ML20090B244

From kanterella
Jump to navigation Jump to search

Forwards Safety Evaluation Re Plant Operation on Single Loop W/Power Limited to 50%.Evalution Completes One Action Under Multi Plant Item E-04
ML20090B244
Person / Time
Site: 05000000, Cooper
Issue date: 12/10/1981
From: Speis T
Office of Nuclear Reactor Regulation
To: Novak T
Office of Nuclear Reactor Regulation
Shared Package
ML17139C189 List:
References
FOIA-84-105 TAC-42418, NUDOCS 8112300246
Download: ML20090B244 (1)


Text

p s

2 f['# Etcug'e,

{

M UNITED STATES NUCLEAR REGULATORY COMMisslON 4

y' g

wassincTon, o. c. 2osss y_g a e

\\,

,/

DEC 10198)

Docket tio.: 50-298 MEMORANDUM FOR: Thomas M. Novak, Assistant Director for Operating Reactors Division of Licensing FROM:

Themis P. Spets Assistant Director for Reactor Safety Division of Systems Integration

SUBJECT:

SAFETY EVALUATION OF COOPER NUCLEAR STATION SINGLE LOOP OPERATION Plant Namer Cooper Nuclear Station Docket Number:

50-298 NSSS Supplier:

General Electric Responsible Branch:

ORB-2 Project Manager:

B. L. Siegel Review Status:

Complete Enclosed is the Safety Evaluation Report to permit Cooper Nuclear Station to operate on a single loop with power limited to 50%.

This completes one action under multiplant item E-04.

(TAC #42418)

'f~

.i1 W.: ~

Themis P. Speis,, Assistant Director for Reactor Safety Division of Systems Integration

Enclosure:

As stated cc:

DSI Record Copy (P. Triplett)

~

R. Mattson D. Eisenhut C. Liang G. Mazetis

.B. Sheron S. Gupta C. Berlinger W. Hodges B. L. Siegel Richard Clark

.T. A. Ippolito G. Thomas CONTACT:

G. Thomas, X29445 g z.36dLW g

. -