Forwards Revised Tech Specs Updating 800805 Submittal Re Single Loop Operation
ML20071K539
Person / Time
Site: Cooper Entergy icon.png
Issue date: 07/28/1982
From: Pilant J
NEBRASKA PUBLIC POWER DISTRICT
To: Vassallo D
Office of Nuclear Reactor Regulation
Shared Package
ML20071K541 List:
References
LQA8200163, TAC-42418, NUDOCS 8208020126
Download: ML20071K539 (2)


Text

,

k p

a

~'

GENERAL OFFICE hj T

Nebraska Public Power District

" ""etess"eS*4'f"^&M S**"

LQA8200163 July 28, 1982 U.S. Nuclear Regulatory Commissien Attention:

Mr. Domenic B. Vassallo, Chief Operating Reactors Branch No. 2 Division of Licensing Washington, DC 20555 Subj ec t :

Single Loop Operation Revised lechnical Specifications

Reference:

1) Letter from J. M. Pilant to T. A. Ippolito dated August 5, 1980, " Change to Appendix A Technical Specifications-Single Loop Operation"
2) Letter from J. M. Pilant to D. B. Vassallo dated May 6, 1982, " Single Loop Operation -

Response to NRC Questions"

Dear Mr. Vassallo:

The District submitted proposed Technical Specifications for single loop l

operation with Reference 1.

Revised Technical Specifications were sub-sequently submitted with Reference 2.

Since that time there have been j

numerous discussions on this issue at the request of the Staff.

Per the Staff's request, enclosed are updated Technical Specification pages from our August 5, 1980 submittal which incorporate the Staff requests and all recent license amendments through Amendment 80.

Additionally, in a telephone conversation July 22, 1982, the Staff requested assurance that the changes in setpoints which will result from the enclosed Technical Specifications will be made properly.

Station Procedure 10.1 "APRM Calibration" has been reviewed, approved and utilized extensively over the years at CNS.

This procedure was recently modified to include a modification for APRM gain adjustment to account for the difference between effective drive flow for single loop and two loop operation. This modification simply involves adding a term.66AW to the APRM readings. After completion of the APRM adjustment, the results are reviewed by the Shift Supervisor and the CNS Engineering Department.

This procedure ensures the necessary adjustments are performed properly.

The District once again respectively requests expeditious issuance of these Technical Specifications so that future Emergency Technical C7/

8208020126 820728 PDR ADOCK 05000298 P

PDR

1

/,'

Mr. Domenic B. Vaasallo July 28, 1982 Page 2 Specification changes will not be necessary.

Sincerely, M. Pilant Division Manager of Licensing and Quality Assurance JMP:JDW:cmk Enclosure