation W/One Recirculation Loop Out of Svc Greater than 24 H.Fee Paid1985-09-20020 September 1985 Application for Amend to License DPR-46,revising Tech Specs to Allow Operation W/One Recirculation Loop Out of Svc Greater than 24 H.Fee Paid Project stage: Request ML20132C4571985-09-20020 September 1985 Proposed Tech Specs Allowing Operation W/One Recirculation Loop Out of Svc Greater than 24 H Project stage: Other NLS8500261, Revised Application for Expedited Amend to License DPR-46, Revising 850920 Tech Spec Changes Re Single Loop Operation. Revs Incorporate All Amends to OL Up to & Including Amend 93 Issued on 8306031985-09-23023 September 1985 Revised Application for Expedited Amend to License DPR-46, Revising 850920 Tech Spec Changes Re Single Loop Operation. Revs Incorporate All Amends to OL Up to & Including Amend 93 Issued on 830603 Project stage: Request ML20132H0281985-09-23023 September 1985 Proposed Tech Specs,Revising 850920 Tech Spec Change Request Re Single Loop Operation Project stage: Other ML20137S7731985-09-24024 September 1985 Amend 94 to License DPR-46,permitting Reactor Operation W/One Recirculation Loop Out of Svc,Allowing Detection of thermal-hydraulic Instabilities,Updating Refs & Deleting Blank Pages Project stage: Other ML20137S7991985-09-24024 September 1985 Safety Evaluation Supporting Amend 94 to License DPR-46 Project stage: Approval NLS8500266, Requests Withdrawal of Single Loop Operation Tech Spec Changes Requested in 800805,820506 & 28 & 831202 Submittals. Proposed Changes Superseded by 850923 & 25 Requests1985-09-27027 September 1985 Requests Withdrawal of Single Loop Operation Tech Spec Changes Requested in 800805,820506 & 28 & 831202 Submittals. Proposed Changes Superseded by 850923 & 25 Requests Project stage: Withdrawal ML20138H1791985-10-18018 October 1985 Notice of Withdrawal of Application for Amend to License DPR-46 Project stage: Withdrawal 1982-07-28
[Table View] |
Text
~
w GENERAL OFFICE Nebraska Public Power District
"" EflOE7Alf0fE^>" '""
=
=
August 5,1980 Director, Nuclear Reactor Regulation Operating Reactors Branch No. 2 Division of Operating Reactors U.S. Nuclear Regulatory Commission Washington, DC 20555 Attention: Mr. Thomas A. Ippolito, Chief
Dear Mr. Ippolito:
Subject:
Change to Appendix A Technical Specifications -
Single-Loop Operation Cooper Nuclear Station NRC Docket No. 50-298, DPR-46
Reference:
- 1) " Cooper Nuclear Station Single-Loop Operation," NEDO-24258, dated May,1980 The current Technical Specifications for Cooper Nuclear Station do not allow plant operation beyond a relatively short period of time 11 an idle recirculation loop cannot be returned to service.
The capability of operating at reduced power with a single recirculation loop is highly desirable from a plant availability / outage planning standpoint in the event maintenance of a recirculation pump or other component renders one loop inoperable.
For this reason Nebraska Public Power District requests that the Technical Specifications be revised as indicated in the attached pages to allow for single-loop operation.
Forty copies of the CNS Plant Specific Safety Analysis (Reference 1) to support this change are submitted.
The safety significance of this proposed change has been revierai by the appropriate District personnel, and under 10CFR Part 170, this change has been judged to be a class III amendment. Payment in the amount of $4,000 is enclosed. NRC acceptability for this
(
type of operation has been identified on other plant dockets.
Since one of the recirculation pump seals has commenced alarming periodically, prompt review and approval of this change is requested.
800814o37g
(.
~
Mr. Thomas A. Ippolito August 5,1980 Page Two If you have any questions or require additional information, please contact me.
In addition to three signed originals, 37 copies are also submitted for your use.
Sincerely,
%A a
. Pflant Director of Licensing and Qu611ty Assurance JMP/jdw:bn5/1 Enclosure l
I l
l l
\\
i
Mr. Thomas A. Ipplito i
August 5,1980 Page Three STATE OF NEBRASKA)
)ss PLATTE COUNTY
)
Jay M. Pflant, being first duly sworn, deposes and says that he is an authorized representative of the Nebraska Public Power District, a public corporation and political subdivision of the State of Nebraska; that he is duly authorized to submit this request on behalf on Nebraska Public Power District; and that the statements in said application are true to the best of his knowledge and belief.
MA M M. Pilant S bscribed in my presence and sworn to before me this 6 day of nsf /f&)-
f W i k fa a > W % d d x A 1 /
/ NOTARY PUBLIg My Commission expires I/
/9,Fd EMEAL Bff4RT State of NettasLa MARLYN R. HoHNDoBF
% Comsa. Esp. oct. t 4, t oeo