Public Version of Rev 2 to Corporate Plan Implementing Procedures,Including Procedures CPIP-3.0 Re Administrative Svc Manager callout/activation,CPIP-3.2 Re Immediate Action Items & CPIP-3.3 Re Message Handling.Revised Index Encl
ML20072J099
Person / Time
Site: Surry, North Anna, 05000000
Issue date: 02/15/1983
From:
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
Shared Package
ML18139C286 List:
References
PROC-830215-01, NUDOCS 8303290743
Download: ML20072J099 (18)


Text

.

_ , , . . . _ _ _ _ . . . '-... . . . - .--w - - - - - -+ -

CPIP Page 1-1 02-15-83 m

VIRGINIA ELECTRIC AND POWER COMPANY Co ES SUBJECT INDEX .

Section No. Page No.

1.0 Corporate Response Manager Call-out/ Activation 1-1 1.1 Corporate Response Manager Situation AppraisalProcedure 1-4 2.0 Public News Center Director Call-out/ Activation 2-1 2.1 Senior Editorial Specialist Media Call-out/ Activation 2-5 2.2 Rumor Control Center 2-7 3.0 Administrative / Services Manager Call-Out/ Activation 3-1 3.2 Immediate Action Items 3-6 -

3.3 Message Handling 3-8 4.0 Scheduling / Planning Manager Call-Out/ Activation 4-1 l

4.1 Scheduling / Planning Support 4-2 5.0 Advisory Support Manager 5-1 6.0 TechnicalSupport Manager Call-out/ Activation 6-1 6.1 Operations Support Activation and Duties 6-3 6.2 Instrumentation and Control Activation and Duties 6-4 6.3 Reactor Analysis Activation and Duties 6-5 6.4 System Analysis Activation and Duties 6-6 6.5 Radiological Control and Waste Management V Activation and Duties 6-7 8303290743 830323 PDR ADOCK 05000280 F PDR

-- -w-- , - . - - > w w w---y , + , -.-,w-- --

--wg---

CPIP-1.0 Page 1-2 02-15-83

,' 2.1 Call-out List (Call principals first)

Corporate Response Manager Time Date Individual Home Phone Business Phone Prin. R. H. Leasburg "

- Alt. J. A. Ahladas Recovery Manager Prin. W. L. Stewart Alt. H. L. Millee Public News Center Director Prin. P. G. Edwards Alt. E. Munsey Corporate Response Coordinator Prin. V. M. Board Alt. . A. L. Geddy Alt. R. B. Brand .

( , Chief TechnicalSpokesman Prin. J. T. Rhodes Alt. E. A. Baum Public Information Director Prin. J. R. Prazier, Jr.

Alt. D. W. Hedgepeth Medical Director Prin. W. S. Dingledine Alt. C. Tatum (If no answer call) R. Cockerham Admin / Service Manager Prin. R. L. Baldwin' Alt. J. P. Maciejewski Scheduling / Planning Manager Prin. P. R. Beament Alt. G. Wroniewicz

~

a ,- '

~

CPIP-2.0 Page 2-2 02-15-83 p .

2.2 Call-out List: .

g Time Date Individual ,

Home Phone Business Phone Senior Editorial Specialist:

Prin. R.' A. Smith Alt. J. J. Austin

. Public Information Specialist:

Prin. F. C. Carmichael Prin. A. M. Grier Prin. D. F. Cochran Prin. R. L. Beck Prin. L. A. Hedgepeth Prin. J. M. Barr, Jr. -

P rin. P. A. Walters Prin. M. N. Healy Prin. N. W. Parham P rin. S. N. Gardner Alt. C. J. Busto Alt. S. D. Kirkham (x

( , /

Alt.

Alt.

S. R. Holt D. Burnette ',

EOF News Coordinator:

Prin. F. R. Ellis Alt. E. H. Musser EOF Technical Representative - North Anna:

P rin. A. L. Hogg Alt D. F. DebcoH EOF Technical Representative -Surry:

Prin. D. F. Driscoll Alt. A. L. Hogg

.. . .. . . . . .. ..n. . . . - - .-. . . . . ..

s e CPIP-2.0 Ptga 2-3 02-15-83 A

! Local Media Center Coordinator: .

Prin. P. L. Starkey Alt J. A. Buck Public News Center Clerk:

1 Prin. B. Gayle 3 Prin. J. P. Sherry Prin. N. J. Jewell Alt. L. Gilmer Alt. B. B'. Purnell Local Media Center Clerk:

Prin. D. S. Turner Prin. J. H. Greene

! P rin. D. F. Gibson Prin. J. A. Herndon Alt. T. M. Apperson Alt. B. F. Holderfield Alt. D. S. Davis GovernmentalInformation Director:

Prin. E. L. Crump, Jr.

Investor Information Director:

P rin. A. J. Wallmeyer Alt. W. W. Flowers

Video Communications Specialist

Prin. M. H. Jenkins Alt. J. S. Smith Health Physics Information Director:

Prin. R. R. Irwin (NAPS)

Prin. B. A. Garber (SPS)

Alt. M. L. Johnson (NAPS Alt. C. E. Folz (SPS) t l ._ . . . ._._ _:.

L. =

4
  • s C PIP-2.2 Page 2-7 02-15-83 em

'" CORPORATE EMERGENCY RESPONSE PLAN IMPLEMENTING PROCEDURE 3.1' RUMOR CONTROL CENTER Rumor Control Number -

r Collect calls will be accepted at this number. 'Ihis number serves 10 telephones in One James River Plaza, which will be manned continuously by Public Affairs emergency personnel throughout any Alert or emergency.

?

4 e

CPIP-3.0 Page 3-1 02-15-83

( CORPORATE EMERGENCYhESPONSE PLAN IMPLEMENTING PROCEDURE 3.0 ADMINISTRATIVE SERVICES MANAGER '

CALL-OUT/ ACTIVATION Purpose This procedure provides the Administrative Services Manager (ASM) with a sequence of events to serve as a guide in organizing his team and marshalling the required resources to perfor. . assigned tasks.

Activation This procedure will be activated on the notification of the Administra-tive Services Manager, or his alternate of an Alert, Site Emergency or General Emergency.

1.0 Immediate Function 1.1 Notification The ASM shall immediately start the call out sequence of Attachment 1, using the following message:

"This is . An emergency has been declared at (Surry) (North Anna) Power Station. Report immediately to your designated place of duty."

Note: It shall be at the discretion of the ASM as to whether to call-out.

alternates,' as well as principals, whether to call team members k', , immediately or delay until 'th'e situation develops, and whether to direct EOF team members to report to EOF or CERC to await further instructions. These decisioni shall be based on current location of team members and the known and projected situation of the affected site.

1.2 Call-out List ADMINSTRATIVE SERVICES TEAM Time Date Individual Home Phone Business Phone CERC Administrative / Services Manager:

Prin. R. L. Baldwin Alt. W. R. Runner (N.; Anna Alert)

Alt. G. J. Paxton (Surry Alert)

Alt. J. P. Maciejewski (CERC) Administrative Coordinator:

Prin. I. B. Taylor Alt. D. A. Pickett - . -

E

~

~2-Alt. C. L. Hutcherson >

L. A. Kaplan

-. C. F. Moore -

CPIP-3.0 Page 3-2 02-15-83

. (CERC) Of fice Services Suoervisor:

~

Prin. M. L. Carter ,

Alt. S. M. Vaughan M. L. Brown '

J. M. Johnson

  • A. C. McGee F.L.Shupe ~;

V. G. Valcntine  ;'

O. G. Washington ,

R. A. Washington ,*

M. W. Deal

L. M. Anderson (CERC) Personnel Services Team:

Prin. U. G. Williford '

Alt. Pat Maciejewski (N. Anna Alert) ,

Alt. M. S. Harrel (Surry Alert) '-

C. E. Bullock

  • D. D. Jones (CERC) Communication Advisor:

(# Prin.

Alt.

K. G. Higgins C. F. Neblett .

(CERC) Logistics Team: ,

Prin. J. R. Wine Alt. D. C. Martin -

P. K. Baucom -

J. C. Ferguson H. M. Salkin B. J. Sharp R. F. Tegethoff (CERC) Communicator Team D. L. Smith P rin.

Alt. R. H. Adams '

(Surry Alert)

AIL J. M. McAvoy (N. Anna Alert)

D. J. Fortin (Surry Alert)

W. E. Pheris (N. Anna Alert) ~

= -

% : a_.. a

. - - , _ -- - - c

CPIP-3.0 Page 3-3 02-15-83 r,

( , (CERC) Technical Library Team Prin. R. H. Hunter R. G. Smith, III J. A. Lawler (EOF) Services Coo'dinator:

Prin. C. E. Kube, Jr.

Alt. J. B. Logan J. R. Garvey (EOF) Security Coordinator:

Prin. - L. L. Comstock Alt. C. F. Wheeler (Rich)

(Suffolk)

(EOF) Office Services Coordinator:

Prin. B. J. Patteson (N. Anna Alert)

Prin. G. F. Parent (Surry Alert)

Alt. T. Y. Bailey -

Y. C. Franklin

(" .

(N. Anna Alert)

M. M. Field (N. Anna Alert)

C. B. Austin (Surry Alert)

D. P. Arrington (Surry Alert)

(EOF) Communications Coordinator:

Prin. B. H. Hendrix (Surry Alert)

, P rin. W. L. Austin (N. Anna Alert) -

Alt. D. F. Hudgins (Surry Alert)

Alt. W. C. Young (N. Anna Alert)

~

2.0 CERC Function - ~ ~

2.1 Support Services The Procurement Services principal / alternate shall make initial contact with the following support organizations whether or not their services are required. The official contacted should be informed of the situation and is requested to put the organization in a standby alert status, if not required immediately.

C PIP-3.0 Paga 3-4 02-15-83 When contacting outside agencies and/or vendors during an emergency exercise, the following message shan be used:

~

~'

"'Ihis is , of Virginia Electric and Power Company, We are conducting an emnegency drill at our (North Anna /Surry) Power Station. If this emergency actually occurred, would you be able to provide us with ..."

i Emergency Call Directory BUILDING SECURITY NAME HOME OFF PHONE

-- x 24 hr. coverage on building PURCHASNG DEPP. F. B. McNeil C. A. Brown

)

- K. V. Cumming J. R. Cobb North Anna Incident W. L. Tillman Surry COMMUNIC ATIONS DEPT.

(' Call . . . If no answer, call system operator on

- COMPANY SWITCHBOARD Margaret Lane Kitty Collins Joyce Whitlock INSURANCE DEPr. E. Douberly Robert Blanton, Jr.

Clifford Sinopoli CL AIMS DE Pr. W. D. Keesee ~

Don Coats E. J. Wright, Jr. -

W. R. Thomas, Jr.

C & P TELEPHONE CO. Chief Operator' 24 hr. coverage CENTRAL WAREHOUSE E. Pryor T. Thomas K. Sutterfield E. Freeman

+~. ...

PERSONNEL (EM PLOYMENT) W. W. Sayton t

" Sylvia Brooks -

H. O. Allen

6  %

CPIP-3,0 Page 3-5 02-15-83

' ENVIRONMENTAL SERVICES Forrest Martin Bob Greer MEDICAL SECTION Dr. Dingledine Carolyn Tatum Reba Cockerham VEHICLE DISPATCHER John Keesling -

' ' Eddy Ward Lawrence Stout ENGINEERING SERVICES Otto Schulz Arial (Photography, Carol Miller S2rveys) Del Revere -

Photo Science M.I.S. SUPPORT

. 24 hr. coverage ACCOUNTING Curtis Carlton Debbie Amis G. H. Schwartz 3.0 EO'F Function ~~

(,, , The EOF Administrativ'e Team shall establish contact with the CERC on all available channels as soon as possible.

Support contact information developed by the CERC will be passed to EOF -

Administrative Services Coordinator so that appropriate preparations can be made to receive the services.

3.1 A separate phone circuit has been a<tahnshed for routing CERC-EOF logistics information.

to the CERC,This number will be - ~ and is located in the cubicle adjacent 1

% a 9

- - - e , - - - - , - .

- - - - - - - - - - - - ~ - , - - - > - - --

O

,V c

{ { - - -

CPIP ..t)

Page 3-6 02-15-83

' ~

y....e.--- .----- --..-- 5 I CORPORATE EIAERGENCY RESPOISSE TEAtt 3 SEQUENCE g g STARTS g ADAB0000STRAYlVE SERVICES OROUP g e CALLOUT SEOUEISCE I

'------------------E d

'I"!L l---cail.-- l

' Sie ' m l _-c.n. - TOLI I l I ADMIN I 4

I SVCS I ,

STATION 1 1 ROL l MCRS l-------calle----- M TOLI -sol TOLI EMERG I CERT l 8 ROL l- 1 PERSONNELI----calle= l CERC l---calls TEAM i I (CPIP-1) i 1 TEAM i l COMMUNICATORS I I l 1 1 NOL --calls ~ i BOL I ROL # l l TOL -m4 TOLI

' ' I,"~**

I*

(CPIP-3) INl l 0FFICE SVCS TEAM I SVCS I I ROL t l TEAM l------calle l ROL

-a=4 TOLI OF SERVICES COORD. I LOGISTICS TEAM

'~~***

EOF ADMIN l l 8

I EOF SECURITY COORD.

l_ EOF 0FFICE SERVICES COORD. I BOL Legend

-e=4* TOL I TOL - First person contacted on each list I I~~**

  • COMMUNICATIONS NOL - Next person contacted l l ROL - Rest of list below person contacted l ROL Explanations -e4 TOLI T *
1. This callout procedure is to be used with the most recent revision of the CERT Administrative Services Group Team Assignment List i ROL

/

2. Callers must make sure persons contacted understand their responsibilities to call others (if required by this diagram), to report to their assigned -M  !~~**
  • ADMIN. COORDINATOR i place of duty, or remain on standby alert until needed (as determined by team I leaders / alternates) l ROL i

). All Team members must be contacted, if oossible, to determine what resources

-*4 '~~**

are available. COMMUNICATIONS EOF Followup calls can I

i ROL If P"

4. Initial calls on this diagram should be made from home.

be made from duty location during course of emergency.

i!

I

t C_OFLOOR PLAN.- CT J .0.

P3. 3-7 .

'02 '15-83 ,

gg '

r iD l5 0 [0 e P 1

4- 5 -

I a Go -

5D #}/s s o. -

o f D g -

)

\ -

l (jh 9 Tech.

Supt l r hh

~

Response

lv Manager ,

g-

1. CERC Storage Cabinet _

h f["f* g ,

i. s. *
2. CERC File Cabinet - N
3. CERC Signs / Status GG 'aN r

\T .

l Boards / Easels A - Surry EOF Ringdown w/ speaker affected plant RED phone and speaker on Response Manager's Table '

B - N.A. EOF Ringdown w/soeaker

4. CERC Bookcase C - System Operator PBX.

D- .(also has N ,'which do not ring) Jack on back of phone on E . ._ \~ -.

N - P. A. system selected lina.

F - Surry EOF Jack 0 - PNC ringdown G - N.A. EOF Jack P - Emergency lighting II - Status Board Q - Response Manager's table . .

I " Rover" Board R - Administrative Services Manager's table .

J - Table for overhead projector K - Affected station map L & N - North Anna and Surry maps

CPIP-3.2 Page 3-8

. 02-15-83 CORPORATE EMERGENCY RESPONSE PLAN IMPLEMENTING PROCEDURES 3.2 IMMEDIATE ACTION ITESS

Purpose:

This proce' dure provides a sequence of events to be followed for setting up the Corporate Emergency Response Center with resources to perform assigned tasks.

2 Activation: This procedure will be activated by the Administrative / Services Manager, or his alternate, upon notification of an Alert, Site Emergency or General Emergency.

1.0 Immediate Action 1.1 The following immediate action items should be carried out in the order listed:

1.1.1 Insure Security Officers are on floor. Phone .-

I Cary St. side 1.1.2 Turn on lights - flip all switches.

elevator core 1.1.3 Retrieve arm bands put one on, rest on CERC File-2 Admin. Sves. Table.

1.1.4 Retrieve badges give to Sec'urity officer. CERC File-2 1.1.5 Turn on copy machine -Insure toner and paper Copy Room supply is adequate. ,

1.1.6 Set up tape player on red phone. Bob Nicholls desk to CERC A g B

~

1.1.7 Insure communication channels are open to Red Phone affected site. If not, call Communications at (CERC)

Jr EOF (N. A. u , (Surry -

1.1.8 Insure aperture card reader / printer is opera- Tech.

tional(e.g., toner, paper, etc.). Library 1.1.9 Insure video tape deck is on floor. Get key to 14th floor camera room from l Security.

1.1.10 Post Functional Communication Diagram. CERC - 1 1.1.11 Insure head-set is plugged in D and F or G. CERC File-2 (blue pouch) 1.1.12 Locate easels. CERC - 3 1

CPIP-3 2 Paga 3-9 02-15-83 p.

i 1.1.13 Put two status boards on easels. CERC - 3 to CERC - H

~

1.1.14 Post Sign-In Sheet and Locator Board on easels. CERC -3 to )

Reception 1.1.15 Verify Admir. Services call-out list (CPIP-3), CERC - 4 has been initiated. If not, instruct someone to start.

1.1.16 Insure tables and chairs are arranged according CERC to attached diagram.

1.1.17 Put overhead projector on Table J, plug it in CERC - 3 and place package of acetate near it.

1.1.18 Arrange two sets of signs at the team tables CERC - 1 and work area (See attached diagram and backs of team signs).

1.1.19 Check emergency lighting. CERC-area E 1.1.20 Place CPIP's at appropriate tables (2 cc each). CERC -2 1.1.21 Place telephone books on table in CERC (at Iva Taylor's phone E). office

( '

.. (binder bin) 1.1.22'Put out pads of paper, pencils, message CERC File-2 forms, message logs, ash trays put extras on Admin. Sves. Table.

1.1.23 Put affected station map on easel at K. Map in L or M 1.1.24 Post North Anna and Surry Location Maps CERC File-2 1.1.25 Retrieve smaller coffee pot and make coffee, Roger Baldwin's first smaller pot then larger pot. Place credenza and cups, sugar and cream near coffee pot. coffee

' locker (out-side CERC) 1.1.26: Prepare to translate messages from CERC status boards on a continuing basis for distribution to CERT members and team work areas.

'~-

CPIP-3.3 Page 3-10 02-15-83

,a '

i CORPORATE EMERGENCY RESPONSE PLAN IMPLEMENTING PROCEDURE 3.3 MESSAGE HANDLING Purpose This procedure provides each individualin the Emergency Opera-tions Facility and an individuals in each team work area with all information which is received from the station by the Recovery Operations Planning Coordinator during an emergency.

Activation This procedure will be activated upon the notifloation of an Alert, Site Emergency or General Emergency.

1.0 The message handler shall report to the Office Services Supervisor upon

~

notification of an emergency.

2.0 All message handlers will be advised of all duties by the Office Services Supervisor.

3.0 Upon receipt of a message, the Recovery Operations Planning Coordinator will give the message handler the message he takes down on a transparency sheet. This transparency sheet will be taken to the Kodak room where nineteen (19) copies will be made and distributed immediately to the following persons and also to the designated team work areas for each group listed below: -

( '~

Corporate Response Manager Public News Center Director Scheduling / Planning Manager TechnicalSupport Manager

, Administrative / Services Manager Advisory Support Manager Design and Construction Support Manager 3.1 All messages will be logged on the message log sheets and retained in the CERC File.

3.1.1 The Office Services Supervisor shall be responsible for the proper distributioa, logging and filing of all messages received.

4.0 All messages shall be logged, copied and distributed immediately. Copies of all transparencies will be retained in the CERC Files for future reference.

,.e ~ .. . - - . , - . . , . - - - - . - - . - - - ,..,,_,---.-n,

, _ , ,. - - -n- , - , , , - , ,,.

. - - . _ . . . _ _ _ _ .. . _ . _ . _ . . _ _ _ _ _ ._.; . j , __ , _ _ . _ , _ , ,

t

& h

{,

C PIP-6.0 Page 6-1 02-15-83 ,

t !

CORPORATE EMERGENCY RESPONSE PLAN

- , ,e .

IMPLEMENTING PROCEDURE 6.0 TECHNICAL SUPPORTMANAGER CALI.-OUT/ ACTIVATION  ;

/

(4 Purpose 'Ihis procedure provides the necessary steps to c'all th'e members of the Technical Support Sttdf, and/or their alternates, and have them repo'et to the Corporate Emergency Response Center (CERC) or, when required, to the affected station.  ; , e ,. ,

1.0 Immediate Assessment - .

i I d' 1.1 The Technical Support Manager'shall repdct to the Corporate Emergency '

Response Center (CERC) upon , notification by the General Office Building Security.

, 3 1.2 The Technical Support Manager snall assess t.te situation with his Corporate Emergency Response Team (CERT), and determine which members of the Technical Support staff should be called out'and to what location (CERC or

  • affected station) they should report'.

2.0 Call-Out 2.1 The Technical' Support , Man 9ger all"himself or have Staff Support personnel notify the appropriate memoers of the Technical Support Staff

('-. with the following message:

i J

_ _. An Emergency has "This is __

been declared at (Surry) (North Anna) Power Station. Report immediately to the 5th floor of the General Office Building, One James River Eaza, Richmond, Virginia." {

2.2 Call-Out List (Call principal first)

! Business Phone Time Date Individual Home Phone Radiological Control and Waste Management a >

1

,N '

Prin. F.L. Thomasson,Jr <

F Alt. D. S. Wagner g i

Systems Analysis Prin. '/ J. O. Eastwood i Alt. 4 M. L. Smith i

Reactor Analysis ,

I Prin. .

R. M. Berryman Alt. R. W. Cecss, III

~l~ ,

l' ., .

l

\

)

a s.

CPIP-6.0 Page 6-2

, 02-15-83 (m '

~

Instrumentation and Control Prin. - -

W. L. Thompson Alt. B. F. Hill i Operations Supoort

k. /

i Prin. l D. W. Speidell, Jr.

Alt. D. B. Roth Licensinst 5 A Prio. J. H. Leberstien

, ,e Alt.

  • W. D. Craft 2

Staff Suoport' . _ ,,

rs Prin.

D. W. Lippard 3

- Alt. R. M. Taylor

~

Me t=~ l Coordinator

/

Prin. F. B. Martin Alt. R. S. Greer, Jr.

g s Chemistrv Sucoort v 4 7

Prin. W. 'A. Thorn ton .

Alt. J. H. 'Hortor.

  • 2.3 Any given event may n'ot, require full staffing in a specific ar The Technical Support Manager shall make this asses,sment and have individuals called out accordingly.

t l 2.4 If appropriate, the Technical Support Manager may himself or have Staff f Support personnel brief members of the Technical Support Staff on the situation during call-out (prior to having them report to the CERC or the affected station), and direct them to activitate appropriate additional

support in their area of responsibility.

I

(

l, O 9 4

l j j ,

-i .

P

- . - -~., , . . - - _

_ . .. gi -w

.....;a..

r+ ,W-c

.w i , s

.. s  ?- CPISS.0 ~

.M .

' , v'

-1 > -

f.

P ga 8 ,~ , 02-15 'l3 L

  • G' a

-( -

-- CORPORATE EMERGENCY RESPONSE PIJ N -

N. .. .  ;. , --

. , n ~

>? ) E ' IMPLEMENTING PROCEDURE 8.0 e RECOVERY MANAGER ACTIVATION / CALL-OUT

.6 j,- _

y

~

~"

1. 1 Purpost:. ' This procedure provides the necessary steps to call personnel

.7 '

gesponsible for manning the Emergency Operations Facility et the affected i - station, y Activetion The Corporate Respense Manager has ini.tiated the; Corporate Emer-gency Response Plan due to an Alert, Sitel Emergency, or General ss ' s ,

Erneigency at -the affected station. The Vice President . Nuclear

+,. .

Operations, or his alternate, Director - ' Operations and. Maintenance

.- ) _ Support, i: designated as Recovery Manager. ,. . 7 ; -

~~

< 1.0 Calt-Out ,+

r-- - -

The; Recovery Manger will call the personnel dho'is, ti report to' the Emergency Operations Facility at1he affceted station with the, follewing message:

~

n; 2,  ; y

~

"I'his is the (Recotery Mansger) or (Alternate). An Emergency

'~f~~"# has been declared at (Surry)(North Anna) Power Station. Report

/ immediately to the EOF." ,'

( 2.r[ Call-Ou1 List

- m.

,.h Time . ,_ D a t e . Individi al, Home Phone Business Phone Radiological Assessm~ent Coordinator P rin. W. W. Cameron Alt. S. P. Sarver A. H. Stafford Operations Suppop Prin. L. A. Johnson Alt.

Emergency Plan Advisor Prin. J. W. Martin, Jr.

Alt. J. W. Ogren Alt. E. M. Topping Alt. R. E. Beckwith og j ,, f g  %,p , *4A=#**O* - O M N* *'

-s e - ~