ML20091K537
| ML20091K537 | |
| Person / Time | |
|---|---|
| Site: | 05000000, Pilgrim |
| Issue date: | 01/22/1976 |
| From: | Eisenhut D Office of Nuclear Reactor Regulation |
| To: | Goller K Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML17139C189 | List:
|
| References | |
| FOIA-84-105 NUDOCS 8406070127 | |
| Download: ML20091K537 (1) | |
Text
- n nta O 6C/w)Ct2 y
- g UNITED STATES
'p..
- t NUCLEAR REGULATORY CoMMisSIO.
5.3 i
h,f?fy/)j WASHINGTON, D. C. 20555 3M..
J.'3 n2 ie17(,
Docket No. 50-293 MEMORANDUM FOR:
K. R. Goller, Assis~ tant Director for Operating Reactors, D0R j
i FROM:
D. G. Eisenhut, Assistant Director for Operational i
Technology, DOR
SUBJECT:
SINGLE LOOP OPERATION - PILGRIM UNIT 1 i
l Plant Name:
Pilgrim Unit 1 l
Docket No.:
50-293 Licensing Stage:
Post OL Responsible Branch and Project Manager:
LWR-2, P. O'Connor Technical Review Branch Involved:
Reactor Safety Review Status: Complete Enclosed is the Reactor Safety Branch's Safety Evaluation of the non-ECCS portions of the Boston Edison Company's requestMfor single I
loop operation of the Pilgrim Unit 1 plant.
The Analysis Branch has reviewed the ECCS analysis and the Plant Systems Branch has reviewed single failures in one loop operation.
Their safety evaluations will be submitted separately.
/
i
< hk 0
i Darrell G. Eisenhut, Assistant Director for Operational Technology i
Division of Operating Reactors i
Enclosure:
As stated cc:
V. Stello D. Ziemann R. Baer
- ?";
y (Lbl Nn 17, m'>
R. Frahm
[Y[
/ f q cl 2 R. Woods J. Burdoin
- "My **'
kdackf AEDO 2.0917 P. Norian L. Olshan 8406070127 040319 PDR FOIA BELL 84-105 PDR
~c y
n.