|
---|
Category:TECHNICAL SPECIFICATIONS
MONTHYEARML20211Q4981999-09-10010 September 1999 Proposed Tech Specs Clarifying Conditions of Use Re Analytical Methods Used to Determine Core Operating Limits & Adding Ref to Caldon TR for LEFM ML20211G3221999-08-26026 August 1999 Proposed Tech Specs 4.0.6 Re SG Surveillance Requirements ML20210R7091999-08-13013 August 1999 Revised Proposed Tech Specs for LAR 98-010,proposing Rev to TS Table 3.3.1-1, Rt Sys Instrumentation & TS Table B 3.3.1-1, Rt Sys Setpoints ML20209E1861999-07-0909 July 1999 Proposed Tech Specs,Adding Reactor Core Safety Limit Figures to Section 5.6.5 of Ts,Clarifying That Overpower N-16 Setpoint Remains in TS & Reflecting NRC Approval of TRs Used to Determine Core Operating Limits Presented in COLR ML20212J4251999-06-23023 June 1999 Proposed Tech Specs,Revising EDG Start Be Emergency Start Instead of Normal Start Following Loss of Offsite Power ML20195E5401999-06-0404 June 1999 Proposed Tech Specs Pages 3.2-6,3.4-24,3.4-25,3.7-23,3.7-30, 3.8-25,3.9-9,3.9-10 & 4.0-2,provided as Addl Aditorial Changes Supplementing LAR 99-001 ML20195B6461999-05-27027 May 1999 Marked-up TS Pages Re LAR 99-004,changing Plant Battery Surveillance ML20195B6771999-05-24024 May 1999 Proposed Tech Specs Relocating Parameter Limits Allows for Available Operating & Analytical Margins to Be Used in Most Efficient Manner ML20206G7111999-05-0404 May 1999 Proposed Tech Specs Revising Surveillances Associated with Plant Battery & EDGs & Miscellaneous Editorial Corrections ML20198J3171998-12-21021 December 1998 Proposed Tech Specs,Proposing Changes Administratively for Unit 1 & Increasing Licensed Power for Operation of Unit 2 to 3445 Mwt ML20198J2541998-12-18018 December 1998 Proposed Tech Specs Sections 1.0,3.1,3.3,3.4,3.6,3.7,3.9 & 5.0,converting to ITS ML20198J5211998-12-17017 December 1998 Corrected Tech Specs Pages for Section 3.8 to 971211 Submittal Re TS Conversion Application ML20197K0491998-12-11011 December 1998 Proposed Tech Specs Section 3.8, Electrical Power Systems, Converting to ITS ML20196C5361998-11-20020 November 1998 Proposed TS Converting to ITS Sections 4.0,3.4 & 3.6 ML20195F1751998-11-13013 November 1998 Proposed Tech Specs,Revising Administrative Controls Section to Include Configuration Risk Mgt Program Into CPSES TS ML20195F5291998-11-11011 November 1998 Proposed Tech Specs Revising Core Safety Limit Curves & Overtemperature N-16 Reactor Trip Setpoints for Unit 2 Cycle 5 ML20196B8811998-10-30030 October 1998 Proposed Tech Specs Section 3.3 Re Instrumentation ML20154R7861998-10-21021 October 1998 Proposed Tech Specs Section 3.7, Plant Systems ML20154S2901998-10-14014 October 1998 Proposed Tech Specs Sections 3.1,3.2,3.4,3.5 & 5.0 Re Reactivity Control Sys,Power Distribution Sys,Rcs,Eccs & Administrative Control,Respectively ML20154C9101998-10-0202 October 1998 Proposed Tech Specs 4.0.6, SG SR, Adding Definitions Required for F* Alternate Plugging Criterion & Identifies Portion of Tube Subject to Criteria ML20153E2661998-09-24024 September 1998 Proposed Improved Tech Specs Sections 3.4, RCS & 5.0, Administrative Controls ML20237E8461998-08-28028 August 1998 Proposed Tech Specs Pages Re Sections 1.0,2.0 & 3.0 of Proposed TS Changes in 980707 & s,In Response to NRC RAI ML20236J3131998-07-0101 July 1998 Revised Proposed Tech Specs Pages Re Safety Injection Signal & Blackout Signal ML20249C6101998-06-22022 June 1998 Proposed Tech Specs Section 3.6 Re Conversion Application ML20216E6291998-04-0909 April 1998 Marked-up TS Pages,Reflecting Proposed Changes in Amends to Licenses NPF-87 & NPF-89 ML20216B1471998-04-0606 April 1998 Proposed Tech Specs,Allowing Plant to Continue to Operate W/O Having to Perform Portions of SRs ML20217A3901998-03-18018 March 1998 Proposed Tech Specs Surveillance Requirements 4.8.1.1.2f.4)a) & 4.8.1.1.2f.6)a) at Power Re Enforcement Discretion ML20216H1361998-03-13013 March 1998 Proposed Tech Specs Re Electrical Systems Surveillance Requirements ML20248L3191998-03-12012 March 1998 Proposed Tech Specs TS 4.8.1.1.2f.4)b) & TS 4.8.1.1.2f.6)b) Re Request for Enforcement Discretion ML20216D6021998-03-0909 March 1998 Proposed Tech Specs Temporarily Removing Requirement to Demonstrate Load Shedding Feature of MCC XEB4-3 as Part of SRs 4.8.1.1.2f.4)a) & 4.8.1.1.2f.6)a),for Unit 2 Only ML20203K8621998-02-27027 February 1998 Proposed Tech Specs,Increasing RWST low-low Level Setpoint ML20203J5211998-02-25025 February 1998 Proposed Tech Specs Page to Remove Requirement to Demonstrate Load Shedding Feature of MCC XEB4-3 as Part of Surveillance Requirements 4.8.1.1.2f.4(a) & 4.8.1.1.2f.7(a) Until Plant Startup Subsequent to Next Refueling Outage ML20202B1641998-02-0505 February 1998 Proposed Tech Specs Bases 3/4.7.1.5 Re Main Steam Line Isolation Valves ML20212C3881997-10-24024 October 1997 Proposed Tech Specs Re Revised Core Safety Limit Curves & Revised Overtemperature N-16 Reactor Trip Setpoints ML20141G1941997-05-16016 May 1997 Proposed Tech Specs,Consisting of Change Request 97-002 Re Rev to Unit 2 Rt Setpoint ML20134B9801996-09-19019 September 1996 Proposed Tech Specs Re Inverter/Battery Charger Mod ML20116F0471996-08-0202 August 1996 Proposed Tech Specs Re Increase in Allowed Outage Time for Charging Pump from 72 H to 7 Days ML20116E8651996-07-31031 July 1996 Proposed Tech Specs Modifying Inverter/Battery Chargers by Incorporating Listed Changes Into CPSES Units 1 & 2 TSs ML20116F3711996-07-31031 July 1996 Proposed Tech Specs 6.9.1.6b Including TR, SBLOCA Analysis Methodology, in List of NRC-approved Methodologies & Rev of Unit 1 Rx Trip Setpoints ML20115E8041996-07-10010 July 1996 Proposed TS 3/4.7.11,revising Lco,Actions & SRs to Take Credit for Addition of Train Oriented Fan Coil Units for Each UPS & Distribution Room ML20115C9461996-07-0909 July 1996 Proposed Tech Specs Re Steam Line pressure-low Allowable Value ML20113B5891996-06-21021 June 1996 Proposed Tech Specs,Removing Request to Relocate MSIV Full Closure Time Requirement to Program Administratively Controlled by TS & Revising Associated Bases to Include Info to Clarify Expanded Bases Specific to CPSES ML20106G8231996-03-13013 March 1996 Proposed Tech Specs,Supplementing LAR-95-007,revising TS LCO 3.9.4 to Allow Both Doors of Personnel Airlock to Remain Open as Long as One Pal Door Capable of Being Closed ML20101C5681996-03-12012 March 1996 Proposed Tech Specs 3/4.6.1 & 6.8.3g to Implement New Containment Leakage Rate Testing Program Required by 10CFR50 App J,Option B ML20100J0791996-02-22022 February 1996 Proposed Tech Specs 3/4.9.4,revising Units 1 & 2 TS Bases Allowing Both Doors of Pal to Remain Open as Long One Pal Door Is Capable of Closing ML20096B3281996-01-0505 January 1996 Proposed TS Re Wide Range RCS Temp.-Th Remote Shutdown Indication ML20095E8311995-12-15015 December 1995 Proposed TS Bases 2.2.1,deleting Unnecessary Details Re Time Delay Requirements for Undervoltage & Underfrequency RCP Trip Setpoints ML20094N6201995-11-21021 November 1995 Proposed Tech Specs,Allowing Containment Pal Doors to Remain Open During Movement of Irradiated Fuel & During Core Alterations for Plant ML20094N9011995-11-21021 November 1995 Proposed Tech Specs,Incorporating Revised Core Safety Limit Curves & Revised N-16 Overtemp Reactor Trip Setpoints, Resulting from Reload Analyses for CPSES Unit 2,Cycle 3 ML20087L4581995-08-15015 August 1995 Proposed Tech Specs Removing Several Cycle Specific Parameter Limits & Adding Limits to COLR 1999-09-10
[Table view] Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML20211Q4981999-09-10010 September 1999 Proposed Tech Specs Clarifying Conditions of Use Re Analytical Methods Used to Determine Core Operating Limits & Adding Ref to Caldon TR for LEFM ML20211G3221999-08-26026 August 1999 Proposed Tech Specs 4.0.6 Re SG Surveillance Requirements ML20212H0771999-08-20020 August 1999 Rev 6 to CPSES Glen Rose,Tx ASME Section XI ISI Program Plan for 1st Interval on 990820. Page 119 in Unit 1 ASME Section XI of Incoming Submittal Not Included ML20212G0821999-08-20020 August 1999 Rev 4 to Augmented Inservice Insp Plan for Cpses,Unit 1 ML20210R7091999-08-13013 August 1999 Revised Proposed Tech Specs for LAR 98-010,proposing Rev to TS Table 3.3.1-1, Rt Sys Instrumentation & TS Table B 3.3.1-1, Rt Sys Setpoints ML20211M0041999-08-0505 August 1999 Rev 31 to Technical Requirements Manual ML20211G7401999-07-27027 July 1999 Revs 29 & 30 to Technical Requirements Manual (TRM) for Cpses,Units 1 & 2 ML20209E1861999-07-0909 July 1999 Proposed Tech Specs,Adding Reactor Core Safety Limit Figures to Section 5.6.5 of Ts,Clarifying That Overpower N-16 Setpoint Remains in TS & Reflecting NRC Approval of TRs Used to Determine Core Operating Limits Presented in COLR ML20212J4251999-06-23023 June 1999 Proposed Tech Specs,Revising EDG Start Be Emergency Start Instead of Normal Start Following Loss of Offsite Power ML20195E5401999-06-0404 June 1999 Proposed Tech Specs Pages 3.2-6,3.4-24,3.4-25,3.7-23,3.7-30, 3.8-25,3.9-9,3.9-10 & 4.0-2,provided as Addl Aditorial Changes Supplementing LAR 99-001 ML20195B6461999-05-27027 May 1999 Marked-up TS Pages Re LAR 99-004,changing Plant Battery Surveillance ML20195B6771999-05-24024 May 1999 Proposed Tech Specs Relocating Parameter Limits Allows for Available Operating & Analytical Margins to Be Used in Most Efficient Manner ML20206G7111999-05-0404 May 1999 Proposed Tech Specs Revising Surveillances Associated with Plant Battery & EDGs & Miscellaneous Editorial Corrections ML20206Q0311999-04-16016 April 1999 Rev 28 to CPSES Technical Requirements Manual ML20205Q1681999-04-14014 April 1999 Rev 27 to CPSES Technical Requirements Manual ML20207F3511999-02-25025 February 1999 Fire Endurance Test to Qualify Protective Envelope for Class IE Electrical Circuits ML20203B0011999-01-25025 January 1999 Rev 10 to Security Training & Qualification Plan ML20211C1071999-01-15015 January 1999 Rev 3 to ASME Section XI ISI Program Plan,Unit 2 - 1st Interval ML20198J3171998-12-21021 December 1998 Proposed Tech Specs,Proposing Changes Administratively for Unit 1 & Increasing Licensed Power for Operation of Unit 2 to 3445 Mwt ML20198J2541998-12-18018 December 1998 Proposed Tech Specs Sections 1.0,3.1,3.3,3.4,3.6,3.7,3.9 & 5.0,converting to ITS ML20198J5211998-12-17017 December 1998 Corrected Tech Specs Pages for Section 3.8 to 971211 Submittal Re TS Conversion Application ML20197K0491998-12-11011 December 1998 Proposed Tech Specs Section 3.8, Electrical Power Systems, Converting to ITS ML20196C5361998-11-20020 November 1998 Proposed TS Converting to ITS Sections 4.0,3.4 & 3.6 ML20195F1751998-11-13013 November 1998 Proposed Tech Specs,Revising Administrative Controls Section to Include Configuration Risk Mgt Program Into CPSES TS ML20195F5291998-11-11011 November 1998 Proposed Tech Specs Revising Core Safety Limit Curves & Overtemperature N-16 Reactor Trip Setpoints for Unit 2 Cycle 5 ML20196B8811998-10-30030 October 1998 Proposed Tech Specs Section 3.3 Re Instrumentation ML20154R7861998-10-21021 October 1998 Proposed Tech Specs Section 3.7, Plant Systems ML20154S2901998-10-14014 October 1998 Proposed Tech Specs Sections 3.1,3.2,3.4,3.5 & 5.0 Re Reactivity Control Sys,Power Distribution Sys,Rcs,Eccs & Administrative Control,Respectively ML20154C9101998-10-0202 October 1998 Proposed Tech Specs 4.0.6, SG SR, Adding Definitions Required for F* Alternate Plugging Criterion & Identifies Portion of Tube Subject to Criteria ML20153E2661998-09-24024 September 1998 Proposed Improved Tech Specs Sections 3.4, RCS & 5.0, Administrative Controls ML20237E8461998-08-28028 August 1998 Proposed Tech Specs Pages Re Sections 1.0,2.0 & 3.0 of Proposed TS Changes in 980707 & s,In Response to NRC RAI ML20154C4511998-07-20020 July 1998 Interim Change Request ISI-1R5-01, Unit 1 ISI Plan,Rev 5 ML20236T9931998-07-20020 July 1998 1RF06 ISI Summary Rept First Interval,Third Period,First Outage for CPSES Unit 1, Commerical Operating Date 900830 ML20236J3131998-07-0101 July 1998 Revised Proposed Tech Specs Pages Re Safety Injection Signal & Blackout Signal ML20249C6101998-06-22022 June 1998 Proposed Tech Specs Section 3.6 Re Conversion Application ML20216B2811998-04-24024 April 1998 Rev 13 to Cpses,Units 1 & 2,IST Plan for Pumps & Valves First Interval ML20216E6291998-04-0909 April 1998 Marked-up TS Pages,Reflecting Proposed Changes in Amends to Licenses NPF-87 & NPF-89 ML20216B1471998-04-0606 April 1998 Proposed Tech Specs,Allowing Plant to Continue to Operate W/O Having to Perform Portions of SRs ML20217A3901998-03-18018 March 1998 Proposed Tech Specs Surveillance Requirements 4.8.1.1.2f.4)a) & 4.8.1.1.2f.6)a) at Power Re Enforcement Discretion ML20216H1361998-03-13013 March 1998 Proposed Tech Specs Re Electrical Systems Surveillance Requirements ML20248L3191998-03-12012 March 1998 Proposed Tech Specs TS 4.8.1.1.2f.4)b) & TS 4.8.1.1.2f.6)b) Re Request for Enforcement Discretion ML20216D6021998-03-0909 March 1998 Proposed Tech Specs Temporarily Removing Requirement to Demonstrate Load Shedding Feature of MCC XEB4-3 as Part of SRs 4.8.1.1.2f.4)a) & 4.8.1.1.2f.6)a),for Unit 2 Only ML20203K8621998-02-27027 February 1998 Proposed Tech Specs,Increasing RWST low-low Level Setpoint ML20203J5211998-02-25025 February 1998 Proposed Tech Specs Page to Remove Requirement to Demonstrate Load Shedding Feature of MCC XEB4-3 as Part of Surveillance Requirements 4.8.1.1.2f.4(a) & 4.8.1.1.2f.7(a) Until Plant Startup Subsequent to Next Refueling Outage ML20203J6151998-02-24024 February 1998 Rev 26 to Technical Requirements Manual ML20217P1531998-02-12012 February 1998 Rev 2 to ISI-2R2-01, Unit 2 ISI Plan ML20202B1641998-02-0505 February 1998 Proposed Tech Specs Bases 3/4.7.1.5 Re Main Steam Line Isolation Valves ML20217P2961998-01-30030 January 1998 Rev 5 to Unit 1 ISI Program Plan ML20202E5981997-11-25025 November 1997 Rev 12 to CPSES Units 1 & 2 IST Testing Plan for Pumps & Valves,First Interval ML20212C3881997-10-24024 October 1997 Proposed Tech Specs Re Revised Core Safety Limit Curves & Revised Overtemperature N-16 Reactor Trip Setpoints 1999-09-10
[Table view] |
Text
- -_- _ - _ _ . _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ - _ _ _ _ _ - - __ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ - . . -
LAttechment 3tto TXX-901035 Page : 11o f. 2 ELECTRICAL DC'aE: 5vS'E*5 LIM 111NG CONDIT!ON FOR OPERATION ACTICN (Continued)1
-offsite source restored, restore at least two offsite circuits to ODERAELE: 5titus within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> from time of initial loss or be in at
.least MOT 57ANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> anc in COLD SHUTDOWN aitnin tne following 30 nours.
- f. With two of the above required diesel generators inoperable, cemonstrate the OPERABillit of two offsite A.C. circuits by performing Surveil-lance Reautrement 4.8.1.1.la, within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> and at least once per S hours thereafter; restore at least one of the inoperable diesel-gener-ators to OPERABLE status within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />. Restore at'least two diesel-generators to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> from time of initial loss or be in at'least HOT STANDBY within s
l the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />, SURVEILLANCE REQUIREMENTS 4.B.1.1.1 Each of tne above. required independent circuits between the of fsite transmission network and the Onsite Class 1E Distribution System-shall oe:
l-
- a. Determined OPERABLE at least once per 7 days by verifying correct ,
creaker al_ignments, indicated power availability, and b, Demonstrated OPERABLE at least orice per 18 ,ths during shutcown by transferring.(manually and automatically) t + 6.9 kV safeguarcs Dus l power supply from.the preferred offsite sou";e to'the alternate effsite scurce.
L 4.5.1.1'.2. Each diesei generator shall be demonstratec OPERABLE:
i ta.. I'n accordance .ith the frequency specified in Table 4.8-1 on a g -STAGGEREC 'EST BASIS by:
l') Ver '3 i ng the fuel level in the cay fuel tank, d
- 2) Verifying the fuel level in the fuel storage tank, L 3) Verifying the fuel transfer pump starts and transfers fuel from l the. Storage system _to the day fuel tank, 4)- Verifying the-diesel starts from ambient condition:and acceler-ates-to at least 441 rpm in less than or equal to 10 seconds.* t All'olanned diesel engine starts for the purpose of this surveillance may be
' preceded by a preluce period in accordance with vendor recommendations.
COMANCHE PEAK - UNIT'1 3/4 8-3 9012120025 901205 PDR ADOCK 05000445 p PDC
-* & . . . -
g , -- -- .-
Attachment 3 to TXX- 901035 Page 2 of 2 ELECTRICAL DOWER SYSTEMS SURVEILLANCEREQUIREMENTS(Continuec)
The generator voltage and frequency shall ce 6900 : 690 veits and 60 1 1.2 Hz within 10 seconcs after tne start signal ** The diesel generator snall ce startea for this test ey using one of the following signals:
a) Manual, cr t) Ster t up t r3 %4rmeMe<4NW-y--w+nd&ng-tinosthgeM es 5 i mv i et+d-4es s - O f perfmed c f f 3 ite-powee- W4+44, y Q b [ Simulated safeguaras bus undervoltage, or c,_ ,e( Safety Injection Actuation test signal in conjunction with loss of preferred offsite power, or cl [ Safety Injection Actuation test signal by itself.
- 5) Verifying the generator is synchronized, loaded to detween 6,300 and 7,000 kW and operates at this load condition for at least 60 minutes, and
- 6) Verifying the diesel generator is aligned to provice stanc::. ,
power to the associated emergency busses,
- b. At least once per 31 days and after each ope stion of the dieset where the period of operation was greater t- n or equal to 1 nour by checking for and removing accumulated water "om the day fuel tank;
- c. At least once per 31 days by checking for a removing accumulatec
.ater from the fuel oil storage tanks;
- c. By sampling new fuel oil in accordance with ASTM-04057-19El orier to addition to storage tanks and:
- 1) By verifying in accordance with the tests soecifiec in aETM-0975-1981 prior to addition to tne storage tanks that ne sample has:
- 0iesel generator loading for the purpose of this surveillance may De accomolished in accordance with vendor recommendations; i.e., >110 seconds.
- During performance of surveillance activities as a requirement for ACT'CN statements, the air-roll test shall not be performed.
This cand is meant as guidance to avoid routine overloading of ciesel generator. Momentary load excursions outside this band due to changing cus loads shall not invalidate the test.
COMANCHE PEAK - UNIT 1 3/4 S-4
Attachpent 4 to TXX 901035 i P, age *1 of 1 -DETAILED DESCR!PTION
{ ~
Page (n tegndgd) Group Description 3/4 8 5 3 Removal of duplicate diesel generator start signal.
Correction:
Deletes start-up transformer secondary winding under-voltage as a diesel generator start signal since this signal and the loss of preferred of f site power signal are initiated by the same undervoltage relay.
See description below for the deletion of the loss of preferred offsite power source diesel start signal (TS 90 020).
FSAR Change Request Number: TS 89 099 Related SER Section: 8.3.1: SSER22 8.3.1 SER/SSER Impact: No 3/4 8 5 2 Revises diesel generator start logic to prevent start on loss of preferred offsite power with alternate offsite power available and supplying power to Class 1E buses.
Revision:
. On a loss of the preferred power source, if the alter-nate power source is available and powers the Class 1E buses, the diesel generator will now not start. This design modiff'.e, ion prevents unnecessary starts of the diesel generators when they are not needed. The relay logic was changed by removing 27AX-2/ST2, which started the diesel generators on a loss of preferred offsite power, and ren.oving the start signal from 27-2X/1EA1 and replacing it with a new time delay relay. 272X-1/
1EA1. The new time delay relay has a delay of 1.0 sec.
to allow time for the alternate offsite power source breaker to close and power the bus. If the alternate offsite power source does not energize the bus, then the diesel generator starts and powers the Class 1E buses. This design modification does not affect the start of a diesel generator on a safety injection signal. A safety injection signal still immediately starts the diesel generator. The time delay selected for the new relay remains within the allowance made for relay operation for starting the diesel generator and powering loads used in the accident analysis in Chapter Chapter 15 of the FSAR.
FSAR Change Request Number: TS-90 020 Related SER Section: 8.3.1: SSER22 8.3.1 SER/SSER Impact: Yes SSER 22 Section 8.3.1 states that the diesel generator will start on undervoltage on the loss of the preferred offsite source.
- - - - - - - - - _ - - - - _ _