ML20138P524
| ML20138P524 | |
| Person / Time | |
|---|---|
| Site: | Byron, Braidwood, 05000000 |
| Issue date: | 10/25/1985 |
| From: | Miosi A COMMONWEALTH EDISON CO. |
| To: | James Keppler NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| References | |
| 0815K, 815K, 82-03, 82-3, NUDOCS 8511070216 | |
| Download: ML20138P524 (1) | |
Text
.
bN6 ;
CN Commonwe lth Edison
/
O ) One First National Plaza. Chicago, Illinois O
Address Reply to: Post Ottice Box 767 Chicago Winois 60690 October 25, 1985 I
j Mr. James G. Keppler j
Regional Administrator i
Region III U.S. Nuclear Regulatory Commission I
799 Roosevelt Road Glen Ellyn, IL. 60137
Subject:
Byron Station Units 1 and 2 Braidwood Station Units 1 and 2 1
Emergency Diesel Generator Field Relay Failure NRC Docket Nos. 50-454, 50-455, 50-456, and 50-457
Reference:
(a)
September 3, 1982, letter from j
T. R.
Tramm to J. G. Keppler
Dear Mr. Keppler:
The above reference transmitted Commonwealth Edison's final 4
report relative to a relay deficiency reported to the NRC on our j
emergency diesel generators (55(e) report 82-03).
The purpose of i
this letter is to revise that response.
Our final report identified two corrective actions to be taken to remedy this problem (1) replacement of the speed sensing auxiliary relay with heavy duty j
relays and (2) replacement of the 120 VAC voltage sensing relays with 125 VDC relays and a diode rectifier circuit.
The 120 VAC voltage sensing relays (VR) which were i
identified to be replaced with 125 VDC relays were actually replaced l
with 110 VDC relays.
This change has been tested and qualified for it's intended purpose and therefore is considered to be acceptable.
Tests and analysis of this circuit can be found in the qualification report for this equipment.
Very truly yours, j
8511070216 851025 h*k 4
4 ADOCK 05000454 PDR PDR S
A. D.
losi Nuclear Licensing Administrator
/kl) cc:
NRC Resident Inspector - Braidwood 0815K OCT 2 81985 Z G427 IO