ML20090A681
| ML20090A681 | |
| Person / Time | |
|---|---|
| Site: | 05000000, Brunswick |
| Issue date: | 06/10/1980 |
| From: | Satterfield R Office of Nuclear Reactor Regulation |
| To: | Ippolito T Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML17139C189 | List:
|
| References | |
| FOIA-84-105 NUDOCS 8006260149 | |
| Download: ML20090A681 (1) | |
Text
_ _ _ _ _ _ _
j, Q \\A e p
[
n arce
, /'o 5
5hg%
UNITED STATES J-
, Ag [,/
j NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 f
Y...I JUN 101930 g g f j/ / /
L MEFORAflDUM FOR:
T. A. Ippolito, Chief Operating Reactors Branch No. 2 Division of Licensing i
?
FROM:
R. M. Satterfield, Chief Instrumentation E Control Systems Branch Division of Systems Integration Z
SUBJECT:
UPDATED ENCLOSURE TO OUR SER FOR BRUNSWICK STEAM ELECTRIC PLANT, UNIT 2, DATE NOVEMBER 14, 1979 E
The Safety Evaluation Report on Brunswick, Unit 2 for N-1 Loop Operation dated Noveser 14, 1979 enclosed a technical evaluation by Lawrence Livermore Laboratory / EG&G (Consultant).
The consultant has modified the conclusion section of his technical evaluation.
The changes are editorial to emphasize that plant specific analysis of ECCS in the single-loop mode of operation, not
[
yet completed by the licensee,will require additional review of the instru-mentaticn system.
Our evaluation of November 14, 1979, addressed this concern.
The April 1980 issue of the consultant's technical evaluation is herewith 5
attached as a replacement for the enclosure to our SER of Novem.ber 14, 1979 E
for Brunswick Unit 2.
i
/
l
. M. Satterfield., Chief k
Instrumentation & Control Systems Division of Systems Integration cc:
J. Hannon
~
g.
5
Contact:
J. Burdoin, x29434 9
b
=
1
$()" 3 D M
I