Interim Significant Const Deficiency Rept SD-S3 Re Improperly Crimped Lugs on Isolator Cabinets/Main Ventilation,Air Conditioning & Other Panels.Initially Reported on 840215.Next Rept by 840601
ML20087N518
Person / Time
Site: Millstone Dominion icon.png
Issue date: 03/16/1984
From: Counsil W, Sears C
NORTHEAST UTILITIES
To: Murley T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
F0500A, F500A, SD-S3, NUDOCS 8404030533
Download: ML20087N518 (2)


Text

- _ _ _ _ _ _ _ _ _ _ _ _ _

T.

General Offices

"' '""*n . co*" P.O. BOX 270 q

N7,o,,,.17 ~~ HARTFORD. CONNECTICUT 06141-0270 g .ame=, weanu eravice co - (203) 666-6911

,,on,.e., ,,, o,-

March '.6,1984 Docket No. 50-423 F0500A Dr. Thomas E. Murley Regional Administrator Region i U. S. Nuclear Regulatory Commission 631 Park Avenue l

King of Prussia, PA 19406

Dear Dr. Murley:

Millstone Nuclear Power Station, Unit No. 3 Reporting of Potential Significant Deficiencies in Design and Construction:

Isolator Cabinets / Main Ventilation, Air Conditioning and Other Miscellaneous Panels with improperly Crimped Lugs (SD-S3)

In a February 15,1984 telephoi conversation between your Mr. T. Rebelowski and our Mr. R. E. Lefebvre, Northeast Nuclear Energy Company (NNECO) reported a potential significant deficiency in the construction of Millstone Unit No. 3 as required by 10CFR50.55(e). The potential significant deficiency involves inadequate lug crimping in cabinets supplied by Systems Control.

On March 16, 1984, our architect-engineer, Stone & Webster Engineering Corporation, will initiate a 100% inspection and repair program for all pre-turned over panels supplied by Systems Control. NNECO will initiate a similar program for all turned over panels supplied by Systems Control by March 23, 1984. These programs will determine the corrective actions necessary to resolve this significant deficiency, as well as the completion date for its resolution.

As such, we are not able to provide you with a final report at this time.

However, we will provide you with an update on this matter before June 1,1984.

Very truly yours, W .C5. b rru.

W. G. Counsil Senior Vice President By: C. F. Sears Vice President Nuclear and /

8404030533 840316 Environmental Engineering

-PDR ADOCK 05000423

, PDR ,,