Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML20211H431 | 27 August 1999 | Revised Bases for TS 2.2.1, Reactor Trip Sys Instrumentation Setpoints | |
ML18152B359 | 23 August 1999 | Revised Tech Specs Basis Pages for TS 3.1.B,deleting Reactor Vessel Toughness Data Duplicated in UFSAR & Includes Ref to Applicable UFSAR Section | |
ML20211D920 | 20 August 1999 | Revised Pages to Third Ten Year ISI Program & Relief Requests | |
ML18151A664 | 6 August 1999 | Rev 0 to Surry Unit 2 Cycle 16 Startup Physics Tests Rept. | |
ML20210L163 | 4 August 1999 | Proposed Tech Specs,Ack Establishment of Seal Injection for RCP in Isolated & Drained Loop as Prerequisite for vacuum-assisted Backfill Technique & Extending Drained Loop Verification to 4 H Prior to Commencing Backfill Operation | Boric Acid Shutdown Margin |
ML20212J304 | 22 June 1999 | Proposed Tech Specs Re Revised Surveillance Frequency & Action Times Reactor Trip & ESFAS | |
ML20195B588 | 14 May 1999 | Rev 8,Change 2 to Vepc North Anna Unit 2 IST Program Plan for Pumps & Valves Second Insp Interval,901214-001214 | Boric Acid Stroke time Cold shutdown justification Scaffolding |
ML20195B569 | 14 May 1999 | Rev 8,Change 2 to Vepc North Anna,Unit 1 IST Program Plan for Pumps & Valves Second Insp Interval 901214-001214 | Boric Acid Stroke time Cold shutdown justification Power Operated Valves Scaffolding |
ML20206N369 | 6 May 1999 | Proposed Tech Specs,Revising Surveillance Frequency for RTS & ESFAS Analog Instrumentation Channels & Modifying AOT & Action Times for RTS & ESFAS Analog Instrumentation Channels & Actuation Logic | Shutdown Margin Earthquake |
ML20206G836 | 3 May 1999 | Proposed Tech Specs,Deleting &/Or Relocating Addl primary- to-secondary Leak Rate Limits & Enhanced Leakage Monitoring Requirements Imposed Following 1987 SG Tube Rupture Event | Grab sample Pressure Boundary Leakage Pressure boundary leak |
ML20206G881 | 3 May 1999 | Proposed Tech Specs,Increasing Allowable Leakage from ECCS Components,Establishing Consistent Licensing Basis for Accidents Requiring Dose Analysis & Clarifying Requirements of CREVS | Ultimate heat sink |
ML20206H030 | 3 May 1999 | Proposed Tech Specs Bases Page B 3/4 6-1,allowing Use of NRC Staff Approved/Endorsed Integrated Leak Test Methodologies to Perform Containment Leakage Rate Testing | |
ML20205P251 | 1 May 1999 | Rev 0 to Vepc North Anna Power Station Unit 1 ISI Program Plan for Third Insp Interval:Components & Component Supports | VT-2 Dissimilar Metal Weld |
ML20205P234 | 1 May 1999 | Rev 0 to Vepc North Anna Unit 1 ISI Program for Third Insp Interval Vol 1:ISI Program for Components & Component Supports for Interval 3 990501-090430 | Boric Acid Time of Discovery High Radiation Area Hydrostatic Nondestructive Examination VT-2 Through-Wall Leak Dissimilar Metal Weld Scaffolding |
ML18152B659 | 28 April 1999 | Proposed Tech Specs Re Refueling Water Chemical Addition Tank Min Vol | Boric Acid |
ML18152B545 | 16 February 1999 | Proposed Tech Specs Pages,Revising Augmented Insp Requirements for Reactor Coolant Pump Flywheels | |
ML18152A213 | 16 February 1999 | Proposed Tech Specs,Consolidating AFW cross-connect Requirements by Relocation of Electrical Power Requirements from TS 3.16 to TS 3.6 | Tornado Missile |
ML18151A551 | 10 February 1999 | to NE-1187, Surry Unit 1,Cycle 16 Startup Physics Tests Rept. | High Radiation Area Hydrostatic VT-2 |
ML20203C825 | 5 February 1999 | Proposed Tech Specs Re Allowed Outage Time for PORV Nitrogen Accumulators & Separate Actions for PORV Operability | Pressure Boundary Leakage |
ML20205P265 | 4 February 1999 | Rev 0 to Vepc North Anna Power Station Unit 1 ISI Plan for Third Interval for Sys Pressure Tests | B.5.b Mitigating Strategies |
ML20196K197 | 22 December 1998 | Rev 0 to NE-1176, North Anna Unit 1,Cycle 14 Startup Physics Tests Rept, Dec 1998 | |
ML20198J097 | 22 December 1998 | Proposed Tech Specs Bases Changes Re EDG Steady State Frequency to Be Incorporated Into TS During Implementation of Amends 216 & 197 | |
ML20206N885 | 14 December 1998 | Rev 0 to ASME Section XI Sys Pressure Test Program,Second Insp Interval | Boric Acid Hydrostatic VT-2 |
ML20206N871 | 30 November 1998 | Rev 11,Vol I to ISI Plan for Second Insp Interval for Components & Component Supports | Boric Acid VT-2 Scaffolding |
ML20195J443 | 18 November 1998 | Proposed Tech Specs Re Revs to Allowable Groundwater Elevations & Removal of Piezometer Device Numbers Associated with Svc Water Reservoir | |
ML20195C946 | 10 November 1998 | Proposed Tech Specs,Clarifying Operability Requirements for Pressurizer Heaters & Emergency Power Source for Pressurizer Heaters | |
ML18152B615 | 4 November 1998 | Proposed Tech Specs 4.6.A.1.b,re EDG Start & Load Time Testing Requirements & TS 3.16 Bases Re EDG Ratings | |
ML20154P283 | 16 October 1998 | Marked-up & Typed Tech Spec Pages to Revise EDG Section to Be Consistent with Station Procedures Associated with Steady State Conditions & W NSAL 93-022,for 980728 Application for Amends to Licenses NPF-4 & NPF-7 | |
ML18153A331 | 24 September 1998 | Proposed Tech Specs Modifying Testing Requirements for Reactor Trip Bypass Breaker | |
ML18153A335 | 24 September 1998 | Proposed Tech Specs Pages Affected by Suppl to 960912 Resubmittal of Change Request Re Relocation of Fire Protection Requirements from TS to UFSAR | Safe Shutdown Offsite Dose Calculation Manual Process Control Program Fire Protection Program |
ML20153H534 | 24 September 1998 | Proposed Tech Specs 3/4.5.1 Re Safety Injection Accumulator Boron Concentration Verification | |
ML20236U871 | 28 July 1998 | Proposed Tech Specs,Revising EDG Section to Be Consistent W/ Station Procedures Associated W/Steady State Conditions & W Nuclear Safety Advisory Ltr NSAL 93-022 | Safe Shutdown |
ML20236U865 | 28 July 1998 | Proposed Tech Specs 3/4.1.2 & 3/4.5.5,re RWST & Boron Concentration Ph Range Bases Change to Address Discrepancies Between Previous NRC Issued Ser,Ts Bases & Applicable Sections of SRP | Shutdown Margin |
ML20236U841 | 28 July 1998 | Proposed Tech Specs 4.6.2.2.1 & 4.6.2.2.2,revising Testing Acceptance Criteria to Demonstrate Operability of Casing Cooling & Outside Recirculation Spray Pumps | |
ML20236H531 | 1 July 1998 | Draft Nuclear Control Room Operator Development Program NAPS Module NCRODP-78 Spent Fuel Dry Storage Cask System. Draft Lesson Plans & Job Performance Measures Included | Safe Shutdown Earthquake Job Performance Measure Design basis earthquake Earthquake |
ML20236U889 | 25 June 1998 | Rev 0 to NE-1163, North Anna Unit 2 Cycle 13 Startup Physics Tests Rept | |
ML18152B755 | 19 June 1998 | Proposed Tech Specs Establishing Requirements for Use of Temporary Supply Line (Jumper) to Provide Svc Water to Component Cooling Heat Exchangers | |
ML20249C721 | 19 June 1998 | Proposed Improved Tech Specs for North Anna ISFSI | Time of Discovery Fuel cladding |
ML20236H554 | 4 June 1998 | Rev 5 to Procedure VPAP-0810, Crane & Hoist Program | Safe Shutdown Job Performance Measure Control of Heavy Loads |
ML20236H539 | 4 June 1998 | Rev 1 to Procedure VPAP-0809, NUREG-0612 Heavy Load Program | Safe Shutdown Control of Heavy Loads Scaffolding |
ML20249B991 | 6 May 1998 | Analysis of Capsule X Virginia Power Surry Unit 1 Reactor Vessel Matl Surveillance Program. W/Evaluation of Surry Unit 1 Surveillance Capsule X Results & Response to NRC RAI Re GL 92-01,rev 1,suppl 1 | Anticipated operational occurrence Hydrostatic |
ML18151A193 | 4 May 1998 | Rev 1 to Summary of Changes to Surry Units 1 & 2 Third Interval IST Program. | Boric Acid Stroke time Incorporated by reference Cold shutdown justification Power-Operated Valves Power Operated Valves Scaffolding |
ML20206N858 | 30 April 1998 | Rev 5,Vol 1 to ISI Program for Second Insp Interval & Components & Component Supports,For 901214-010430 | Hydrostatic Nondestructive Examination VT-2 Dissimilar Metal Weld Scaffolding Grace period |
ML20236H570 | 2 April 1998 | Rev 8 to Procedure VPAP-1901, Industrial Safety & Health | Fitness for Duty Fire Protection Program Fatality |
ML20217E901 | 25 March 1998 | Proposed Tech Specs Re Configuration Risk Mgt Program for risk-informed Allowed Outage Times & Insp Frequency of EDGs | Safe Shutdown Probabilistic Risk Assessment Maintenance Rule Program Offsite Circuit |
ML18152A365 | 25 March 1998 | Proposed Tech Specs Revising Station Mgt Titles to Reflect New Positions Approved by Vepc Board of Directors on 980220 | Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Process Control Program Fire Protection Program |
ML20236H563 | 10 February 1998 | Rev 11 to Procedure VPAP-0105, Fitness for Duty Program | Fitness for Duty Fatality |
ML20202E155 | 9 February 1998 | Proposed Tech Specs Re EDG Allowed Outage Time | Safe Shutdown Maintenance Rule Program Offsite Circuit |
ML20202C338 | 3 February 1998 | Proposed Tech Specs Modifying Testing Requirements for Reactor Trip Bypass Breaker | |
ML20202C587 | 3 February 1998 | Proposed Tech Specs Re Reactor Coolant Pump Flywheel Insps & Loop Flow Straightener Insps |