Commonwe:lth Edison

[.O]r C~5 , one First Nitaonal Plaza. Chicago. filinois Address Reply to. Post Office Box 767 Mf

. Chicago, litinois 60690 December 6, 1983 Mr. James G. Keppler Regional Administrator U.S. Nuclear Regulatory Commission Region III 799 Roosevelt Road Glen Ellyn, IL 60137

Subject:

Byron Generating Station Units 1 and 2 Reactor Coolant Pump Bearing Failure NRC Docket-Nos 50-454 and 50-455 References (a): June 9, 1983 letter from E. D. Swartz to J. G. Keppler.

(b): September 23, 1983 letter from T. R. Tramm to J. G. Keppler

Dear Mr. Keppler:

This letter provides a third interim report on the failure of a bearing on rector collant pumps lA at Byron Generating Station. For NRC tracking purposes this deficiency is numbered 83-07.

. In reference (b) we indicated that our final report of this bearing failure was to be issued in October, 1983. This is to inform you that the report is now expected to be available by January 15, 1984.

Please address questions regarding this matter to this office.

Very truly yours, 8322190027 831209 gDRADOCK05000 T. R. Tramm Nuclear Licensing Administrator 1m cc: Director of Inspection and Enforcement NRC Resident Inspector - Byron

.ZEA7 7712N DEC g 33 ) 0