ML20091K537

From kanterella
Jump to navigation Jump to search
Forwards Reactor Safety Branch Safety Evaluation of non-ECCS Portions of Util Request for Single Loop Operation. Analysis Branch Reviewed ECCS Analysis & Plant Sys Branch Reviewed Single Failures in One Loop Operation
ML20091K537
Person / Time
Site: 05000000, Pilgrim
Issue date: 01/22/1976
From: Eisenhut D
Office of Nuclear Reactor Regulation
To: Goller K
Office of Nuclear Reactor Regulation
Shared Package
ML17139C189 List:
References
FOIA-84-105 NUDOCS 8406070127
Download: ML20091K537 (1)


Text

n nta O 6C/w)Ct2 y
  • g UNITED STATES

'p..

  1. t NUCLEAR REGULATORY CoMMisSIO.

5.3 i

h,f?fy/)j WASHINGTON, D. C. 20555 3M..

J.'3 n2 ie17(,

Docket No. 50-293 MEMORANDUM FOR:

K. R. Goller, Assis~ tant Director for Operating Reactors, D0R j

i FROM:

D. G. Eisenhut, Assistant Director for Operational i

Technology, DOR

SUBJECT:

SINGLE LOOP OPERATION - PILGRIM UNIT 1 i

l Plant Name:

Pilgrim Unit 1 l

Docket No.:

50-293 Licensing Stage:

Post OL Responsible Branch and Project Manager:

LWR-2, P. O'Connor Technical Review Branch Involved:

Reactor Safety Review Status: Complete Enclosed is the Reactor Safety Branch's Safety Evaluation of the non-ECCS portions of the Boston Edison Company's requestMfor single I

loop operation of the Pilgrim Unit 1 plant.

The Analysis Branch has reviewed the ECCS analysis and the Plant Systems Branch has reviewed single failures in one loop operation.

Their safety evaluations will be submitted separately.

/

i

< hk 0

i Darrell G. Eisenhut, Assistant Director for Operational Technology i

Division of Operating Reactors i

Enclosure:

As stated cc:

V. Stello D. Ziemann R. Baer

?";

y (Lbl Nn 17, m'>

R. Frahm

[Y[

/ f q cl 2 R. Woods J. Burdoin

  • "My **'

kdackf AEDO 2.0917 P. Norian L. Olshan 8406070127 040319 PDR FOIA BELL 84-105 PDR

~c y

n.