Category:DEFICIENCY REPORTS (PER 10CFR50.55E & PART 21)
MONTHYEARML20217A1691999-09-22022 September 1999 Part 21 Rept Re Engine Sys,Inc Controllers,Manufactured Between Dec 1997 & May 1999,that May Have Questionable Soldering Workmanship.Caused by Inadequate Personnel Training.Sent Rept to All Nuclear Customers ML20207M9231999-03-12012 March 1999 Amended Part 21 Rept Re Cooper-Bessemer Ksv EDG Power Piston Failure.Total of 198 or More Pistons Have Been Measured at Seven Different Sites.All Potentially Defective Pistons Have Been Removed from Svc Based on Encl Results ML20140A9661997-05-29029 May 1997 Part 21 Rept Re Ksv Emergency Diesel Generator Power Piston Failure.Caused by Jacket Water in Combustion Chamber. Recommends That Users Verify That Crown Thickness at Valve Cutout Be 100 Minimum NSD-NRC-97-5093, Part 21 Rept Re W Identified Defects That Could Create Substantial Safety Hazard Should Defect Remain Uncorrected. Plans to Complete Proper Refurbishment of All of Returned Breakers Being Established1997-05-14014 May 1997 Part 21 Rept Re W Identified Defects That Could Create Substantial Safety Hazard Should Defect Remain Uncorrected. Plans to Complete Proper Refurbishment of All of Returned Breakers Being Established ML20137G6261997-03-25025 March 1997 Svcs Part 21 Rept Re Emergency Generators Installed at Zion Station Which Developed Significant Drop in Crankcase Lube Oil Level.Caused by Crack in Liner Wall,Allowing Jacket Water to Enter Chamber ML20135E3811997-03-0303 March 1997 Part 21 Rept Re Output Drift W/Increasing Temperature on Several RTD Amplifiers Noted During Installation of RTD by-pass Mod at Station.Action to Identify All Circuit Cards W/Affected Date Codes,Identified ML20117G4641996-05-14014 May 1996 Part 21 Rept Re Cooper Bessemer Reciprocating Products,Div of Cooper Cameron Corp,Issued Ltr to Define Utils/Plants Containing Similar Equipment as Supplied on Cooper Bessemer Ksv & Enterprise Dsr EDGs ML20097J6351996-01-30030 January 1996 Part 21 Rept Re Intermittent Failure of DG Relay Mfg by Amerace Electronic Components.Suspect Relays at Plants Identified & Replaced.Amerace Indicated That Operators & QC Personnel Made Aware of Need for Proper Soldering ML20096E6511996-01-18018 January 1996 Part 21 Rept Re Failure of MOV Motor Pinion Gear Mfg by Limitorque at Byron Station.Replacement & Insp Activities Initiated for Potentially Impacted Populations of MOVs at Byron & Braidwood Stations ML20094R7391995-11-28028 November 1995 Potential Part 21 Rept Re Ksv EDG Sys Mfg by Cooper-Bessemer Reciprocating Products Div,Div of Cooper Cameron Corp. Recommends That All Utils Verify Open Oil Passage in Assembly ML20082Q9491995-04-21021 April 1995 Part 21 Rept Re Notifying Commission of Potential Design Defect of Ksv EDG Sys ML20077D3431994-11-29029 November 1994 Part 21 Rept Re Suspect Master Connecting Rods & Contains Info Location in Engine for Rods ML20078G3051994-11-0909 November 1994 Rev to Part 21 Rept Re Potential Problem W/Master Power Connecting Rods.Vendor Recommends Listed Utils Perform Visual Insp of Master Rods to Determine Applicability of Rept ML20071J1891994-07-22022 July 1994 Final Part 21 Rept Re Cracks Found in Body to Bonnet Nuts on Copes-Vulcan Airoperated Valves.Operability Evaluation for Byron Units 1 & 2,of Affected Valves W/Nuts of Heat Numbers H & I Completed on 940622 ML20073S9541994-06-27027 June 1994 Part 21 Rept Re Incorrect Matl Supply Discovered on Unshipped Order.Pump Div Will Notify Enertech W/ Recommendation That Items Supplied W/Incorrect Matl Be Removed & Destroyed ML20070A1441994-06-22022 June 1994 Part 21 Rept Re Conditions Which Affect Hydraulic Valve Operators Supplied by Bw/Ip to Enertech Co & Listed Utils. Vendor Will Notify Enertech W/Recommendations That All Items Supplied W/Incorrect Matl Be Removed & Destroyed ML20059L9861993-11-11011 November 1993 Part 21 Rept Re Deviation Wherein Fully Open Butterfly Valve Located 15 Pipe Diameters Upstream of Sensors Was Disturbing Flow Profile Enough to Cause Ultrasonic Meter to Indicate 3 to 4% Low.Customers Notified & Valve Removed ML20127M5201992-11-24024 November 1992 Final Part 21 Rept Re Reject Lot Serial Numbers of Defective Fuel Nozzle Tips,Consisting of Corrected Page 6 of 921102 Rept Re Reject Lots for Fuel Injector Assembly ML20012A9011990-02-27027 February 1990 Suppls 900213 10CFR21 Rept Re Chilled Water Sys Operation. Evaluation of Crystal River Determined That Postulated High Energy Line Break in Intermediate Bldg May Be Subj to Steam Loads Higher than Normal Loads,Causing Rising Water Temp ML20011F5971990-02-22022 February 1990 Part 21 Rept Re Solder Connections in Abb 27/59 Relays Deteriorated Due to Thermal Stress,Causing Bonding of Printed Wiring Pattern to Glass Epoxy Circuit Board.Interim Circuit Board W/Larger Pads & Higher Wattage Will Be Used ML20011F1941990-02-22022 February 1990 Part 21 Rept Re Abb 27/59 Relay Catalog Series 211L.Solder Connections to Printed Wiring Runs on Bottom of Circuit Board Deteriorated Due to Thermal Stress.No Actual Failure Occurred & Relays to Be Changed at Next Outage ML18153C1011990-02-0202 February 1990 Part 21 Rept Re Two of Three Pc Cards in GE Type SLV11A1 Over/Undervoltage Relays Failing to Produce Output.Short Between Leads Would Result in Damage to Component 1C5. Sketch of Threshold Detection Board Encl ML17223A7451990-01-26026 January 1990 Part 21 Rept Re Backup Rings Furnished in Spare Parts Seal Kits & in 25 Gpm 4 Way Valves as Part of Actuators Made of Incorrect Matl.Rings Should Be Viton & Have Been Identified as Buna N ML20005G6831990-01-0505 January 1990 Part 21 Rept Re Installation Instructions for Grommet Use Range for Patel Conduit Seal P/N 841206.Conduit Seals in Environ Qualification Applications Inspected for Proper Wire Use Range & Grommets Replaced ML19325E0861989-10-16016 October 1989 Followup Part 21 Rept Re Class 1E Battery Chargers W/ Transformers Running at Temps Exceeding Those Used in Qualification Rept When Operating at or Near Full Load Rating of Equipment.Listed Corrective Actions Underway ML19351A2941989-10-0909 October 1989 Part 21 Rept Re Potential of Ambient Compensated Molded Case Circuit Breakers to Deviate from Published Info. Instantaneous Trip Check Will Be Instituted on All Class 1E Thermal/Magnetic Ambient Breakers Prior to Shipment ML19325C9521989-09-29029 September 1989 Part 21 Rept Re Potential Common Failure of SMB-000 & SMB-00 Cam Type Torque Switches Supplied Prior to 1981 & 1976. Vendor Recommends That Switch W/Fiber Spacer Be Replaced ML20248E0121989-09-13013 September 1989 Supplemental Part 21 Rept Re Potential Problem W/Six Specific Engine Control Devices in Air Start,Lube Oil, Jacket Water & Crankcase Sys.Initially Reported on 890429. California Controls Co Will Redesign Valve Seating ML20246P7111989-07-17017 July 1989 Part 21 Rept Re Quench Cracks in Bar of A-SA-193 Grade B7 Component.Quench Cracks Found in One Bar of Matl.Listed Purchasers Informed of Potential Defect.Next Rept Will Be Submitted When Addl Info Becomes Available ML20247D3011989-07-12012 July 1989 Part 21 Rept 10CFR21-0047 Re Control Wiring Insulation of Inner Jacket Used on General Motors Diesel Generator Sets Identified as 999 or MP Series.Encl List of Owners of Units Notified ML20245B6651989-06-15015 June 1989 Part 21 Rept 150 Re Potential Defect in Component of Dsr Standby Diesel Generator.Cause of Failure Determined to Be Combination of Insufficient Lubrication to Bushings.Listed Course of Action Recommended at Next Scheduled Engine Maint ML20246K7401989-04-26026 April 1989 Part 21 Rept Re Incorrectly Stamped Name Plates on Certain Asco Nuclear Qualified Valves.Vendor Will Contact Each Affected Facility & Furnish Correctly Stamped Plates & in Near Future Discontinue Sale of Rebuild Kits for Valves ML20244D8161989-04-13013 April 1989 Part 21 Rept Re Failure of Rosemount Transmitters.All Failed Transmitters Replaced,Inservice Test Procedure Prepared & Monthly Test of All 12 Transmitters in RCS Throughout Cycle 2 Operation Will Be Performed.Review Continuing ML20247P7991989-04-0404 April 1989 Part 21 Rept Re Atmospheric Dump Valves.Cause of Failure Speculative But Result of Piston Ring That Failed to Seal. Resolution to Problem Requires Increasing Pilot Valve Capacity & Reworking of Plug to Enlarge Pilot Flow Area ML20207N4641988-10-12012 October 1988 Part 21 Rept Re Potential Problem W/Emd 20-645E4,Type 999 Excitation Sys Circuit Breaker & Wiring.Potential for Field Circuit Breaker to Trip Due to Combined Air Temps & Field Current Exists at All Plants W/Model 999 Sys ML20205F3211988-10-10010 October 1988 Part 21 Rept Re Potential Deviation from Tech Spec Concerning Ry Indicators Due to Operating Temp Effect on Analog Meter Movement.Initially Reported on 881006.Customers Verbally Notified on 881006-07 ML20207P0451988-10-0505 October 1988 Part 21 Rept 146 Re Defect in Left Intercooler Inlet Adapter on Standby Diesel Engine Generator.Recommends Utils Inspect Left Intake Manifold Drain as Part of Operating Plan.Addl Info Expected by 881015 ML20207P0151988-10-0404 October 1988 Part 21 Rept Re Fuel Nozzle Tips in Standby Diesel Generator KSV-20-T W/Cracks Permitting Diesel Fuel to Be Sprayed Into Cylinders.Heavy Vapors Observed Emitting from Breathers on Some Cylinder Heads ML20245D9541988-09-0606 September 1988 Part 21 Rept Re Condition Involving Inconel 600 Matl Used to Fabricate Steam Generator Tube Plugs & Found to Possess Microstructure Susceptible to Stress Corrosion Cracking ML20154J4101988-05-12012 May 1988 Addendum 1 to Supplemental Part 21 Rept 145 Re Potential Problem w/F-573-156 Pressure Sensor/Lube Oil Trip.Initially Reported on 880429.Addl 1-1/8-inch Diameter W/Deep Counterbone in Pressure Head Added to Activate Valve ML18093A8281988-05-0606 May 1988 Part 21 & Deficiency Rept Re Asea Brown Boveri,Power Distribution,Inc Low Voltage K-Line Circuit Breakers. Efforts Underway to Define Quantity & Type of Component Parts That May Need to Be Replaced ML20153G0111988-05-0606 May 1988 Part 21 Rept Re Potential Defect in Bussman Buss KTK-R Fuse Blocks W/Part Numbers 2078,2079 & 2080.Purchasing Records Reviewed to Identify If Any Parts Were Actually Used or Shipped to Customers.Results Listed ML20153B6191988-04-29029 April 1988 Part 21 Rept Re Potential Defect in Component of Dsr or Dsrv Standby Diesel Generators Supplied to Utils.Recommends Return of Subj Components in Onsite Warehouse Storage & Suggests Surveillance of Devices Already Installed ML20153B2811988-02-22022 February 1988 Part 21 Rept Re Defect in Operation of Gas Monitors Using Fixed Filters.Initially Reported on 880212.Caused by Error in Software for Monitors.Vendor Testing Mod to Software & in Interim Recommends Changing Filters Every 48 H ML20149H8211988-02-11011 February 1988 Final Deficiency Rept 457/87-01 Re Diesel Engine Generator Rocker Arm Failure.Initially Reported on 870217.Util Took Steps to Determine Strength of Rocker Arms.Low Strength Rocker Arms Replaced W/New Rocker Arms ML20196D6281988-02-10010 February 1988 Part 21 Rept Re Potential Defect in Certain Model RTF-480/120-30 Ac Line Regulating Transformers Involving Nuisance Tripping of 100 Ampere Ac Input Circuit Breaker When Initializing Unit.Breaker Should Be Replaced ML20149J0261987-12-21021 December 1987 Part 21 Rept Re Installation of Relay Part B8002DN in Foxboro 62H Controllers in Facilities.Subj Relay Must Be Replaced by Relay Part N0196ZN.Relay B8002DN Not Used in Any Other Plants ML20235U0271987-10-0707 October 1987 Part 21 Rept Re Westinghouse Plant Steam Generator Tubes Susceptible to High Cycle Fatigue Failure Similar to 870715 Event at North Anna Unit 1.Caused by Mean Stress in Tube & Superimposed Alternating Stress ML20237G5781987-08-0707 August 1987 Part 21 & Deficiency Rept 142 Re Defect in Starting Air Distributor Sys of Dsr Standby Diesel Generator.Drain Sys Will Be Permanently Installed in Start Air Distributor ML20236N7131987-08-0505 August 1987 Part 21 Rept Re Potential Problem W/Vibration in Lube Oil & Jacket Water Sys.At Rancho Seco Site,Fatigue Cracks Found in Welds of Support Members in Lubricating Oil Sys.Cracks Due to Vibration in Lube Oil Sys.Addl Preventive Action Taken 1999-09-22
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217G9961999-10-14014 October 1999 SER Accepting First 10-year Interval Inservice Insp Requests for Relief for Plant,Units 1 & ML20217H5221999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Byron Station, Units 1 & 2.With BW990066, Monthly Operating Repts for Sept 1999 for Braidwood Station, Units 1 & 2.With1999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Braidwood Station, Units 1 & 2.With ML20217P6351999-09-29029 September 1999 Non-proprietary Rev 6 to HI-982083, Licensing Rept for Spent Fuel Rack Installation at Byron & Braidwood Nuclear Stations ML20217A1691999-09-22022 September 1999 Part 21 Rept Re Engine Sys,Inc Controllers,Manufactured Between Dec 1997 & May 1999,that May Have Questionable Soldering Workmanship.Caused by Inadequate Personnel Training.Sent Rept to All Nuclear Customers ML20212A7441999-09-10010 September 1999 Safety Evaluation Concluding That Alternatives Contained in Relief Request 12R-07 Provide Acceptable Level of Quality & Safety BW990056, Monthly Operating Repts for Aug 1999 for Braidwood Station, Units 1 & 2.With1999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Braidwood Station, Units 1 & 2.With ML20212B9261999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Byron Station,Units 1 & 2.With ML20210R6421999-08-13013 August 1999 ISI Outage Rept for A2R07 ML20210U8111999-08-0404 August 1999 SER Granting Licensee Relief Requests VR-1,VR-3 & Portion of VR-2 Pursuant to 10CFR50.55a(a)(3)(ii).Relief Request VR-4 Does Not Require Explicit NRC Approval Because Relief Applies to Valves Not Required by 10CFR50.55a ML20210R3431999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Byron Station, Units 1 & 2.With BW990048, Monthly Operating Repts for Jul 1999 for Braidwood Station, Units 1 & 2.With1999-07-31031 July 1999 Monthly Operating Repts for Jul 1999 for Braidwood Station, Units 1 & 2.With ML20210K9861999-07-30030 July 1999 Safety Evaluation Accepting Licensee 60-day Response to GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Movs ML20210E2251999-07-21021 July 1999 B1R09 ISI Summary Rept Spring 1999 Outage, 980309-990424 M990002, Revised NFM9900022, Braidwood Unit 2 Cycle 8 COLR in ITS Format & W(Z) Function1999-07-12012 July 1999 Revised NFM9900022, Braidwood Unit 2 Cycle 8 COLR in ITS Format & W(Z) Function ML20216D3841999-07-12012 July 1999 Revised NFM9900022, Braidwood Unit 2 Cycle 8 COLR in ITS Format & W(Z) Function ML20209G1751999-07-0808 July 1999 SG Eddy Current Insp Rept,Cycle 9 Refueling Outage (B1R09) ML20209H3711999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Byron Station, Units 1 & 2.With BW990038, Monthly Operating Repts for June 1999 for Braidwood Station, Units 1 & 2.With1999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Braidwood Station, Units 1 & 2.With ML20207H7771999-06-30030 June 1999 Rev 0 to WCAP-15177, Evaluation of Pressurized Thermal Shock for Byron,Unit 2 ML20207H7851999-06-30030 June 1999 Rev 0 to WCAP-15183, Commonwealth Edison Co Byron,Unit 1 Surveillance Program Credibility Evaluation ML20207H7941999-06-30030 June 1999 Rev 0 to WCAP-15180, Commonwealth Edison Co Byron,Unit 2 Surveillance Program Credibility Evaluation ML20207H8071999-06-30030 June 1999 Rev 0 to WCAP-15178, Byron Unit 2 Heatup & Cooldowm Limit Curves for Normal Operations ML20207H7561999-06-28028 June 1999 Pressure Temp Limits Rept (Ptlr) ML20207H7621999-06-28028 June 1999 Pressure Temp Limits Rept (Ptlr) ML20195J8001999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Byron Station,Units 1 & 2.With BW990029, Monthly Operating Repts for May 1999 for Braidwood Stations, Units 1 & 2.With1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Braidwood Stations, Units 1 & 2.With ML20209H7481999-05-31031 May 1999 Revised Monthly Operating Repts for May 1999 for Braidwood Station,Units 1 & 2 ML20207B6481999-05-25025 May 1999 SER Accepting Revised SGTR Analysis for Byron & Braidwood Stations.Revised Analysis Was Submitted to Support SG Replacement at Unit 1 of Each Station ML20195B2591999-05-19019 May 1999 Rev 66a to CE-1-A,consisting of Proposed Changes to QAP for Dnps,Qcs,Znps,Lcs,Byron & Braidwood Stations ML20206R6991999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Byron Station Units 1 & 2.With BW990021, Monthly Operating Repts for Apr 1999 for Braidwood Station, Units 1 & 2.With1999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Braidwood Station, Units 1 & 2.With M980023, Rev 2 to NFM9800233, Byron Station Unit 2 COLR for Cycle 8A (BY2C8A)1999-04-28028 April 1999 Rev 2 to NFM9800233, Byron Station Unit 2 COLR for Cycle 8A (BY2C8A) ML20195C7961999-04-28028 April 1999 Rev 2 to NFM9800233, Byron Station Unit 2 COLR for Cycle 8A (BY2C8A) BW990016, Monthly Operating Repts for Mar 1999 for Braidwood Generating Station,Units 1 & 2.With1999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Braidwood Generating Station,Units 1 & 2.With ML20205P7001999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Byron Station,Units 1 & 2.With ML20205B5091999-03-26026 March 1999 SER Accepting Relief Requests 12R-24,Rev 0 & 12R-34,Rev 0, Related to Second 10-year Interval Inservice Insp for Byron Station,Units 1 & 2 ML20205C5101999-03-21021 March 1999 Revised Safety Evaluation Supporting Improved TS Amends Issued by NRC on 981222 to FOLs NPF-37,NPF-66,NPF-72 & NPF-77.Revised Pages Include Editorial Corrections ML20204G3831999-03-19019 March 1999 Safety Evaluation Accepting Second 10-yr Interval ISI Request for Relief 12R-11 M990004, Rev 0 to NFM9900043, Byron Unit 1,Cycle 10 COLR in ITS Format W(Z) Function1999-03-17017 March 1999 Rev 0 to NFM9900043, Byron Unit 1,Cycle 10 COLR in ITS Format W(Z) Function ML20206A8831999-03-17017 March 1999 Rev 0 to NFM9900043, Byron Unit 1,Cycle 10 COLR in ITS Format W(Z) Function ML20196A0721999-03-16016 March 1999 Cycle 8 COLR in ITS Format & W(Z) Function ML20207M9231999-03-12012 March 1999 Amended Part 21 Rept Re Cooper-Bessemer Ksv EDG Power Piston Failure.Total of 198 or More Pistons Have Been Measured at Seven Different Sites.All Potentially Defective Pistons Have Been Removed from Svc Based on Encl Results ML20207J4371999-03-0808 March 1999 ISI Outage Rept for A1R07 ML20204H9941999-03-0303 March 1999 Non-proprietary Rev 4 to HI-982083, Licensing Rept for Spent Fuel Rack Installation at Byron & Braidwood Nuclear Stations BW990010, Monthly Operating Repts for Feb 1999 for Braidwood Generating Station,Units 1 & 2.With1999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Braidwood Generating Station,Units 1 & 2.With ML20204C7671999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Byron Station,Units 1 & 2.With ML20206U9011999-02-15015 February 1999 COLR for Braidwood Unit 2 Cycle 7. Page 1 0f 13 of Incoming Submittal Was Not Included BW990004, Monthly Operating Repts for Jan 1999 for Braidwood Generating Station,Units 1 & 2.With1999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for Braidwood Generating Station,Units 1 & 2.With ML20202F6181998-12-31031 December 1998 Cycle 8 COLR in ITS Format & W(Z) Function 1999-09-30
[Table view] |
Text
' . : 3; ; M "r- ;
y a
~.... y:# . Y CORNRORW981100 EdiSOR -.
p; 1 .:- C' / one First Ittiortil Pitts, Chicago, lihnois C ) Addrzss RIply 12 Post Office Box 767.
.{f _ Chicago, Illinois 60690 7
T November 29,~1984 ,
s.
Mr.: James G. Keppler:
- Regional Administrator U.S. Nuclear Regulatory Commission Region III,
-799; Roosevelt Road.-
Glen Ellyn, IL x 60137'
Subject:
Byron' Generating Station Units 1 and 2 Braidwood: Generating Station Units 1-and 2 10 CFR-50.55(e) 30-day. Report Energy Absorbing Material NRC-00cket-Nos.- 50-454/455 and 50-456/457-I Reference (a): E. ' D. Swartz letter to H.10 Denton .
dated November 15,'1984 h .
Dear Mr. Keppler:
I, '
'On October 30, 1984, Commonwealth Edison Company notified Mr..R.-Lerch of your office of'a' potential deficiency reportable
- lpursuantito '10 CFR 50.55(e) regarding the" crush strength of energy n- absorbing material (EAM) used in pipe whip = restraints. This letter
[ ~ provides information.concerning'this matter.ito fulfill the ~
r . thirty-day' reporting requirement and is considered an interim p report. For tracking purposes, this potential deficiency was.
assigned' Numbers 64-07 at Byron and;84-19 at Braidwood.
~
?
Description of Deficiency I
! - During testing of Byron energy-absorbing material-(EAM) et Hexcel, 'the supplier of the EAM, it' was discovered that some material used in the pipe whip. restraints had a lower than specified
= crush' strength. Hexcel's earlier production testing results-for-this material were reviewed and showed that, when tested prior to delivery, it met the~specified crush strength.
Analysis of Safety-Implications Deficient EAM:in pipe whip restraints could result in idamage to nearby equipment during postulated breaks of high energy lines. Case-by-case analyses would be necessary to determine the actual ' consequences of this deficiency; -Such analyses would~
-consider the consequences of whip restraint failure, the as-built capability of the-restraints and the actual expected loads, and the
' likelihood of the design basis breaks.
k 0 NOV 301984 k V_ '
76D4
. 'T
-Corrective Action Taken Hexcel has been requested to provide an evaluation of the -
EAM piece which showed the most significant reduction in crush strength. Hexcel has informed us that the brazing process used to manufacture Byron /Braidwood EAM was revised in 1980. The new brazing process.used to manufacture EAM is considered-by-Hexcel to be a significant improvement over the original brazing process and-is not suspected of any discrepancy at this time.
Based on this information, the following steps have been taken to resolve the problem with respect to Byron /Braidwood stations:
'1. Westinahouse Designed Restraints Hexcel has informed us that the EAM used in Westinghouse designed restraints was manufactured using their current brazing process. Although this process is not considered suspect by Hexcel, they have been requested to . test a number of specimens from a core block manufactured using the current process to evaluate the material variability within the core block. The results from these tests, along with the details of the manufacturing process used for this test block and the core block used to fabricate Westinghouse designed restraints, will be evaluated to determine if any further corrective action is necessary.
- 2. Sargent &'Lundy-Designed Restraints
- a. The number of restraints required for each unit has been re-evaluated by eliminating the arbitrary intermediate pipe breaks. . An analysis for elimination of intermediate pipe.
breaks has been submitted to NRR with a request for expeditious review in Reference (a).
- b. After considering the potential deletions of those restraints which are associated with arbitrary intermediate breaks, there are 21 restraints in each unit at Byron /Braidwood Stations which utilize EAM. Although we believe that design adequacy of these restraints can be shown by further analysis using lower crush strenght, we plan to replace those EAM pieces from these 21 restraints which are associated with terminal breaks. The replacement material will be manufactured by Hexcel using their current brazing process. This approach has been chosen based on considerations of scheduling, feasibility of replacement and preservation of safety margin in restraint design.
v.,
- c. In order to address the issue of material variability for.
the new material, no less than four specimens from different parts of the core block will be tested to determine the crush strength. Design of restraints will be re-evaluated for any crush' strength values outside the specified range. In this evaluation, the information obtained from the. evaluation described in paragraph (1) will also~be considered.
We expect that all corrective action will be complete by January-15, 1985 and that a final report on the corrective actions taken will be filed by January. 31, 1985.
Please address any questions that you or your staff may have concerning this matter to th fice.
I Very truly o}rs,
& 31 Day . Smith Nuclear Licensing Administrator cc: Resident Inspector - Byron Resident Inspector - Braidwood Director of Inspection and Enforcement US Nuclear Regulatory Commission Washington, DC 20555 9480N