Text
___
c 4
UNITED STATES j
p
- g NUCLEAR REGULATORY COMMISSION l
u o
WASHINGTON, D. C. 20555 i
g
%, * *.s /
NOV 151976 Docket No. 50-293 MEMORANDUM FOR:
K. Goller, Assistant Director for Operating Reactors, DDR FROM:
D. Eisenhut, Assistant Director for Operational Technology, DDR
SUBJECT:
SINGLE LOOP OPERATION - PILGRIM UNIT 1 PLANT NAME: Pilgrim Unit 1 DOCKET NO.: 50-293 LICENSING STAGE:
Post CL RESPONSIBLE BRANCH AND PROJECT PN4AGER:
LWR-2, P, O'Connor TECHNICAL REVIEW BRANCH INVOLVED:
Reactor Safety REVIEW STATUS: Awaitir.g Information The Reactor Safety Branca, in conjunction with the Analysis Branch (DSS),
is reviewing the Boston Edison Company's request for single loop operation of the Pil' grim Unit 1 clant.
Enclosed is additional information we require to complete our r view of the non-ECCS aspects of single loop operation.
LU' Darrell G. Eisenhut, Assistant Director for Operational Technology Division of Operating Reactors
Enclosure:
i As stated cc:
V. Stello D. Ziemann R. Baer F. Coffman P,O' Conner /
R. Frahm Z. Roszttitzy R. Audette L. 01shan 1
8406070159 840319
$00Lb 05 PDR 6
W o
e The idle loop startup transient has been analyzed in your FSAR from an ini.tial power of 70%.
In supplement 1 to NED0-20999, page 4-1, it states that " operation with one recirculation loop results in a maximum power output which is 20 to 30% below that from (sic) which ca..
be attained for two-pump operation."
Is 70% power the most severe initial power for the idle loop startup transient analysis?
If not, revise the analysis using the most severe initial power level.