_
~
EVALSATION OF i
,$5-W 7g e
SINGLE-LOOP OPEMTION I
PILGRD! NUCLEAR POWER STATION, UNIT 1 1.
INTRODU TION The Boston Edison Company (BEC), in its letters to the NRC dated Nove=ber 17, 1975 and March 1 and 19,1976, submitted infornation to support its proposed operation of the Pilgrim Station, Unit I with one recirculation loop,out of service (single-loop operation).
The above cited letters presented the licensee's analyses of signif'icant
=
events, based on its review of accidents and abnor=al operational transients associated with power operations for the single-loop mode of operation.
These analyses were performed by the General Electric (GE) on a generic basis.
Conservative assumptions were e= ployed in the GE analysis (NEDO-20999, dated October 1975,"Pilgri= Nuclear Power Station Unit 1 License Amendment for Single-Loop Operation") to ensure that its generic analyses were applicable to Pilgrim, Unit 1.
9 N
The licensee states in its submittals for single-loop operation, that the only changes to the p.rotection system are modif'ications to the rod block setpoints of the Rod Block Monitor (RBM) system and to the f
scram trip settings, 'of the Average Power Range monitor (APRJf) system.
t i
8406070169 840319 b5 PDR
[t,-g4 10 s,,...,
,.s J
L
./
- agy
,7 2.
EVALUATION The analysis for single-loop operation revealed that, because of reverse flow through ten of the twenty jet pumps (with the recircula-tion equali er valves closed), the present rod block setpoint equation shown in the Technical Specifications for Pilgrim, Unit I has to be modified to provide adequate local core protection for the' postulated rod withdrawal error.
The new rod block monitor equation was developed from the results of tests performed during a period when the Pilgrim reactor was operated in the single-loop mode for short periods of time.
The existing Technical Specifications permit operation in the single-loop mode for a period of up to twenty-four hours.
The APRM trip settings are flow-biased in the same manner and by the same flow signal as that for the RBM setpoints. Setpoint changes which require more conservative flow rate values must be set in the RBM system and APRM scra= trip system. These settings will be delineated in the Technical Specifications., Power will be restricted to a maximum of 70% of rated power while operating th the single-loop mode, and only manual flow control will be allowed.
The Technical Specifications will be revised to allow operation in the singic-loop mode for unrestricted periods.
This mode of operation
[
is desired by the licensee to facilitate more extensive emergency 8 f h.
=aintenance such as replacement of recirculation pu p seals without the need for shutting down the reactor.
The licensee st.ates tha't q
u 'I e
^
,.a
I
..~
. single-loop operation will not be a planned mode of operation.
Pas:
experience indicates that operation in thb mode is typically required for periods of about 14 days during ap:fm;i7"iW4-.. qcycle.
OP The licensee states that approximately two to three hours are required to reset the RBM rod block and APRM scram setpoints with' the present configuration.
These adjustments entail readjusting the pcVer and flow q
potentiometers in each of the six APRM channels and the two RBM channel modules in the power range cabinets which are located in the control room.
We require that these adjustments be made with the plant in Hot Standby or shutdown.
One channel of the ' multi-channel system will g
be adjusted at a time and then returned to service.
Before all channels are returned to service the new trip setpoints will be verified by the, instrument engineer following the readjustment and testing by the tecnnician.
Two operators will perform, functional tests to double-check.the new setpoint settings.
The sequence as outlined above is written into the plant op'erating procedures.
We find this acceptable for the interim period until the 1978 refueling outage..At that time, the licensee will be required to make certain hardwire modifications l-to the systems to facilitate se: point changes from the, power range cabinets via ccatrol switches to preclude the need for entering the protection cabinets to make " screwdriver" adjustments.
The licensee's proposed design for these modifications must be submitted to the staff for review.
.. (
e 0
e d
I
, s.
l' y st s
The new rod block and trip setpoints vary linearly as a function of recirculation flow rate.
For power increases by rod withdrawal, the RBM rodblock must be set up to the next higher trip level by manual operator action. The APRM scram trip follows automatically the new trip curve for both power increases and decreases.
?? ***
?
During our review of the single-loop' mode of operation, we found that interlocks are provided to allow pump start only if the recirculation
~r r pump discharge valve,is closed, the bypass valve is open, an.d the suction valve-is open.
This configuration would limit'the amount of. -
cold water which could be transported through the reactor vessel from
{
a cold loop startup, thereby limiting the effect of cold water slug While these interlocks are provided, no credit for their event.
safety function is taken in the safety analysis for single-loop operation'.
During our review,we found that the Low Pressure Coolant Injection (LPCI) system loop selection logic is designed for operation in either the
~
normal two-loop or single-loop : ode of operation.
However, since no "i
credit is given for the ECCS function provided by the LPCI system; LPCI
.a selection logic, function has been determined to have no significance to rj the safety of sin 21e-100P. Operation.
The ECCS meets the require.5ents of
...a j
Appendix X,10 CFR Part 50 exclusive of the LPCI system.
3.'
CONCLUSIONS We have completed our review of the documentation submitted by.the licensee, and we conclude that:
Tj D
_ g.l e
' ~ ' '
0 5
j-T, s, y
/
,/-
a)
The more conser.ative RBM rod block setpoints and AP?3: scram
~
trip settings which have been selected for single-1 cop operabon are consistent with the assumptions cade in the safety analysis j
of the plant for single-loop operation.
b) The interim procedure for setting the new RBM rod. block set,
i i
points and APRM scram trip settings into the system as outline.d l
3 in this evaluation while in the Hot Standby operating mode Vill i
gy 3
not degrade the integrity of the RBM or the kPRM of the Reactor
'f 4
Protection System.
I c) The RBM rod block and APRM scram trip systems will be modified (hardwired) during the 19 refueling ou'tage so that the rod
~
(
block and trip settings for the single-loop operating mode can be more efficiently set into the system,i.e., use of a control switch (es)..
d)
The plant operating power will be restricted to a maximum of 70% of rated power during single-loop operation with the recirculation loop equali:er valves closed and with recirculation loop flow controlled manually by the operator.
The proposed modifications to the plant for single-loop operation as
~
described by Boston Edison Company satisfy the requirements of EIC53 Branch Technical Position 12 of the Standard Review Plan and conform to _ the requirements of the single failure criterion.
Accordingly, we conclude that the proposed modifications are acceptable.