ML20090B723

From kanterella
Jump to navigation Jump to search

Forwards SER Permitting Operation on Single Loop W/Power Limited to 50%.W/o Encl
ML20090B723
Person / Time
Site: 05000000, Brunswick
Issue date: 12/21/1982
From: Speis T
Office of Nuclear Reactor Regulation
To: Lainas G
Office of Nuclear Reactor Regulation
Shared Package
ML17139C189 List:
References
FOIA-84-105 TAC-46779, NUDOCS 8301060183
Download: ML20090B723 (1)


Text

--

RSB Plant File: Brunswick DEC U N GThomas R/F TSpets WHodges BSheron CBerlinger GThomas D:cket f.cs.:

50-224/325 2

!212A!:C':1 FOR:

Gus C. Laints Assistant Director for Operating Reactors, DL J

FRO:::

Themis P. Speis Assistant Director for Reacter Safety, DSI

SUBJECT:

SAFETY EVALUATIO:10F BRUNSL'ICK STEAfl ELECTRIC FLA!.T.

UtiIT liOS.1 AND 2 SIliG.E LOOP OPERATION Plant !! ace:

Brunswick Steam Electric Plant, Unit 1 & 2 Docket liu:ters:

50-324/325

!!SSS Supplier:

General Electric Responsible Brar.ch:

ORO-2 Project l'.cnager:

J. VanVliet Revio.t Status:

Complete Enclosed is the Safety Evaluation Report to permit Brunswick Units 1 & 2 to operate on a single loop with power limited to 50::. This completes one action under multiplant itect E-04.

(TAC #46779).

Onr/nul Sign:d By Themis P. Spels Themis P. Speis, Assistant Direc'ar for Reactor Safety Division of Systems Integration

Enclosure:

As stated cc:

R. Mattson L. Phillips G. Schaenk Richard Clark D. B. Vassallo T. I'.arsh J. Rosenthal fi. Lath en J. VanVliet CONTACT:

G. Thomas, RSB

~

~

/jf i 4

X29413 y L 4 & & i t.3 g /t

~Eingr*

Wr.h I

/

1 f" 'r>,

I,RSB DSI:RSB l

1,- 1 l

QSI:AD:RS s

~~> Ufh hbh" ~hokAs""""I TSpels"I"~

~ " " " " ~ ~ "

" " " " " " ~ " "

a q,yjs5 p > g gs ;; p,:;g r g p r 7 ::::::::; ;3;; ;;;;;;.:::::j;;::::::.: :

_