Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML20211D920 | 20 August 1999 | Revised Pages to Third Ten Year ISI Program & Relief Requests | |
ML20195B569 | 14 May 1999 | Rev 8,Change 2 to Vepc North Anna,Unit 1 IST Program Plan for Pumps & Valves Second Insp Interval 901214-001214 | Boric Acid Stroke time Cold shutdown justification Power Operated Valves Scaffolding |
ML20195B588 | 14 May 1999 | Rev 8,Change 2 to Vepc North Anna Unit 2 IST Program Plan for Pumps & Valves Second Insp Interval,901214-001214 | Boric Acid Stroke time Cold shutdown justification Scaffolding |
ML20205P234 | 1 May 1999 | Rev 0 to Vepc North Anna Unit 1 ISI Program for Third Insp Interval Vol 1:ISI Program for Components & Component Supports for Interval 3 990501-090430 | Boric Acid Time of Discovery High Radiation Area Hydrostatic Nondestructive Examination VT-2 Through-Wall Leak Dissimilar Metal Weld Scaffolding |
ML20205P251 | 1 May 1999 | Rev 0 to Vepc North Anna Power Station Unit 1 ISI Program Plan for Third Insp Interval:Components & Component Supports | VT-2 Dissimilar Metal Weld |
ML20205P265 | 4 February 1999 | Rev 0 to Vepc North Anna Power Station Unit 1 ISI Plan for Third Interval for Sys Pressure Tests | B.5.b Mitigating Strategies |
ML20206N885 | 14 December 1998 | Rev 0 to ASME Section XI Sys Pressure Test Program,Second Insp Interval | Boric Acid Hydrostatic VT-2 |
ML20206N871 | 30 November 1998 | Rev 11,Vol I to ISI Plan for Second Insp Interval for Components & Component Supports | Boric Acid VT-2 Scaffolding |
ML20236H531 | 1 July 1998 | Draft Nuclear Control Room Operator Development Program NAPS Module NCRODP-78 Spent Fuel Dry Storage Cask System. Draft Lesson Plans & Job Performance Measures Included | Safe Shutdown Earthquake Job Performance Measure Design basis earthquake Earthquake |
ML20236H539 | 4 June 1998 | Rev 1 to Procedure VPAP-0809, NUREG-0612 Heavy Load Program | Safe Shutdown Control of Heavy Loads Scaffolding |
ML20236H554 | 4 June 1998 | Rev 5 to Procedure VPAP-0810, Crane & Hoist Program | Safe Shutdown Job Performance Measure Control of Heavy Loads |
ML18151A193 | 4 May 1998 | Rev 1 to Summary of Changes to Surry Units 1 & 2 Third Interval IST Program. | Boric Acid Stroke time Incorporated by reference Cold shutdown justification Power-Operated Valves Power Operated Valves Scaffolding |
ML20206N858 | 30 April 1998 | Rev 5,Vol 1 to ISI Program for Second Insp Interval & Components & Component Supports,For 901214-010430 | Hydrostatic Nondestructive Examination VT-2 Dissimilar Metal Weld Scaffolding Grace period |
ML20236H570 | 2 April 1998 | Rev 8 to Procedure VPAP-1901, Industrial Safety & Health | Fitness for Duty Fire Protection Program Fatality |
ML20236H563 | 10 February 1998 | Rev 11 to Procedure VPAP-0105, Fitness for Duty Program | Fitness for Duty Fatality |
ML20210Q205 | 31 December 1997 | 1997 Severe Accident Management Tabletop (Scenario 1) Drill Manual | Severe Accident Management Guideline |
ML18150A466 | 16 December 1997 | ISI Plan for Third Insp Interval,Vol 2,Rev 9 for Components & Component Supports,940510-040510, for Surry Power Station,Unit 2 | VT-2 Liquid penetrant |
ML18150A464 | 27 October 1997 | Risk-Informed ISI (RI-ISI) Pilot Program Submittal. | |
ML18151A391 | 16 October 1997 | Rev 8 to VPAP-2103, Odcm. | Grab sample Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Process Control Program Annual Radiological Effluent Release Report Power change |
ML18151A723 | 7 August 1997 | Rev 1 to Nuclear Safety Analysis Manual Part Iv,Chapter a Probabilistic Safety Assessment Products. | VT-2 Severe Accident Management Guideline |
ML20199G568 | 30 June 1997 | Rev 5 to VPAP-2001, Station Planning & Scheduling. Even Numbered Pages of Incoming Submittal Not Included | Shutdown Margin Maintenance Rule Program Scaffolding Grace period |
ML20210Q199 | 10 June 1997 | Rev 0 to VPAP-2604, Severe Accident Mgt Guideline (SAMG) Program Administration | Reactor Vessel Water Level Severe Accident Management Guideline |
ML18150A444 | 9 June 1997 | Vol 2,Rev 8 to ISI Plan for Third Insp Interval for Components & Component Supports,Oct 14,1993-Oct 13,2003. | VT-2 |
ML20199G446 | 29 August 1996 | Rev 28 to 1-MOP-6.90, Emergency Diesel Generator 1-EE-EG-1H. Page 35 of 72 in Attachment 4 of Incoming Submittal Was Not Included | Boric Acid Maintenance Rule Program Offsite Circuit |
ML20236H556 | 2 August 1996 | Rev 3 to Procedure TRCP-0009, Instructional Staff Training & Qualifications | |
ML20134J986 | 30 July 1996 | /Unit 2 Fuel Assembly Insp Program | |
ML20134J960 | 31 May 1996 | /Unit 2 Fuel Assembly Insp Program | |
ML20138B542 | 16 May 1996 | Rev 7 to VPAP-2103, Odcm | |
ML20217K448 | 31 October 1995 | Seismic Design & Evaluation Guidelines for DOE HLW Storage Tanks & Appurtenances | Hydrostatic Design basis earthquake Earthquake |
ML18151A642 | 1 August 1995 | Change 3 to Rev 0 to Third Interval IST Program | Safe Shutdown Stroke time Cold shutdown justification Power-Operated Valves |
ML20084U181 | 30 April 1995 | Rev 5 to Second 10-yr Interval ISI Program Plan | |
ML20076F834 | 4 August 1994 | Rev 0,Change 1 to Surry Unit 2 Third Interval IST Program | Boric Acid Cold shutdown justification |
ML18151A245 | 31 July 1994 | ISI Program,Interval 3,940510-040509, for Surry Power Station,Unit 2,rev 1 | Boric Acid Hydrostatic Nondestructive Examination VT-2 Liquid penetrant Dissimilar Metal Weld Scaffolding |
ML18151A210 | 31 July 1994 | ISI Program,Interval 3,931014-031013, Rev 1 | Boric Acid Hydrostatic Nondestructive Examination VT-2 Liquid penetrant Through-Wall Leak |
ML20069A797 | 29 March 1994 | Second Interval ISI Plan, Rev 5 ISI Program,Rev 3 | |
ML18151A901 | 3 March 1994 | ISI Program Interval 3,940510- 040509, Rev 0 | Boric Acid Hydrostatic Nondestructive Examination VT-2 Liquid penetrant Scaffolding |
ML20065H922 | 30 November 1993 | ISI Program General Second Insp Interval | |
ML20058N491 | 5 November 1993 | Rev 7 to North Anna Units 1 & 2 IST Program Plan Second Insp Interval 901214-001214 | |
ML18151A165 | 30 April 1993 | Rev 0 to Surry Power Station Unit 1 ISI Program Interval 3 931014-031013. | Boric Acid Hydrostatic Nondestructive Examination VT-2 |
ML18151A641 | 19 March 1992 | Rev 5 to Surry Power Station,Unit 1,Inservice Testing Program Plan for Pumps & Valves,Second Insp Interval 821222-921222. | Boric Acid Stroke time Cold shutdown justification |
ML18151A371 | 19 March 1992 | Rev 3 to Surry Power Station,Unit 2 Inservice Testing Program Plan for Pumps & Valves,Second Insp Interval 821222-921222. | Boric Acid Grab sample Stroke time Cold shutdown justification Power Operated Valves |
ML20079L209 | 22 September 1991 | Rev 2 to Station Administrative Procedure VPAP-0805, MOV Program, Upgrading Procedure to Acup Format | Stroke time Weak link |
ML18151A412 | 1 September 1991 | Rev 2 to VPAP-2103, Odcm. | Grab sample Offsite Dose Calculation Manual Annual Radiological Environmental Operating Report Process Control Program Power change |
ML20092M906 | 1 September 1991 | Rev 2 to VPAP-2103, Odcm | Grab sample Offsite Dose Calculation Manual Annual Radiological Environmental Operating Report Process Control Program Power change |
ML20081F350 | 28 May 1991 | Rev 1 to North Anna Unit 1 Inservice Insp Plan for Components & Component Supports,Second Insp Interval | |
ML20082K821 | 3 May 1991 | Rev 1 to Station Administrative Procedure VPAP-2104, Radwaste Process Control Program | Process Control Program |
ML18151A655 | 14 November 1990 | Revised Corporate Emergency Plan Implementing Procedures, Including Rev 0 to CPIP-1.0,CPIP-2.0,CPIP-2.1,CPIP-2.2, CPIP-2.3,CPIP-2.4,CPIP-2.5,CPIP-2.6,CPIP-3.0,CPIP-3.1 & CPIP-3.2 | Minimum staff |
ML20058C115 | 17 October 1990 | Inservice Testing Program Plan for North Anna Unit 1 | |
ML20065P271 | 30 September 1990 | Vol 1,Rev 0 to VEPCO North Anna Power Station Unit 1 Inservice Insp Plan for Second Insp Interval:For Components & Component Supports Dec 1988 - Dec 1998 | |
ML20065P274 | 30 September 1990 | Rev 1 to Vol 1 of VEPCO North Anna Power Station Unit 2 Inservice Insp Plan for Second Insp Interval:For Components & Component Supports 901214-001214 |