9.-n -
pa Cec UNITED STATES o
NUCLEAR REGULATORY COMM!sSION y,
g i
{ g, 47 g
WASHINGTON, D. C. 20555 s"
I
\\,+
./
Docket No. ::0-298 IN MEMORANDUM FOR:
Thema N. Novak, Assistant Director for Operating Reactors, DL FROM:
Themis P. Speis, Assistant Director for Reactor Safety, DSI
SUBJECT:
COOPER NUCLEAR STATION SINGLE LOOP OPERATION, NEBRASKA PUBLIC POWER DISTRICT Plant Name:
Cooper Nuclear Station Docket Number:
50-298 NSSS Supplier:
General Electric Responsible Branch: ORB-2 Project Manager; B. L. Siegel Review Status:
Complete TAC Number:
42418 Cooper SER for Single Loop Operation (SLO) with power operation limited to 50%
wc; issued on December 10, 1981.
The following requirements were among the conditions for SLO.
a) APRM flux noise will be measured once per shift and the recirculation pump speed will be reduced if the flux noise e.<.ceeds 5-percent peak to peak.
b) The core plate delta noise be measured once per shift and the recirculation pump speed will be ec:.ced if the noise exceeds 1 psi peak to peak.
The staff requires that the licensee perform daily surveillance on the jet pumps to ensure that the pressure drop for cne jet pump in a loop does not vary from the mean of all jet pumps in that loop by more than 5%.
The above requirements were imposed based on SLO experience of other BWRs especially Browns Ferry-l. But the licensee (Nebraska Public Power District) during a tele-conference on February 11, 1982 has indicated that the operating margins we imposed for ApRM flux noise and core plate delta noise are too stringent and too difficult to conform during SLO. The. licensee requested relief from the 5% margin we specified..The licensee proposed that they will monitor the noises at about 40% of power for a reasonable time period of 1/2 hour to I hour and the cperating margin they get will be increased by a maximum of 50% to get the allowable margin at 50T, power.
p1 L
JOH B GE The noise levels at reoper during SLO may not be same as other BWRs, and it
-may vary during different power and flow conditions. We believe the proposed method to determine the operating margins for the flux nosie and core plate delta. noise during SLO give sufficient conservatism to satisfy our BF-1 concerns
.hence is acceptable. The licensee may be informed accordingly.
Themis P. Speis, Assistant Director for Reactor Safety, DSI cc:
B. Siegel
.D. Vassallo R. Clark C. Berlinger RSB Section Leaders RSB Section B Members G. Thomas
+
.O
.2
.